Attachment I - 1632846dwg11of24.pdf
PDF 28 MB Posted
- Solicitation number
- N62470-21-R-0015
About this file
This document provides details on a federal solicitation for construction services. The solicitation number is N62470-21-R-0015 and is seeking offers for Phase 2 of the Family Housing Villaggio project at Vicenza, Italy. The Naval Facilities Engineering Command within the Department of the Navy is the contracting agency. Offerors should submit responses in accordance with the instructions and specifications contained in the attached solicitation document by the specified closing date. The solicitation involves the construction of additional family housing units and associated site work at an estimated price of $50-100 million. Award is expected within 90 days of the closing date for sealed bids.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
AR
K D A
TE
D
ES
C R
IP
TI
O N
A
B
C
D
A/E INFO
SEAL
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
D E P A R
TM
E N T O F
TH
E
N A V Y
N A V A L F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N O
RF
O
LK
VA
VI
LL
AG
GI
O
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
A
TL
A N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DRAWFORM REVISION: 25 AUGUST 2020
OF
EPROJECT NO.:
1 2 3 4 5
A
B
C
D
1 2 3 4 5
A P P R
D E S C R
IP
TI
O N
S Y M
P L O
TT
E D
H
AM
P
TO
N B
LV
D
VI
C
EN
ZA
IT
AL
Y
P-
0 A
RM
Y
FA
MI
LY
H
OU
SI
NG
P
RO
JE
CT
AECOM
10 S. Jefferson Street, Suite 1600 Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
1632846
N33191-15-D-0811
CCA/MPO
DER
R. STEPHENS, PE
DPS
AS NOTED
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
2 JUNE 2021
F
IL
E
P A
TH
A U
TH
O R
:5 :2
IDB MHAGM
S
TR
U C
TU
R
A L
G E
N E
R A
L N
O
TE
S N
O
TE
G E
N E
R A
LI
S
TR
U
TT
U
R E
S-001
14091928
A G M
V ic e n z a
A F H p h a s e
P S
IT
E S .r vt
1. INTERNATIONAL BUILDING CODE (2018 EDITION)
2. ACI 318-14 BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE
3. UFC 1-200-01 GENERAL BUILDING REQUIREMENTS, ( OCTOBER 1, 2020)
4. UFC 1-300-09N DESIGN PROCEDURES, WITH CHANGE 4, 14 JUNE 2018
5. UFC 3-301-01 STRUCTURAL ENGINEERING, (OCTOBER 1, 2019)
6. UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12
DECEMBER 2018
7. ASCE 7-16 MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER
STRUCTURES
8. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) SPECIFICATION FOR
THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR
BUILDINGS, FIFTEENTH EDITION
9.AWS STRUCTURAL WELDING CODE (2015 EDITION)
10. ACI 350/350R-06 CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING
CONCRETE STRUCTURES
11. D.M., CONSTRUCTION CODE (17 JANUARY 2018)
12. CIRCOLARE DEL 21 GENNAIO 2019 N. 7. INSTRUCTIONS FOR THE
APPLICATION OF THE UPDATE OF THE TECHNICAL STANDARDS FOR
CONSTRUCTION REFERRED TO IN THE MINISTERIAL DECREE OF 17 JANUARY
13. LAW N. 1086, NORMS RELATED TO NORMAL AND PRE-STRESSED
REINFORCED CONCRETE STRUCTURES AND STEEL STRUCTURES (5
NOVEMBER 1971)
14. LAW N. 64, PROVISIONS FOR STRUCTURES, WITH SPECIAL PRESCRIPTIONS
FOR THE SEISMIC ZONES (2 FEBRUARY 1974)
15. UNI EN 1090: EXECUTION OF STEEL AND ALUMINUM STRUCTURES
16. UNI EN 206: CONCRETE. SPECIFICATION, PERFORMANCE, PRODUCTION AND
COMPLIANCE
17. UNI 11104: CONCRETE. SPECIFICATION, PERFORMANCE, PRODUCTION AND
COMPLIANCE. COMPLEMENTARY INSTRUCTIONS FOR THE APPLICATION OF EN
206-1
18. UNI 8520: AGGREGATES FOR CONCRETE. COMPLEMENTARY INSTRUCTIONS
FOR THE APPLICATION OF EN 1262
19. UNI 7122: TEST ON FRESH CONCRETE. DETERMINATION OF THE AMOUNT OF
EXUDED MIXING WATER
20. EN 10080: STEEL FOR THE REINFORCEMENT OF CONCRETE
21. UNI EN 13670: EXECUTION OF CONCRETE STRUCTURES – GENERAL
REQUIREMENTS
22. CNR-DT 207/2008: INSTRUCTIONS FOR EVALUATING WIND ACTIONS AND
EFFECTS ON BUILDINGS
DESIGN LOADS ARE IN ACCORDANCE WITH UFC 3-310-01, UFC 3-310-04, ASCE7,
IBC 2018, ITALIAN LAW 1086(5/11/71), LAW 64(2/02/74), DM (17/01/18)
1. LIVE LOADS:
ROOF . . . 1 Kpa FLOOR . . . 2.0 Kpa BALCONY . . . 4.8 Kpa ELEVATOR LOBBY AND STAIRS . . . 4.8 Kpa
2. SUPERIMPOSED LOADS:
CEILING, MEP SYSTEMS AND PV PANELS 1 Kpa FLAT ROOF 0.4 kpa PITCH ROOF 0.8 kpa
3. WIND LOAD APARTMENTS AND TOWNHOUSES:
Vu ULTIMATE WIND SPEED (3 SECOND GUST) . . 41 m/s OR 148 km/h
STRUCTURAL CLASSIFICATION ENCLOSED
RISK CATEGORY . . . II
WIND EXPOSURE . . . B
INTERNAL PRESSURE COEFFICIENT GCpi=±0.18
4. WIND LOAD WATERSTORAGE BUILDING AND SUBSTATION:
Vu ULTIMATE WIND SPEED (3 SECOND GUST) . . 44 m/s OR 158 km/h
STRUCTURAL CLASSIFICATION ENCLOSED
RISK CATEGORY . . . IV
WIND EXPOSURE . . . B
INTERNAL PRESSURE COEFFICIENT GCpi=±0.18
5. WIND LOAD (ITALIAN CODE)
Vb,0 BASIC WIND SPEED . . .25 m/s BASIC VELOCITY PRESSURE, qb = 0.39 kPa
ROUGHNESS B
EXPOSURE CATEGORY: IV
INTERNAL PRESSURE COEFFICIENT: DEPENDS ON THE NUMBER OF OPENINGS
CPI (min 0/ max±0.40)
6. SEISMIC PARAMETERS (US CODE) APARTMENTS AND TOWNHOUSES:
SEISMIC IMPORTANCE FACTOR 1.0
MAPPED SPECTRAL RESPONSE ACCELERATIONS
Ss 0.76g S1 0.21g
SITE CLASS D
SPECTRAL RESPONSE COEFFICIENT
SDs 0.606g SD1 0.305g
SEISMIC DESIGN CATEGORY D
STRUCTURAL SYSTEM SPECIAL REINFORCED CONCRETE SHEAR WALL
RESPONSE MODIFICATION FACTOR R=5
SYSTEM OVERSTRENGTH FACTOR Ω=2.5
DEFLECTION AMPLIFICATION FACTOR Cd=5
7. SEISMIC PARAMETERS (US CODE) WATERSTORAGE BUILDING AND
SUBSTATION:
SEISMIC IMPORTANCE FACTOR 1.5
MAPPED SPECTRAL RESPONSE ACCELERATIONS
Ss 0.76g S1 0.21g
SITE CLASS D
SPECTRAL RESPONSE COEFFICIENT
SDs 0.606g SD1 0.305g
SEISMIC DESIGN CATEGORY D
SUBSTATION
STRUCTURAL SYSTEM SPECIAL REINFORCED CONCRETE SHEAR WALL
RESPONSE MODIFICATION FACTOR R=5
SYSTEM OVERSTRENGTH FACTOR Ω=2.5
DEFLECTION AMPLIFICATION FACTOR Cd=5
WATERSTORAGE BUILDING
STRUCTURAL SYSTEM: FLAT BOTTOM GROUND-SUPPORTED TANKS:
REINFORCED NONSLIDING BASE
RESPONSE MODIFICATION FACTOR R=2
OVERSTRENGTH FACTOR Ω=2
DEFLECTION AMPLIFICATION FACTOR Cd=2
8.SEISMIC PARAMETERS (ITALIAN CODE):
SITE CLASS C
SERVICEABILITY LIFE Vn=50 YEARS
OCCUPANCY CLASS II
OCCUPANCY FACTOR Cu=1.0
REFERENCE LIFE 50 YEARS
SOIL ACCELERATION FACTOR SLV ag/g=0.147g
RETURN PERIOD SLV 475
9. SNOW LOAD(US CODE):
GROUND SNOW LOAD 1.68 Kpa
IMPORTANCE FACTOR 1.0
10. SNOW LOAD (ITALIAN CODE):
GROUND SNOW LOAD 1.50 Kpa
EXPOSURE COEFFICIENT 1.0
1. CODICE INTERNAZIONALE DELL'EDILIZIA (EDIZIONE 2018)
2. ACI 318-14 REQUISITI DEL CODICE EDILIZIO PER IL CALCESTRUZZO ARMATO
3. UFC 1-200-01 REQUISITI GENERALI PER GLI EDIFICI, (1 OTTOBRE 2020)
4. UFC 1-300-09N PROCEDURE DI PROGETTAZIONE, CON MODIFICA 4, 14
GIUGNO 2018
5. UFC 3-301-01 INGEGNERIA STRUTTURALE, (1 OTTOBRE 2019)
6. UFC 4-010-01 DOD STANDARD MINIMI ANTITERRORISMO PER GLI EDIFICI, 12
DICEMBRE 2018
7. ASCE 7-16 CARICHI MINIMI DI PROGETTO PER EDIFICI E ALTRE STRUTTURE
8. ISTITUTO AMERICANO PER LE COSTRUZIONI IN ACCIAIO (AISC) SPECIFICA
PER LA PROGETTAZIONE, LA FABBRICAZIONE E L'EREZIONE DELL'ACCIAIO
STRUTTURALE PER LE COSTRUZIONI, QUINDICESIMA EDIZIONE
9.AWS CODICE DI SALDATURA STRUTTURALE (EDIZIONE 2015)
10. ACI 350/350R-06 REQUISITI DEL CODICE PER STRUTTURE IN CALCESTRUZZO
DI INGEGNERIA AMBIENTALE
11. D.M., CODICE DI COSTRUZIONE (17 GENNAIO 2018)
12. CIRCOLARE DEL 21 GENNAIO 2019 N. 7. ISTRUZIONI PER L'APPLICAZIONE
DELL'AGGIORNAMENTO DELLE NORME TECNICHE PER LE COSTRUZIONI DI CUI
AL DECRETO MINISTERIALE 17 GENNAIO 2018
13. LEGGE N. 1086, NORME RELATIVE ALLE STRUTTURE IN CALCESTRUZZO
ARMATO NORMALE E PRECOMPRESSO E ALLE STRUTTURE IN ACCIAIO (5
NOVEMBRE 1971)
14. LEGGE N. 64, DISPOSIZIONI PER LE STRUTTURE, CON PRESCRIZIONI
SPECIALI PER LE ZONE SISMICHE (2 FEBBRAIO 1974)
15. UNI EN 1090: ESECUZIONE DI STRUTTURE IN ACCIAIO E ALLUMINIO
16. UNI EN 206: CALCESTRUZZO. SPECIFICHE, PRESTAZIONI, PRODUZIONE E
CONFORMITÀ
17. UNI 11104: CALCESTRUZZO. SPECIFICHE, PRESTAZIONI, PRODUZIONE E
CONFORMITÀ. ISTRUZIONI COMPLEMENTARI PER L'APPLICAZIONE DELLA EN
206-1
18. UNI 8520: AGGREGATI PER CALCESTRUZZO. ISTRUZIONI COMPLEMENTARI
PER L'APPLICAZIONE DELLA EN 1262
19. UNI 7122: TEST SUL CALCESTRUZZO FRESCO. DETERMINAZIONE DELLA
QUANTITÀ DI ACQUA D'IMPASTO TRASUDATA
20. EN 10080: ACCIAIO PER L'ARMATURA DEL CALCESTRUZZO
21. UNI EN 13670: ESECUZIONE DI STRUTTURE DI CALCESTRUZZO - REQUISITI
GENERALI
22. CNR-DT 207/2008: ISTRUZIONI PER LA VALUTAZIONE DELLE AZIONI DEL
VENTO E DEGLI EFFETTI SUGLI EDIFICI
I CARICHI DI PROGETTO SONO CONFORMI A UFC 3-310-01, UFC 3-310-04, ASCE7,
IBC 2018, LEGGE 1086(5/11/71), LEGGE 64(2/02/74), DM (17/01/18)
1. CARICHI VARIABILI:
TETTO. . . 1 Kpa PAVIMENTO . . . 2.0 Kpa BALCONE . . . 4.8 Kpa CORTILE DELL'ASCENSORE E SCALE . . . 4.8 Kpa
2. CARICHI PERMANENTI:
SOFFITTO, SISTEMI MEP E PANNELLI FV 1 Kpa TETTO PIANO 0,4 kpa TETTO A FALDE 0,8 kpa.
3. CARICO DA VENTO APPARTAMENTI E CASE A SCHIERA:
VELOCITÀ MASSIMA DEL VENTO (RAFFICA DI 3 SECONDI) . 41 m/s O 148 km/h
CLASSIFICAZIONE STRUTTURALE: CHIUSO
CATEGORIA DI RISCHIO . . II
ESPOSIZIONE AL VENTO . . . B
COEFFICIENTE DI PRESSIONE INTERNA GCpi=±0,18
4. CARICO DA VENTO EDIFICIO DI STOCCAGGIO DELL'ACQUA E
SOTTOSTAZIONE:
VELOCITÀ MASSIMA DEL VENTO (RAFFICA DI 3 SECONDI) . 44 m/s O 158 km/h
CLASSIFICAZIONE STRUTTURALE: CHIUSO
CATEGORIA DI RISCHIO . . IV
ESPOSIZIONE AL VENTO . . . B
COEFFICIENTE DI PRESSIONE INTERNA GCpi=±0,18
5. CARICO DA VENTO (CODICE ITALIANO)
Vb,0 VELOCITÀ DI RIFERIMENTO DEL VENTO . .25 m/s PRESSIONE DI VELOCITÀ DI BASE, qb = 0,39 kPa
RUGOSITA' B
CATEGORIA DI ESPOSIZIONE: IV
COEFFICIENTE DI PRESSIONE INTERNA: DIPENDE DAL NUMERO DI APERTURE
CPI (min 0/ max±0,40)
6. PARAMETRI SISMICI (CODICE US) APPARTAMENTI E CASE A SCHIERA:
FATTORE DI IMPORTANZA SISMICA 1.0
PARAMETRI ACCELERAZIONI SPETTRALI
Ss 0.76g S1 0.21g
CATEGORIA DI SOTTOSUOLO D
COEFFICIENTI SPETTRO DI RISPOSTA ELASTICO
SDs 0.606g SD1 0.305g
CATEGORIA DI PROGETTAZIONE SISMICA D
SISTEMA STRUTTURALE: PARETI SPECIALI A TAGLIO IN CALCESTRUZZO
ARMATO
FATTORE DI COMPORTAMENTO R=5
FATTORE DI SOVRARESISTENZA Ω=2,5
FATTORE DI AMPLIFICAZIONE DELLA DEFLESSIONE Cd=5
7. PARAMETRI SISMICI (CODICE US) EDIFICIO DI STOCCAGGIO DELL'ACQUA E
SOTTOSTAZIONE:
FATTORE DI IMPORTANZA SISMICA 1,5
PARAMETRI ACCELERAZIONI SPETTRALI
Ss 0.76g S1 0.21g
CATEGORIA DI SOTTOSUOLO D
COEFFICIENTI SPETTRO DI RISPOSTA ELASTICO
SDs 0.606g SD1 0.305g
CATEGORIA DI PROGETTAZIONE SISMICA D
SOTTOSTAZIONE
SISTEMA STRUTTURALE PARETI SPECIALI A TAGLIO IN CALCESTRUZZO ARMATO
FATTORE DI COMPORTAMENTO R=5
FATTORE DI SOVRARESISTENZA Ω=2,5
FATTORE DI AMPLIFICAZIONE DELLA DEFLESSIONE Cd=5
EDIFICIO DI STOCCAGGIO DELL'ACQUA
SISTEMA STRUTTURALE: SERBATOI APPOGGIATI A TERRA A FONDO PIATTO:
BASE RINFORZATA NON SCORREVOLE
FATTORE DI COMPORTAMENTO R=2
FATTORE DI SOVRARESISTENZA Ω=2
FATTORE DI AMPLIFICAZIONE DELLA DEFLESSIONE Cd=2
8.PARAMETRI SISMICI (CODICE ITALIANO):
CATEGORIA DI SOTTOSUOLO C
VITA NOMINALE Vn=50 ANNI
CLASSE D'USO II
COEFFICIENTE D'USO Cu=1,0
VITA DI RIFERIMENTO 50 ANNI
ACCELERAZIONE AL SUOLO SLV ag/g=0,147g
PERIODO DI RITORNO SLV 475
9. CARICO DA NEVE (CODICE US):
CARICO DA NEVE AL SUOLO 1.68 Kpa
FATTORE DI IMPORTANZA 1.0
10. CARICO DA NEVE (CODICE ITALIANO):
CARICO DA NEVE AL SUOLO 1,50 Kpa
COEFFICIENTE DI ESPOSIZIONE 1.0
CODES NORMATIVE DESIGN LOADS CARICHI DI PROGETTAZIONE
M
AR
K D A
TE
D
ES
C R
IP
TI
O N
A
B
C
D
A/E INFO
SEAL
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
D E P A R
TM
E N T O F
TH
E
N A V Y
N A V A L F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N O
RF
O
LK
VA
VI
LL
AG
GI
O
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
A
TL
A N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DRAWFORM REVISION: 25 AUGUST 2020
OF
EPROJECT NO.:
1 2 3 4 5
A
B
C
D
1 2 3 4 5
A P P R
D E S C R
IP
TI
O N
S Y M
P L O
TT
E D
H
AM
P
TO
N B
LV
D
VI
C
EN
ZA
IT
AL
Y
P-
0 A
RM
Y
FA
MI
LY
H
OU
SI
NG
P
RO
JE
CT
AECOM
10 S. Jefferson Street, Suite 1600 Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
1632846
N33191-15-D-0811
CCA/MPO
DER
R. STEPHENS, PE
DPS
AS NOTED
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
2 JUNE 2021
F
IL
E
P A
TH
A U
TH
O R
:5 :3
IDB MHAGM
S
TR
U C
TU
R
A L
G E
N E
R A
L N
O
TE
S N
O
TE
G E
N E
R A
LI
S
TR
U
TT
U
R E
S-002
14091929
A G M
V ic e n z a
A F H p h a s e
P S
IT
E S .r vt
1. GENERAL NOTES AND TYPICAL DETAILS APPLY TO ALL STRUCTURAL
FEATURES UNLESS OTHERWISE SHOWN OR NOTED. IF CERTAIN FEATURES
ARE NOT FULLY SHOWN OR CALLED FOR ON THE DRAWINGS OR
SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER
AS FOR SIMILAR CONDITIONS
2. ANCHORS ARE TO BE INSTALLED WITHIN A TOLERANCE OF 6mm OF
SPECIFIED LOCATION
3. A SOIL OR WASTE PIPE OR A BUILDING DRAIN, ETC PASSING UNDER A
FOOTING OR THROUGH A FOUNDATION WALL SHALL BE PROVIDED WITH A
RELIEVING ARCH, OR THERE SHALL BE BUILT INTO THE WALL OR FOUNDATION
AN IRON PIPE SLEEVE TWO PIPE SIZES GREATER THAN THE PIPE PASSING
THROUGH FOR PIPES 150mmø AND LESS AND ONE PIPE SIZE GREATER THAN THE PIPE PASSING THROUGH FOR PIPES GREATER THAN 150mmø.
4. THE STRUCTURES ARE DESIGNED TO BE SELF-SUPPORTING AND STABLE
AFTER THE BUILDING IS FULLY COMPLETED. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND SEQUENCE AND
TO ENSURE THE SAFETY OF WORKERS, THE BUILDING AND ITS COMPONENT
PARTS DURING ERECTION. THIS INCLUDES THE ADDITION OF WHATEVER
SHORING,TEMPORARY BRACING, ETC. THAT MAY BE NECESSARY AS WELL AS
FULL COMPLIANCE WITH ALL APPLICABLE OSHA REGULATIONS. OBSERVATION
VISITS TO THE SITE BY AECOM PERSONAL SHALL NOT INCLUDE INSPECTION
FOR THESE ITEM.
5. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO ENSURE ALL WORK IS
PERFORMED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
6. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF OPENING AND
HEIGHTS OF ALL WALLS NOT SHOWN OR OTHERWISE NOTED ON THE
STRUCTURAL DRAWINGS.
7. REFER TO ARCHITECTURAL AND MECHANICAL DRAWINGS FOR SIZE AND
LOCATION OF ALL FLOOR AND ROOF OPENINGS NOT SHOWN OR OTHERWISE
NOTED ON THE STRUCTURAL DRAWINGS.
8. DIMENSIONS SHALL NOT BE SCALED
9. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS AND DIMENSIONS
RELATIVE TO SAME. WHERE THERE ARE CONFLICTS BETWEEN ACTUAL FIELD
CONDITIONS AND/OR DATA PRESENTED ON THESE DRAWINGS, SUCH INFORM
THE GEOTECHNICAL & ENGINEER IMMEDIATELY, AND DEVELOPE NECESSARY
ADJUSTMENTS MADE PER THEIR INSTRUCTIONS.
