Attachment F - Section F Deliverables (Amend 0003).pdf
PDF 208 KB Posted
- Solicitation number
- N62470-22-R-0006
About this file
This document outlines deliverables required under a base operations support services contract at the Russell Knox Building, a secure facility aboard Marine Corps Base Quantico in Virginia. The contractor must submit various plans, reports, certifications and other documentation on a recurring basis, with many due at least 15 days prior to the start of the contract period. Key deliverables include quality, safety, environmental and emergency plans; training records for personnel; maintenance schedules and work orders; monthly labor and waste reports; and incident notification to the government within specified timeframes. The related solicitation is for solicitation number N62470-22-R-0006 issued by the Department of the Navy Naval Facilities Engineering Command for base operations support services at this secure facility.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION F – 0200000
MANAGEMENT AND ADMINISTRATION
SECTION F 0200000
DELIVERIES OR PERFORMANCE
DELIVERABLES
Annex/Spec Item Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
0200000 Management and Administration 0200000/2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day
KO, COR,
RKB Facilities Office
As specified
0200000/2.3.4 N/A Permits and Licenses
Before work commences and as requested by the KO
KO, COR,
RKB Facilities Office
As specified
0200000/2.3.5 N/A Certificate of Insurance
At least 15 calendar days after award
KO, COR,
RKB Facilities Office
As specified
0200000/2.3.6 N/A Government Furnished Property Damage Report
At least 5 calendar days of incident
KO, COR,
RKB Facilities Office
As specified
0200000/2.6.1 N/A Safeguarding Information Compliance Checklist
POA&M
Upon completion of compliance
KO, COR,
RKB Facilities Office
As specified
0200000/2.6.1 N/A Cybersecurity Incident Notification
Immediately after incident
KO, COR,
RKB Facilities Office
As specified
0200000/2.6.4 N/A Work Status Update
Within two hours of inquiry during normal working hours, by 0800 following work day for after hours
KO, COR,
RKB Facilities Office
As specified
0200000/2.6.5 N/A Notification of Difficulty in Scheduling Work
Immediately following identification of scheduling difficulty
KO, COR,
RKB Facilities Office
As specified
0200000/2.6.7 N/A Request for Authorization for Utility Service Interruption
At least 5 working days prior to the event
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.6.8.3
N/A List of personnel requiring access to RKB CMMS
At least 30 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.6.9.1
N/A Quality Management (QM) Plan
At least 30 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.6.9.1
N/A Revised Quality Management Plan
Within seven calendar days of changes
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.6.9.2
N/A Quality Inspection and Surveillance File
Within five calendar days of completion/ termination of the contract
KO, COR,
RKB Facilities Office
As specified
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.6.9.3
N/A Contractor Quality Inspection and Surveillance Report
First work day of each month.
KO, COR,
RKB Facilities Office
Monthly
0200000/ 2.6.10
N/A Property Management Plan
At least 45 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.7.1
N/A List of Key Personnel and Qualifications
At least 30 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.7.1
N/A Organizational Chart
At least 30 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.7.2.6
N/A Proof of Legal Residency
Prior to be admitted to site of work.
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.7.3
N/A Service Contract Reporting (SCR)
No later than 31 October, for labor executed during the period of performance during each Government fiscal year
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.8.1
N/A Employee List At least 15 calendar days prior to contract start, within seven calendar days of changes
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.8.8
N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
RKB Facilities Office
As required
0200000/ 2.8.9
N/A List of personnel requiring access to and the justification for their access to Government IT, OT, and FRCS
At least 15 calendar days prior to contract start and within seven calendar days of changes
KO, COR,
RKB Facilities Office
As required
0200000/ 2.9.2
N/A Accident Prevention Plan
At least 15 calendar days prior to contract start and within seven calendar days of changes
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.3
N/A Activity Hazard Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes
KO, COR,
RKB Facilities
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.9.4
N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.4.14
N/A Control of Hazardous Energy (lockout/tagout)
At least 30 calendar days after annual inspection
KO, COR,
RKB Facilities Office
Annually
2.9.6 N/A NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO, COR,
RKB Facilities Office
Annually
0200000/ 2.9.6
N/A Weight Handling Equipment Accident Report
At least 30 calendar day of accident
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.6
N/A Initial Accident Reporting Notification Report
Immediately after an accident or near miss
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.6
N/A Follow-on Accident Reporting Notification Report
Close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.6.1
N/A Final Accident Reporting Notification Report
Within 24 hours after completing the investigation of the accident
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.8
N/A On-Site Labor Report
Monthly KO, COR, RKB Facilities Office
Fifth day of each month.
