N6247021R0015 Amend 0007.pdf

PDF 141 KB Posted

Attached to
P-91330, Phase 2 Family Housing Villaggio at Vicenza, Italy
Solicitation number
N62470-21-R-0015
Issued by

About this file

This amendment to a solicitation extends the proposal due date for a firm-fixed-price construction contract to build Phase 2 of the Family Housing Villaggio at Vicenza, Italy. The Navy Facilities Engineering Command, Atlantic is seeking proposals for work including structural foundation systems by March 18, 2022. The amendment also notifies offerors that specifications may be updated in a future amendment if the government redesigns foundation systems, and would consider extending the due date accordingly. It provides responses to pre-proposal inquiries clarifying quality control specialist requirements and the fixed-price nature of the contract given current market volatility.

View the file

Other files

File Type Posted
Revised Attachment E - Schedule B Price Proposal Form_21JUN2022.pdf PDF
N6247021R0015 Amend 0015.pdf PDF
N6247021R0015 Amend 0014.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_16JUN2022.pdf PDF
N6247021R0015 Amend 0013.pdf PDF
Revised Attachment E - Schedule B Price Proposal Form_10JUN2022.pdf PDF
N6247021R0015 Amend 0012.pdf PDF
Attachment W - Anti-Mafia Self-Certification Form for Contracts between 150000 and 5382000.pdf PDF
Attachment X - Anti-Mafia Self-Certification Form for Contracts greater than 5382000.pdf PDF
N6247021R0015 Amend 0011.pdf PDF
Attachment V - Revised 1632468 Drawings Amendment 0010.pdf PDF
Attachment U - Revised 1632468 Specification Amendment 0010.pdf PDF
N6247021R0015 Amend 0010.pdf PDF
Attachment T - 1632846 Foundation and Misc Revisions Drawings 02of 02.pdf PDF
Attachment R - 1632846 Foundation and Misc Revisions Specifications.pdf PDF
Attachment E - Schedule B Price Proposal Form Revised March 24 2022.pdf PDF
N6247021R0015 Amend 0009.pdf PDF
Attachment J - PSC Italian Revised March 24 2022.pdf PDF
Attachment S - 1632846 Foundation and Misc Revisions Drawings 01 of 02.pdf PDF
N6247021R0015 Amend 0008.pdf PDF
Attachment Q Revised 1632468 Drawings Amendment 0006.pdf PDF
N6247021R0015 Amend 0006.pdf PDF
Attachment P Revised 1632468 Specification Amendment 0006.pdf PDF
N6247021R0015 Amend 0005.pdf PDF
Attachment M Pre-proposal Conference Attendee Log.pdf PDF
Attachment N Revised 1632846 Specifications.pdf PDF
Attachment O Revised 1632846 Drawings.pdf PDF
N6247021R0015 Amend 0004.pdf PDF
N6247021R0015 Amend 0003.pdf PDF
N6247021R0015 Amend 0002.pdf PDF
N6247021R0015 Amend 0001.pdf PDF
Attachment I - 1632846dwg20of24.pdf PDF
Attachment I - 1632846dwg09of24.pdf PDF
Attachment I - 1632846dwg04of24.pdf PDF
Attachment I - 1632846dwg10of24.pdf PDF
Attachment I - 1632846dwg14of24.pdf PDF
Attachment I - 1632846dwg11of24.pdf PDF
Attachment I - 1632846dwg08of24.pdf PDF
Attachment E - Schedule B Price Proposal Form.pdf PDF
Attachment I - 1632846dwg24of24.pdf PDF
Attachment I - 1632846dwg13of24.pdf PDF
Attachment H - Specifications.pdf PDF
Attachment I - 1632846dwg02of24.pdf PDF
Attachment I - 1632846dwg03of24.pdf PDF
Attachment I - 1632846dwg18of24.pdf PDF
Attachment I - 1632846dwg12of24.pdf PDF
Attachment L - DWG Index.pdf PDF
Attachment I - 1632846dwg23of24.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
N6247021R0015.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

MILCON PROJECT P-91330, PHASE 2 FAMILY HOUSING VILLAGIO AT VICENZA, ITALY

Please see Block 14 Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Feb-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247021R0015

X 9B. DATED (SEE ITEM 11)

27-Oct-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Feb-2022

CODE

COMNAVFACSYSCOM ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247021R0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

The purpose of this amendment is for the following items:

1. Extend the proposal due date

2. Special Notice to Offerors

3. Responses to Pre-Proposal Inquiries (PPIs)

1. The proposal due date is extended from Friday, 25 February 2022 at 2:00 PM Eastern Standard Time to Friday, 18 March 2022 at 2:00 PM Norfolk, Virginia Local Time.

2. Special Notice to Offerors

The Government is contemplating redesigning structural foundation systems currently specified in the Army Family Housing Phase 2 solicitation N62470-21-R-0015. If the Government chooses to include a foundation redesign in Army Family Housing Phase 2, updated specifications will be issued via future solicitation amendment posted on sam.gov. A proposal due date extension will be considered at time of potential foundation redesign amendment issuance to ensure adequate time for proposal submission.

3. Responses to PPIs

PPI

No.

REFERENCE QUESTION GOVERNMENT RESPONSE

Page Section Para.

21 Technical specifications 1.5.5 calls for “…a separate QC specialist at the work site for each of the areas of responsibility, specified in Part 3, Execution, of the technical sections…” However, Part 3, Execution, says: “Not used.” Should the bidder assume that no QC specialists are required to be on site during the construction?

No. Part 3 EXECUTION is used. See paragraph 3.1. Refer to Section 01 45 00.00 20 para

1.5.5 for the requirement of QC Specialists as indicated in technical sections, if any.

22 Since last two year, Italian market of constructions, as indeed the worldwide market, is subject to significant turbulences and it's almost impossible now to evaluate the risk of costs escalation and to have certainty on the availability and delivery schedules of the materials. The market conditions at the moment of the execution may be so different

NAVFAC intends to award a firm-fixed-price contract to the offeror who provides the best value to the government. The contractor will need to account for risks in the price it proposes.

N6247021R0015 to compromise the capability of the Contractor to perform the works. The problem is so important that the Italian Government has issued regulatory adjustments, the latest of which is Decreto Legge 4/2022, published on the Gazzetta Ufficiale (the Official Journal) n.21 of 27 Jan 2022.

We respectfully ask which way Navfac intends to face and manage this issue.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .