J-0200000-09 ELINS (Amend 0005).xlsx

XLSX spreadsheet 232 KB Posted

Attached to
Base Operations Support (BOS) Services at Russell Knox Building, a secure facility aboard Marine Corps Base (MCB) Quantico, VA
Solicitation number
N62470-22-R-0006
Issued by

About this file

This solicitation notice is for base operations support (BOS) services at the Russell Knox Building, a secure facility aboard Marine Corps Base Quantico in Virginia. The solicitation seeks proposals for facility management, facility investment, custodial, pest control, integrated solid waste management, grounds maintenance and landscaping, pavement clearance, transportation, and environmental services. Proposals are due by April 15, 2022, with the period of performance beginning on October 1, 2022 for one base year plus four option years. Pricing is required for recurring and non-recurring work in the base year and first option year. Services will be ordered on both a recurring and task order basis, with unit pricing provided for potential non-recurring tasks. The Naval Facilities Engineering Command is the contracting agency.

View the file

Other files

File Type Posted
N62470-22-R-0006 RKB Amend 0007.pdf PDF
N62470-22-R-0006 RKB Amend 0006.pdf PDF
J-1503030 (Amend 0005).pdf PDF
J-1700000 (Amend 0005).pdf PDF
J-1502000 (Amend 0005).pdf PDF
J-0200000-02-02 General Decision Number VA20220174 Rev. 09022022 (Amend 0005).pdf PDF
J-1502000-04 Systems Description-Facility Service Matrix-Fac Inv Assets (Amend 0005).xlsx XLSX spreadsheet
J-1503050 (Amend 0005).pdf PDF
N62470-22-R-0006 RKB Amend 0005.pdf PDF
J-1503010-05 Custodial Inventory (Amend 0005).xlsx XLSX spreadsheet
N62470-22-R-0006 RKB Amend 0004.pdf PDF
J-1503010 (Amed 0004).pdf PDF
J-1503010-05 Custodial Inventory (Amend 0004).xlsx XLSX spreadsheet
J-1503050 (Amend 0004).pdf PDF
J-1502000 (Amend 0004).pdf PDF
J-1503010 (Amend 0003).pdf PDF
J-1502000-04 Systems Description - Facility Service Matrix - Fac Inv Assets (Amend 0003).xlsx XLSX spreadsheet
N62470-22-R-0006 RKB Amend 0003.pdf PDF
J-1503050 (Amend 0003).pdf PDF
J-1503010-05 Custodial Inventory (Amend 0003).xlsx XLSX spreadsheet
Attachment F - Section F Deliverables (Amend 0003).pdf PDF
J-2 Corporate Experience Project Data Sheet (Amend 0003) (Word).docx DOCX document
J-0200000-09 Exhibit Line Item Numbers (ELINs) (Amendment 0002).xlsx XLSX spreadsheet
J-10 Site Visit Sign-In Sheet (Amendment 0002).pdf PDF
N62470-22-R-0006 RKB Amend 0002.pdf PDF
J-9 Pre-Proposal Conference PowerPoint (Amendment 0002).pptx PPTX presentation
Attachment J-8 SECNAV 5512 Form.pdf PDF
Attachment J-07 Site Visit Registration Form.xlsx XLSX spreadsheet
N62470-22-R-0006 RKB Amend 0001.pdf PDF
J-1503020.pdf PDF
J-0200000-09 ELINS.xlsx XLSX spreadsheet
Attachment F - Section F Deliverables.pdf PDF
J-1501000.pdf PDF
J-1502000-04 Systems Description - Facility Service Matrix - Facility Investment Assets.xlsx XLSX spreadsheet
J-6 Post-Award Limitations on Subcontracting Report-Deviation-Sept 2021.doc DOC document
J-0200000-02-01 Wage Determination No. 2015-4281 Rev. 06272022.pdf PDF
J-5 CBA signed 2022 - 2024 - NCS-EMLJV - Russell Knox Building.pdf PDF
J-1503060.pdf PDF
J-1503010-05 Custodial Inventory.xlsx XLSX spreadsheet
J-1503060-05 Site Maps and Locations.pdf PDF
J-0200000.pdf PDF
J-1502000.pdf PDF
J-1503010.pdf PDF
J-1503050.pdf PDF
N6247022R0006 RKB Solicitation.pdf PDF
J-0200000-02-02 General Decision Number VA20220174 Rev. 08052022.pdf PDF
J-1700000.pdf PDF
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-0200000-04 Invoice Form Sample.xls XLS spreadsheet
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period - RW

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-22-R-0006
EXHIBIT A - BASE PERIOD - RECURRING WORK
CLIN 0001
Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 THROUGH A009
ELIN/ SubELINDescriptionQuantityUnit of IssueUnit Price (USD)Total (USD)
Russell Knox Building - Agency Funded - Recurring Work
A001Specification 1501000 Facility Management (FP)
A001AAWork Control (Spec Item 3.1)12MO$0.00
A002Specification 1502000 Facility Investment (ST)
Service Orders, Spec Item 3.1
A002AAEmergency Service Orders (Spec Item 3.1.1)12MO$0.00
A002ABUrgent Service Orders (Spec Item 3.1.2)12MO$0.00
A002ACRoutine Service Orders (Spec Item 3.1.3)12MO$0.00
Preventive Maintenance Program (PM), Spec Item 3.2
A002ADCross Connection Control and Backflow Prevention Devices (Spec Item 3.2.1)12MO$0.00
A002AECathodic Protection Systems (Spec Item 3.2.2)12MO$0.00
A002AFCompressed Air Systems (Spec Item 3.2.3)12MO$0.00
A002AGLightning Arresting and Grounding Systems (Spec Item 3.2.4)12MO$0.00
A002AHOverhead Doors (Spec Item 3.2.5)12MO$0.00