0200000/ 2.9.9
N/A OSHA Violations and Corrective Action Report
Within 48 hours after receiving a citation
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.10
N/A Safety Inspections and Monitoring Report
Within one day of request
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.9.11
N/A Safety Certifications
Prior to start of work and as old certifications expire
KO, COR,
RKB Facilities Office
As specified
0200000/2.10 N/A EMS Goals and Policy Measurement Information
Within one day of request
KO, COR,
RKB Facilities Office
As required
0200000/ 2.10.1.1
N/A Water Conservation Plan
At least 15 calendar days prior to contract start
KO, COR,
RKB Facilities
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.10.2
N/A Environmental Protection Plan
At least 15 calendar prior to contract start
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.10.2.1
N/A Sampling Plan Prior to each sampling event
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.10.2.1
N/A Sample, Test, and Laboratory Analysis Results
Within one day of request
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.10.2.2
N/A Class I ODS Report
At least 5 calendar days after delivery of refrigerant to DLA-
DRMO
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.10.2.3
N/A Solid Waste Management and Recycling Reports
First work day of each month
KO, COR,
RKB Facilities Office
Monthly
0200000/ 2.10.2.5
Waste Stream Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO, COR,
RKB Facilities Office
Monthly
0200000/ 2.10.2.7
N/A Fuel and hazardous substance spill report
Within 48 hours of discovery
KO, COR,
RKB Facilities Office As specified
As required
0200000/ 2.10.2.8 N/A Emergency Planning and Community Right-To-Know Act (EPCRA) Report
At least 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material
KO, COR,
RKB Facilities
0200000/ 2.10.2.8
J-0200000-
Contractor Hazardous Material Inventory Log
At least 15 calendar days after the end of each calendar year and at termination of the contract
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.10.2.12
N/A Asbestos Containing Material Notification
Within 24 hours if ACM is encountered or suspected in the performance of work
KO, COR,
Office
As specified
0200000/ 2.10.2.12
N/A Asbestos Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO, COR,
RKB Facilities
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
0200000/ 2.10.2.12
N/A Hazardous Air Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.10.3
N/A Sustainable Procurement and Practices Plan
At least 15 calendar days prior to contract start and within 15 calendar days after exercised option periods
KO, COR,
RKB Facilities Office, Installation Environmental Division, City, State, and EPA
As specified
0200000/ 2.10.3
N/A Sustainable Delivery of Services Report
Within five calendar days after each contract period
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.10.3.2
N/A Recovered Material Certification
When a product containing recovered materials is equal to or better than the original and could be used
Office
As specified
0200000/ 2.11
N/A Mission Critical/Mission Essential Personnel
At least 15 calendar days prior to contract start and within seven calendar days of changes
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.12
N/A Technical Library Table of Contents
At least 15 calendar days after contract start and within seven calendar days of changes
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.14.1
N/A Recurring Work Proposal
Within five calendar days following receipt of request
KO, COR,
RKB Facilities Office
As specified
0200000/ 2.14.2
N/A Notification to the Government for Work Above the Recurring Work Limitations and detailed scope of work and detailed estimate
Within two hours of identification
KO, COR,
RKB Facilities Office
As specified
0200000/2.15.1.1 N/A Non-Recurring Work Quantities Ordered via FedMall
By the fifth day of the following month
KO, COR,
RKB Facilities Office
As specified
0200000/2.15.2.1 N/A Non-Recurring Work Proposals
Within two working days following receipt of request
As required
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
1501000 Facility Management 1501000/2.2.1 N/A Certification, Training and Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR,
RKB Facilities Office
As specified
1501000/2.3.1 N/A System Access Personnel Listing
At least 30 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
1501000/3.1.2 N/A Waiting Approval Report
Weekly KO, COR, RKB Facilities Office
As specified
1501000/3.2.1 N/A Outstanding Work Order Report
Weekly KO, COR, RKB Facilities Office
As specified
1502000 Facility Investment 1502000/2.2.1 N/A Certification and
Training At least 30 calendar days prior to contract start and upon request
KO, COR,
RKB Facilities Office
As specified
1502000/3.1 N/A Summary of Competed and Unaccomplished Service Orders
The first workday of each month.
