This is an amendment to a solicitation for design-build construction services for Phase 2 of the Family Housing Villaggio at Vicenza, Italy project.
The amendment extends the proposal due date to February 7, 2022, provides responses to pre-proposal inquiries, and revises the solicitation and specifications. It seeks a firm fixed price contract not to exceed $73,050,000 for construction including site work, utilities, buildings, landscaping, and associated construction. The Naval Facilities Engineering Command is the contracting agency. Revisions include updates to specifications and drawings for various aspects of the construction.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILCON PROJECT P-91330, PHASE 2 FAMILY HOUSING VILLAGIO AT VICENZA, ITALY
Please see Section SF 30 Block 14 Continuation Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Dec-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247021R0015
X 9B. DATED (SEE ITEM 11)
27-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Dec-2021
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247021R0015
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is for the following items:
1. Extend the proposal due date
2. Responses to Pre-Proposal Inquiries (PPIs)
3. Solicitation Revisions
4. Specification and Drawing Revisions
5. Provide Attachments
1. The proposal due date is extended from Friday, 07 January 2022 at 2:00 PM Eastern Standard Time to Monday, 07 February 2022 at 2:00 PM Eastern Standard Time.
2. Responses to PPIs 2 Solicitation Given that the site visit is happening on
November 15, we would like to request a 2 weeks extension to be able to provide the Government with a more competitive proposal.
See previous amendments extending proposal due date.
3 14 i Factor 3 With reference to Factor 3 - Past Performance, Paragraph (i) Solicitation Submittal Requirements, confirmation is requested that PPQs related to projects already submitted in previous RFPs may be submitted and included in the bid for this RFP.
The Solicitation already addresses this question.
Propose in accordance with the Solicitation.
4 Dear Sirs, we would like to draw your attention to the following:
- the site visit was conducted on November 15th, this means offerors could have gotten some potentially important information very close to the deadline; this is even more significant if we consider that we envisage 4/5 working days for shipping time only;
- the current Italian market situation makes it difficult and complicated to obtain quotations from suppliers, and the response/delivery times are longer than expected due to an increased volume of works boosted by Italian Government incentives;
- additional time is necessary in order to submit an accurate and competitive economical / technical offer for a building project of such magnitude.
See previous amendments extending proposal due date.
In consideration of the above we would respectfully request an extension of the deadline to submit the proposals of three weeks, i.e. from December 6 to December 27.
We appreciate your attention and truly hope that our requests can be accommodated.
5 VOL IV
Drawing
ES 101
The drawing shows the installation of Type 9 ducts and cables, but the corresponding table (Drawing ES604) does not show the required cable and pipe section. Please Clarify
See Amendment Detail Below: 14092812 (ES101)
6 Given the complexity of the project and the necessity to analyze the drawings for quantities take off before requesting quotations from potential suppliers and subcontractors, in order to submit a responsive bid we respectfully request to give consideration to extend the deadline for the submission of the bids of at least 45 days.
See previous amendments extending proposal due date.
7 12 3 2.1 With reference to the Narratives required for Non-Price factors, please clarify if tables, images, drawings, etc are intended to be included in the limitation to the number of pages. If yes, please clarify if it is acceptable to include as attachments any element, such as tables, images, drawings, etc., useful to support the Narrative, provided that our understanding is that the Contracting Officer requires a straight and clear proposal.
The Solicitation already addresses this question.
Propose in accordance with the solicitation. Any documentation in excess of the page limitations will not be evaluated.
8 17 Delivery Method. Could the Government please reconsider the submittal method of proposals and allow for electronic submittals and/or in person delivery?
The required delivery process is not under full control of the Contractors, for which shipping their proposals from Europe to the USA the risk of a lost or delayed delivery is higher and unjustified.
The Government considered this and the solicitation will remain unchanged. Propose in accordance with the solicitation.
9 17 With reference to our previous question, please consider that the impact we need to take into account on the tender study schedule is two weeks, for which we kindly ask a consequent extension of the proposal submittal time of 10 additional business days, in addition to any extension due to technical/adminisrative reason.
See previous amendments extending proposal due date.
10 We respectfully request that a time extension of 15 business days be granted to this bid. The site visit took place on 15th November, which is about 3 weeks after the issue of this solicitation (27 October). To attend it is not mandatory, but it gives information about the project and the existing conditions. Real price calculations can take place only after the site visit.
See previous amendments extending proposal due date.
11 We respectfully request that a time extension of 15 business days be granted to this bid. In accordance with Instruction to Bidders Section 4.3, any pre-proposal Inquiry has to be submitted at latest 15 business days before the solicitation closing date, which is exactly the site visit day (15 November). This leaves Offerors with practically no time to ask questions following the site visit.
See previous amendments extending proposal due date.
12 CLIN
Such option includes only “Venezia Neighborhood playground”; what about all other playgrounds (such as “Milano Neighborhood playground”, LS402, for example)? Shall we include them into our offer?
And, in case of positive answer, which is/are the relevant CLIN/CLINS?
The Solicitation already addresses this question.
Propose in accordance with the solicitation.
3. Solicitation Revisions
CURRENT:
1.1.4 This acquisition will result in a firm fixed price contract for design-bid-build construction services. In accordance with FAR 36.205, the statutory cost limitation is $73,050,000 USD for P- 91330, Phase 2 Family Housing Villaggio at Vicenza, Italy. Award will be made in U.S. Dollars.
