Attachment H - 1595974dwg39of43.pdf
PDF 18 MB Posted
- Attached to
- P-759, FAMILY HOUSING NEW CONSTRUCTION VILLAGGIO SW & CAMP EDERLE NORTH - VICENZA, ITALY
- Solicitation number
- N62470-20-R-4007
About this file
This document provides details for a federal contract solicitation for construction services. The solicitation number is N62470-20-R-4007 and is being issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy. The solicitation is for new family housing construction at Villaggio Southwest and Camp Ederle North in Vicenza, Italy. Interested parties should review the solicitation document and attachments for additional requirements and response instructions. The deadline and award dates are not specified in this attachment.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WP
WPTYPICAL PV
MODULE /
MODULO TIPICO
PANNELLO
FOTOVOLTAICO
.8 m
.8 m
1.8 m 1.8 m
10A
10A
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER
DC COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
DC DISCONNECT /
SEZIONATORE DCPV SOURCE
CIRCUIT /
CIRCUITO
SORGENTE PV
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
DC
AC 3Ø
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
kWh
SPI
DDI
32A
32A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(2)-16mm2 IN 21mm C.
(4)-16mm2 IN 21mm C.
32A
DDR
GENERAL NOTES: /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE
BASED. REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO
SULLE PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE -
SEZIONE 26 31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE
ESSERE CONFORME A TUTTE LE NORMATIVE REGIONALI E
LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF
THE COTR AND UTILITY PRIOR TO GRID CONNECTION.
SCHEDULE AND NOTIFY COTR AND ALL APPLICABLE AGENCIES
PRIOR TO TEST. VERIFY PROPER SYSTEM OPERATION WITH
COTR AND PROVIDE DOCUMENTATION TO THE COTR. NOTIFY
THE COTR OF ANY ISSUES DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN
PRESENZA DEL CONTRAENTE E DEL DISTRIBUTORE DEL
SERVIZIO PRIMA DELLA CONNESSIONE ALLA RETE. PIANIFICARE
ED AVVISARE IL CONTRAENTE E TUTTI GLI ENTI INTERESSATI
PRIMA DELLA PROVA. VERIFICARE L'OPERATIVITA' CORRETTA
DEL SISTEMA CON IL CONTRAENTE E FORNIRGLI LA
DOCUMENTAZIONE. NOTIFICARE IL CONTRAENTE DI QUALSIASI
PROBLEMA RISCONTRATO DURANTE LA PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON
ELECTRICAL FLOORPLANS FOR ADJACENT PV EQUIPMENT
INDICATED ON ONE-LINE DIAGRAMS. / FARE RIFERIMENTO ALLE
POSIZIONI PRINCIPALI DEL PANNELLO DI DISTRIBUZIONE SUI
PIANI ELETTRICI PER APPARECCHIATURE FV ADIACENTI INDICATI
SU SCHEMI A UNA LINEA.
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P E D B L D G E .r v t
E D
E R
LE
A
P T
B
LD
G
P H
O T
O V
O
LT
A
IC
P
LA
N
E D
E R
LE
A
P T
B
LD
G
P
IA
N
TA
IM
P
IA
N
T O
F O
T O
V O
LT
A
IC
O
EPV101
EJA EJA DMS
14083773
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
PIANTA FOTOVOLTAICO TETTO
SCALE: NTS
PHOTOVOLTAIC SYSTEM
ONE-LINE DIAGRAM /
SCHEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
PHOTOVOLTAIC SYSTEM SCHEDULE / TABELLA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
DIMENSIONE
DEL MODULO
DI
RIFERIMENTO
DI PROGETTO
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Vmax
SYSTEM
VOLTAGE
[DC] /
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'
INVERTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430W 26 11.18 kW 48 V 600 V 12.5 kW 13 2
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs. 28-2011 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA
DELL'IMPIANTO
PRESCRIBED K VALUE
(AFTER JAN 1 2017) /
VALORE K
PRESCRITTO (DOPO IL
1 GENNAIO 2017)
MINIMUM RENEWABLE ENERGY SYSTEM SIZE CALCULATION / CALCOLO MINIMO DI
MISURA DEL SISTEMA ENERGETICO RINNOVABILE
P(kW) = S/K
521.82 m² 50 10.44 kW
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH
THAT RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON
LOSS OF UTILITY POWER OR OPERATION OF DISCONNECTING
MEANS. PROVIDE EXTERIOR SIGNAGE INDICATING RAPID
SHUTDOWN FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER
CHIUDERE LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA
O FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE
UNA SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI
SPEGNIMENTO RAPIDO.
2 PROVIDE LOCAL MONITORING AND COMMUNICATIONS
FUNCTIONALITY (SPI DEVICE) THAT ALLOW FOR PHOTOVOLTAIC
SYSTEM OUTPUT VOLTAGE MONITORING AND CONTROL.
PHOTOVOLTAIC SYSTEM MUST BE CAPABLE OF REMOTE
SHUTDOWN DURING PERIODS OF GRID INSTABILITY. PROVIDE
CAT6 CABLING TO FACILITY COMMUNICATIONS BACKBOARD AND
TERMINATE PER UTILITY AND COTR DIRECTION. ENSURE THE
CABLING IS INTEGRATED AND COMMISSIONED SUCH THAT THE
PV SYSTEM PARAMETERS MAY BE SUPERVISED AND
CONTROLLED REMOTELY BY UTILITY. / FORNIRE FUNZIONALITÀ
DI MONITORAGGIO E COMUNICAZIONE (SPI) CHE CONSENTONO IL
MONITORAGGIO DEL SISTEMA FOTOVOLTAICO E IL CONTROLLO
DELL'UTILITÀ LOCALE. IL SISTEMA FOTOVOLTAICO DEVE ESSERE
IN GRADO DI SPEGNIMENTO REMOTO DURANTE I PERIODI DI
INSTABILITÀ DELLA RETE. FORNISCI IL CABLAGGIO CAT6 ALLA
SCHEDA COMUNICAZIONE DEGLI IMPIANTI E IL TERMINATO PER
UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE IL CABLAGGIO SIA
INTEGRATO E MESSA IN SERVIZIO TALE CHE I PARAMETRI
DELL'IMPIANTO FAVORE POSSONO ESSERE SUPERVISITI E
CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE
INTERMEDIO MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
10A
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER
DC COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
DC DISCONNECT /
SEZIONATORE DC
PV SOURCE
CIRCUIT /
CIRCUITO
SORGENTE PV
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV (2)-16mm2 IN
21mm C.