A002AJEyewash Stations (Spec Item 3.2.6)12MO$0.00
A002AKTrap Primer Stations (Spec Item 3.2.7)12MO$0.00
A002ALElectrical Distribution Systems (Spec Item 3.2.8)12MO$0.00
A002AMVertical Transportation Equipment (Spec Item 3.2.9)12MO$0.00
A002ANExtior Lighting (Spec Item 3.2.10)12MO$0.00
Integrated Maintenance Program (IMP), Spec Item 3.3
A002APBoilers and Unfired Pressure Vessels (UPVs) Equipment and Systems (Spec Item 3.3.1)12MO$0.00
A002AQAuxiliary Generators (Spec Item 3.3.2)12MO$0.00
A002ARHVAC and Refrigeration Systems (Spec Item 3.3.3)12MO$0.00
A002ASUninterruptible Power Systems (UPS) (Spec Item 3.3.4)12MO$0.00
A002ATFire Protection Systems (Spec Item 3.3.5)12MO$0.00
A002AUPOL System Facilities and Distribution Systems (Spec Item 3.3.6)12MO$0.00
A002AVWatch Standing (Spec Item 3.3.7)12MO$0.00
Other Recurring Services Program, Spec Item 3.4
A002AWGeneral Miscellaneous Services (Spec Item 3.4.1)12MO$0.00
A002AXExhaust Hoods and Ducts (Spec Item 3.4.2)12MO$0.00
A002AYWater Cooler and Bottle Fill Stations (Spec Item 3.4.3)12MO$0.00
A002AZPavement and Parking Lot Maintenance (Spec Item 3.4.4)12MO$0.00
A002BAInterior Lighting (Specc Item 3.4.5)12MO$0.00
A003Specification 1503010 Custodial (FX), Spec Item 3
Scheduled Custodial Services (Spec Item 3.1)
A003AAScheduled Services (Spec Item 3.1)12MO$0.00
A003ABCustodial Service Orders (Spec Item 3.2)12MO$0.00
A004Specification 1503020 Pest Control (FX), Spec Item 3
A004AAScheduled Pest Control Services (Spec Item 3.1)12MO$0.00
A004ABPest Management Reporting (Spec Item 3.2)12MO$0.00
A005Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A005AASolid Waste Collection and Disposal (Spec Items 3.1 - 3.6)12MO$0.00
A006Specification 1503050 Grounds Maintenance & Landscaping, Spec Item 3
A006AAImproved Grounds (Spec Item 3.1)12MO$0.00
A006ABOperational Areas (Spec Item 3.2.)12MO$0.00
A006ACStorm Drainage Systems (Spec Item 3.3)12MO$0.00
A007Specification 1503060 Pavement Clearance, Spec Item 3
A007AAPavement Sweeping Services (Spec Item 3.1)12MO$0.00
A007ABSnow and Ice Removal Services (Spec Item 3.2.)12MO$0.00
A008Specification 1700000 Transportation, Spec Item 3
A008AABus Services (Spec Item 3.1)12MO$0.00
A009Specification 1800000 Environmental, Spec Item 3
A009AAAir Emissions Monitoring (Spec Item 3.1)12MO$0.00

TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 - A009) $0.00

&"Times New Roman,Regular"&10Page &P of &N

Base Period - NRW

ATTACHMENT J-0200000-09
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-20-R-0006
EXHIBIT A - BASE PERIOD - NON-RECURRING WORK
CLIN 0002
Non-Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 THROUGH A827
ELINShort DescriptionLong DescriptionEstimated QuantityUnit of IssueUnit Price (USD)Extended Price (USD)
UNIT PRICED TASK (UPT) WORK
Specification 1502000 - Facility Investment
A700Chiller Rental (225 Ton)Provide labor, management, supervision, tools, material and equipment required to rent 225 Ton chiller. Price per month to include delivery, installation, setup, removal, required cable and fittings, hose, single-point electrical connections, high-efficiency VFDs, and CFC-free refrigerants. Price per month to include delivery/removal of chiller to/from the site, installation, setup, required ancillary supplies, control panels, all connections to the facility, operation, and maintenance. Delivery within 72 hours of notification or as specified in the order.2MO$0.00$0.00
A701Generator Rental (300KW)Provide labor, management, supervision, tools, material and equipment required to provide general rental. Price per month to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple faculties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the facility, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.2MO$0.00$0.00
A702Repair Backflow Preventer: 6 InchThe Contractor shall provide all labor, materials and equipment required to repair and test failed 6 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.5EA$0.00$0.00
A703UPS Battery Bank ReplacementProvide labor, management, supervision, tools, material and equipment required to perform Battery Bank Replacement to UPS system. Battery bank consists of a total of 160 batteries contained in 4 cabinets (40 batteries per cabinet). Service includes removal and disposal of replaced batteries. Complete all work within 3 working days or as specified in the order.1EA$0.00$0.00
A704Replace Fire Alarm System BatteriesThe Contractor shall provide all labor, material, and equipment required to remove and replace batteries for the control panel and annunciator equipment of the fire alarm system in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall test the fire alarm system after battery replacement to ensure proper operation. Work shall be completed within the timeframe specified on the task order.25EA$0.00$0.00