Statutory cost limitation applies to all CLINs.
REVISED TO:
1.1.4 This acquisition will result in a firm fixed price contract for design-bid-build construction services. In accordance with FAR 36.205, the statutory cost limitation is $73,050,000 USD for P- 91330, Phase 2 Family Housing Villaggio at Vicenza, Italy. Award will be made in U.S. Dollars.
Statutory cost limitation applies to all CLINs. In accordance with DFARS 236.204, the magnitude of construction for this project is between $25,000,000 and $100,000,000.
(i) Solicitation Submittal Requirements:
The offeror shall submit one (1) printed original, marked “Original,” and one (1) printed copy, marked “Copy”, each in a separate three-ring or four-ring binder, and one (1) electronic copy (CD format) with the following:
• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Phone Number, and E-mail Address;
• Completed SF-1442 signed with all amendments acknowledged;
• Completed Schedule B, Price Proposal Form;
• Copy of Representation and Certifications from System for Award Management (SAM);
• Required Responsibility Determination Information;
• Anti-Mafia Certification;
• Societa’ Organismi d’Attestazione (SOA) Certification(s); and
• If the prime offeror is a JV, provide a copy of the JV Agreement as well as any legal document that establishes the JV.
ADDITONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:
RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards.
No purchase or award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or the ability to obtain them. The Contracting Officer shall require acceptable evidence of the prospective contractor’s current sound financial status, as well as the ability to obtain required resources if the need arises. In regard to resources, the contractor must be prepared to present acceptable evidence of subcontracts, commitments or explicit arrangements that will be in existence at the time of contract award, to rent, purchase or otherwise acquire the needed facilities, equipment, services, materials, other resources or personnel. Consideration of a prime contractor’s compliance with limitations on subcontracting shall be taken into account for the time period covered by the contract base period or quantities, plus option periods or quantities, if such options are considered when evaluating offers for award. Pursuant to FAR 9.104-4, the Contracting Officer reserves the right to request adequate evidence of responsibility on the part of any prospective subcontractor(s). In the absence of information clearly indicating that the prospective contractor is responsible, the Contracting Officer shall make a determination of non-responsibility. As a minimum requirement, all offerors are requested to submit, as part of the price proposal submissions, the following:
In a separate Tab, in the English language, the offeror shall provide the following information in the price proposal package:
1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Point of contact from a bank or any financial institution with which the offeror transacts business.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms part of the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
(i) Solicitation Submittal Requirements:
The offeror shall submit one (1) printed original, marked “Original,” and one (1) printed copy, marked “Copy”, each in a separate three-ring or four-ring binder, and one (1) electronic copy (CD format) with the following:
• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Phone Number, and E-mail Address;
• Completed SF-1442 signed with all amendments acknowledged;
• Completed Schedule B, Price Proposal Form;
• Copy of Representation and Certifications from System for Award Management (SAM);
• Completed Solicitation Section 00 45 00 - Representations and Certifications;
• Required Responsibility Determination Information;
• Anti-Mafia Certification;
• Societa’ Organismi d’Attestazione (SOA) Certification(s); and
• If the prime offeror is a JV, provide a copy of the JV Agreement as well as any legal document that establishes the JV.
ADDITONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:
RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards.
No purchase or award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or the ability to obtain them. The Contracting Officer shall require acceptable evidence of the prospective contractor’s current sound financial status, as well as the ability to obtain required resources if the need arises. In regard to resources, the contractor must be prepared to present acceptable evidence of subcontracts, commitments or explicit arrangements that will be in existence at the time of contract award, to rent, purchase or otherwise acquire the needed facilities, equipment, services, materials, other resources or personnel. Consideration of a prime contractor’s compliance with limitations on subcontracting shall be taken into account for the time period covered by the contract base period or quantities, plus option periods or quantities, if such options are considered when evaluating offers for award. Pursuant to FAR 9.104-4, the Contracting Officer reserves the right to request adequate evidence of responsibility on the part of any prospective subcontractor(s). In the absence of information clearly indicating that the prospective contractor is responsible, the Contracting Officer shall make a determination of non-responsibility. As a minimum requirement, all offerors are requested to submit, as part of the price proposal submissions, the following:
In a separate Tab, in the English language, the offeror shall provide the following information in the price proposal package:
1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Point of contact from a bank or any financial institution with which the offeror transacts business.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms part of the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
4.3 PRE-PROPOSAL INQUIRIES (PPIs):
All inquiries regarding the Request for Proposal (RFP) shall be submitted electronically to Erica Walker by e-mail at erica.s.walker@navy.mil AND erica.s.walker4.civ@us.navy.mil; and Rebecca Douglas by email at rebecca.douglas@navy.mil AND rebecca.v.douglas.civ@us.navy.mil. Offerors are requested to use the Pre- Proposal Inquiries Submittal Form (Attachment A).
The Government does not intend to respond to any pre-proposal inquiries submitted less than 15 business days before the solicitation closing date in order to permit adequate time to reply to the inquiries. There is no guarantee that a PPI submitted after the cutoff date will be answered before the solicitation closes. A response will be published as an amendment to the solicitation.