KO, COR,
RKB Facilities Office
As specified
1502000/3.2 N/A PM Program Plan At least 15 calendar days prior to contract start, then annually
KO, COR,
RKB Facilities Office
As specified
1502000/3.2 N/A Individual Equipment PM Program Work Schedule
At least 5 working days prior to the month scheduled, then monthly
KO, COR,
RKB Facilities Office
As specified, first working day of the month 1502000/3.3 N/A IMP Program
Plan At least 15 calendar days prior to contract start and as changes occur, then annually
KO, COR,
RKB Facilities Office
As specified, annually
1502000/3.3 N/A Individual Equipment IMP Program Work Schedule
Within 5 working days prior to the beginning of each month and after performance of work
KO, COR,
RKB Facilities Office
As specified
1502000/3.3.1.1 N/A Boiler Water Treatment Test Result Report
Within 5 days of completion of testing
KO, COR,
RKB Facilities Office
As specified
1502000/3.3.3.1 N/A HVAC Water Treatment Test Report
Within 5 days of completion of testing
KO, COR,
RKB Facilities Office
As specified
1502000/3.3.4 N/A Operating Records Report
Monthly KO, COR, Office
As specified
1502000/3.3.4 N/A Annual Resting Report
Annually KO, COR, RKB Facilities
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
1502000/3.3.5 N/A Fire Protection Systems Deficiencies Report
Semiannually KO, COR, RKB Facilities Office
As specified
1502000/3.4 N/A Other Recurring Services Program
At least 15 calendar days prior to contract start and as changes occur, then annually
KO, COR,
RKB Facilities Office
As specified
1502000/3.4 N/A Other Recurring Services Program Summary Report
The first workday of each month
KO, COR,
RKB Facilities Office
As specified
1502000/3.4.4 N/A Maintenance Plan At least 15 calendar days prior to contract start, then annually
KO, COR,
RKB Facilities Office
As specified
1503010 Custodial 1503010/2.2.1 N/A Certification, Training and Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR,
RKB Facilities Office
As specified
1503010/2.3.1 N/A Pathogen Training Certificates
At least 15 calendar days prior to contract start and as changes occur
KO, COR,
RKB Facilities Office
As specified
1503010/2.4 N/A Notification Within 4 hour of anomaly discovery
KO, COR,
RKB Facilities Office
As specified
1503010/3.1 N/A Annual Work Schedule
Annually, at least 15 calendar days prior to contract start and as changes occur
KO, COR,
RKB Facilities Office
As specified
1503010/3.1 N/A Monthly Work Plan
Monthly, within 5 working days following end of month
KO, COR,
RKB Facilities Office
As specified
1503010/3.1.3.2 N/A Samples and Technical Documentation of Proposed Products
Annually, at least 15 calendar days prior to contract start and as changes occur
KO, COR,
RKB Facilities Office
As specified
1503010/3.2 N/A Unscheduled Services Report
Monthly, within 5 working days following end of month
KO, COR,
RKB Facilities Office
As specified
1503020 Pest Control 1503020/2.2.1 N/A Required
Certification, Training and Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR,
RKB Facilities Office
As specified
1503020/2.3.1 N/A Required Business Licensing
At least 30 calendar days prior to contract start and upon request
KO, COR,
RKB Facilities
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
1503020/2.3.2 N/A Required Permits At least 30 calendar days prior to contract start and upon request
KO, COR,
RKB Facilities Office
As specified
1503020/2.3.4 N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
At least 15 calendar days prior to the start of work; thereafter every 50 hours of ULV equipment use
KO, COR,
RKB Facilities Office
As specified
1503020/2.3.5 J-1503020-
Planned Pesticide Use Sheets including Pesticide Labels and Material Safety Data Sheets (MSDS)