A705Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 5 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 5 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A706Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 7.5 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 7.5 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A707Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A708Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A709Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A710Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 25 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 25 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A711Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 30 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 30 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A712Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 40 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 40 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A713Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 50 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 50 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A714Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 60 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 60 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A715Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 75 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 75 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A716Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 100 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 100 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A717Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 125 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 125 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A718Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 150 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 150 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A719Replace Variable Frequency Drive, Enclosed, up to 460 Volt, 200 HP motor size, NEMA 1The Contractor shall provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 200 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.4EA$0.00$0.00
A720Split System DX Unit Replacement - 1.5 TonThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace split system DX 1.5 ton units. Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational.2EA$0.00$0.00
A721Split System DX unit replacement - 2 TonThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace split system DX 2 ton units. Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational.2EA$0.00$0.00
A722SCIF Door ReplacementThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace SCIF doors. STC rating for the door is STC 50; the lock package requirement is LKM 10K with X10 lock, with a LKM push bar interior and level exterior. Complete all work within 3 working days or as specified in the order.5EA$0.00$0.00
A723CAT 5 InstallationThe Contractor shall provide all labor, management, supervision, tools, material and equipment to install CAT 5 wiring and connections at specified locations. Complete all work within 3 working days or as specified in the order.5,000LF$0.00$0.00
A724Single Mode Fiber InstallationThe Contractor shall provide all labor, management, supervision, tools, material and equipment to install single mode fiber at specified locations. Complete all work within 3 working days or as specified in the order.5,000LF$0.00$0.00
A725Non destructive pump testingThe Contractor shall provide all labor, management, supervision, tools, material and equipment to perform non-destructive pump testing. Results of testing shall be reported to within 4 hours of test. Complete all work within 3 working days or as specified in the order.4EA$0.00$0.00
A726Jib Crane replacementThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace facility mounted jib cranes. Complete all work within 3 working days or as specified in the order.1EA$0.00$0.00
A727Duct CleaningThe Contractor shall provide labor, management, supervision, tools, material and equipment to clean and sanitize supply and return air ducts, including supply air diffusers, return air diffusers, grilles, all ducting components and ventilation system. Complete all work within 3 working days or as specified in the order.1,000LF$0.00$0.00