4.3 PRE-PROPOSAL INQUIRIES (PPIs):
All inquiries regarding the Request for Proposal (RFP) shall be submitted electronically to Ed Flint by e-mail at edward.d.flint@navy.mil AND edward.d.flint.civ@us.navy.mil; and Rebecca Douglas by email at rebecca.douglas@navy.mil AND rebecca.v.douglas.civ@us.navy.mil. Offerors are requested to use the Pre- Proposal Inquiries Submittal Form (Attachment A).
The Government does not intend to respond to any pre-proposal inquiries submitted less than 15 business days before the solicitation closing date in order to permit adequate time to reply to the inquiries. There is no guarantee that a PPI submitted after the cutoff date will be answered before the solicitation closes. A response will be published as an amendment to the solicitation.
4. Specification and Drawing Revisions
SECTION 01 14 00 WORK RESTRICTIONS
Delete Section 01 14 00 in its entirety and insert new section 01 14 00 accompanying this amendment.
SECTION 01 33 00 SUBMITTAL PROCEDURES
Delete the Submittal Register attached to the end of the section and replace with the Submittal Register accompanying this amendment.
SECTION 01 45 00.00 20 QUALITY CONTROL
Delete Section 01 45 00.00 20 in its entirety and insert new section 01 45 00.00 20 accompanying this amendment.
SECTION 08 33 23 OVERHEAD COILING DOORS
Delete Section 08 33 23 in its entirety and insert new section 08 33 23 accompanying this amendment.
SECTION 08 71 00 DOOR HARDWARE
Delete the Door Hardware Schedule in its entirety and replace with the Door Hardware Schedule accompanying this amendment.
SECTION 11 31 13 ELECTRIC KITCHEN EQUIPMENT
Delete Section 11 31 13 in its entirety and insert new section 11 31 13 accompanying this amendment.
SECTION 11 68 13 PLAYGROUND, FITNESS AND SPORTING EQUIPMENT
Delete Section 11 68 13 in its entirety and insert new section 11 68 13 accompanying this amendment.
SECTION 23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
Delete Section 23 09 13 in its entirety and insert new section 23 09 13 accompanying this amendment.
SECTION 32 14 16 UNIT PAVERS
Delete Section 32 14 16 in its entirety and insert new section 32 14 16 accompanying this amendment.
SECTION 32 14 43 PERMEABLE CONCRETE PAVER
Delete Section 32 14 43 in its entirety and insert new section 32 14 43 accompanying this amendment.
SECTION 32 18 16.13 IMPACT ATTENUATION SURFACING
Delete Section 32 18 16.13 in its entirety and insert new section 32 18 16.13 accompanying this amendment.
SECTION 32 31 19 DECORATIVE METAL FENCES AND GATES
Delete Section 32 31 19 in its entirety and insert new section 32 31 19 accompanying this amendment.
THE FOLLOWING DRAWINGS ARE REVISED:
NAVFAC DWG NO. Title
14091598 (G-003) INDEX OF DRAWINGS VOLUME I / ELENCO DISEGNI VOLUME I
14091599 (G-004) INDEX OF DRAWINGS VOLUME II PART I / ELENCO DISEGNI VOLUME II
PARTE I
14091600 (G-005) INDEX OF DRAWINGS VOLUME II PART II / ELENCO DISEGNI VOLUME II
PARTE II
14091601 (G-006) INDEX OF DRAWINGS VOLUME III PART I / ELENCO DISEGNI VOLUME III
PARTE I
14091602 (G-007) INDEX OF DRAWINGS VOLUME III PART II / ELENCO DISEGNI VOLUME
III PARTE II
14091603 (G-008) INDEX OF DRAWINGS VOLUME IV PART I / ELENCO DISEGNI VOLUME
IV PARTE I
14091604 (G-009) INDEX OF DRAWINGS VOLUME IV PART II / ELENCO DISEGNI VOLUME
IV PARTE II
14091609 (GI001) MILANO NEIGHBORHOOD LIFE SAFETY SITE PLAN / PIANO DI
SICUREZZA QUARTIERE MILANO
14091610 (GI002) VENEZIA NEIGHBORHOOD LIFE SAFETY SITE PLAN / PIANO DI
SICUREZZA QUARTIERE VENEZIA
14091611 (GI003) VERONA AND NAPOLI NEIGHBORHOOD LIFE SAFETY SITE PLAN /