At least 15 days prior to contract start With the Technical Proposal, Contractor’s Work Plan, proposed changes in pesticide usage at least 5 calendar days in advance of pesticide use
KO, COR,
RKB Facilities Office
As specified
1503020/3 N/A Contractor's Work Plan (CWP)
At least 15 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
1503020/3 N/A Report of Conditions Conducive to Pest Infestation
Within 1 working day after citing conditions
KO, COR,
RKB Facilities Office
As specified
1503020/3.2 N/A Pest Management Record
Monthly, electronically once per month by the 15th of the following month
KO, COR,
RKB Facilities Office
As specified (Example:
July data must be submitted by August 15)
1503030 Integrated Solid Waste Management (ISWM) 1503030/ 2.2.1 N/A Proof of
Certification, Training, and Licensing
At least 15 calendar days prior to contract start and as changes occur
KO, COR,
RKB Facilities Office
As specified
1503030/2.3.1 N/A Weight Tickets (Non-Recyclable)
Monthly with invoice KO, COR, RKB Facilities Office
As specified
1503030/3.1 N/A Solid Waste Collection and Disposal Schedule
At least 15 calendar days prior to contract start and as changes occur
KO, COR,
RKB Facilities Office
As specified
1503050 Grounds Maintenance and Landscaping 1503050/ 2.2.1 N/A Proof of
Certification, Training, and Licensing
At least 15 calendar days prior to contract start and as changes occur
KO, COR,
RKB Facilities
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
1503050/ 2.3.2 N/A Required Permits At least 30 calendar days prior to contract start and upon request
KO, COR,
RKB Facilities Office
As specified
1503050/2.3.9.1 N/A Water Conservation Plan
At least 15 calendar days prior to contract start
KO, COR,
RKB Facilities Office
Annually and five calendar days prior to implementin g changes to the schedule
1503050/3 N/A
Organic Debris Recycling Weight Tickets
Monthly with invoice KO, COR, RKB Facilities Office
As specified
1503050/3 N/A SDS sheets and catalog cut sheets or samples for fertilizer and mulch
At least 15 calendar days prior to contract start and as soon as new material are added
KO, COR,
RKB Facilities Office
As specified
1503050/3 N/A Contractor’s Work Schedule
At least 15 calendar days after award/Every 3 months, during the first week of each season
KO, COR,
RKB Facilities Office
As specified
1503050/3.1.1.3 N/A Soil Analysis Within 15 days after receipt of the test results by the Contractor
KO, COR,
RKB Facilities Office
As specified
1503050/3.1.1.3 N/A Top Dressing and Over Seeding Seed Type
Within 15 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
1503050/3.3 N/A Notification of Missing or damaged Yard Drain Covers and Grates
Immediately upon discovery
KO, COR,
RKB Facilities Office
As specified
1503060 Pavement Clearance 1503060/3.1.1 N/A Pavement
Sweeping Schedule
15 working days after award and 15 working days after the start of each option year
Office
Annually
1503060/3.2 N/A Snow and Ice Removal Plan
15 working days after award and 15 working days after the start of each option year
Office
Annually
1800000 Environmental
Form
Attachment Number
Deliverable Title Dates of Submission Distribution Frequency
1800000/2.2.1 N/A Documentation Certification, Training, and Licensing
At least 15 calendar days prior to contract start
KO, COR,
RKB Facilities Office
As specified
1800000/3 N/A Hazardous Waste Management Plan
At least 15 calendar prior to contract start
KO, COR,
RKB Facilities Office
As specified
1800000/3 N/A Spill Prevention and Response Plan
At least 15 calendar prior to contract start.
KO, COR,
RKB Facilities Office
As specified
1800000/3.1 N/A Air Emissions Monitoring and Inventory
Annually, within 15 working days of new contract term
KO, COR,
RKB Facilities
As Required
Notes:
Note 1. All deliverables shall be in Microsoft Office (Word/Excel) electronic format unless otherwise specified.