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
DC
AC 3Ø
kWh
SPI
DDI
32A
32A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(4)-16mm2 IN 21mm C.
32A
DDR
TYPICAL PV
MODULE /
MODULO TIPICO
PANNELLO
FOTOVOLTAICO
1.8 m
.8 m
1.8 m
.8 m
GENERAL NOTES: /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE
BASED. REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO
SULLE PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE -
SEZIONE 26 31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE
ESSERE CONFORME A TUTTE LE NORMATIVE REGIONALI E
LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF
THE COTR AND UTILITY PRIOR TO GRID CONNECTION.
SCHEDULE AND NOTIFY COTR AND ALL APPLICABLE AGENCIES
PRIOR TO TEST. VERIFY PROPER SYSTEM OPERATION WITH
COTR AND PROVIDE DOCUMENTATION TO THE COTR. NOTIFY
THE COTR OF ANY ISSUES DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN
PRESENZA DEL CONTRAENTE E DEL DISTRIBUTORE DEL
SERVIZIO PRIMA DELLA CONNESSIONE ALLA RETE. PIANIFICARE
ED AVVISARE IL CONTRAENTE E TUTTI GLI ENTI INTERESSATI
PRIMA DELLA PROVA. VERIFICARE L'OPERATIVITA' CORRETTA
DEL SISTEMA CON IL CONTRAENTE E FORNIRGLI LA
DOCUMENTAZIONE. NOTIFICARE IL CONTRAENTE DI QUALSIASI
PROBLEMA RISCONTRATO DURANTE LA PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON
ELECTRICAL FLOORPLANS FOR ADJACENT PV EQUIPMENT
INDICATED ON ONE-LINE DIAGRAMS. / FARE RIFERIMENTO ALLE
POSIZIONI PRINCIPALI DEL PANNELLO DI DISTRIBUZIONE SUI
PIANI ELETTRICI PER APPARECCHIATURE FV ADIACENTI INDICATI
SU SCHEMI A UNA LINEA.
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P E D B L D G E .r v t
E D
E R
LE
A
P T
B
LD
G
P H
O T
O V
O
LT
A
IC
P
LA
N
E D
E R
LE
A
P T
B
LD
G
P
IA
N
TA
IM
P
IA
N
T O
F O
T O
V O
LT
A
IC
O
EPV103
EJA EJA DMS
14083774
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH
THAT RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON LOSS
OF UTILITY POWER OR OPERATION OF DISCONNECTING MEANS.
PROVIDE EXTERIOR SIGNAGE INDICATING RAPID SHUTDOWN
FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER
CHIUDERE LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA O
FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE UNA
SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI
SPEGNIMENTO RAPIDO.
2 PROVIDE LOCAL MONITORING AND COMMUNICATIONS
FUNCTIONALITY (SPI DEVICE) THAT ALLOW FOR PHOTOVOLTAIC
SYSTEM OUTPUT VOLTAGE MONITORING AND CONTROL.
PHOTOVOLTAIC SYSTEM MUST BE CAPABLE OF REMOTE
SHUTDOWN DURING PERIODS OF GRID INSTABILITY. PROVIDE
CAT6 CABLING TO FACILITY COMMUNICATIONS BACKBOARD AND
TERMINATE PER UTILITY AND COTR DIRECTION. ENSURE THE
CABLING IS INTEGRATED AND COMMISSIONED SUCH THAT THE PV
SYSTEM PARAMETERS MAY BE SUPERVISED AND CONTROLLED
REMOTELY BY UTILITY. / FORNIRE FUNZIONALITÀ DI
MONITORAGGIO E COMUNICAZIONE (SPI) CHE CONSENTONO IL
MONITORAGGIO DEL SISTEMA FOTOVOLTAICO E IL CONTROLLO
DELL'UTILITÀ LOCALE. IL SISTEMA FOTOVOLTAICO DEVE ESSERE
IN GRADO DI SPEGNIMENTO REMOTO DURANTE I PERIODI DI
INSTABILITÀ DELLA RETE. FORNISCI IL CABLAGGIO CAT6 ALLA
SCHEDA COMUNICAZIONE DEGLI IMPIANTI E IL TERMINATO PER
UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE IL CABLAGGIO SIA
INTEGRATO E MESSA IN SERVIZIO TALE CHE I PARAMETRI
DELL'IMPIANTO FAVORE POSSONO ESSERE SUPERVISITI E
CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE
INTERMEDIO MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
SCALE: NTS
PHOTOVOLTAIC SYSTEM
ONE-LINE DIAGRAM /
SCHEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
PIANTA FOTOVOLTAICO TETTO
PHOTOVOLTAIC SYSTEM SCHEDULE / TABELLA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
DIMENSIONE
DEL MODULO
DI
RIFERIMENTO
DI PROGETTO
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Vmax
SYSTEM
VOLTAGE
[DC] /
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'INVE
RTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430 26 11.18 kW 48 V 600 V 12.5 kW 13 2
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs. 28-2011 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA
DELL'IMPIANTO
PRESCRIBED K VALUE
(AFTER JAN 1 2017) /
VALORE K
PRESCRITTO (DOPO IL
1 GENNAIO 2017)
MINIMUM RENEWABLE ENERGY SYSTEM SIZE CALCULATION / CALCOLO MINIMO DI
MISURA DEL SISTEMA ENERGETICO RINNOVABILE
P(kW) = S/K
523.00 m² 50 10.46 kW
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER
DC COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
PV SOURCE
CIRCUIT /
CIRCUITO
SORGENTE PV
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
DC DISCONNECT /
SEZIONATORE DC
(2)-16mm2 IN 21mm C.
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
DC
AC 3Ø
kWh
SPI
DDI
32A
32A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(4)-16mm2 IN 21mm C.
32A
DDR
GENERAL NOTES: /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE
BASED. REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO
SULLE PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE -
SEZIONE 26 31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE
ESSERE CONFORME A TUTTE LE NORMATIVE REGIONALI E
LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF
THE COTR AND UTILITY PRIOR TO GRID CONNECTION.
SCHEDULE AND NOTIFY COTR AND ALL APPLICABLE AGENCIES
PRIOR TO TEST. VERIFY PROPER SYSTEM OPERATION WITH
COTR AND PROVIDE DOCUMENTATION TO THE COTR. NOTIFY
THE COTR OF ANY ISSUES DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN
PRESENZA DEL CONTRAENTE E DEL DISTRIBUTORE DEL
SERVIZIO PRIMA DELLA CONNESSIONE ALLA RETE. PIANIFICARE
ED AVVISARE IL CONTRAENTE E TUTTI GLI ENTI INTERESSATI
PRIMA DELLA PROVA. VERIFICARE L'OPERATIVITA' CORRETTA
DEL SISTEMA CON IL CONTRAENTE E FORNIRGLI LA
DOCUMENTAZIONE. NOTIFICARE IL CONTRAENTE DI QUALSIASI
PROBLEMA RISCONTRATO DURANTE LA PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON
ELECTRICAL FLOORPLANS FOR ADJACENT PV EQUIPMENT
INDICATED ON ONE-LINE DIAGRAMS. / FARE RIFERIMENTO ALLE
POSIZIONI PRINCIPALI DEL PANNELLO DI DISTRIBUZIONE SUI
PIANI ELETTRICI PER APPARECCHIATURE FV ADIACENTI INDICATI
SU SCHEMI A UNA LINEA.
TYPICAL PV
MODULE /
MODULO TIPICO
PANNELLO
FOTOVOLTAICO
1.8 m
1.8 m
. 8 m
1.8 m
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P E D B L D G E .r v t
E D
E R
LE
A
P T
B
LD
G
P H
O T
O V
O
LT
A
IC
P
LA
N
E D
E R
LE
A
P T
B
LD
G
P
IA
N
TA
IM
P
IA
N
T O
F O
T O
V O
LT
A
IC
O
EPV107
EJA EJA DMS
14083775
SCALE: NTS
PHOTOVOLTAIC SYSTEM
ONE-LINE DIAGRAM /
SCHEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH
THAT RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON LOSS
OF UTILITY POWER OR OPERATION OF DISCONNECTING MEANS.
PROVIDE EXTERIOR SIGNAGE INDICATING RAPID SHUTDOWN
FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER
CHIUDERE LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA O
FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE UNA
SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI
SPEGNIMENTO RAPIDO.
2 PROVIDE LOCAL MONITORING AND COMMUNICATIONS
FUNCTIONALITY (SPI DEVICE) THAT ALLOW FOR PHOTOVOLTAIC
SYSTEM OUTPUT VOLTAGE MONITORING AND CONTROL.
PHOTOVOLTAIC SYSTEM MUST BE CAPABLE OF REMOTE
SHUTDOWN DURING PERIODS OF GRID INSTABILITY. PROVIDE
CAT6 CABLING TO FACILITY COMMUNICATIONS BACKBOARD AND
TERMINATE PER UTILITY AND COTR DIRECTION. ENSURE THE
CABLING IS INTEGRATED AND COMMISSIONED SUCH THAT THE PV
SYSTEM PARAMETERS MAY BE SUPERVISED AND CONTROLLED
REMOTELY BY UTILITY. / FORNIRE FUNZIONALITÀ DI
MONITORAGGIO E COMUNICAZIONE (SPI) CHE CONSENTONO IL
MONITORAGGIO DEL SISTEMA FOTOVOLTAICO E IL CONTROLLO
DELL'UTILITÀ LOCALE. IL SISTEMA FOTOVOLTAICO DEVE ESSERE
IN GRADO DI SPEGNIMENTO REMOTO DURANTE I PERIODI DI
INSTABILITÀ DELLA RETE. FORNISCI IL CABLAGGIO CAT6 ALLA
SCHEDA COMUNICAZIONE DEGLI IMPIANTI E IL TERMINATO PER
UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE IL CABLAGGIO SIA
INTEGRATO E MESSA IN SERVIZIO TALE CHE I PARAMETRI
DELL'IMPIANTO FAVORE POSSONO ESSERE SUPERVISITI E
CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE
INTERMEDIO MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
PIANTA FOTOVOLTAICO TETTO
PHOTOVOLTAIC SYSTEM SCHEDULE / TABELLA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
DIMENSIONE
DEL MODULO
DI
RIFERIMENTO
DI PROGETTO
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Vmax
SYSTEM
VOLTAGE
[DC] /
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'INVE
RTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430W 26 11.18 kW 48 V 600 V 12.5 kW 13 2
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs.
28-20122 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA DI BASE
DELL'EDIFICIO
PRESCRIBED K VALUE
(AFTER JAN 1 2017) /
VALORE K
PRESCRITTO (DOPO IL
1 GENNAIO 2017)
MINIMUM RENEWABLE ENERGY SYSTEM SIZE CALCULATION / CALCOLO DIMENSIONE
MINIMA DEL SISTEMA ENERGETICO RINNOVABILE
540.00 m² 50 10.80 kW
T
WP
WP
10A
10A
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER
DC COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
DC DISCONNECT /
SEZIONATORE DC
PV SOURCE
CIRCUIT /
CIRCUITO
SORGENTE PV
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
32A
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
DC
AC 3Ø
kWh
SPI
DDI
32A
32A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(4)-16mm2 IN 21mm C.
DDR
(2)-16mm2 IN 21mm C.
GENERAL NOTES: /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE
BASED. REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO
SULLE PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE -
SEZIONE 26 31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE
ESSERE CONFORME A TUTTE LE NORMATIVE REGIONALI E
LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF
THE COTR AND UTILITY PRIOR TO GRID CONNECTION.
SCHEDULE AND NOTIFY COTR AND ALL APPLICABLE AGENCIES
PRIOR TO TEST. VERIFY PROPER SYSTEM OPERATION WITH
COTR AND PROVIDE DOCUMENTATION TO THE COTR. NOTIFY
THE COTR OF ANY ISSUES DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN
PRESENZA DEL CONTRAENTE E DEL DISTRIBUTORE DEL
SERVIZIO PRIMA DELLA CONNESSIONE ALLA RETE. PIANIFICARE
ED AVVISARE IL CONTRAENTE E TUTTI GLI ENTI INTERESSATI
PRIMA DELLA PROVA. VERIFICARE L'OPERATIVITA' CORRETTA
DEL SISTEMA CON IL CONTRAENTE E FORNIRGLI LA
DOCUMENTAZIONE. NOTIFICARE IL CONTRAENTE DI QUALSIASI
PROBLEMA RISCONTRATO DURANTE LA PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON
ELECTRICAL FLOORPLANS FOR ADJACENT PV EQUIPMENT
INDICATED ON ONE-LINE DIAGRAMS. / FARE RIFERIMENTO ALLE
POSIZIONI PRINCIPALI DEL PANNELLO DI DISTRIBUZIONE SUI
PIANI ELETTRICI PER APPARECCHIATURE FV ADIACENTI INDICATI
SU SCHEMI A UNA LINEA.