PIANO DI SICUREZZA QUARTIERE VERONA E NAPOLI
14091619 (GI101) AP BUILDING 23400 GROUND FLOOR LIFE SAFETY PLAN / PIANO DI
SICUREZZA AP EDIFICIO 23400 PIANO TERRA
14091625 (GI107) AP BUILDING 23200 GROUND FLOOR LIFE SAFETY PLAN / PIANO DI
SICUREZZA AP EDIFICIO 23200 PIANO TERRA
14091629 (GI111) AP BUILDING 26200 GROUND FLOOR LIFE SAFETY PLAN / PIANO DI
SICUREZZA AP EDIFICIO 26200 PIANO TERRA
14091652 (C-005) CONTRACTOR LAYDOWN AND STAGING PLAN / PIANTA DEPOSITO E
STAZIONAMENTO DELL'APPALTATORE
14091676 (CS102) SITE LAYOUT PLAN / PLANIMETRIA DEL SITO
14091677 (CS103) SITE LAYOUT PLAN / PLANIMETRIA DEL SITO
14091678 (CS104) SITE LAYOUT PLAN / PLANIMETRIA DEL SITO
14091679 (CS105) SITE LAYOUT PLAN / PLANIMETRIA DEL SITO
14091680 (CS106) SITE LAYOUT PLAN / PLANIMETRIA DEL SITO
14091685 (CU102F) FIRE WATER UTILITY PLAN / PLANIMETRIA DEI SOTTOSERVIZI ACQUA
ANTINCENDIO
14091686 (CU103F) 14091686 FIRE WATER UTILITY PLAN / PLANIMETRIA DEI SOTTOSERVIZI
ACQUA ANTINCENDIO
14091687 (CU104F) 14091687 FIRE WATER UTILITY PLAN / PLANIMETRIA DEI SOTTOSERVIZI
ACQUA ANTINCENDIO
14091688 (CU105F) FIRE WATER UTILITY PLAN / PLANIMETRIA DEI SOTTOSERVIZI ACQUA
ANTINCENDIO
14091689 (CU106F) FIRE WATER UTILITY PLAN / PLANIMETRIA DEI SOTTOSERVIZI ACQUA
ANTINCENDIO
14091706 (CU102D) STORM SEWER UTILITY PLAN / PLANIMETRIA DEI SOTTOSERVIZI
ACQUE METEORICHE
14091708 (CU104D) STORM SEWER UTILITY PLAN / PLANIMETRIA DEI SOTTOSERVIZI
ACQUE METEORICHE
14091720 (CU202) FIRE WATER UTILITY PROFILES / PROFILI LINEA DI SOTTOSERVIZIO
ACQUA ANTINCENDIO
14091721 (CU203) FIRE WATER UTILITY PROFILES / PROFILI LINEA DI SOTTOSERVIZIO
ACQUA ANTINCENDIO
14091722 (CU204) FIRE WATER UTILITY PROFILES / PROFILI LINEA DI SOTTOSERVIZIO
ACQUA ANTINCENDIO
14091759 (CG102) GRADING AND DRAINAGE PLAN / PLANIMETRIA SISTEMAZIONE DEL
TERRENO E DRENAGGIO
14091760 (CG103) GRADING AND DRAINAGE PLAN / PLANIMETRIA SISTEMAZIONE DEL
TERRENO E DRENAGGIO
14091761 (CG104) GRADING AND DRAINAGE PLAN / PLANIMETRIA SISTEMAZIONE DEL
TERRENO E DRENAGGIO
14091762 (CG105) GRADING AND DRAINAGE PLAN / PLANIMETRIA SISTEMAZIONE DEL
TERRENO E DRENAGGIO
14091814 (C-517) CIVIL DETAILS / DETTAGLI CIVILI
14091825 (D-601) WATER STORAGE BUILDING PROCESS SCHEDULES / EDIFICIO
IMPIANTO ACQUE SCHEDE PROCESSO
14091836 (L-001) LANDSCAPE GENERAL NOTES, LEGENDS AND SYMBOLS
14091839 (LS102) LANDSCAPE MATERIALS SITE PLAN / PIANTA PAESAGGIO DEL SITO
14091841 (LS104) LANDSCAPE MATERIALS SITE PLAN / PIANTA PAESAGGIO DEL SITO
14091842 (LS105) LANDSCAPE MATERIALS SITE PLAN / PIANTA PAESAGGIO DEL SITO
14091843 (LS106) LANDSCAPE MATERIALS SITE PLAN / PIANTA PAESAGGIO DEL SITO
14091855 (LS411) LANDSCAPE MATERIALS SITE PLAN ENLARGEMENTS / PIANTA
ALLARGATA PAESAGGIO DEL SITO
14091879 (LS524) LANDSCAPE SITE DETAILS / DETTAGLI PAESAGGIO DEL SITO
14091891 (LL102) LANDSCAPE LAYOUT SITE PLAN / LAYOUT PAESAGGISTICA DEL SITIO
14091893 (LL104) LANDSCAPE LAYOUT SITE PLAN / LAYOUT PAESAGGISTICA DEL SITIO
14091894 (LL105) LANDSCAPE LAYOUT SITE PLAN / LAYOUT PAESAGGISTICA DEL SITIO
14091895 (LL106) LANDSCAPE LAYOUT SITE PLAN / LAYOUT PAESAGGISTICA DEL SITIO
14091903 (LL404) LANDSCAPE LAYOUT SITE PLAN ENLARGEMENTS / LAYOUT
PAESAGGISTICA AMPLIAMENTO DEL SITIO
14091904 (LL405) LANDSCAPE LAYOUT SITE PLAN ENLARGEMENTS / LAYOUT
PAESAGGISTICA AMPLIAMENTO DEL SITIO
14091905 (LL405A) LANDSCAPE LAYOUT SITE PLAN ENLARGEMENTS / LAYOUT
PAESAGGISTICA AMPLIAMENTO DEL SITIO
14091909 (LP102) LANDSCAPE PLANTING PLAN / PIANTA DI PIANTUMAZIONE PAESAGGIO