A728Pressure Washing ServiceThe Contractor shall provide all labor, management, supervision, tools, material and equipment required to provide pressure washing services. The Contractor shall provide miscellaneous pressure washings up to 5,000 SF of surface per order. Surfaces may be horizontal or vertical areas related to, attached to, or adjoining to facilities. The Contractor shall utilize high-pressure water equipment to clean exterior facility and adjoining surfaces as requested and to exclude windows surfaces. Pressure washing may require the use of man lift and other devices to perform work safely. This may require work after normal working hours to prevent disruption to operations. Complete all work within 3 working days or as specified in the order.20,000SF$0.00$0.00
A729Carpet ReplacementThe Contractor shall provide all labor, materials and equipment required to install 2x2 carpet tiles for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order.4,000SY$0.00$0.00
A730Furniture Move Incidental to Carpet ReplacementThe Contractor shall provide all labor, materials, and equipment required to move furniture incidental to carpet replacement. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order.100EA$0.00$0.00
A731Replace 4" Vinyl Cove BaseThe Contractor shall provide all labor, materials and equipment required to install 4” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order.5,000LF$0.00$0.00
A732Interior PaintingThe Contractor shall provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all interior surfaces specified. Surface preparation includes, but is not limited to wood, metal, sheetrock, concrete, and plaster. Related services shall include wall-papering, plastering, and dry-wall repair. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered and priced in increments up to 500 square feet (SF). Work shall be completed within the timeframe specified on the task order.25,000SF$0.00$0.00
A733Replace Suspended Ceiling TileThe Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order.2,000EA$0.00$0.00
A734Fitness center flooring replacementThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace fitness flooring. Service includes breakdown, remove, and disposal of existing floor, preparation and installation of new flooring. Complete all work within 10 working days or as specified in the order.500SF$0.00$0.00
A735Wallpaper replacementThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace wallpaper. Services include removal of old wallpaper, wall repair and preparation, and installation of new wallpaper. Complete all work within 10 working days or as specified in the order.1,000SF$0.00$0.00
A736Pavement Crack FillingThe Contractor shall provide all labor, management, supervision, tools, material and equipment to hot fill cracks in asphalt pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order.6,000LF$0.00$0.00
A737Pavement Seal CoatingThe Contractor shall provide all labor, management, supervision, tools, material and equipment to seal coat asphalt pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order.375,000SF$0.00$0.00
A738Pavement StripingThe Contractor shall provide all labor, management, supervision, tools, material and equipment to perform pavement striping to pavement and parking lots. Services to be performed per Annex 1502000 Spec Item 3.4.4. Complete all work within 10 working days or as specified in the order.4,000LF$0.00$0.00
A739Parking Garage Joint SealingThe Contractor shall provide all labor, management, supervision, tools, material and equipment to perform joint sealing of parking garage surfaces. Complete all work within 10 working days or as specified in the order.1,000LF$0.00$0.00
A740Parking garage Remarking/StripingThe Contractor shall provide all labor, management, supervision, tools, material and equipment to perform parking garage remarking and striping services. Complete all work within 10 working days or as specified in the order.2,000LF$0.00$0.00
A741Fence RepairThe Contractor shall provide all labor, management, supervision, tools, material and equipment repair installation perimeter and interior fencing. Complete all work within 10 working days or as specified in the order.1,000SF$0.00$0.00
A742Concrete ReplacementThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace concrete surfaces. Includes breakup, removal, and disposal of old concrete, all preparation necessary for new concrete pour, and pouring and finishing of new concrete. Complete all work within 10 working days or as specified in the order.2,000SF$0.00$0.00
A743Curbing ReplacementThe Contractor shall provide all labor, management, supervision, tools, material and equipment to replace curbing. Includes breakup, removal, and disposal of old curbing, all preparation necessary for installation of new curbing, and installation of new curbing. Complete all work within 10 working days or as specified in the order.500LF$0.00$0.00