TYPICAL PV
MODULE /
MODULO TIPICO
PANNELLO
FOTOVOLTAICO
.8 m
.8 m
1.8 m 1.8 m
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P E D B L D G E .r v t
E D
E R
LE
A
P T
B
LD
G
P H
O T
O V
O
LT
A
IC
P
LA
N
E D
E R
LE
A
P T
B
LD
G
P
IA
N
TA
IM
P
IA
N
T O
F O
T O
V O
LT
A
IC
O
EPV109
EJA EJA DMS
14083776
SCALE: NTS
PHOTOVOLTAIC SYSTEM
ONE-LINE DIAGRAM /
SCHEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH
THAT RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON LOSS
OF UTILITY POWER OR OPERATION OF DISCONNECTING MEANS.
PROVIDE EXTERIOR SIGNAGE INDICATING RAPID SHUTDOWN
FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER
CHIUDERE LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA O
FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE UNA
SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI
SPEGNIMENTO RAPIDO.
2 PROVIDE LOCAL MONITORING AND COMMUNICATIONS
FUNCTIONALITY (SPI DEVICE) THAT ALLOW FOR PHOTOVOLTAIC
SYSTEM OUTPUT VOLTAGE MONITORING AND CONTROL.
PHOTOVOLTAIC SYSTEM MUST BE CAPABLE OF REMOTE
SHUTDOWN DURING PERIODS OF GRID INSTABILITY. PROVIDE CAT6
CABLING TO FACILITY COMMUNICATIONS BACKBOARD AND
TERMINATE PER UTILITY AND COTR DIRECTION. ENSURE THE
CABLING IS INTEGRATED AND COMMISSIONED SUCH THAT THE PV
SYSTEM PARAMETERS MAY BE SUPERVISED AND CONTROLLED
REMOTELY BY UTILITY. / FORNIRE FUNZIONALITÀ DI
MONITORAGGIO E COMUNICAZIONE (SPI) CHE CONSENTONO IL
MONITORAGGIO DEL SISTEMA FOTOVOLTAICO E IL CONTROLLO
DELL'UTILITÀ LOCALE. IL SISTEMA FOTOVOLTAICO DEVE ESSERE IN
GRADO DI SPEGNIMENTO REMOTO DURANTE I PERIODI DI
INSTABILITÀ DELLA RETE. FORNISCI IL CABLAGGIO CAT6 ALLA
SCHEDA COMUNICAZIONE DEGLI IMPIANTI E IL TERMINATO PER
UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE IL CABLAGGIO SIA
INTEGRATO E MESSA IN SERVIZIO TALE CHE I PARAMETRI
DELL'IMPIANTO FAVORE POSSONO ESSERE SUPERVISITI E
CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE
INTERMEDIO MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
PIANTA FOTOVOLTAICO TETTO
PHOTOVOLTAIC SYSTEM SCHEDULE / PROGRAMMA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
DIMENSIONE
DEL MODULO
DI
RIFERIMENTO
DI PROGETTO
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Vmax
SYSTEM
VOLTAGE
[DC]/
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'INVE
RTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430W 26 11.18 kW 48 V 600 V 12.5 kW 13 2
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs.
28-2011 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA DI BASE
DELL'EDIFICIO
PRESCRIBED K VALUE
(AFTER JAN 1 2017) /
VALORE K
PRESCRITTO (DOPO IL
1 GENNAIO 2017)
MINIMUM RENEWABLE ENERGY SYSTEM SIZE CALCULATION / CALCOLO MINIMO DI
MISURA DEL SISTEMA ENERGETICO RINNOVABILE
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER
DC COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
DC DISCONNECT /
SEZIONATORE DC
PV SOURCE
CIRCUIT /
CIRCUITO
SORGENTE PV
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV (2)-16mm2 IN
21mm C.
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
DC
AC 3Ø
kWh
SPI
DDI
32A
32A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(4)-16mm2 IN 21mm C.
32A
DDR
GENERAL NOTES: /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE
BASED. REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO
SULLE PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE -
SEZIONE 26 31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE
ESSERE CONFORME A TUTTE LE NORMATIVE REGIONALI E
LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF
THE COTR AND UTILITY PRIOR TO GRID CONNECTION.
SCHEDULE AND NOTIFY COTR AND ALL APPLICABLE AGENCIES
PRIOR TO TEST. VERIFY PROPER SYSTEM OPERATION WITH
COTR AND PROVIDE DOCUMENTATION TO THE COTR. NOTIFY
THE COTR OF ANY ISSUES DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN
PRESENZA DEL CONTRAENTE E DEL DISTRIBUTORE DEL
SERVIZIO PRIMA DELLA CONNESSIONE ALLA RETE. PIANIFICARE
ED AVVISARE IL CONTRAENTE E TUTTI GLI ENTI INTERESSATI
PRIMA DELLA PROVA. VERIFICARE L'OPERATIVITA' CORRETTA
DEL SISTEMA CON IL CONTRAENTE E FORNIRGLI LA
DOCUMENTAZIONE. NOTIFICARE IL CONTRAENTE DI QUALSIASI
PROBLEMA RISCONTRATO DURANTE LA PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON
ELECTRICAL FLOORPLANS FOR ADJACENT PV EQUIPMENT
INDICATED ON ONE-LINE DIAGRAMS. / FARE RIFERIMENTO ALLE
POSIZIONI PRINCIPALI DEL PANNELLO DI DISTRIBUZIONE SUI
PIANI ELETTRICI PER APPARECCHIATURE FV ADIACENTI INDICATI
SU SCHEMI A UNA LINEA.