14091911 (LP104) LANDSCAPE PLANTING PLAN / PIANTA DI PIANTUMAZIONE PAESAGGIO
14091913 (LP106) LANDSCAPE PLANTING PLAN / PIANTA DI PIANTUMAZIONE
PAESAGGIO
14092198 (A-101) AP BUILDING 23400 GROUND FLOOR PLAN / AP EDIFICIO 23400 PIANTA
PIANO TERRA
14092203 (A-106) AP BUILDING 23400 ROOF PLAN / AP EDIFICIO 23400 PIANTA
COPERTURA
14092209 (A-112) AP BUILDING 23500 ROOF PLAN / AP EDIFICIO 23500 PIANTA
COPERTURA
14092210 (A-113) AP BUILDING 23200 GROUND FLOOR PLAN / AP EDIFICIO 23200 PIANTA
PIANO TERRA
14092215 (A-118) AP BUILDING 23200 ROOF PLAN / AP EDIFICIO 23200 PIANTA
COPERTURA
14092216 (A-119) AP BUILDING 26200 GROUND FLOOR PLAN / AP EDIFICIO 26200 PIANTA
PIANO TERRA
14092221 (A-124) AP BUILDING 26200 ROOF PLAN / AP EDIFICIO 26200 PIANTA
COPERTURA
14092225 (A-128) TH BUILDING 23100 AREA A ROOF PLAN / TH EDIFICIO 23100 AREA A
PIANTA COPERTURA
14092229 (A-132) TH BUILDING 23100 AREA B ROOF PLAN / TH EDIFICIO 23100 AREA B
PIANTA COPERTURA
14092233 (A-136) TH BUILDING 24100 ROOF PLAN / TH EDIFICIO 24100 PIANTA
COPERTURA
14092237 (A-140) TH BUILDING 24300 AREA A ROOF PLAN / TH EDIFICIO 24300 AREA A
PIANTA COPERTURA
14092241 (A-144) TH BUILDING 24300 AREA B ROOF PLAN / TH EDIFICIO 24300 AREA B
PIANTA COPERTURA
14092245 (A-148) TH BUILDING 26100 ROOF PLAN / TH EDIFICIO 26100 PIANTA
COPERTURA
14092249 (A-152) TH BUILDING 26305 ROOF PLAN / TH EDIFICIO 26305 PIANTA
COPERTURA
14092253 (A-156) TH BUILDING 26600 ROOF PLAN / TH EDIFICIO 26600 PIANTA
COPERTURA
14092311 (A-401) 3BR APARTMENT GROUND FLOOR PLAN / 3BR APPARTAMENTO PIANTA
PIANO TERRA
14092312 (A-402) 3BR APARTMENT TYPICAL FLOOR PLAN / 3BR APPARTAMENTO PIANTA
PIANO TIPICO
14092313 (A-403) 3BR APARTMENT FIRST FLOOR PLAN / 3BR APPARTAMENTO PIANTA
PIANO PRIMO
14092314 (A-404) 3BR APARTMENT ABA GROUND FLOOR PLAN / 3BR APPARTAMENTO
ABA PIANTA PIANO TERRA
14092315 (A-405) 3BR APARTMENT ABA FLOOR PLAN / 3BR APPARTAMENTO ABA PIANTA
PIANO
14092316 (A-406) 4BR APARTMENT TYPICAL FLOOR PLAN / 4BR APPARTAMENTO PIANTA
PIANO TIPICO
14092317 (A-407) 4BR APARTMENT ABA FLOOR PLAN / 4BR APPARTAMENTO ABA PIANTA
PIANO
14092326 (A-416) 3BR TOWNHOUSE GROUND, FIRST AND SECOND FLOOR PLAN / 3BR
TOWNHOUSE PIANTA PIANO TERRA, PRIMO E SECONDO
14092327 (A-417) 4BR TOWNHOUSE GROUND, FIRST AND SECOND FLOOR PLAN / 4BR
TOWNHOUSE PIANTA PIANO TERRA, PRIMO E SECONDO
14092328 (A-418) 3BR CORNER TH GROUND, FIRST AND SECOND FLOOR PLAN / 3BR
CORNER TH PIANTA PIANO TERRA, PRIMO E SECONDO
14092537 (FA101) AP BUILDING 23400 GROUND FLOOR FIRE ALARM PLAN / AP EDIFICIO
23400 ALLARME INCENDIO PIANO TERRA
14092543 (FA107) AP BUILDING 23200 GROUND FLOOR FIRE ALARM PLAN / AP EDIFICIO
23200 ALLARME INCENDIO PIANO TERRA
14092547 (FA111) AP BUILDING 26200 GROUND FLOOR FIRE ALARM PLAN / AP EDIFICIO
26200 ALLARME INCENDIO PIANO TERRA
14092565 (FX101) AP BLDG 23400 GROUND FLOOR FIRE SUPPRESSION PLAN / AP ED. 23400
PIANTA SPEGNIMENTO INCENDI PIANO TERRA
14092571 (FX107) AP BLDG 23200 GROUND FLOOR FIRE SUPPRESSION PLAN / AP ED. 23200
PIANTA SPEGNIMENTO INCENDI PIANO TERRA
14092575 (FX111) AP BLDG 26200 GROUND FLOOR FIRE SUPPRESSION PLAN / AP ED. 26200
PIANTA SPEGNIMENTO INCENDI PIANO TERRA
14092579 (FX301) AP BUILDING 23400 FIRE SUPPRESSION SECTIONS / AP EDIFICIO 23400
SEZIONI SPEGNIMENTO INCENDI
14092581 (FX303) AP BUILDING 23200 FIRE SUPPRESSION SECTIONS / AP EDIFICIO 23200
SEZIONI SPEGNIMENTO INCENDI
14092582 (FX304) AP BUILDING 26200 FIRE SUPPRESSION SECTIONS / AP EDIFICIO 26200
SEZIONI SPEGNIMENTO INCENDI
14092584 (FX401) AP BLDG 23400 MECHANICAL ROOM FIRE SUPPRESSION PLAN / AP ED.
23400 SALA MACCHINE PIANTA SPEGNIMENTO INCENDI
14092586 (FX403) AP BLDG 23200 MECHANICAL ROOM FIRE SUPPRESSION PLAN / AP ED.
23200 SALA MACCHINE PIANTA SPEGNIMENTO INCENDI
14092587 (FX404) AP BLDG 26200 MECHANICAL ROOM FIRE SUPPRESSION PLAN / AP ED.
26200 SALA MACCHINE PIANTA SPEGNIMENTO INCENDI
14092596 (FX901) AP BLDG 23400 FIRE SUPPRESSION ISOMETRIC VIEW / AP ED. 23400
VISTA ISOMETRICA SPEGNIMENTO INCENDI
14092598 (FX903) AP BLDG 23200 FIRE SUPPRESSION ISOMETRIC VIEW / AP ED. 23200
VISTA ISOMETRICA SPEGNIMENTO INCENDI
14092599 (FX904) AP BLDG 26200 FIRE SUPPRESSION ISOMETRIC VIEW / AP ED. 26200
VISTA ISOMETRICA SPEGNIMENTO INCENDI
14092625 (PW101) AP BUILDING 23400 GROUND FLOOR WASTE PLAN / AP EDIFICIO 23400
PIANTA SCARICHI PIANO TERRA
14092635 (PW112) AP BUILDING 23200 GROUND FLOOR WASTE PLAN / AP EDIFICIO 23200
PIANTA SCARICHI PIANO TERRA
14092640 (PW118) AP BUILDING 26200 GROUND FLOOR WASTE PLAN / AP EDIFICIO 26200
PIANTA SCARICHI PIANO TERRA
14092678 (P-504) PLUMBING DETAILS / DETTAGLI IMPIANTO IDRICO
14092697 (PW902) AP BUILDING 23400 WASTE RISER DIAGRAM / AP EDIFICIO 23400
DIAGRAMMA COLONNA MONTANTE SCARICO
14092701 (PW906) AP BUILDING 23200 WASTE RISER DIAGRAM / AP EDIFICIO 23200
DIAGRAMMA COLONNA MONTANTE SCARICO
14092702 (PW907) AP BUILDING 26200 WASTE RISER DIAGRAM / AP EDIFICIO 26200
DIAGRAMMA COLONNA MONTANTE SCARICO
14092708 (M-002) 14092708 MECHANICAL GENERAL NOTES, LEGENDS AND SYMBOLS /
NOTE GENERALI, LEGENDE E SIMBOLI MECCANICI
14092709 (M-101) AP BUILDING 23400 GROUND FLOOR MECHANICAL PLAN / IMPIANTI
MECCANICI AP EDIFICIO 23400 PIANO TERRA
14092719 (M-111) AP BUILDING 23200 GROUND FLOOR MECHANICAL PLAN / IMPIANTI
MECCANICI AP EDIFICIO 23200 PIANO TERRA
14092724 (M-116) AP BUILDING 26200 GROUND FLOOR MECHANICAL PLAN / IMPIANTI
MECCANICI AP EDIFICIO 26200 PIANO TERRA
14092771 (MP407) AP BUILDING 23400 CORE PIPING PLAN / AP EDIFICIO 23400 IMPIANTO
IDRICO CENTRALE
14092772 (MP408) AP BUILDING 23400 CORE PIPING PLAN / AP EDIFICIO 23400 IMPIANTO
IDRICO CENTRALE
14092773 (MP409) AP BUILDING 23500 CORE PIPING PLAN / AP EDIFICIO 23500 IMPIANTO
IDRICO CENTRALE
14092775 (MP411) AP BUILDING 23200 CORE PIPING PLAN / AP EDIFICIO 23200 IMPIANTO
IDRICO CENTRALE
14092777 (MP413) AP BUILDING 26200 CORE PIPING PLAN / AP EDIFICIO 26200 IMPIANTO
IDRICO CENTRALE
14092779 (MP415) 3BR TH GROUND FLOOR PIPING PLAN / 3BR TH IMPIANTO IDRICO
PIANO TERRA
14092780 (MP417) 4BR TH GROUND FLOOR PIPING PLAN / 4BR TH IMPIANTO IDRICO PIANO
TERRA
14092781 (MP419) 3BR CORNER TH GROUND FLOOR PIPING PLAN / 3BR CORNER
TOWNHOUSE IMPIANTO IDRICO PIANO TERRA
14092794 (MI702) SEQUENCE OF OPERATIONS / SEQUENZA DI OPERAZIONI
14092812 (ES101) ELECTRICAL SITE POWER PLAN AREA 101 / PIANTA ALIMENTAZIONE
ELETTRICA DEL SITO AREA 101
14092835 (EL101) AP BUILDING 23400 GROUND FLOOR LIGHTING PLAN / PIANTA
ILLUMINAZIONE AP EDIFICIO 23400 PIANO TERRA
14092845 (EL111) AP BUILDING 23200 GROUND FLOOR LIGHTING PLAN / PIANTA
ILLUMINAZIONE AP EDIFICIO 23200 PIANO TERRA
14092850 (EL116) AP BUILDING 26200 GROUND FLOOR LIGHTING PLAN / PIANTA
ILLUMINAZIONE AP EDIFICIO 26200 PIANO TERRA
14092857 (EP101) AP BUILDING 23400 GROUND FLOOR POWER PLAN / PIANTA
ALIMENTAZIONE AP EDIFICIO 23400 PIANO TERRA
14092867 (EP111) AP BUILDING 23200 GROUND FLOOR POWER PLAN / PIANTA
ALIMENTAZIONE AP EDIFICIO 23200 PIANO TERRA
14092872 (EP116) AP BUILDING 26200 GROUND FLOOR POWER PLAN / PIANTA
ALIMENTAZIONE AP EDIFICIO 26200 PIANO TERRA
14092884 (EG101) AP BUILDING 23400 GROUND FLOOR GROUNDING PLAN / IMPIANTO
MESSA A TERRA AP EDIFICIO 23400 PIANO TERRA
14092887 (EG104) AP BUILDING 23200 GROUND FLOOR GROUNDING PLAN / IMPIANTO
MESSA A TERRA AP EDIFICIO 23200 PIANO TERRA
14092888 (EG106) AP BUILDING 26200 GROUND FLOOR GROUNDING PLAN / IMPIANTO
MESSA A TERRA AP EDIFICIO 26200 PIANO TERRA
14092925 (EP407) AP BUILDING 23400 CORE ROOMS ELECTRICAL PLAN / AP ED. 23400
PIANTA IMPIANTO ELETTRICO LOCALI CENTRALI
14092927 (EP409) AP BUILDING 23200 CORE ROOMS ELECTRICAL PLAN / AP ED. 23200
PIANTA IMPIANTO ELETTRICO LOCALI CENTRALI
14092928 (EP410) AP BUILDING 26200 CORE ROOMS ELECTRICAL PLAN / AP ED. 26200
PIANTA IMPIANTO ELETTRICO LOCALI CENTRALI
14092988 (TS401) AREA DISTRIBUTION NODE FLOOR PLAN / PIANTA NODO DI
DISTRIBUZIONE DELL'AREA
14092996 (TS508) TELECOMMUNICATIONS DETAILS / DETTAGLI TELECOMUNICAZIONI
THE FOLLOWING ARCHITECTURE LARGE SCALE PLANS HAVE BEEN REVISED. Bathrooms in all the units have been redesigned. General contractor shall apply the changes to the Mechanical, Plumbing and Electrical Sheets impacted by the revisions.
NAVFAC Dwg No. 14092311 (A-401) 3BR APARTMENT GROUND FLOOR PLAN / 3BR
APPARTAMENTO PIANTA PIANO TERRA
Delete Dwg No. 1632846-A-401 and replace with new Dwg No. 1632846-A-401 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-401 has been revised as of November 19, 2021, Revise Master Bathroom A010 and Bathroom A011 as indicated. These modifications must be applied to all 3BR Apartment Ground Floor Plans on NAVFAC Drawing Number 14092210 (A-113).
NAVFAC Dwg No. 14092312 (A-402) 3BR APARTMENT TYPICAL FLOOR PLAN / 3BR
APPARTAMENTO PIANTA PIANO TIPICO
Delete Dwg No. 1632846-A-402 and replace with new Dwg No. 1632846-A-402 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-402 has been revised as of November 19, 2021, Revise Master Bathroom E209 and Bathroom A210 as indicated. These modifications must be applied to the 3BR Apartment
Plans on NAVFAC Drawing Numbers, 14092200 (A-103), 14092201 (A-104), 14092206 (A-109), 14092207 (A-110), 14092212 (A-115), 14092213 (A-116), 14092218 (A-121), and 14092219 (A-122).