A744Portable ToiletProvide labor, management, supervision, tools, material and equipment required to provide, deliver, clean and service portable toilet(s) to specified location(s). Unit price per day/per toilet. The Contractor shall clean and service portable toilet(s) once per day as specified in the order to ensure all surfaces are cleaned, disinfected and deodorized, supplies are restocked, waste is removed and disposed of, and chemical are provided. The Contractor shall dispose of waste resulting from the use of portable toilet(s) in accordance with all applicable local regulations. Portable toilet(s) shall be removed within 1 working day past requirement termination. Delivery shall be completed within 2 calendar days or as specified in the order. Cost is based on a minimum 3 calendar days per unit (unit cost shall be per calendar day).25EA$0.00$0.00
A745-A749Reserved
Specification 1503010 - CustodialSpecification 1503010 - Custodial
A750Additional Custodial ServicesProvide labor, management, supervision, tools, material and equipment to custodial services. Custodial work includes but is not limited to: emptying waste containers, low dusting, water fountains cleaning, sweeping/dust mopping, vacuum carpets and rugs, walk-off mats cleaning, damp mopping, restroom cleaning and restocking. Work shall be started within 2 hours after notification and may continue beyond government regular working hours with no price adjustments. Complete all work within 2 working days or as specified in the order.80HR$0.00$0.00
A751Vacuum Carpets and RugsProvide labor, management, supervision, tools, material, and equipment required to vacuum carpets and rugs to ensure they are clean. Complete all work within 3 working days or as specified in the order.5,000SF$0.00$0.00
A752Carpet and Rug Deep CleaningProvide labor, management, supervision, tools, material, and equipment required to carpet and rug deep cleaning. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Complete all work within 3 working days or as specified in the order.10,000SF$0.00$0.00
A753Machine Scrub FloorsProvide labor, management, supervision, tools, material, and equipment required to machine scrub floors to include fitness center flooring. Floor surfaces, including joints and corners, are clean and sightly, without embedded dirt, cleaning solution, film debris, stains, marks, wads of gum, tar and similar substances. Complete all work within 3 working days or as specified in the order.2,500SF$0.00$0.00
A754Damp Mop FloorsProvide labor, management, supervision, tools, material, and equipment required to damp mop floors. Kitchen and restroom floors shall be sanitized. This service includes the floors to be swept prior to wet-mopping. Complete all work within 3 working days or as specified in the order.2,500SF$0.00$0.00
A755Low Area CleaningProvide labor, management, supervision, tools, material, and equipment required to clean low areas. All dust and debris shall be removed. Low area cleaning includes all furniture and fixtures (e.g., doors, partitions, radiators, equipment, hand railings in stairways, grills, ledges, sills, walls, doors, light fixtures, chalk and dry boards and trays, miscellaneous hardware and bright metal work, and similar dust catching surfaces) to a maximum height of 2.1 meters above floor level. Complete all work within 3 working days or as specified in the order.2,000SF$0.00$0.00
A756High Area CleaningProvide labor, management, supervision, tools, material, and equipment required to clean high areas. High area cleaning includes all areas that are vertical and horizontal above 2.1 meters and can exceed 4 meters from floor level. Cleaning may be performed with extension tools or step ladders. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris. Complete all work within 3 working days or as specified in the order.2,000SF$0.00$0.00
A757Interior Window CleaningProvide labor, management, supervision, tools, material, and equipment required to clean interior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.2,000SF$0.00$0.00
A758Exterior Ground Floor Window CleaningProvide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.2,500SF$0.00$0.00
A759Exterior Elevated Floor Window CleaningProvide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces above ground floors and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.2,500SF$0.00$0.00
A760Window Blinds CleaningProvide labor, management, supervision, tools, material, and equipment required to remove, clean, and rehang window blinds. Complete all work within 3 working days or as specified in the order.2,000SF$0.00$0.00
A761Glass Surface CleaningProvide labor, management, supervision, tools, material, and equipment required to clean glass surfaces. The Contract shall ensure that glass surfaces are sightly and free of all dirt and provide a clear, streak-, smudge- and mark-free appearance regardless of height. Glass surfaces include but are not limited to interior doors, (including associated transoms and sidelights). Complete all work within 3 working days or as specified in the order.1,000SF$0.00$0.00
A762Restroom Cleaning and ServicingProvide labor, management, supervision, tools, material, and equipment required to clean and servicing restrooms. All restroom surfaces are cleaned, sanitized and deodorized. Restroom supplies are completely restocked and all dispensers are in working condition. After work is completed, restrooms are clean, sanitary and sightly. Complete all work within 1 working days or as specified in the order.5,000SF$0.00$0.00
A763Perimeter Area CleaningProvide labor, management, supervision, tools, material, and equipment required to debris removal. The Contractor shall police the area and remove all trash and debris. Area shall be free of all trash and debris and waste containers shall be emptied. This service may be ordered for the interior or exterior of buildings. Complete all work within 3 working days or as specified in the order.1,000SF$0.00$0.00
A764Stripping and RefinishingProvide labor, management, supervision, tools, material, and equipment required to stripping and refinishing floors at designated location(s). Complete all work within 3 working days or as specified in the order.2,500SF$0.00$0.00
A765Reserved
Specification 1503020 - Pest Control
A766Adult Mosquito SurveillanceProvide labor, management, supervision, tools, material, and equipment required to conduct surveillance for adult mosquitos using light trap(s) and deliver catches to Naval Hospital Sigonella Preventive Medicine within 2 working days following receipt of the task order. Complete work within time periods specified in J-1503020.10EA$0.00$0.00
A767Adult Mosquito ControlProvide labor, management, supervision, tools, material, and equipment required to apply a mosquito adulticide (ULV formulation) at the designated location(s) within time period of 24 hours to respond. Pest control services for adult mosquitoes shall be performed in the early morning hours (between 3am-6am). The Contractor shall nebulize and spray approved pesticide utilizing fog-generating equipment as requested in the order. Complete work within time periods specified in J-1503020.10AC$0.00$0.00
A768Larval Mosquito SurveillanceProvide labor, management, supervision, tools, material, and equipment required to conduct surveillance of designated mosquito breeding sites for immature mosquitoes (eggs, larvae, and pupae). Time Period to Respond: within 2 working days. Complete work within time periods specified in J-1503020.10EA$0.00$0.00
A769Larval and Pupal Mosquito ControlProvide labor, management, supervision, tools, material, and equipment required to control larval and pupal mosquitoes in designated area(s) and time periods to control within time period of 1 working day to respond. Complete work within time periods specified in J-1503020.10EA$0.00$0.00
A770Nuisance Pest ControlProvide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control ants, cockroaches, silverfish, centipedes, millipedes, beetles, fleas, spiders, and/or stored product pests at the designated location(s) per the applicable General Requirements and Performance Standards (Nuisance Pest Requirements) within time period of 3 working days to respond, 7 working days to obtain control, and 30 days to maintain control. (up to 50 square feet)5EA$0.00$0.00
A771Disease Vector and Health Pest ControlProvide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control bed bugs, bees, wasps, hornets, and other stinging arthropods, filth flies, and/or ticks at the designated location(s) per the applicable General Requirements and Performance Standards (Disease Vector and Health Pest Requirements) within time period of 1 working day to respond.5EA$0.00$0.00
A772Vertebrate Pest ControlProvide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control commensal rodents, pest birds, feral dogs and cats, and snakes in and around designated location(s) per the applicable General Requirements and Performance Standards (Vertebrate Pest Requirements) within time period of 24 hours to respond, and time periods to obtain and maintain control as specified in Pest Control Section J. (up to 50 square metersards)