TYPICAL PV
MODULE /
MODULO TIPICO
PANNELLO
FOTOVOLTAICO
.8 m
1.8 m
.8 m
1.8 m
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P E D B L D G E .r v t
E D
E R
LE
A
P T
B
LD
G
P H
O T
O V
O
LT
A
IC
P
LA
N
E D
E R
LE
A
P T
B
LD
G
P
IA
N
TA
IM
P
IA
N
T O
F O
T O
V O
LT
A
IC
O
EPV111
EJA EJA DMS
14083777
SCALE: NTS
PHOTOVOLTAIC SYSTEM
ONE-LINE DIAGRAM /
SCHEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH
THAT RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON
LOSS OF UTILITY POWER OR OPERATION OF DISCONNECTING
MEANS. PROVIDE EXTERIOR SIGNAGE INDICATING RAPID
SHUTDOWN FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER
CHIUDERE LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA
O FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE
UNA SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI
SPEGNIMENTO RAPIDO.
2 PROVIDE LOCAL MONITORING AND COMMUNICATIONS
FUNCTIONALITY (SPI DEVICE) THAT ALLOW FOR PHOTOVOLTAIC
SYSTEM OUTPUT VOLTAGE MONITORING AND CONTROL.
PHOTOVOLTAIC SYSTEM MUST BE CAPABLE OF REMOTE
SHUTDOWN DURING PERIODS OF GRID INSTABILITY. PROVIDE
CAT6 CABLING TO FACILITY COMMUNICATIONS BACKBOARD AND
TERMINATE PER UTILITY AND COTR DIRECTION. ENSURE THE
CABLING IS INTEGRATED AND COMMISSIONED SUCH THAT THE
PV SYSTEM PARAMETERS MAY BE SUPERVISED AND
CONTROLLED REMOTELY BY UTILITY. / FORNIRE FUNZIONALITÀ DI
MONITORAGGIO E COMUNICAZIONE (SPI) CHE CONSENTONO IL
MONITORAGGIO DEL SISTEMA FOTOVOLTAICO E IL CONTROLLO
DELL'UTILITÀ LOCALE. IL SISTEMA FOTOVOLTAICO DEVE ESSERE
IN GRADO DI SPEGNIMENTO REMOTO DURANTE I PERIODI DI
INSTABILITÀ DELLA RETE. FORNISCI IL CABLAGGIO CAT6 ALLA
SCHEDA COMUNICAZIONE DEGLI IMPIANTI E IL TERMINATO PER
UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE IL CABLAGGIO SIA
INTEGRATO E MESSA IN SERVIZIO TALE CHE I PARAMETRI
DELL'IMPIANTO FAVORE POSSONO ESSERE SUPERVISITI E
CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE
INTERMEDIO MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
PIANTA FOTOVOLTAICO TETTO
PHOTOVOLTAIC SYSTEM SCHEDULE / TABELLA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
BASE DEL
FORMATO DEL
MODULO DI
DESIGN
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Vmax
SYSTEM
VOLTAGE
[DC] /
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'
INVERTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430W 26 11.18 kW 48 V 600 V 12.5 kW 13 2
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs. 28-2011 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA DI BASE
DELL'EDIFICIO
PRESCRIBED K VALUE
(AFTER JAN 1 2017) /
VALORE K
PRESCRITTO (DOPO IL
1 GENNAIO 2017)
MINIMUM RENEWABLE ENERGY SYSTEM SIZE CALCULATION / CALCOLO MINIMO DI
MISURA DEL SISTEMA ENERGETICO RINNOVABILE
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER DC
COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
PV SOURCE CIRCUIT /
CIRCUITO SORGENTE
PV
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
DC DISCONNECT /
SEZIONATORE DC
(2)-16mm2 IN 21mm C.
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
DC
AC 3Ø
kWh
SPI
DDI
32A
32A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(4)-16mm2 IN 21mm C.
32A
DDR
GENERAL NOTES /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE BASED.
REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO SULLE
PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE - SEZIONE 26
31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE ESSERE
CONFORME A TUTTE LE NORMATIVE REGIONALI E LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF THE
COTR AND UTILITY PRIOR TO GRID CONNECTION. SCHEDULE AND
NOTIFY COTR AND ALL APPLICABLE AGENCIES PRIOR TO TEST.
VERIFY PROPER SYSTEM OPERATION WITH COTR AND PROVIDE
DOCUMENTATION TO THE COTR. NOTIFY THE COTR OF ANY ISSUES
DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN PRESENZA
DEL CONTRAENTE E DEL DISTRIBUTORE DEL SERVIZIO PRIMA DELLA
CONNESSIONE ALLA RETE. PIANIFICARE ED AVVISARE IL
CONTRAENTE E TUTTI GLI ENTI INTERESSATI PRIMA DELLA PROVA.
VERIFICARE L'OPERATIVITA' CORRETTA DEL SISTEMA CON IL
CONTRAENTE E FORNIRGLI LA DOCUMENTAZIONE. NOTIFICARE IL
CONTRAENTE DI QUALSIASI PROBLEMA RISCONTRATO DURANTE LA
PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON ELECTRICAL
FLOORPLANS FOR ADJACENT PV EQUIPMENT INDICATED ON ONE-
LINE DIAGRAMS. / FARE RIFERIMENTO ALLE POSIZIONI PRINCIPALI
DEL PANNELLO DI DISTRIBUZIONE SUI PIANI ELETTRICI PER
APPARECCHIATURE FV ADIACENTI INDICATI SU SCHEMI A UNA
LINEA.
TYPICAL
PV MODULE /
MODULO
IMPIANTO
FOTOVOLTAICO
TIPICO
4.0 m
.8 m
4.0 m
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P V
IL
S F B R E .r v t
V
IL
LA
G
G
IO
O F
H P
H O
T O
V O
LT
A
IC
P
LA
N
V
IL
LA
G G
IO
S
F P
IA
N
T A
IM
P
IA
N
T O
F O
T O
V O
LT
A
IC
O
EPV120
EJA EJA DMS
14083778
SCALE: NTS
PHOTOVOLTAIC SYSTEM ONE-LINE
DIAGRAM /
SCHEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH
THAT RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON
LOSS OF UTILITY POWER OR OPERATION OF DISCONNECTING
MEANS. PROVIDE EXTERIOR SIGNAGE INDICATING RAPID
SHUTDOWN FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER
CHIUDERE LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA
O FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE
UNA SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI
SPEGNIMENTO RAPIDO.