10. COORDINATE BONDING OF FOUNDATION REBAR TO ELECTRICAL GROUND
WITH ELECTRICAL CONTRACTOR.
11. SPECIALTY ENGINEER REQUIREMENTS: A LICENSED PROFESSIONAL
ENGINEER, WHO IS NOT THE STRUCTURAL ENGINEER OF RECORD, WHO
PROVIDES ENGINEERING CRITERIA OR DESIGNS NECESSARY FOR THE
STRUCTURE TO BE COMPLETED. THE SPECIALTY ENGINEER MAY BE A
DELEGATED ENGINEER.
12. SPECIFICATIONS, CODES, AND STANDARDS NOTED IN THESE CONTRACT
DOCUMENTS SHALL BE OF THE LATEST EDITION APPROVED BY THE
APPROPRIATE REGULATORY AGENCIES.
13. SHOP DRAWINGS AND CALCULATIONS FOR ALL STOREFRONT SYSTEMS,
CANOPIES, AND SPECIALTY ENGINEERED BUILDING ELEMENTS MUST BE
SIGNED AND SEALED BY THE CURRENTLY LICENSED ENGINEER RESPONSIBLE
FOR THE DESIGN AT TIME OF SUBMISSION
14. THE CONTRACTOR SHALL PROVIDE AND INSTALL THE FOLLOWING
PREFABRICATED ITEMS AS INDICATED IN THE DRAWINGS AND SPECIFICATIONS:
• PRESTRESSED "PREDALLE" TYPE CONCRETE PLANKS WITH CAST-IN-PLACE
TOPPING SLAB.
• IGLOO SLABS WITH POLYPROPYLENE FORMS AND CAST-IN-PLACE CONCRETE
SLAB
THEIR INSTALLATION SHALL BE COORDINATED WITH CAST-IN-PLACE PORTIONS
OF THE STRUCTURE PRIOR TO CONCRETE POURING OPERATIONS.
1. THE EXCAVATION OF ALL DEBRIS-LADEN MATERIALS AND SUBSEQUENT
REPLACEMENT WITH COMPACTED FILL LOCATED BENEATH THE ENTIRE
STRUCTURE FOOTPRINT PLUS A 1.5M MARGIN OUTSIDE THE PERIMETER
FOUNDATION IN STRICT ACCORDANCE WITH ALL OF THE RECOMMENDATIONS
BY GEOTECHNICAL ENGINEER FOR THIS PROJECT. THE GEOTECHNICAL
REPORTS SHALL BE INCORPORATED INTO THE SPECIFICATIONS AND AS SUCH
BECOME PART OF THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
BECOME FAMILIAR WITH AND FOLLOW ALL OF THE RECOMMENDATIONS
CONTAINED IN THESE GEOTECHNICAL INVESTIGATIONS INCLUDING, BUT NOT
LIMITED TO GROUNDWATER CONTROL, SUBGRADE PREPARATION, AND FILL
SUITABILITY.
2.THE DEGREE OF COMPACTION OF ANY GRANULAR MATERIALS USED TO
REACH THE FINAL PROJECT LEVEL MUST BE VERIFIED BY TESTS ON A
CIRCULAR PLATE WITH A DIAMETER OF 30 CM THROUGH A DOUBLE LOADING
AND UNLOADING CYCLE ACCORDING TO THE RECOMMENDATIONS OF CNR
146/1992
3. FOUNDATIONS SHALL NOT BE PLACED ABOVE SLOPES EXCEEDING ONE
VERTICAL AND TWO HORIZONTAL AS MEASURED FROM THE CLOSEST EDGE OF
ANY UNDISTURBED SOIL OR OTHER FOUNDATION STRUCTURE.
4. ALL FOUNDATIONS SHALL BE CENTERED UNDER COLUMN OR WALL
CENTERLINES UNLESS SHOWN OR NOTED OTHERWISE.
5. REPORT ANY UNUSUAL BELOW GRADE CONDITIONS ENCOUNTERED TO THE
STRUCTURAL ENGINEER.
6. SLAB ON GRADE WILL BE SUPPORTED BY HIGH STRENGTH PLASTIC
MODULES TO PROVIDE CRAWL SPACE.
7. FOUNDATION DESIGN IS BASED ON SOIL REPORT "GEOTECHNICAL
INVESTIGATION REPORT - PHASE 1-4" PREPARED BY AECOM DATED 25th JUNE 2021.
8. CFA-TYPE REINFORCED LOAD-BEARING PILES SHALL BE INSTALLED IN
ACCORDANCE WITH THE CRITERIA ESTABLISHED BY THE DESIGNER. THE
TOTAL SETTLEMENT, UNDER SERVICE LOADS, MUST BE LIMITED TO 25 MM
ACCORDING TO THE INDICATIONS OF UFC 3-220-01 GEOTECHNICAL
ENGINEERING.
9. A GEOTECHNICAL ENGINEER SHALL OBSERVE THE OPEN EXCAVATION TO
DETERMINE THAT THE SOIL TYPE AND CONDITIONS ARE CONSISTENT WITH
DESIGN CRITERIA OF THE SOIL REPORT. IF THE SOIL PROPERTIES ARE FOUND
TO BE DIFFERENT FROM THIS CRITERIA THE OWNER’S REPRESENTATIVE SHALL
BE PROMPTLY NOTIFIED SO THAT THE FOUNDATION DESIGN MAY BE
REVIEWED.
10. TO MINIMIZE WEATHERING, THE LAST 150 mm OF EXCAVATION FOR ALL
SLABS SHALL BE MADE IMMEDIATELY PRIOR TO POURING OF SLAB.
11. QUALITY ASSURANCE COMPACTION DENSITY UNDER FOOTINGS AND SLABS
SHALL BE A MINIMUM OF "95%" OF THE MAXIMUM DRY DENSITY AS
DETERMINED BY ASTM D-1557 (MODIFIED PROCTOR) THROUGHOUT EACH 300
mm LIFT, TO A DEPTH AS INDICATED IN THE GEOTECHNICAL REPORT. IN
ADDITION TO THIS MINIMUM COMPACTION REQUIREMENT, THE BEARING SOILS
MUST EXHIBIT STABILITY AND BE FREE OF "PUMPING" CONDITIONS.
12. BELOW THE SLAB ON GRADE, A DEFORMATION MODULUS OF 80MPA SHALL
BE REACHED AFTER COMPACTION OF THE SOIL; PLATE LOAD TESTS CARRIED
OUT BY AN AUTHORIZED LABORATORY ARE REQUIRED
13. PILE LOAD TESTS HAVE TO BE CARRIED OUT FOLLOWING REQUIREMENTS
GIVEN BY NTC18, SECTION 6.4.3.7.2.
THE BUILDING CONTROLLER (COLLAUDATORE) DURING THE EXECUTION OF
THE WORKS AND/OR THE DIRECTOR OF WORKS WILL DECIDE NUMBER AND
LOCATION OF THE TESTS, MAINTAINING REQUIREMENTS OF NTC18 AS A
MINIMUM.
THE PROGRAM OF TESTS REQUIRED BY THE BUILDING CONTROLLER, WITH
THE INDICATION OF THE LOADING PROCEDURE AND THE EXPECTED
PERFORMANCES (DEFORMATIONS, STRESS LEVELS, REACTION OF THE
CONSTRAINTS, ETC.), MUST BE:
- SUBMITTED TO THE DIRECTOR OF WORKS FOR IMPLEMENTATION;
- MADE KNOWN TO THE DESIGNER, SO THAT HE CAN VERIFY ITS COMPATIBILITY
WITH THE STRUCTURAL DESIGN;
- MADE KNOWN TO THE CONTRACTOR FOR ACCEPTANCE AND EXECUTION
1. LE NOTE GENERALI E I DETTAGLI TIPICI SI APPLICANO A TUTTE LE
CARATTERISTICHE STRUTTURALI A MENO CHE NON SIA MOSTRATO O
ANNOTATO DIVERSAMENTE. SE ALCUNE CARATTERISTICHE NON SONO
COMPLETAMENTE MOSTRATE O RICHIESTE NEI DISEGNI O NELLE SPECIFICHE,
LA LORO COSTRUZIONE DEVE SEGUIRE LO STESSO PRINCIPIO SEGUITO IN
CONDIZIONI SIMILI
2. GLI ANCORAGGI DEVONO ESSERE INSTALLATI ENTRO UNA TOLLERANZA DI 6
mm DALLA POSIZIONE SPECIFICATA
3. UN TUBO DI TERRA O DI SCARICO O UN DRENAGGIO DELL'EDIFICIO, ECC.
CHE PASSA SOTTO UN BASAMENTO O ATTRAVERSO UN MURO DI FONDAZIONE
DEVE ESSERE DOTATO DI APPOSITA PROTEZIONE AD ARCO, OPPURE DEVE
ESSERE COSTRUITO NEL MURO O NELLA FONDAZIONE UN MANICOTTO IN
FERRO DI DUE DIMENSIONI MAGGIORI DEL TUBO CHE PASSA PER I TUBI DI
DIAMETRO INFERIORE A 150mmø E UNA DIMENSIONE MAGGIORE DEL TUBO CHE Passa PER TUBI SUPERIORI A 150mmø.
4. QUESTE STRUTTURE SONO PROGETTATE PER ESSERE AUTOPORTANTI E
STABILI DOPO CHE LA COSTRUZIONE DELL'EDIFICIO È ULTIMATA. È
RESPONSABILITÀ DELL'APPALTATORE DETERMINARE LA PROCEDURA E LA
SEQUENZA DI MONTAGGIO E GARANTIRE LA SICUREZZA DEI LAVORATORI,
DELL'EDIFICIO E DELLE SUE PARTI COMPONENTI DURANTE IL MONTAGGIO.
QUESTO INCLUDE L'AGGIUNTA DI QUALSIASI PUNTELLAMENTO, RINFORZO
TEMPORANEO, ECC. CHE POSSONO ESSERE NECESSARI, COSÌ COME IL PIENO
RISPETTO DI TUTTI I REGOLAMENTI OSHA APPLICABILI. LE VISITE DI
OSSERVAZIONE AL SITO DA PARTE DEL PERSONALE AECOM NON INCLUDONO
L'ISPEZIONE DI QUESTI ELEMENTI.
5. È ESCLUSIVA RESPONSABILITÀ DELL'APPALTATORE ASSICURARE CHE TUTTO
IL LAVORO SIA ESEGUITO IN CONFORMITÀ AI DOCUMENTI DEL CONTRATTO.
6. FARE RIFERIMENTO AI DISEGNI ARCHITETTONICI PER LE POSIZIONI DELLE
APERTURE E LE ALTEZZE DI TUTTE LE PARETI NON MOSTRATE O ALTRIMENTI
ANNOTATE SUI DISEGNI STRUTTURALI.
7. FARE RIFERIMENTO AI DISEGNI ARCHITETTONICI E MECCANICI PER LE
DIMENSIONI E LA POSIZIONE DI TUTTE LE APERTURE DEL PAVIMENTO E DEL
TETTO NON MOSTRATE O ALTRIMENTI ANNOTATE SUI DISEGNI STRUTTURALI.