5EA$0.00$0.00
A773Subterranean Termite ControlProvide labor, management, supervision, tools, material, and equipment required to control infestations of subterranean termites per J-1503020 (Termite Control Specifications) within 5 working days after receipt of the order. Complete work within time periods specified in J-1503020.500SF$0.00$0.00
A774Weed Control (Herbicide Treatment)Provide labor, management, supervision, tools, material, and equipment required to perform selective herbicide treatment to the location(s) indicated on the order. Selective herbicide shall be handled and applied as indicated by the manufacturer printed directions/instructions. Herbicide products shall be usable at locations normally frequented by persons / pets. Herbicide shall destroy only the infesting weeds without harming/damaging the surrounding ornamental vegetation (such as lawn, ornamental plants, etc.). All warning signs indicating herbicide application/contamination to limit/restrict utilization of the application areas shall be used and enforced for the decay period of the herbicide being used. Herbicide shall not be used when the environment conditions conflict with manufacturers printed directions. Herbicide products shall be submitted to the KO for approval prior their use. Use of not approved herbicide is prohibited. Time Period to Respond: 7 working days.5,000SF$0.00$0.00
A775 - A779Reserved
Specification 1503030 - Integrated Solid Waste Management
A780Pallet Removal and DisposalProvide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall remove and dispose of pallets at the designated location(s). Complete all work within 2 working days. Submit documentation supporting disposal/recycling within five working days. (not to exceed 80 pallets per order)160EA$0.00$0.00
A781Solid Waste Removal and Disposal - Provide Commercial Container - 30 Cubic YardProvide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 30-cubic yard container(s) at location(s) identified in the order and dispose of the entire contents of solid waste. Waste shall be transported, disposed or recycled in accordance with applicable Spanish local and local laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery date, location and duration in days.12DA$0.00$0.00
A782Reserved
Specification 1503050 - Grounds Maintenance and Landscaping
A783Grass Cutting and TrimmingProvide labor, management, supervision, tools, material, and equipment required to mow and trim lawns. Grass shall be mowed at a height between 3 and 5 inches or as specified in the order. Grass adjacent to fencing, poles, walls, valves, trees, signs, valve boxes and other similar objects shall be trimmed to match the height and appearance of surrounding grass. Prior to mowing or trimming, remove and appropriately dispose of debris that interferes with the mowing or trimming operation. After cutting, grass shall have a uniform height. Grass clippings and trimmings shall be removed from sidewalks and other paved areas the same day the grass is cut and disposed of off the activity. Complete all work within 3 working days or as specified in the order.20,000SF$0.00$0.00
A784Vegetation RemovalProvide labor, management, supervision, tools, material, and equipment required to perform vegetation removal. Trees, stumps and above ground roots shall be removed to a depth of six inches below normal ground elevation, avoiding any unnecessary soil excavation and ground disruption. The Contractor shall utilize “stump grinding” type equipment for the removal of stumps and above ground roots. The stump hole and any other surface damage caused by removal shall be filled with clean topsoil, fertilized, raked, and seeded with Bermuda and Rye and Clover mixture. Mixture shall be 5% Clover, 10% Bermuda and 85% Rye grass. Seeded areas shall be watered for 30 days. All debris shall be disposed of off Station the day of removal. Complete all work within 3 working days or as specified in the order.2,000SF$0.00$0.00
A785Grassing and Erosion ControlProvide labor, management, supervision, tools, material, and equipment required to perform grassing and erosion control. The Contractor shall be responsible for repairing bare and eroded areas. Contractor shall fill eroded areas with clean topsoil, rake, fertilize, seed with grass mixture. Water for 30 days until a healthy stand of grass is established. Top soil shall then be placed to return the area to normal ground elevation; raked; fertilized; seeded; covered with straw, matting or other material suitable to reduce the effects of erosion; and watered to establish a healthy grassed covering. Repaired areas shall be watered and otherwise cared for until grass is firmly established. Repaired areas on which grass dies or fails to develop noticeable growth or which again erode within one year shall be repaired and re-grassed by the Contractor at no additional cost to the Government. Soil erosion damage which is greater than 93 SF. or which requires more than 10 cm. of topsoil to repair shall be repaired by filling in washed out / bare areas (areas requiring less than 4 cubic meters of fill soil) with topsoil to within 10 cm. of normal ground elevation. Complete all work within 3 working days or as specified in the order.50,000SF$0.00$0.00
