N62470-20-R-4007 Amendment 11.pdf
PDF 26 KB Posted
- Attached to
- P-759, FAMILY HOUSING NEW CONSTRUCTION VILLAGGIO SW & CAMP EDERLE NORTH - VICENZA, ITALY
- Solicitation number
- N62470-20-R-4007
About this file
This amendment modifies a solicitation for family housing new construction at Villaggio Southwest and Camp Ederle North in Vicenza, Italy. The amendment provides responses to pre-proposal inquiries, additional informational attachments including health and safety, UXO reports, and demolition building as-builts. Offerors may revise their price proposals in response to the changes, but no other revisions are permitted. The response due date remains April 7, 2021. The amendment confirms local gas utility design and installation costs should be included in a specific CLIN.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
P-759 FAMILY HOUSING NEW CONSTRUCTION VILLAGGIO SW & CAMP EDERLE NORTH VICENZA, ITALY (Phase 1)
PLEASE SEE SF 30 BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Mar-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247020R4007
X 9B. DATED (SEE ITEM 11)
26-Oct-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Mar-2021
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247020R4007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0011
The purpose of this amendment is for the following items:
1. Provide responses to Pre-Proposal Inquiries (PPI’s)
2. Additional Attachments
3. Provide Attachment P – Demo Bldg As-Built
4. Amendment response due date remains unchanged: Wednesday, April 7, 2021 at 1430 (EST)
This amendment is applicable to ONLY THOSE OFFERORS that previously submitted a proposal in response to the solicitation by the original proposal due date of December 30, 2020. Those offerors are invited to revise their existing Attachment E – Schedule B Price Proposal Form, if necessary, in response to amendments 10 and 11. Offerors are NOT required to provide a revised Attachment E – Schedule B Price Proposal Form; however, all Offerors are required to provide an acknowledged copy of amendments 10 and 11.
The scope of proposal revisions is limited to the areas directly impacted by amendments 10 and 11; thus, offerors are permitted only to revise their existing Attachment E – Schedule B Price Proposal Form, if necessary. Offerors are not permitted to make any changes to the previously submitted non-price technical binders or to the previously submitted price proposals with the exception of the Attachment E – Schedule B Price Proposal Form. Changes to non-price technical binders, other portions of the price proposals, or any other change not specifically requested in this amendment will not be accepted.
If an offeror submits any changes other than those requested in this amendment, the proposal may be disqualified at the Government’s discretion.
Acknowledgement of amendments 10 and 11; and, if desired, revised Attachment E – Schedule B Price Proposal Form shall be submitted electronically and directly to the Government’s point of contact, Crystal Carter, via email at crystal.r.carter@navy.mil prior to the amendment response due date established by amendment 10. Offerors shall not submit hard copy responses.
1. Pre-Proposal Inquiries (PPI’s) Question
No.
REFERENCE QUESTION GOVERNMENT RESPONSE
Page Section Para
With reference to the Amendment n.10 (dated 17- Mar-2021) and particularly to the modified response to PPI #59, we are hereby seeking confirmation that the requested update only refers to the recalibration of the expressed amounts for CLIN 0001AA and CLIN 001AB of the Schedule B Price Proposal Form (revised 12/08/2020), keeping the amounts of the other CLINS unchanged with respect to the previous offer presented on 12/30/2020.
Offerors are permitted to revise any CLIN.
N6247020R4007
2. Additional Attachments (Attached Separately):
• Attachment N – Health and Safety Plan (For Informational Purposes Only)
• Attachment O – ENG-UXO Report Annex 1 (For Informational Purposes Only)
3. Attachment P – Demo Bldg As-Built (For Informational Purposes Only)
SECTION 00 01 15 LIST OF DRAWINGS
Insert the attached reference drawings (CD801, CD802, CD803, CD804, CD805) after the table in paragraph 1.3.1.
4. Amendment response due date remains unchanged: Wednesday, April 7, 2021 at 1430 (EST)
(End of Summary of Changes)
With reference to the Amendment n.10 (dated 17- Mar-2021) - Item 1 (Solicitation Revisions: page 3 of 60), you are kindly asked to confirm that the SAR local gas utility purveyor costs related to design and installation of the gas main shall be included in CLIN 0001AC, together with the related General Contractor mark-up and coordination costs.
Yes, confirmed.