8. LE DIMENSIONI NON DEVONO ESSERE SCALATE
9. L'APPALTATORE DEVE VERIFICARE TUTTE LE CONDIZIONI DEL CAMPO E LE
DIMENSIONI RELATIVE ALLO STESSO. DOVE CI SONO CONFLITTI TRA LE
CONDIZIONI REALI DEL CAMPO E/O I DATI PRESENTATI SU QUESTI DISEGNI,
INFORMARE L'INGEGNERE GEOTECNICO IMMEDIATAMENTE, E SVILUPPARE LE
REGOLAZIONI NECESSARIE FATTE SECONDO LE SUE ISTRUZIONI.
10. COORDINARE IL COLLEGAMENTO DELL'ARMATURA DI FONDAZIONE ALLA
MESSA A TERRA CON L'APPALTATORE ELETTRICO.
11. REQUISITI DELL'INGEGNERE SPECIALIZZATO: UN INGEGNERE
PROFESSIONISTA AUTORIZZATO, CHE NON È L'INGEGNERE STRUTTURALE DI
RIFERIMENTO, CHE FORNISCE CRITERI O PROGETTI INGEGNERISTICI
NECESSARI PER LA STRUTTURA DA COMPLETARE. L'INGEGNERE
SPECIALIZZATO PUÒ ESSERE UN INGEGNERE DELEGATO.
12. LE SPECIFICHE, I CODICI E GLI STANDARD INDICATI IN QUESTI DOCUMENTI
CONTRATTUALI DEVONO ESSERE DELL'ULTIMA EDIZIONE APPROVATA DALLE
AGENZIE DI REGOLAMENTAZIONE APPROPRIATE.
13. I DISEGNI E I CALCOLI DI OFFICINA PER TUTTI I SISTEMI, LE TETTOIE E GLI
ELEMENTI EDILIZI SPECIALI INGEGNERIZZATI DEVONO ESSERE FIRMATI E
SIGILLATI DALL'INGEGNERE ATTUALMENTE AUTORIZZATO RESPONSABILE
DELLA PROGETTAZIONE AL MOMENTO DELLA PRESENTAZIONE
"14. L'APPALTATORE DOVRÀ FORNIRE E INSTALLARE I SEGUENTI ELEMENTI
PREFABBRICATI COME INDICATO NEI DISEGNI E NELLE SPECIFICHE:
- LASTRE DI CALCESTRUZZO PRECOMPRESSO TIPO "PREDALLE" CON SOLETTA
DI COPERTURA GETTATA IN OPERA.
- IGLOO CON CASSERI IN POLIPROPILENE E SOLETTA IN CALCESTRUZZO
GETTATO IN OPERA
LA LORO INSTALLAZIONE DEVE ESSERE COORDINATA CON LE PORZIONI DI
STRUTTURA GETTATE IN OPERA PRIMA DELLE OPERAZIONI DI GETTO DEL
CALCESTRUZZO".
1. LO SCAVO DI TUTTI I MATERIALI CARICHI DI DETRITI E LA SUCCESSIVA
SOSTITUZIONE CON MATERIALE DI RIEMPIMENTO COMPATTATO SITUATO
SOTTO L'INTERA IMPRONTA DELLA STRUTTURA PIÙ UN MARGINE DI 1,5 M
ALL'ESTERNO DELLA FONDAZIONE PERIMETRALE IN STRETTA CONFORMITÀ
CON TUTTE LE RACCOMANDAZIONI DELL'INGEGNERE GEOTECNICO PER
QUESTO PROGETTO. LE RELAZIONI GEOTECNICHE SARANNO INCORPORATE
NELLE SPECIFICHE E COME TALI DIVENTERANNO PARTE DEI DOCUMENTI
CONTRATTUALI. L'APPALTATORE DEVE FAMILIARIZZARE CON TUTTE LE
RACCOMANDAZIONI CONTENUTE IN QUESTE INDAGINI GEOTECNICHE E
SEGUIRLE, INCLUSO, MA NON SOLO, IL CONTROLLO DELLE ACQUE
SOTTERRANEE, LA PREPARAZIONE DEL SOTTOFONDO E L'IDONEITÀ DEL
RIEMPIMENTO.
2.IL GRADO DI COMPATTAZIONE DEI MATERIALI GRANULARI EVENTUALMENTE
UTILIZZATI PER RAGGIUNGERE IL LIVELLO FINALE DEL PROGETTO DEVE
ESSERE VERIFICATO MEDIANTE PROVE DI CARICO SU UNA PIASTRA
CIRCOLARE DEL DIAMETRO DI 30 CM ATTRAVERSO UN DOPPIO CICLO DI
CARICO E SCARICO SECONDO LE RACCOMANDAZIONI DEL CNR 146/1992
3. LE FONDAZIONI NON DEVONO ESSERE COLLOCATE SOPRA PENDENZE
SUPERIORI A UNA VERTICALE E DUE ORIZZONTALI MISURATE DAL BORDO PIÙ
VICINO DI QUALSIASI TERRENO INDISTURBATO O ALTRA STRUTTURA DI
FONDAZIONE.
4. TUTTE LE FONDAZIONI DEVONO ESSERE CENTRATE SOTTO LE LINEE
CENTRALI DELLE COLONNE O DEI MURI, A MENO CHE NON SIA INDICATO O
ANNOTATO DIVERSAMENTE.
5. SEGNALARE ALL'INGEGNERE STRUTTURALE QUALSIASI CONDIZIONE
INSOLITA SOTTO IL LIVELLO DEL TERRENO INCONTRATA.
6. LA SOLETTA SUL PAVIMENTO SARÀ SUPPORTATA DA MODULI DI PLASTICA AD
ALTA RESISTENZA PER FORNIRE UNO SPAZIO DI VESPAIO.
7. IL PROGETTO DELLE FONDAZIONI SI BASA SUL REPORT GEOTECNICO
"GEOTECHNICAL INVESTIGATION REPORT - PHASE 1-4" PREPARATO DA AECOM
IN DATA 25 GIUGNO 2021.
8. I PALI PORTANTI RINFORZATI DI TIPO CFA DEVONO ESSERE INSTALLATI
SECONDO I CRITERI STABILITI DAL PROGETTISTA. L'ASSESTAMENTO TOTALE,
SOTTO I CARICHI DI SERVIZIO, DEVE ESSERE LIMITATO A 25 MM SECONDO LE
INDICAZIONI DELLA UFC 3-220-01 INGEGNERIA GEOTECNICA.
9. UN INGEGNERE GEOTECNICO DEVE OSSERVARE LO SCAVO APERTO PER
DETERMINARE CHE IL TIPO E LE CONDIZIONI DEL SUOLO SIANO COERENTI CON
I CRITERI DI PROGETTAZIONE DEL REPORT GEOTECNICO. SE LE PROPRIETÀ
DEL SUOLO SONO DIVERSE DA QUESTI CRITERI, IL CLIENTE DEVE ESSERE
PRONTAMENTE INFORMATO IN MODO CHE IL PROGETTO DELLA FONDAZIONE
POSSA ESSERE RIVISTO.
10. PER RIDURRE AL MINIMO LE INTEMPERIE, GLI ULTIMI 150 mm DI SCAVO PER
TUTTE LE FONDAZIONI DEVONO ESSERE FATTI IMMEDIATAMENTE PRIMA DEL
GETTO.
11. LA DENSITÀ DI COMPATTAZIONE SECONDO IL CONTROLLO QUALITA' SOTTO
LE FONDAZIONI DEVE ESSERE ALMENO IL "95%" DELLA DENSITÀ MASSIMA A
SECCO COME DETERMINATA DA ASTM D-1557 (PROCTOR MODIFICATO) PER
OGNI STRATO DI 300 mm, AD UNA PROFONDITÀ COME INDICATO NELLA
RELAZIONE GEOTECNICA. OLTRE A QUESTO REQUISITO MINIMO DI
COMPATTAZIONE, I TERRENI PORTANTI DEVONO MOSTRARE STABILITÀ ED
ESSERE PRIVI DI CONDIZIONI DI "POMPAGGIO".
12. AL DI SOTTO DELLE PAVIMENTAZIONI INDUSTRIALI, UN MODULO DI
DEFORMAZIONE DI 80MPA DEVE ESSERE RAGGIUNTO DOPO LA
COMPATTAZIONE DEL TERRENO; SONO RICHIESTE PROVE DI CARICO SU
PIASTRA ESEGUITE DA UN LABORATORIO AUTORIZZATO
13. LE PROVE DI CARICO SUI PALI DEVONO ESSERE ESEGUITE SEGUENDO I
REQUISITI DELLA NTC18, SEZIONE 6.4.3.7.2.
IL COLLAUDATORE DELL'EDIFICIO DURANTE L'ESECUZIONE DEI LAVORI E/O IL
DIRETTORE DEI LAVORI DECIDERÀ IL NUMERO E LA POSIZIONE DELLE PROVE,
MANTENENDO I REQUISITI DELLA NTC18 COME MINIMO.
IL PROGRAMMA DELLE PROVE RICHIESTO DAL COLLAUDATORE, CON
L'INDICAZIONE DELLA PROCEDURA DI CARICO E DELLE PRESTAZIONI PREVISTE
(DEFORMAZIONI, LIVELLI DI SOLLECITAZIONE, REAZIONE DEI VINCOLI, ECC:
- SOTTOPOSTO AL DIRETTORE DEI LAVORI PER LA REALIZZAZIONE;
- RESO NOTO AL PROGETTISTA, AFFINCHÉ POSSA VERIFICARNE LA
COMPATIBILITÀ CON IL PROGETTO STRUTTURALE;
- RESI NOTI ALL'APPALTATORE PER L'ACCETTAZIONE E L'ESECUZIONE.
GENERAL GENERALE FOUNDATION FONDAZIONE
1. SHOP DRAWINGS AND CALCULATIONS FOR ALL STOREFRONT SYSTEMS,
CANOPIES, AND SPECIALTY ENGINEERED BUILDING ELEMENTS MUST BE
SIGNED AND SEALED BY THE CURRENTLY REGISTERD SPECIALTY ENGINEER
RESPONSIBLE FOR THE DESIGN AT TIME OF SUBMISSION.
2. ALL SHOP DRAWINGS MUST BE REVIEWED AND STAMPED BY THE GENERAL
CONTRACTOR PRIOR TO SUBMITTAL.
3. THE GENERAL CONTRACTOR SHALL SUBMIT FOR ENGINEER REVIEW SHOP
DRAWINGS FOR THE FOLLOWING ITEMS
i. CONCRETE MIX DESIGNS.
ii. REINFORCING STEEL.
iii. EXPANSION & EPOXY ANCHORS.
iv. MECHANICAL EQUIPMENT AND TIE DOWNS, INCLUDING BUT NOT LIMITED TO
BURBS AND ISOLATION SPRINGS.
4. ITEMS MARKED WITH AN (*) SHALL HAVE SHOP DRAWINGS SIGNED AND
SEALED BY A LICENSED PROFESSIONAL ENGINEER.