2 PROVIDE MONITORING AND COMMUNICATIONS FUNCTIONALITY
(SPI) THAT ALLOW FOR PHOTOVOLTAIC SYSTEM MONITORING
AND LOCAL UTILITY CONTROL. PHOTOVOLTAIC SYSTEM MUST BE
CAPABLE OF REMOTE SHUTDOWN DURING PERIODS OF GRID
INSTABILITY. PROVIDE CAT6 CABLING TO FACILITY
COMMUNICATIONS BACKBOARD AND TERMINATE PER UTILITY
AND COTR DIRECTION. ENSURE THE CABLING IS INTEGRATED
AND COMMISSIONED SUCH THAT THE PV SYSTEM PARAMETERS
MAY BE SUPERVISED AND CONTROLLED REMOTELY. / FORNIRE
FUNZIONALITÀ DI MONITORAGGIO E COMUNICAZIONE (SPI) CHE
CONSENTONO IL MONITORAGGIO DEL SISTEMA FOTOVOLTAICO E
IL CONTROLLO DELL'UTILITÀ LOCALE. IL SISTEMA FOTOVOLTAICO
DEVE ESSERE IN GRADO DI SPEGNIMENTO REMOTO DURANTE I
PERIODI DI INSTABILITÀ DELLA RETE. FORNISCI IL CABLAGGIO
CAT6 ALLA SCHEDA COMUNICAZIONE DEGLI IMPIANTI E IL
TERMINATO PER UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE
IL CABLAGGIO SIA INTEGRATO E MESSA IN SERVIZIO TALE CHE I
PARAMETRI DELL'IMPIANTO FAVORE POSSONO ESSERE
SUPERVISITI E CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE
INTERMEDIO MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
IMPIANTO FOTOVOLTAICO SUL TETTO
PHOTOVOLTAIC SYSTEM SCHEDULE / TABELLA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
DIMENSIONE
DEL MODULO
DI
RIFERIMENTO
DI PROGETTO
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Vmax
SYSTEM
VOLTAGE
[DC] /
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'
INVERTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430W 10 4.3 kW 48 V 600 V 5.8 kW 10 1
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs. 28-2011 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA DI BASE
DELL'EDIFICIO
PRESCRIBED K VALUE
(AFTER JAN 1 2017) /
VALORE K
PRESCRITTO (DOPO IL
1 GENNAIO 2017)
MINIMUM RENEWABLE ENERGY SYSTEM SIZE CALCULATION / CALCOLO MINIMO DI
MISURA DEL SISTEMA ENERGETICO RINNOVABILE
197.10 m² 50 3.94 kW
WP
R
10A
10A
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER DC
COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
PV SOURCE CIRCUIT /
CIRCUITO SORGENTE
PV
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
DC DISCONNECT /
SEZIONATORE DC
(2)-17mm2 IN 27mm C.
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
DC
AC 3Ø
kWh
SPI
DDI
45A
45A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(4)-25mm2 IN 27mm C.
DDR
45A
GENERAL NOTES /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE BASED.
REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO SULLE
PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE - SEZIONE 26
31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE ESSERE
CONFORME A TUTTE LE NORMATIVE REGIONALI E LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF THE
COTR AND UTILITY PRIOR TO GRID CONNECTION. SCHEDULE AND
NOTIFY COTR AND ALL APPLICABLE AGENCIES PRIOR TO TEST.
VERIFY PROPER SYSTEM OPERATION WITH COTR AND PROVIDE
DOCUMENTATION TO THE COTR. NOTIFY THE COTR OF ANY ISSUES
DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN PRESENZA
DEL CONTRAENTE E DEL DISTRIBUTORE DEL SERVIZIO PRIMA DELLA
CONNESSIONE ALLA RETE. PIANIFICARE ED AVVISARE IL
CONTRAENTE E TUTTI GLI ENTI INTERESSATI PRIMA DELLA PROVA.
VERIFICARE L'OPERATIVITA' CORRETTA DEL SISTEMA CON IL
CONTRAENTE E FORNIRGLI LA DOCUMENTAZIONE. NOTIFICARE IL
CONTRAENTE DI QUALSIASI PROBLEMA RISCONTRATO DURANTE LA
PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON ELECTRICAL
FLOORPLANS FOR ADJACENT PV EQUIPMENT INDICATED ON ONE-
LINE DIAGRAMS. / FARE RIFERIMENTO ALLE POSIZIONI PRINCIPALI
DEL PANNELLO DI DISTRIBUZIONE SUI PIANI ELETTRICI PER
APPARECCHIATURE FV ADIACENTI INDICATI SU SCHEMI A UNA
LINEA.
TYPICAL
PV MODULE /
MODULO
IMPIANTO
FOTOVOLTAICO
TIPICO
.8 m
1.8 m
1.8 m
.8 m
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P V
IL
A P T B L D G E .r v t
V
IL
LA
G
G
IO
A P
T B
LD
G
P
H O
T O
V O
LT
A
IC
P
LA
N
V
IL
LA
G G
IO
A
P T
B
LD
G
P
IA
N T
A
IM
P
IA
N T
O F
O T
O V
O
LT
A
IC
O
EPV121
EJA EJA DMS
14083779
SCALE: NTS
PHOTOVOLTAIC SYSTEM
ONE-LINE DIAGRAM /
SCHEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH THAT
RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON LOSS OF
UTILITY POWER OR OPERATION OF DISCONNECTING MEANS.
PROVIDE EXTERIOR SIGNAGE INDICATING RAPID SHUTDOWN
FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER CHIUDERE
LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA O
FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE UNA
SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI SPEGNIMENTO
RAPIDO.
2 PROVIDE MONITORING AND COMMUNICATIONS FUNCTIONALITY (SPI)
THAT ALLOW FOR PHOTOVOLTAIC SYSTEM MONITORING AND LOCAL
UTILITY CONTROL. PHOTOVOLTAIC SYSTEM MUST BE CAPABLE OF
REMOTE SHUTDOWN DURING PERIODS OF GRID INSTABILITY.
PROVIDE CAT6 CABLING TO FACILITY COMMUNICATIONS BACKBOARD
AND TERMINATE PER UTILITY AND COTR DIRECTION. ENSURE THE
CABLING IS INTEGRATED AND COMMISSIONED SUCH THAT THE PV
SYSTEM PARAMETERS MAY BE SUPERVISED AND CONTROLLED
REMOTELY. / FORNIRE FUNZIONALITÀ DI MONITORAGGIO E
COMUNICAZIONE (SPI) CHE CONSENTONO IL MONITORAGGIO DEL
SISTEMA FOTOVOLTAICO E IL CONTROLLO DELL'UTILITÀ LOCALE. IL
SISTEMA FOTOVOLTAICO DEVE ESSERE IN GRADO DI SPEGNIMENTO
REMOTO DURANTE I PERIODI DI INSTABILITÀ DELLA RETE. FORNISCI
IL CABLAGGIO CAT6 ALLA SCHEDA COMUNICAZIONE DEGLI IMPIANTI E
IL TERMINATO PER UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE IL
CABLAGGIO SIA INTEGRATO E MESSA IN SERVIZIO TALE CHE I
PARAMETRI DELL'IMPIANTO FAVORE POSSONO ESSERE SUPERVISITI
E CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE INTERMEDIO
MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
IMPIANTO FOTOVOLTAICO SUL TETTO
PHOTOVOLTAIC SYSTEM SCHEDULE / TABELLA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
DIMENSIONE
DEL MODULO
RIFERIMENTO
DI PROGETTO
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Vmax
SYSTEM
VOLTAGE
[DC] /
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'
INVERTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430W 32 13.76 kW 48 V 600 V 20 kW 12 3
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs. 28-2011 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA DI BASE
DELL'EDIFICIO
PRESCRIBED K VALUE
(AFTER JAN 1 2017) /
VALORE K
PRESCRITTO (DOPO IL
1 GENNAIO 2017)
MINIMUM RENEWABLE ENERGY SYSTEM SIZE CALCULATION / CALCOLO MINIMO DI
MISURA DEL SISTEMA ENERGETICO RINNOVABILE
682.97 m² 50 13.66 kW
TYPICAL PV
MODULE /
MODULO
FOTOVOLTAICO
TIPICO
1.8 m
1.8 m
1.8 m
1.8 m
GENERAL NOTES: /
NOTE GENERALI
A. PHOTOVOLTAIC SYSTEM AS DETAILED IS PERFORMANCE
BASED. REFER TO SPECIFICATION SECTION 26 31 00. /
IMPIANTO FOTOVOLTAICO COME DETTAGLIATO E' BASATO
SULLE PERFORMANCE. FARE RIFERIMENTO ALLE SPECIFICHE -
SEZIONE 26 31 00.
B. ALL PHOTOVOLTAIC SYSTEM WIRING MUST BE AS DETAILED IN
SPECIFICATIONS AND MUST COMPLY WITH ALL REGIONAL AND
LOCAL CODES. /
TUTTO IL CABLAGGIO DEL SISTEMA FOTOVOLTAICO DEVE
ESSERE CONFORME A TUTTE LE NORMATIVE REGIONALI E
LOCALI.
C. CONDUCT PHOTOVOLTAIC SYSTEM TEST IN THE PRESENCE OF
THE COTR AND UTILITY PRIOR TO GRID CONNECTION.
SCHEDULE AND NOTIFY COTR AND ALL APPLICABLE AGENCIES
PRIOR TO TEST. VERIFY PROPER SYSTEM OPERATION WITH
COTR AND PROVIDE DOCUMENTATION TO THE COTR. NOTIFY
THE COTR OF ANY ISSUES DISCOVERED DURING THE TEST. /
ESEGUIRE LA PROVA DEL SISTEMA FOTOVOLTAICO IN
PRESENZA DEL CONTRAENTE E DEL DISTRIBUTORE DEL
SERVIZIO PRIMA DELLA CONNESSIONE ALLA RETE. PIANIFICARE
ED AVVISARE IL CONTRAENTE E TUTTI GLI ENTI INTERESSATI
PRIMA DELLA PROVA. VERIFICARE L'OPERATIVITA' CORRETTA
DEL SISTEMA CON IL CONTRAENTE E FORNIRGLI LA
DOCUMENTAZIONE. NOTIFICARE IL CONTRAENTE DI QUALSIASI
PROBLEMA RISCONTRATO DURANTE LA PROVA.
D. REFER TO SHEET EPV-501 FOR PHOTOVOLTAIC DETAILS. /
FARE RIFERIMENTO ALLA TAVOLA EPV-501 PER I DETTAGLI DEL
FOTOVOLTAICO
E. REFER TO MAIN DISTRIBUTION PANEL LOCATIONS ON
ELECTRICAL FLOORPLANS FOR ADJACENT PV EQUIPMENT
INDICATED ON ONE-LINE DIAGRAMS. / FARE RIFERIMENTO ALLE
POSIZIONI PRINCIPALI DEL PANNELLO DI DISTRIBUZIONE SUI
PIANI ELETTRICI PER APPARECCHIATURE FV ADIACENTI INDICATI
SU SCHEMI A UNA LINEA.
10A
10A
10A
DC COMBINER
(PARTIAL) /
COMBINATORE DC
(PARZIALE)
REFER TO SCHEDULE FOR QUANTITY OF
MODULES PER STRING AND STRINGS PER
DC COMBINER /
FARE RIFERIMENTO ALL'ABACO DELLE
QUANTITA' DEI MODULI PER STRINGA E
STRINGHE PER COMBINTORE DC
DC DISCONNECT /
SEZIONATORE DCPV SOURCE
CIRCUIT /
CIRCUITO
SORGENTE PV
PV OUTPUT CIRCUIT /
CIRCUITO USCITA
FOTOVOLTAICO
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV
PV STRING /
STRINGA PV (2)-16mm2 IN
21mm C.
FACILITY MAIN
DISTRIBUTION
PANEL (PARTIAL) /
QUADRO DI
DISTRIBUZIONE
PRINCIPALE
DELL'ABITAZIONE
(PARZIALE)
INVERTER /
INVERTER
INVERTER
OUTPUT
CIRCUIT /
CIRCUITO DI
USCITA
INVERTER
DC
AC 3Ø
kWh
SPI
DDI
32A
32A
CONTROL SIGNAL FROM
MEDIUM VOLTAGE
SUBSTATION /
SEGNALE DI CONTROLLO
DALLA CABINA DI MEDIA
TENSIONE
PV ENERGY METER
/ CONTATORE DI
ENERGIA DI PV
(4)-16mm2 IN 21mm C.