A786Debris RemovalProvide labor, management, supervision, tools, material, and equipment required to perform debris removal. The Contractor shall remove debris such as, but not limited to fallen leaves and other seasonal debris to present an overall neat appearance. All debris collected shall be removed the same day and disposed of off the activity. Complete all work within 3 working days.10,000SF$0.00$0.00
A787Plant Bed MaintenanceProvide labor, management, supervision, tools, material, and equipment required to perform plant and plant bed maintenance. The Contractor shall maintain plants to ensure a healthy appearance and to ensure there is no interference with pedestrians, vehicular traffic, and building encroachment. Fertilize, edge, weed, and mulch plant beds as appropriate. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days.10,000SF$0.00$0.00
A788Tree MaintenanceProvide labor, management, supervision, tools, material, and equipment required to perform tree maintenance. The Contractor shall provide tree maintenance to ensure tree health and to prevent interference with pedestrian, vehicular traffic, lighting, HVAC Equipment operations and structure encroachment. Tree maintenance includes fertilization; pruning for health and safety, grass clearance, cleanup; removing dead, damaged or diseased wood, or structurally weak limbs and branches. Remove branches that extend over buildings or power lines, and endanger roofs, windows, or hang within 8 feet vertically of sidewalks, parking lots, and driveways. Pruning shall be accomplished by or under guidance of a certified arborist. Climbing devices that may cause damage to trees shall not be used. All debris resulting from work shall be removed the same day and disposed of off the activity. Complete all work within 3 working days.50EA$0.00$0.00
A789Tree and Stump Removal - Small up to 6" Tree and Stump RemovalRemove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Work shall be completed within 5 calendar days.10EA$0.00$0.00
A790Tree and Stump Removal - Medium 6.1" DBH up to 18"Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Work shall be completed within 7 calendar days.10EA$0.00$0.00
A791Tree and Stump Removal - Large18.1" DBH up to 24"Remove trees including stumps and roots. Remove stumps to 12 inches below ground level and remove roots to 4 inches below ground extending to 6 feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with same type of vegetation as surrounding area. Work shall be completed within 10 calendar days.10EA$0.00$0.00
A792Shrub Establishment (4 ft) - Different Local TypesProvide labor, management, supervision, tools material, and equipment required to perform shrub establishment of different local types of shrub. Establishment shall include providing necessary care to firmly establish the new plantings. The Contractor shall provide plant materials nursery grown and shall bear certification indicating species, common name, and grade. Plant materials shall be healthy living specimen. Complete all work within 3 working days or as specified in the order.25EA$0.00$0.00
A793Remove Vegetation from Ditches and SwalesRemove vegetation from ditches and swale to include trees up to 3 inches in diameter, shrubbery, reeds and other plant life. Grass shall be mowed/trimmed to meet requirements in Grounds and Landscaping Annex 1503050. All debris shall be removed the same day and disposed of off the activity. Complete all work within 3 working days. All debris shall be removed the within 3 days and disposed of off the activity. Complete all work within 5 working days. Minimum quantity is 100 LF.2,000LF$0.00$0.00
A794Shrub and Stump Removal
Remove shrubs including stumps and roots. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on a comparative of plant container capacity and plant height. Growing containers are sized by gallon and plant height is measured from ground level. Complete all work within 5 working days or as specified in the order.10EA$0.00$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .