Attachment E - Revised Schedule B Price Proposal Form Dated 8 Dec 2020.pdf
PDF 36 KB Posted
- Attached to
- P-759, FAMILY HOUSING NEW CONSTRUCTION VILLAGGIO SW & CAMP EDERLE NORTH - VICENZA, ITALY
- Solicitation number
- N62470-20-R-4007
About this file
This document contains a price proposal form for the construction of 79 housing units and associated site work at Villaggio and Casserma Ederle in Vicenza, Italy. The Navy seeks fixed-price bids for the base work and six options. The base work includes constructing buildings, site work, and coordinating a new gas main. The six options are additional buildings and site work. Bids must be submitted by line item, and award will be made to the lowest priced responsive bidder based on the total of the base items and any exercised options. Options must be priced firm for potential exercise within 270 days after award. The performance bond amount will increase if options are exercised.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
02/14
REVISED 12/08/2020
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 - BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work to construct 79 housing units at Villaggio and Casserma Ederle complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0001AA
0001AA Construction of 79 Housing Units at Villaggio and Casserma Ederle
CLIN 0001AB. Price for the entire project Site Work at Villaggio and Casserma Ederle, outside each buildings 1.5 meter line, complete in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN DESCRIPTION TOTAL PRICE FOR 0001AB
0001AB Construction of All Site Work at Villaggio and Casserma Ederle
CLIN 0001AC. Price for coordinating the design and construction of the off-installation gas main at Ederle by local gas utility purveyor “SAR”, and excludes all other contract line items (CLINs). The gas main is to be designed and installed by SAR. Includes the pressure reducing valve, approximately 385-meters of off-installation pipeline, all SAR fees and General Contractor mark-up and coordination.
CLIN DESCRIPTION TOTAL PRICE FOR 0001AC
0001AC Ederle Off-Installation Gas Main $
CLIN 0002 Option Item No. 1 - Price includes the following:
Price for providing all work in connection with construction of Townhouse Block 4 to the 1.5 meter line outside of the building in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
CLIN DESCRIPTION TOTAL PRICE FOR CLIN
0002 Construction of Townhouse Block 4
- Villaggio
CLIN 0003 Option Item No. 2 - Price includes the following:
Price for providing all work in connection with construction of Townhouse Block 5 to the 1.5 meter line outside of the building in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
0003 Construction of Townhouse Block 5
CLIN 0004 Option Item No. 3 - Price includes the following:
Price for providing all work in connection with construction of Apartment Building 2 to the 1.5 meter line outside of the building in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
0004 Construction of Apartment Building 2 - Villaggio
CLIN 0005 Option Item No. 4 - Price includes the following:
Price for providing all work in connection with construction of Five (5) K&E Single Family Homes - Villaggio to the 1.5 meter line outside of each building in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
0005 Construction of Five (5) K&E Single Family Homes - Villaggio
CLIN 0006 Option Item No. 5 - Price includes the following:
Price for providing all site work in connection with construction of Five
(5) K&E Single Family Homes - Villaggio outside of the 1.5 meter line of the buildings in accordance with the drawings and specifications, and excludes all other contract line items (CLINs). Site work includes demolition of the existing structures on the site. Provide all utility work indicated on CU101. Work also includes extending the utilities to the site to 1.5 meters of the buildings.
Provide electrical, telecommunications, sanitary sewer, domestic water, and stormwater utilities as indicated on drawing CU101.
Provide fire water, low pressure gas, and medium pressure gas as indicated on drawings CU101,CU102, CU103, CU104 and CU112. Connect as indicated on drawing CU112.
0006 Construction of All Site work for Five (5) K&E Single Family Homes
CLIN 0007 Option Item No. 6 - Price includes the following:
Price for providing all work in connection with construction of Apartment Building 1 - Villaggio to the 1.5 meter line outside of the building in accordance with the drawings and specifications, and excludes all other contract line items (CLINs).
DESCRIPTION TOTAL PRICE FOR CLIN
0007 Construction of Apartment Building 1 - Villaggio
1.2 GENERAL BID NOTES
a. Award will be made on the total sum of Contract Line Item[s] 0001AA, 0001AB, 0001AC, and CLIN 0002, 0003, 0004, 0005, 0006 and 0007.
b. The Government reserves the unilateral right to award CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006 and 0007 to the Contractor at the proposed price within 270 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, CLIN 0003, CLIN 0004, CLIN 0005, 0006 and 0007. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains 800 calendar days after award of the contract.
c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001.In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
e. If CLIN 0002, 0003, 0004, 0005, 0006 and 0007 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Document --