NAVFAC Dwg No. 14092313 (A-403) 3BR APARTMENT FIRST FLOOR PLAN / 3BR
APPARTAMENTO PIANTA PIANO PRIMO
Delete Dwg No. 1632846-A-403 and replace with new Dwg No. 1632846-A-403 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-403 has been revised as of November 19, 2021, Revise Master Bathroom B109 and Bathroom B110 as indicated. These modifications must be applied to the 3BR non-ABA Apartments First Floor Plans on NAVFAC Drawing Numbers, 14092199 (A-102), 14092206 (A-108), 14092211 (A-114), 14092217 (A-120)
NAVFAC Dwg No. 14092314 (A-404) 3BR APARTMENT ABA GROUND FLOOR PLAN / 3BR
APPARTAMENTO ABA PIANTA PIANO TERRA
Delete Dwg No. 1632846-A-404 and replace with new Dwg No. 1632846-A-404 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-404 has been revised as of November 19, 2021, Revise Master Bathroom A010 and Bathroom A011 as indicated. These modifications must be applied to Unit A 3BR ABA Ground Floor Plan on NAVFAC Drawing Number 14092216 (A-119). (3BR ABA UNIT is located in Buildings 23600, 26200, and 27400)
NAVFAC Dwg No. 14092315 (A-405) 3BR APARTMENT ABA FLOOR PLAN / 3BR
APPARTAMENTO ABA PIANTA PIANO
Delete Dwg No. 1632846-A-405 and replace with new Dwg No. 1632846-A-405 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-405 has been revised as of November 19, 2021, Revise Master Bathroom C109 and Bathroom C110 as indicated. These modifications must be applied to Unit C 3BR ABA First Floor Plan on NAVFAC Drawing Number 14092199 (A-102). (3BR ABA UNIT is located in Buildings 23400, and 23300)
NAVFAC Dwg No. 14092316 (A-406) 4BR APARTMENT TYPICAL FLOOR PLAN / 4BR
APPARTAMENTO PIANTA PIANO TIPICO
Delete Dwg No. 1632846-A-406 and replace with new Dwg No. 1632846-A-406 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-406 has been revised as of November 19, 2021, Revise Master Bathroom G210 and Bathroom G212 as indicated. These modifications must be applied to the 4BR Apartment Plans on NAVFAC Drawing Numbers, 14092212 (A-115), 14092213 (A-116), 14092217 (A-120), 14092218 (A-121), 14092219 (A-122), NAVFAC Dwg No. 14092317 (A-407) 4BR APARTMENT ABA FLOOR PLAN / 4BR
APPARTAMENTO ABA PIANTA PIANO
Delete Dwg No. 1632846-A-407 and replace with new Dwg No. 1632846-A-407 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-407 has been revised as of November 19, 2021, Revise Master Bathroom D110 and Bathroom D112 as indicated. These modifications must be applied to the Unit D 4BR ABA Apartment Plans on NAVFAC Drawing Number, 14092211 (A-114) (4BR ABA UNIT is located in Buildings 24200, and 23200)
NAVFAC Dwg No. 14092326 (A-416) 3BR TOWNHOUSE GROUND, FIRST AND SECOND FLOOR
PLAN / 3BR TOWNHOUSE PIANTA PIANO TERRA, PRIMO E SECONDO
Delete Dwg No. 1632846-A-416 and replace with new Dwg No. 1632846-A-416 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-416 has been revised as of November 19, 2021, Revise Half Bathroom H101, Bathroom 2 H203 and Master Bathroom H205 as indicated. These modifications must be applied to all 3BR Townhome Plans on NAVFAC Drawing Numbers, 14092231 (A-134), 14092232 (A-135), 14092235 (A-138), 14092236 (A-139), 14092239 (A-142), 14092240 (A-143), 14092243 (A-146), 14092244 (A-147), 14092251 (A-154) and 14092252 (A-155).
NAVFAC Dwg No. 14092327 (A-417) 4BR TOWNHOUSE GROUND, FIRST AND SECOND FLOOR
PLAN / 4BR TOWNHOUSE PIANTA PIANO TERRA, PRIMO E SECONDO
Delete Dwg No. 1632846-A-417 and replace with new Dwg No. 1632846-A-417 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-417 has been revised as of November 19, 2021, Revise Half Bathroom I101, Bathroom 2 I207 and Master Bathroom I203 as indicated. These modifications must be applied to all 4BR Townhome Plans on NAVFAC Drawing Numbers, 14092223 (A-126), 14092224 (A-127), 14092227 (A-130), 14092228 (A-131), 14092231 (A-134), 14092232 (A-135), 14092239 (A-142), 14092240 (A-143), 14092243 (A-146), 14092244 (A-147), 14092247 (A-150) and 14092248 (A-151).
NAVFAC Dwg No. 14092328 (A-418) 3BR CORNER TH GROUND, FIRST AND SECOND FLOOR
PLAN / 3BR CORNER TH PIANTA PIANO TERRA, PRIMO E SECONDO
Delete Dwg No. 1632846-A-418 and replace with new Dwg No. 1632846-A-418 accompanying this Amendment. NAVFAC Dwg No. 1632846-A-418 has been revised as of November 19, 2021, Revise Half Bathroom J106, Bathroom 2 J203 and Master Bathroom J205 as indicated. These modifications must be applied to all 3 BR Corner Townhome Plans on NAVFAC Drawing Numbers, 14092223 (A-126), 14092224 (A-127), 14092231 (A-134), 14092232 (A-135), 14092235 (A-138), 14092236 (A-139), 14092239 (A-142), 14092240 (A-143), 14092243 (A-146), 14092244 (A-147), 14092251 (A-154) and 14092252 (A-155).
5. Provide Attachments:
• Attachment M: Pre-proposal Conference Attendee Log
• Attachment N: Revised 1632468 Specifications
• Attachment O: Revised 1632468 Drawings
SECTION 00 10 00 - SOLICITATION
The standard size code $39,500,000 has been added.
The Issued By organization has changed from
NAVAL FACILITIES ENGINEERING COMMAND
ATLANTIC DIVISION
6506 HAMPTON BLVD
NORFOLK VA 23511
to
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
(End of Summary of Changes)