5. MANUFACTURER'S LITERATURE: SUBMIT TWO COPIES OF MANUFACTURER'S
LITERATURE FOR ALL MATERIALS AND PRODUCTS USED IN CONSTRUCTION ON
THE PROJEC
1. I DISEGNI E I CALCOLI D'OFFICINA PER TUTTI I SISTEMI, TETTOIE ED
ELEMENTI EDILIZI SPECIALI INGEGNERIZZATI DEVONO ESSERE FIRMATI E
SIGILLATI DALL'INGEGNERE SPECIALIZZATO ATTUALMENTE REGISTRATO
RESPONSABILE DEL PROGETTO AL MOMENTO DELLA PRESENTAZIONE.
2. TUTTI I DISEGNI ESECUTIVI DEVONO ESSERE RIVISTI E TIMBRATI
DALL'APPALTATORE GENERALE PRIMA DELLA PRESENTAZIONE.
3. L'APPALTATORE GENERALE DEVE SOTTOPORRE ALL'ESAME
DELL'INGEGNERE I DISEGNI ESECUTIVI PER I SEGUENTI ELEMENTI
i. DISEGNI DI MISCELE DI CALCESTRUZZO.
ii. ACCIAIO DI RINFORZO.
iii. ESPANSIONE E ANCORAGGI EPOSSIDICI.
iv. EQUIPAGGIAMENTO MECCANICO E LEGAMI, INCLUSI, MA NON LIMITATI A
BURBS E MOLLE D'ISOLAMENTO.
4. GLI ARTICOLI SEGNATI CON UN (*) DEVONO AVERE DISEGNI ESECUTIVI
FIRMATI E SIGILLATI DA UN INGEGNERE PROFESSIONISTA AUTORIZZATO.
5. DOCUMENTAZIONE DEL PRODUTTORE: PRESENTARE DUE COPIE DELLA
DOCUMENTAZIONE DEL PRODUTTORE PER TUTTI I MATERIALI E PRODOTTI
UTILIZZATI NELLA COSTRUZIONE DEL PROGETTO
SUBMITALS CONSEGNE
1. CONTROL JOINTS SHALL BE SAWCUT AS SOON AS POSSIBLE WITHOUT
RAVELING CONCRETE (4 TO 16 HOURS AFTER PLACEMENT MAX)
2. WHERE TOP OF SLAB SURFACES ARE TO BE FINISHED WITH TILE, GENERAL
CONTRACTOR IS TO COORDINATE JOINT LOCATIONS WITH THAT OF MORTAR
JOINTS
3. VERIFY AND COOR'D "GROOVE DETAIL" AND ALL JOINT SEALANTS AS
APPLICABLE WITH FINAL APPROVED WATERPROOF MEMBRANE MANUF PRIOR
TO CONSTRUCTION IN ORDER TO MAINTAIN MANUF'S WARRANTY
4. MAX SPACING OF THE SAW CUT 3000 mm.
5. NO PIPES SHALL PASS THROUGHT OR UNDER COLUMN FOOTINGS ALL PIPES
SHALL BE INSTALLED PRIOR TO CONSTRUCTION OF FOOTING
6. FORM OPENINGS TO EXCLUDE CONCRETE AND CUT THE SLAB AFTER
CONCRETE HAS ATTAINED 75% OF ITS DESIGN STRENGTH. SEE DETAIL AND
SCHEDULE A1, S-529.
1. I GIUNTI DI CONTROLLO DEVONO ESSERE TAGLIATI CON LA SEGA IL PIÙ
PRESTO POSSIBILE, SENZA CHE IL CALCESTRUZZO SI SMUSSI (DA 4 A 16 ORE
AL MASSIMO DOPO IL GETTO).
2. QUANDO LA PARTE SUPERIORE DELLE SUPERFICI DEI SOLAI DEVE ESSERE
RIFINITA CON PIASTRELLE, L'APPALTATORE GENERALE DEVE COORDINARE LE
POSIZIONI DEI GIUNTI CON QUELLE DEI GIUNTI DI MALTA
3. VERIFICARE E COORDINARE IL "DETTAGLIO DELLA SCANALATURA" E TUTTI I
SIGILLANTI DEI GIUNTI, COME APPLICABILE, CON IL PRODUTTORE DELLA
MEMBRANA IMPERMEABILE APPROVATA IN VIA DEFINITIVA PRIMA DELLA
COSTRUZIONE, AL FINE DI MANTENERE LA GARANZIA DEL PRODUTTORE
4. DISTANZA MASSIMA DEI GIUNTI DI CONTROLLO 3000 mm.
5. NESSUN TUBO DEVE PASSARE ATTRAVERSO O SOTTO LE FONDAZIONI DELLE
COLONNE. TUTTI I TUBI DEVONO ESSERE INSTALLATI PRIMA DELLA GETTO
6. FORMARE APERTURE E TAGLIARE LA LASTRA DOPO CHE IL CALCESTRUZZO
HA RAGGIUNTO IL 75% DELLA SUA FORZA DI PROGETTO. VEDI DETTAGLIO E
PROGRAMMA A1, S-529.
CONSTRUCTION DETAILS DETTAGLI DI COSTRUZIONE
BEFORE THE EXECUTION OF THE WORK, THE CONTRACTOR HAS THE OBLIGATION TO CHECK
ALL THE QUOTAS AND MEASURES INDICATED IN THIS DRAWING.
ANY DIFFORMITIES MUST BE REPORTED TO THE DIRECTOR OF WORK.
C12/15 (Rck 15 MPa) C25/30 (Rck 30 MPa) C35/45 (Rck 45 MPa)
B450CSTEEL FOR REINFORCED CONCRETE AND WELDED MESH:
STEEL
LEAN CONCRETE
CONCRETE FOR FOUNDATION PILES
CONCRETE FOR FOUNDATION AND ELEVATION STRUCTURES
CONCRETE
CHARACTERISTIC YIELDING STRESS
CHARACTERISTIC BREAKING STRESS
MINIMUM PERCENTAGE STRETCH
BREAKING/YIELDING
450 MPa 540 MPa gtA 7.5 % tkf1.15 f yk/ 1.35
- GROUND SLAB
- EXTERNAL WALLS AND EXTERNAL SLABS
- CFA PILES (TO STIRRUPS)
- INTERNAL WALLS AND INTERNAL SLABS
- BEAMS (TO STIRRUPS)
- COLUMNS AND PIERS (TO PIES)
L s s s s
GENERAL NOTES
CONCRETE COVER
CONVENTIONS
THE INDICATED LENGTH OF THE BARS IS "OVERALL" (STANDARDS ISO/DIN 4066)
1) FOR FOUNDATIONS, PROVIDE A CLEANING POURING (LEAN CONCRETE) OF AT LEAST 10 cm, IF NOT OTHERWISE SPECIFIED.
2) OVERLAP THE REINFORCMENT BARS FOR AT LEAST 40 DIAMETERS, IF NOT OTHERWISE SPECIFIED.
3) THE REINFORCEMENT BARS MUST BE BENT TO THE ENDS AS INDICATED IN THE REFERENCE DRAWINGS.
4) THE REINFORCEMENT BARS WITH 90 ° BRACKETS MUST BE ATTACHED TO A
TRANSVERSAL BAR PREPARED ION PURPOSE OR BELONGING TO A CROSS BEAM
5) BEND CLOSING BRACKETS AT 135°
Mi n.1
0∅
5°
10∅ ∅
NOMINAL ACCEPTANCE ON SITE
f yk f tk min. 425 MPa max. 572 MPa
6.0 % tk1.13 yk/ 1.37f f
COLUMNS-BEAMS SLAB-WALLS
RESISTANCE CLASS EXPOSURE CLASS
X0
XC2
XC1-XC3
SLUMP W/C
S4
SCC
S5
Smin = 75mm Smin = 40mm Smin = 75mm Smin = 30mm Smin = 40mm Smin = 40mm
0,60 0,45
PRIMA DELL'ESECUZIONE DEI LAVORI L'APPALTATORE HA L'OBBLIGO DI VERIFICARE CHE TUTTE LE
QUOTE E LE MISURE RIPORTATE SU QUESTO DISEGNO. OGNI DIFFORMITÀ VA RIPORTATA AL
DIRETTORE DEI LAVORI.
C12/15 (Rck 15 MPa) C25/30 (Rck 30 MPa) C35/45 (Rck 45 MPa)
B450CACCIAIO PER CLS RINFORZATO CON MAGLIA ELETTROSALDATA:
ACCIAIO
CALCESTRUZZO MAGRO
CALCESTRUZZO PER PALI DI FONDAZIONE
CALCESTRUZZO PER FONDAZIONE E STRUTTURE IN ELEVAZIONE
CALCESTRUZZO
TENSIONE DI SNERVAMENTO CARATTERISTICA
TENSIONE DI ROTTURA CARATTERISTICA
PERCENTUALE MINIMA DI ALLUNGAMENTO
ROTTURA / SNERVAMENTO
450 MPa 540 MPa gtA 7.5 % tkf1.15 f yk/ 1.35
- SOLAIO SU TERRA
- MURI E SOLAI ESTERNI
- MURI E SOLAI ESTERNI
- MURI E SOLAI INTERNI
- TRAVI (ALLE STAFFE)
- COLONNE E PILASTRI
L s s s s
NOTE GENERALI
COPRIFERRO
CONVENZIONI
LA LUNGHEZZA INDICATA SULLE BARRE È "TUTTO FUORI" (STANDARDS ISO/DIN 4066)
1) PER FONDAZIONI, PREVEDERE UNA GETTO (MAGRONE) DI ALMENO 10cm. SE NON DIVERSAMENTE SPECIFICATO
2) SOVRAPPORE LE BARRE DI RINFORZO PER ALMENO 40 DIAMETRI, SE NON DIVERSAMENTE SPECIFICATO
3) LE BARRE DI RINFORZO DEVONO ESSERE PIEGATE ALLE ESTREMITÀ COME INDICATO SUI DISEGNI DI RIFERIMENTO
4) LE BARRE DI RINFORZO CON PIEGHE A 90° DEVONO ESSERE ATTACCATE AD
UNA BARRA TRASVERSALE APPOSITA O APPARTENTENTE AD UNA TRAVE INCROCIATA
5) CHIUSURA SUPPORTI A 135°
Mi n.1
0∅
5° 10∅ ∅
NOMINALE ACCETTAZIONE IN CANTIERE
f yk f tk min. 425 MPa max. 572 MPa
6.0 % tk1.13 yk/ 1.37f f
COLONNE-TRAVI SOLAIO-MURI
CLASSE DI
RESISTENZA
CLASSE DI
ESPOSIZIONE
X0
XC2
XC1-XC3
SLUMP W/C
S4
SCC
S5
Smin = 75mm Smin = 40mm Smin = 75mm Smin = 30mm Smin = 40mm Smin = 40mm
0,60 0,45
M
AR
K D A
TE
D
ES
C R
IP
TI
O N
A
B
C
D
A/E INFO
SEAL
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
D E P A R
TM
E N T O F
TH
E
N A V Y
N A V A L F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N O
RF
O
LK
VA
VI
LL
AG
GI
O
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
A
TL
A N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DRAWFORM REVISION: 25 AUGUST 2020
OF
EPROJECT NO.:
1 2 3 4 5
A
B
C
D
1 2 3 4 5
A P P R
D E S C R
IP
TI
O N
S Y M
P L O
TT
E D
H
AM
P
TO
N B
LV
D
VI
C
EN
ZA
IT
AL
Y
P-
0 A
RM
Y
FA
MI
LY
H
OU
SI
NG
P
RO
JE
CT
AECOM
10 S. Jefferson Street, Suite 1600 Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
1632846
N33191-15-D-0811
CCA/MPO
DER
R. STEPHENS, PE
DPS
AS NOTED
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
2 JUNE 2021
F
IL
E
P A
TH
A U
TH
O R
:5 :3
IDB MHAGM
S
TR
U C
TU
R
A L
G E
N E
R A
L N
O
TE
S N
O
TE
G E
N E
R A
LI
S
TR
U
TT
U
R E
S-003
14091930
A G M
V ic e n z a
A F H p h a s e
P S
IT
E S .r vt
1. CONCRETE TO BE IN ACCORDANCE WITH ACI 318-19/318R-19 "BUILDING CODE
REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY". D.M.,
CONSTRUCTION CODE (17 JANUARY 2018) “NORME TECNICHE PER LE
COSTRUZIONI”.
2. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE WITH STANDARD
ACCESSORIES WHILE PLACING CONCRETE. IF REQUIRED, ADDITIONAL BARS
OR STIRRUPS SHALL BE PROVIDED BY CONTRACTOR TO FURNISH SUPPORT
FOR ALL BARS
3. CONCRETING SHOULD BE CARRIED ON AT SUCH A RATE THAT THE
CONCRETE IS AT ALL TIMES PLASTIC.
4. CONCRETE STRENGTH
GROUND SLABS, FOUNDATION WALLS C35/45-f'c=35 MPa.
BUILDING FRAME MEMBERS C35/45-f'c=35 MPa.
CFA PILES C25/30-f'c=25 Mpa
5. CFA PILES SHALL BE A SCC (SELF COMPACTING CONCRETE).
6. ARRANGE A HYDRO-EXPANDING BENTONITE JOINT TO SEAL THE CASTING
JOINTS (BETWEEN FOUNDATION AND ELEVATION).
7. PARTIALLY HARDENED CONCRETE, CONTAMINATED CONCRETE,
RE-TEMPERED CONCRETE, AND CONCRETE THAT HAS BEEN RE-MIXED AFTER
IT HAS TAKEN ITS INITIAL SET ARE NOT TO BE USED IN NEW CONCRETE
PLACEMENT.
8. ALL DEFORMED REINFORCING STEEL SHALL BE CLEAN AND FREE OF MUD,
OIL, RUST, AND OTHER COATINGS THAT WOULD IMPAIR PROPER BOND TO
CONCRETE. ALL REINFORCING STEEL SHALL BE CONFORMING TO ITALIAN
PRESCRIPTIONS WITH REGARDS STEEL TYPE B450C (DM 17/01/ 18) HAVING
YIELD STRENGTH OF 450 MPa.
9. COVER FOR REINFORCEMENT SHALL BE AS FOLLOWS:
GROUND SLAB 75mm – XC3 EXTERNAL WALLS AND EXTERNAL SLABS 40mm – XC3 CFA PILES 75mm – XC2 INTERNAL WALLS AND INTERNAL SLABS 30mm – XC1 BEAMS (TO STIRRUPS) 40mm – XC1-XC3 COLUMNS AND PIERS (TO TIES) 40mm – XC1-XC3
10. ALL WELDED WIRE REINFORCING SHALL CONFORM TO ASTM A-1064 AND
NTC 2018, LAP SPLICE 25mm
11. DETAIL ALL REINFORCEMENT IN ACCORDANCE WITH ACI 315/ NTC 2018
12. SPLICES IN ALL REINFORCING SHALL BE CLASS B AS CALCULATED PER ACI
318/NTC 2018 AND AS SHOWN ON THESE DWGS, WHICHEVER IS GREATER.
13. REBAR SHALL BE CONTINUOUS AROUND ALL CORNERS AND
INTERSECTIONS OF WALLS, BEAMS, AND FOOTINGS. PROVIDE CORNER BARS
AS REQUIRED.
14. CHAMFER 20mm ALL EDGES OF EXPOSED CONCRETE, UON.
15. USE TABLE #1 FOR REINFORCING WHEN CLEAR CONCRETE COVER IS NOT
LESS THAN ONE (1) BAR DIAMETER (20 mm) AND CLEAR BAR SPACING IS NOT
LESS THAN TWO (2) BAR DIAMETERS. IN ALL OTHER CASES, MULTIPLY THE
TABLE VALUES BY 1.5. THE TABLE VALUES MAY BE REDUCED BY MULTIPLYING
THE VALUES BY 1.5 AND THEN DIVIDING THE PRODUCTS BY RATIO OF
ONE-HALF CENTER TO CENTER BAR SPACING TO BAR DIAMETER OR RATIO OF
BAR CENTER TO SURFACE OF CONCRETE DISTANCE TO BAR DIAMATER,
WHICHEVER GIVES SMALLER RATIO. THE RATIO SHALL NOT BE TAKEN LESS
THAN 2.5. IN NO CASE LAP AND ANCH LENGTH SHALL BE LESS THAN 305mm.
16. WELDED WIRE FABRIC THE MESH SHALL BE MADE WITH WIRES OF ϕ10 DIAMETER WITH YIELDING 450 Mpa
17. FOR BUNDLED BARS MULTIPLY THE TABLE VALUES BY: 1.2 (3 BAR BUNDLE),
1.33 (4 BAR BUNDLE).
18. (MC) DENOTES MECHANICAL COUPLER DEVELOPING 125% OF THE BAR
YIELD STRENGTH. NO OTHER SPLICE WILL BE ACCEPTED.
19. WHEN LAPPING TWO DIFFERENT SIZE BARS, USE THE LAP DIMENSION OR
THE ANCHORAGE DIMENSIONS OF THE LARGER BAR.
20. MECHANICAL SPLICES MAY BE PROVIDED AS A CONTRACTOR OPTION;
PROVIDED THE MECHANICAL COUPLERS ARE CAPABLE OF DEVLOPING 125%
OF THE BAR YIELD STRENGTH.
21. REINFORCED CONCRETE WORK FOR WATER STORAGE TANK IN
ACCORDANCE WITH "CODE REQUIREMENTS FOR ENVIRONMENTAL
STRUCTURE (ACI 350-06)". WATER STORAGE TANKS INSTALLED AND TESTED IN
ACCORDANCE WITH THE AMERICAN CONCRETE INSTITUTE (ACI)
"SPECIFICATION FOR THE TIGHTNESS TESTING OF ENIRONMENTAL ENGINEERS
CONCRETE CONTAINMNET STRUCTURES - ACI 350.1M" (2006).
22. SHRINKAGE TEST FOR CONCRETE MIXES PERFORMED FOR WATER
CONTAINMENT STRUCTURES IN ACCORDANCE WITH ASTM C157/C157M
23. CONTROL/CONTRACTION JOINTS ARE NOT PERMITTED IN WATER
CONTAINMENT STRUCTURES. LIMIT CONSTRUCTION JOINT SPACING TO 12000
mm OR LESS IN SLABS AND WALLS OF WATER CONTAINMENT STRUCTURES
21. LAVORI IN CALCESTRUZZO ARMATO PER SERBATOI DI STOCCAGGIO
DELL'ACQUA IN CONFORMITÀ CON I "REQUISITI DEL CODICE PER LE
STRUTTURE AMBIENTALI (ACI 350-06)". SERBATOI DI STOCCAGGIO DELL'ACQUA
INSTALLATI E TESTATI SECONDO L'AMERICAN CONCRETE INSTITUTE (ACI)
"SPECIFICHE PER LA PROVA DI TENUTA DELLE STRUTTURE DI CONTENIMENTO
IN CALCESTRUZZO DEGLI INGEGNERI AMBIENTALI - ACI 350.1M" (2006).
22. PROVA DI RITIRO PER MISCELE DI CALCESTRUZZO ESEGUITE PER
STRUTTURE DI CONTENIMENTO DELL'ACQUA SECONDO ASTM C157/C157M
23. I GIUNTI DI CONTROLLO/CONTRAZIONE NON SONO AMMESSI NELLE
STRUTTURE DI CONTENIMENTO DELL'ACQUA. LIMITARE LA DISTANZA DEI
GIUNTI DI COSTRUZIONE A 12000 mm O MENO NEI PIATTI E NELLE PARETI DELLE
STRUTTURE DI CONTENIMENTO DELL'ACQUA
1. IL CALCESTRUZZO DEVE ESSERE CONFORME ALL'ACI 318-19/318R-19
"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND
COMMENTARY". D.M., CODICE DELLE COSTRUZIONI (17 GENNAIO 2018) "NORME
TECNICHE PER LE COSTRUZIONI".
2. TUTTE LE ARMATURE DEVONO ESSERE SALDAMENTE TENUTE IN POSIZIONE
CON ACCESSORI STANDARD DURANTE LA POSA DEL CALCESTRUZZO. SE
NECESSARIO, BARRE O STAFFE AGGIUNTIVE SARANNO FORNITE
DALL'APPALTATORE PER FORNIRE SUPPORTO A TUTTE LE BARRE.
3. IL GETTO DEVE ESSERE EFFETTUATO A UN RITMO TALE CHE IL
CALCESTRUZZO SIA SEMPRE PLASTICO.
4. RESISTENZA DEL CALCESTRUZZO
SOLAIO PIANO TERRA, PARETI E FONDAZIONE C35/45-f'c=35 MPa.
ELEMENTI DELLA STRUTTURA C35/45-f'c=35 MPa.
PALI CFA C25/30-f'c=25 Mpa.
5. I PALI CFA DEVONO ESSERE GETTATI CON SCC (CALCESTRUZZO
AUTOCOMPATTANTE)
6. DISPORRE UN GIUNTO DI BENTONITE IDROESPANDIBILE PER SIGILLARE I
GIUNTI DI GETTO (TRA LA FONDAZIONE E L'ELEVAZIONE).
7. IL CALCESTRUZZO PARZIALMENTE INDURITO, IL CALCESTRUZZO
CONTAMINATO, IL CALCESTRUZZO RINVENUTO E IL CALCESTRUZZO CHE È
STATO RIMESCOLATO DOPO LA SUA PRESA INIZIALE NON DEVONO ESSERE
UTILIZZATI PER LA POSA DI NUOVO CALCESTRUZZO.
8. TUTTE LE ARMATURE PIEGATE DOVRANNO ESSERE PULITE E PRIVE DI
FANGO, OLIO, RUGGINE E ALTRI RIVESTIMENTI CHE POSSANO
COMPROMETTERE LA CORRETTA ADESIONE AL CALCESTRUZZO. TUTTO
L'ACCIAIO D'ARMATURA DEVE ESSERE CONFORME ALLE PRESCRIZIONI
ITALIANE PER QUANTO RIGUARDA L'ACCIAIO TIPO B450C (DM 17/01/18) CHE HA
UNA RESISTENZA ALLO SNERVAMENTO DI 450 MPa.
9. I COPRIFERRI PER L'ARMATURA SONO I SEGUENTI:
FONDAZIONI 75mm - XC3 MURI ESTERNI E PIASTRE ESTERNE 40mm - XC3 PALI CFA 75mm - XC2 PARETI E SOLAI INTERNI 30mm - XC1 TRAVI (DALLA STAFFA) 40mm - XC1-XC3 COLONNE E PILASTRI (DALLA STAFFA) 40mm - XC1-XC3
10. TUTTE LE RETI ELETTROSALDATE DEVONO ESSERE CONFORMI ALLE ASTM
A-1064 E NTC 2018, SOVRAPPOSIZIONE 25mm
11. DETTAGLIARE TUTTE LE ARMATURE IN CONFORMITÀ CON ACI 315/ NTC 2018
12. LE GIUNZIONI IN TUTTO IL RINFORZO DEVONO ESSERE DI CLASSE B COME
CALCOLATO PER ACI 318/NTC 2018 E COME MOSTRATO SU QUESTI DISEGNI,
QUALUNQUE SIA IL MAGGIORE.
13. L'ARMATURA DEVE ESSERE CONTINUA INTORNO A TUTTI GLI ANGOLI E LE
INTERSEZIONI DI MURI, TRAVI E PIEDRITTI. FORNIRE BARRE D'ANGOLO COME
RICHIESTO.
14. SMUSSARE 20mm TUTTI I BORDI DEL CALCESTRUZZO ESPOSTO, SE NON
ALTRIMENTI SPECIFICATO.
15. UTILIZZARE LA TABELLA N. 1 PER IL RINFORZO QUANDO LA COPERTURA DEL
CALCESTRATO NON È INFERIORE A UN (1) DIAMETRO DI BARRA (20 mm) E LA
DISTANZA DELLE BARRE NON È INFERIORE A DUE (2) DIAMETRI DI BARRA. IN
TUTTI GLI ALTRI CASI, MOLTIPLICARE I VALORI DELLA TABELLA PER 1,5. I VALORI
DELLA TABELLA POSSONO ESSERE RIDOTTI MOLTIPLICANDO I VALORI PER 1,5 E
POI DIVIDENDO I PRODOTTI PER IL RAPPORTO TRA LA DISTANZA DA CENTRO A
CENTRO DELLA BARRA E IL DIAMETRO DELLA BARRA O IL RAPPORTO TRA IL
CENTRO DELLA BARRA E LA SUPERFICIE DEL CALCESTRUZZO E IL DIAMETRO
DELLA BARRA, QUALUNQUE SIA QUELLO CHE DÀ IL RAPPORTO MINORE. IL
RAPPORTO NON DEVE ESSERE MINORE A 2,5. IN NESSUN CASO LA LUNGHEZZA
DEI GIUNTI E DEGLI ANCORAGGI DEVE ESSERE INFERIORE A 305mm.
16. LA RETE ELETTROSALDATA DEVE ESSERE FATTA CON BARRE DI DIAMETRO
ϕ10 CON RESISTENZA 450 Mpa
17. PER LE BARRE IN FASCIO MOLTIPLICARE I VALORI DELLA TABELLA PER: 1,2
(FASCIO DI 3 BARRE), 1,33 (FASCIO DI 4 BARRE).
18. (MC) INDICA UN ACCOPPIAMENTO MECCANICO CHE SVILUPPA IL 125% DEL
CARICO DI SNERVAMENTO DELLA BARRA. NESSUN'ALTRA GIUNZIONE SARÀ
ACCETTATA.
19. QUANDO SI SOVRAPPONGONO DUE BARRE DI DIMENSIONI DIVERSE,
UTILIZZARE LA DIMENSIONE DI SOVRAPPOSIZIONE O LE DIMENSIONI DI
ANCORAGGIO DELLA BARRA PIÙ GRANDE.
20. GLI ANCORANTI MECCANICI POSSONO ESSERE FORNITI COME OPZIONE
DELL'APPALTATORE; A CONDIZIONE CHE GLI ANCORANTI MECCANICI SIANO IN
GRADO DI SVILUPPARE IL 125% DEL CARICO DI SNERVAMENTO DELLA BARRA.
MINIMUM LAP SPLICE AND ANCHORAGE DIMENSION TABLE
BAR DIAMETER (mm) 8 10 12 16 20 32 40
DEVELOPMENT LENGTH 320 400 470 630 790 1550 1940
LAP LENGTH 450 560 670 890 1120 1780 2230
TABLELLA DELLE DIMENSIONI MINIME DI GIUNZIONE E DI ANCORAGGIO
DIAMETRO DELLA BARRA (mm) 8 10 12 16 20 32 40
LUNGHEZZA DI SVILUPPO 320 400 470 630 790 1550 1940
LUNGHEZZA DI SOVRAPPOSIZIONE 450 560 670 890 1120 1780 2230
CONCRETE CALCESTRUZZO
1. C12/15 LEAN CONCRETE
2. C35/45 MINIMUM CEMENT CONTENT 360 KG/MC TABLE 4/ UNI 11104 W/C RATIO
0,45 SLUMP S5 FOR STRUCTURES
3. C25/30 MINIMUM CEMENT CONTENT 300 KG/MC TABLE 4/ UNI 11104 W/C RATIO
0,60 SCC FOR PILES
1. C12/15 CALCESTRUZZO MAGRO
2. C35/45 CONTENUTO MINIMO DI CALCESTRUZZO 360 KG/MC TABELLA 4/ UNI
11104 RAPPORTO A/C 0,45 SLUMP S5 PER STRUTTURE
3. C25/30 CONTENUTO MINIMO DI CALCESTRUZZO 300 KG/MC TABELLA 4/ UNI
11104 RAPPORTO A/C 0,60 SCC PER PALI
NOTA MATERIALI
MATERIAL NOTES
WATER TANK /
SERBATOIO IDRICO 17.5 800 1’180 255 400 35
TOWNHOUSES 16 600 860 249 300-350 70
APARTMENTS 16 600 860 249 300-350 70
PUMP HOUSE /
STAZIONE DI POMPAGGIO 17.5 600 760 131 350 70
STRUCTURE/
STRUTTURA L(M) D(MM) Q (KN) H (KN) kV MN/M kH MN/M
DRAINED /
DRENATO
UNDRAINED /
NON DRENATO
IRRIGATION TANK/
SERBATOIO PER IRRIGAZIONE 5.5 5.5 214 82 2000
SUBSTATIONS/
SOTTOSTAZIONI 5.0 9.5 201 76 1800
STRUCTURE/
STRUTTURA B(M) L(MM)
qALL(KPA) kV KPA/M
FINE SILTY SAND/
SABBIA FINE LIMOSA 10.50 ff - 19.00 34
CLAY OR SILTY CLAY/
ARGILLA O ARGILLA LIMOSA 29.50 27.50 2.00 3.00 2.00 19.50 28
SILTY CLAY/
ARGILLA LIMOSA 27.50 25.50 2.00 5.00 1.00 19.00 28
(M ASL/
M SLM)
(M ASL/
M SLM) (M) (M BGL/
M DA PC) (kN/mc) (°)
MAT/
PLATEA 30.50 29.50 1.00 1.00
FINE SILTY SAND/
SABBIA FINE LIMOSA 17.50 11.50 6.00 19.00 10÷15 19.00 34
SILTY CLAY/
ARGILLA LIMOSA 11.50 10.50 1.00 20.00 - 19.00 30
FINE SILTY SAND/
SABBIA FINE LIMOSA 22.50 20.50 2.00 10.00 3÷4 19.00 30
SILTY CLAY/
ARGILLA LIMOSA 20.50 19.50 1.00 11.00 1÷2 19.00 28
PEAT/
TORBA 19.50 19.40 0.10 11.10 0.7÷0.8 17.00 24
SILTY CLAY/
ARGILLA LIMOSA 19.40 17.50 1.90 13.00 1÷2 19.00 28
PEAT/
TORBA 25.50 25.40 0.10 5.10 0.7÷0.8 17.00 24
SILTY CLAY/
ARGILLA LIMOSA 25.40 22.50 2.90 8.00 1.00 19.00 28
DESCRIPTION/
DESCRIZIONE
LAYERS/
STRATI
SOIL RESISTANCE/
RESISTENZE DEL TERRENO
FROM/
DA
TO/
A
THICKNESS/
SPESSORE
DEPTH/
PRFONDITA' qc Ƴ ϕ'
SANDY SILT/
LIMO SABBIOSO 10.50 9.50 1.00 22.00 5÷10 19.00 30
(M ASL /
M SLM)
(M ASL /
M SLM) (M) (M BGL /
M DA PC) (kN/mc) (°)
MAT/
PLATEA 31.50 30.50 1.00 1.00
FINE SILTY SAND/
SABBIA FINE LIMOSA 15.50 11.50 4.00 20.00 8÷12 19.00 34
SILTY CLAY/
ARGILLA LIMOSA 11.50 10.50 1.00 21.00 1÷1.5 19.00 28
FINE SILTY SAND/
SABBIA LIMOSA FINE 27.00 21.50 5.50 10.00 8÷12 19.00 34
SILTY CLAY/
ARGILLA LIMOSA 21.50 15.50 6.00 16.00 1÷1.5 19.00 28
SANDY SILT OR SILTY CLAY OR SILTY
SAND/
LIMO SABBIOSO O SABBIA LIMOSA
30.50 29.00 1.50 2.50 2÷3 19.00 28
29.00 27.00 2.00 4.50 1÷2 19.00 28
DESCRIPTION /
DESCRIZIONE
LAYERS /
STRATI
SOIL RESISTANCE /
RESISTENZE DEL TERRENO
FROM /
DA
TO /
A
THICKNESS /
SPESSORE
DEPTH /
PRFONDITA'
qc ɣ ϕ'
SANDY SILT/
LIMO SABBIOSO 10.50 9.50 1.00 22.00 5÷10 19.00 30
(M ASL /
M SLM)
(M ASL /
M SLM) (M) (M BGL /
M DA PC) (kN/mc) (°)
MAT/
PLATEA 31.50 31.00 0.50 1.00
FINE SILTY SAND/
SABBIA FINE LIMOSA 15.50 11.50 4.00 20.00 8÷12 19.00 34
SILTY CLAY/
ARGILLA LIMOSA 11.50 10.50 1.00 21.00 1÷1.5 19.00 28
FINE SILTY SAND/
SABBIA LIMOSA FINE 27.00 21.50 5.50 10.00 8÷12 19.00 34
SILTY CLAY/
ARGILLA LIMOSA 21.50 15.50 6.00 16.00 1÷1.5 19.00 28
SANDY SILT OR SILTY CLAY OR SILTY
SAND/
LIMO SABBIOSO O SABBIA LIMOSA
31.00 29.00 2.00 2.50 2÷3 19.00 28
29.00 27.00 2.00 4.50 1÷2 19.00 28
DESCRIPTION /
DESCRIZIONE
LAYERS /
STRATI
SOIL RESISTANCE /
RESISTENZE DEL TERRENO
FROM /
DA
TO /
A
THICKNESS /
SPESSORE
DEPTH /
PRFONDITA'
qc ɣ ϕ'
M
AR
K D A
TE
D
ES
C R
IP
TI
O N
A
B
C
D
A/E INFO
SEAL
DES DRW CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
D E P A R
TM
E N T O F
TH
E
N A V Y
N A V A L F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
N O
RF
O
LK
VA
VI
LL
AG
GI
O
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
A
TL
A N
TI
C
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DRAWFORM REVISION: 25 AUGUST 2020
OF
EPROJECT NO.:
1 2 3 4 5
A
B
C
D
1 2 3 4 5
A P P R
D E S C R
IP
TI
O N
S Y M
P L O
TT
E D
H
AM
P
TO
N B
LV
D
VI
C
EN
ZA
IT
AL
Y
P-
0 A
RM
Y
FA
MI
LY
H
OU
SI
NG
P
RO
JE
CT
AECOM
10 S. Jefferson Street, Suite 1600 Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
1632846
N33191-15-D-0811
CCA/MPO
DER
R. STEPHENS, PE
DPS
AS NOTED
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
2 JUNE 2021
F
IL
E
P A
TH
A U
TH
O R
:5 :3
IDB MHAGM
S
TR
U C
TU
R
A L
G E
N E
R A
L N
O
TE
S N
O
TE
G E
N E
R A
LI
S
TR
U
TT
U
R E
S-004
14091931
A G M
V ic e n z a
A F H p h a s e
P S
IT
E S .r vt
PILES FOUNDATION NOTES
1. CARRY OUT CONTINUOUS FLIGHT AUGER PILE (CFA) WITH THE DIAMETER,
DISTRIBUTION AND DEPTH SHOWN ON STRUCTURAL DRAWINGS
2. PREVIOUS TO DRILLING COMMENSING CLEAN THE GROUND SURFACE,
INSTALLING EXTERNAL REFERENCES THAT ALLOW THE CORRECT LAYOUT OF
THE PILE MESH, WITH TOLERANCE OF +75MM. REMOVED ANY OBSTACLE AS
WELL AS ANY EXISTING PAVED SURFACES
3. PREVIOUS TO DRILLING, PLACE THE STRUCTURAL FILL LAYER WITH THE
SAME DIMENSIONS AS SHOWN IN DRAWINGS
4. THE INFERRED GROUND CONDITIONS SHALL BE CONFIRMED ON SITE
THROUGH MAPPING AND INSPECTIONS BY SUITABLY QUALIFIED
GEOTECHNICAL ENGINEERS AND/OR ENGINEERING GEOLOGISTS.
DISCREPANCIES SHALL BE REPORTED TO THE DESIGNER AND THE ENGINEER
IMMEDIATELY
5. PILES WITHIN FOUR PILE DIAMETERS SPACING SHOULD NOT BE INSTALLED
WITHIN 12 HOURS OF ONE ANOTHER TO ALLOW THE INITIAL SET-UP OF THE
GROUT TO TAKE PLACE. THE GROUT SHOULD HAVE A FLUIDIFIER TO INHIBIT
EARLY SET-UP, ELIMINATE SHRINKAGE, DECREASE BLEEDING, AND INCREASE
FLUIDITY
NOTE SUI PALI DI FONDAZIONE
1. REALIZZARE PALI AD ELICA CONTINUA (CFA) AVENTI DIAMETRO, DISPOZIONE
IN PIANTA E PROFONDITA’ MOSTRATE NEI DISEGNI STRUTTURALI
2. PRIMA DI INIZIARE LE PERFORAZIONI, PULIRE IL PIANO CAMPAGNA,
INSTALLARE RIFERIMENTI ESTERNI CHE CONSENTONO LA CORRETTA
DISPOSIZIONE DELLA MAGLIA DI PALI, CON TOLLERANZA DI +75MM.
RIMUOVERE OGNI OSTACOLO E OGNI SUPERFICIE PAVIMENTATA.
3. PRIMA DI INIZIARE LE PERFORAZIONI, POSARE LO STRATO DI RIEMPIMENTO
STRUTTURALE COME DA DIMENSIONI MOSTRATE NEI DISEGNI.
4. LE CONDIZIONI DEL TERRENO DEDOTTE DEVONO ESSERE CONFERMATE IN
SITO ATTRAVERSO MAPPATURA E ISPEZIONI EFFETTUATE DA PARTE DI
INGEGNERI GEOTECNICI E/O GEOLOGI TECNICI ADEGUATAMENTE
QUALIFICATI. LE DISCREPANZE DEVONO ESSERE COMUNICATE
TEMPESTIVAMENTE AL PROGETTISTA E ALL'INGEGNERE.
5. PALI AVENTI SPAZIATURA FINO A QUATTRO DIAMETRI NON DEVONO ESSERE
INSTALLATI ENTRO 12 ORE L'UNO DALL'ALTRO PER CONSENTIRE LA PRESA
INIZIALE DEL GETTO. IL GETTO DOVRA’ AVERE UN FLUIDIFICANTE PER INIBIRE
LA PRESA PRECOCE, ELIMINARE IL RITIRO, RIDURRE LE PERDITE E
AUMENTARE LA FLUIDITÀ.
EXCAVATIONS AND BACKFILLING
1. TEMPORARY EXCAVATIONS LESS THAN 6M IN DEPTH MUST BE SLOPED NO
STEEPER THAN 1.5H:1V (HEIGHT TO DEPTH RATIO) OR MUST BE BENCHED
SAFELY ACCORDING TO THE OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) GUIDELINES AND LOCAL CODE REQUIREMENTS.
TEMPORARY EXCAVATION SUPPORT WILL BE REQUIRED FOR EXCAVATIONS
GREATER THAN 6M DEEP OR IF EXCAVATIONS LESS THAN 6M DEEP CANNOT
BE SLOPED OR BENCHED SAFELY. ALL EXCAVATIONS SHOULD BE
PERFORMED IN ACCORDANCE WITH OSHA AND LOCAL REQUIREMENTS
2. ALL NEW COMPACTED STRUCTURAL FILL AND BACKFILL SHOULD BE PLACED
IN LOOSE LIFTS NOT EXCEEDING 203 MM (8 IN) IN THICKNESS AND SHOULD BE
COMPACTED TO AT LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY, IN
ACCORDANCE WITH ASTM D 698. THE SUITABILITY OF THE ONSITE SOILS FOR
REUSE AS FILL AND BACKFILL SHOULD BE DETERMINED BY THE
GEOTECHNICAL ENGINEER DURING CONSTRUCTION. REUSE OF EXCAVATED
SOIL IS ALLOWED ONLY IF THE PRESCRIPTIONS DICTATED BY ITALIAN D.LGS
152/06 AND DPR 120/2017 ARE MET
DEEP FOUNDATION DESIGN /
PROGETTO DELLE FONDAZIONI PROFONDE
1. ALLOWABLE BEARING CAPACITY AND SUBGRADE REACTION MODULI ARE SHOWN IN
THE FOLLOWING TABLE /
CAPACITA’ PORTANTE DI PROGETTO E MODULI DI REAZIONE DEL PIANO DI POSA
DELLA FONDAZIONE SONO MOSTRATI NELLA SEGUENTE TABELLA:
SHALLOW FOUNDATION DESIGN /
PROGETTO DELLE FONDAZIONI SUPERFICIALI
1. ALLOWABLE BEARING CAPACITY AND SUBGRADE REACTION MODULI ARE SHOWN IN
THE FOLLOWING TABLE /
CAPACITA’ PORTANTE DI PROGETTO E MODULI DI REAZIONE DEL PIANO DI POSA DELLA
FONDAZIONE SONO MOSTRATI NELLA SEGUENTE TABELLA
GEOLOGICAL PROFILE AND GROUNDWATER /
MODELLO GEOLOGICO E FALDA
1. ASSUMED GEOLOGICAL PROFILE AND EXISTING GROUND WATER TABLE ARE BASED ON "GEOTECHNICAL INVESTIGATION REPORT – PHASE 1-4” AND ADDENDUMS PREPARED BY AECOM DATED 5TH OF APRIL 2021 AND SHOWN IN THE FOLLOWING TABLES /
I PROFILI GEOLOGICI E IL LIVELLO DI FALDA ESISTENTE ASSUNTI SONO BASATI SUL DOCUMENTO "GEOTECHNICAL INVESTIGATION REPORT – PHASE 1-4” E ADDENDUM PREPARATI DA AECOM, DATATI 5 APRILE 2021 E SONO RIPORTATI NELLE SEGUENTI TABELLE:
APARTMENTS, TOWNHOUSES, SUBSTATIONS AND WATER IRRIGATION TANK /
APARTMENTS, TOWNHOUSES, SOTTOSTAZIONI E SERBATOIO PER IRRIGAZIONE
WATER TANK /
SERBATOIO IDRICO
SCAVI E RIEMPIMENTO
1. GLI SCAVI TEMPORANEI PROFONDI MENO DI 6M DEVONO ESSERE INCLINATI
CON PENDENZA NON SUPERIORE A 1,5H:1V (RAPPORTO TRA ALTEZZA E
PROFONDITÀ) O DEVONO ESSERE RIPROFILATI NEL RISPETTO DELLE
DIRETTIVE DELL'AMMINISTRAZIONE PER LA SICUREZZA E LA SALUTE SUL
LAVORO (OSHA) E LE PRESCRIZIONI DELLA NORMATIVA LOCALE. PER GLI
SCAVI PIU’ PROFONDI DI 6 M O GLI SCAVI MENO PROFONDI DI 6 MCHE NON
POSSONO ESSERE RIPROFILATI IN SICUREZZA SONO RICHIESTI DEI SUPPORTI
TEMPORANEI. TUTTI GLI SCAVI DEVONO ESSERE EFFETTUATI IN CONFORMITÀ
AI REQUISITI OSHA E LOCALI.
2. TUTTI I NUOVI RIEMPIMENTI COMPATTATI, STRUTTURALI E NON, DEVONO
ESSERE POSATI IN STRATI SCIOLTI DI SPESSORE NON SUPERIORE A 203MM (8
IN) E DEVONO ESSERE COMPATTATI AD ALMENO IL 95% DELLA MASSIMA
DENSITA’ SECCA, IN ACCORDO CON LE ASTM D 698. L’ IDONEITA’ AL
RIUTILIZZO DEL TERRENO PRESENTE IN SITO COME RIEMPIMENTO DEVE
ESESRE DETERMINATA DAL INGEGNERE GEOTECNICO DURANTE
L’ESECUZIONE DEI LAVORI. IL RIUTILIZZO DEL TERRENO SCAVATO E’
CONSENTITO SOLAMENTE SE SONO RISPETTATE LE PRESCRIZIONI…