32A
DDR
SCALE:
GRAPHIC SCALE / SCALA GRAFICA
D E P A R T M E N T
O F
T H E
N A V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A V A L
F A C
IL
IT
IE
S
E N G
IN
E E R
IN
G
C O M M A N D
DES DRW
S Y M
D E S C R
IP
T
IO
N
D A T E
A P P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
DES PROD DIR
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
A
T L A
N T
IC
N O R
FO
LK
VA
FIRE PROTECTION
AS SHOWN
1595974
R. STEPHENS, PE
Approved by Michele Millers, AFH-C Program Manager, USAG Italy, via email
R E
VD
AT
E
N33191-15-D-0811
H
AM
P
TO
N
B
LV
D
CCA/MPO
DPS
14 AUG 2020
SEAL
VI
C E N Z A, IT
AL
Y
C
AS
E R M A E D
ER
LE
P -7
A
R M
Y F
A M
IL
Y
H O
U S
IN
G
PLAN NORTH /
PIANTA NORD
1:500
10M 20M 40M
RLS
AECOM
10 S. Jefferson Street, Suite 1600
Roanoke, VA 24011
540.857.3100 tel
540.857.3180 fax
B
IM
V ic e n z a
H o u s in g P E D B L D G E .r v t
E D
E R
LE
A
P T
B
LD
G
P H
O T
O V
O
LT
A
IC
P
LA
N
E D
E R
LE
A
P T
B
LD
G
P
IA
N
TA
IM
P
IA
N
T O
F O
T O
V O
LT
A
IC
O
EPV124
EJA EJA DMS
14083780
SCALE: 1 : 100
ROOF PHOTOVOLTAIC PLAN /
PIANTA FOTOVOLTAICO SUL TETTO
SCALE: NTS
PHOTOVOLTAIC SYSTEM
ONE-LINE DIAGRAM /
SISTEMA UNIFILARE DEL SISTEMA
FOTOVOLTAICO
SHEET KEYNOTES: / NOTE
CHIAVE DEL DISEGNO
1 INVERTER AND DC DISCONNECT MUST BE CONFIGURED SUCH
THAT RAPID SHUTDOWN OF PV PRODUCTION OCCURS UPON
LOSS OF UTILITY POWER OR OPERATION OF DISCONNECTING
MEANS. PROVIDE EXTERIOR SIGNAGE INDICATING RAPID
SHUTDOWN FUNCTION. / L'INTERRUTTORE E L'INTERRUTTORE DI
SCOLLEGAMENTO DC DEVONO ESSERE CONFIGURATI PER
CHIUDERE LA PRODUZIONE FV A CAUSA DI PERDITA DI POTENZA
O FUNZIONAMENTO DEI MEZZI DI DISCONNESSIONE. FORNIRE
UNA SEGNALETICA ESTERNA CHE INDICA LA FUNZIONE DI
SPEGNIMENTO RAPIDO.
2 PROVIDE LOCAL MONITORING AND COMMUNICATIONS
FUNCTIONALITY (SPI DEVICE) THAT ALLOW FOR PHOTOVOLTAIC
SYSTEM OUTPUT VOLTAGE MONITORING AND CONTROL.
PHOTOVOLTAIC SYSTEM MUST BE CAPABLE OF REMOTE
SHUTDOWN DURING PERIODS OF GRID INSTABILITY. PROVIDE
CAT6 CABLING TO FACILITY COMMUNICATIONS BACKBOARD AND
TERMINATE PER UTILITY AND COTR DIRECTION. ENSURE THE
CABLING IS INTEGRATED AND COMMISSIONED SUCH THAT THE PV
SYSTEM PARAMETERS MAY BE SUPERVISED AND CONTROLLED
REMOTELY BY UTILITY. / FORNIRE FUNZIONALITÀ DI
MONITORAGGIO E COMUNICAZIONE (SPI) CHE CONSENTONO IL
MONITORAGGIO DEL SISTEMA FOTOVOLTAICO E IL CONTROLLO
DELL'UTILITÀ LOCALE. IL SISTEMA FOTOVOLTAICO DEVE ESSERE
IN GRADO DI SPEGNIMENTO REMOTO DURANTE I PERIODI DI
INSTABILITÀ DELLA RETE. FORNISCI IL CABLAGGIO CAT6 ALLA
SCHEDA COMUNICAZIONE DEGLI IMPIANTI E IL TERMINATO PER
UTILITÀ E DIREZIONE COTR. ASSICURARSI CHE IL CABLAGGIO SIA
INTEGRATO E MESSA IN SERVIZIO TALE CHE I PARAMETRI
DELL'IMPIANTO FAVORE POSSONO ESSERE SUPERVISITI E
CONTROLLATI DA REMOTO.
3 PROVIDE INVERTER WITH INTERNAL MODULAR DC SURGE
ARRESTOR. / FORNIRE L'INVERTER CON L'ARRESTORE
INTERMEDIO MODULARE DC SURGE.
4 PROVIDE SHUNT TRIP CIRCUIT BREAKER CAPABLE OF RECEIVING
OPENING SIGNAL FROM SPI DEVICE AND ALL COMMUNICATIONS
CABLING. / FORNIRE LO INTERRUTTORE DI CIRCUITO DI CIRCUITO
SHUNT IN GRADO DI RICEVERE IL SEGNALE DI APERTURA DAL
DISPOSITIVO SPI.
PHOTOVOLTAIC SYSTEM SCHEDULE / TABELLA DEL SISTEMA FOTOVOLTAICO
BASIS OF
DESIGN
MODULE SIZE /
DIMENSIONE
DEL MODULO
RIFERIMENTO
DI PROGETTO
FACILITY
MODULE
QUANTITY /
QUANTITA' DI
MODULI DELLA
STRUTTURA
APPROXIMATE
SYSTEM SIZE
[kWdc] /
DIMENSIONE
DEL SISTEMA
APPROSSIMAT
A
MODULE
Vmax [DC]
/ MODULO
Mmax
SYSTEM
VOLTAGE
[DC] /
TENSIONE
DEL
SISTEMA
MIN.
INVERTER
SIZE /
DIMENSIO
NE MINIMA
DELL'INVE
RTER
MODULES
PER STRING /
MODULI PER
STRINGA
MINIMUM #
STRINGS /
MINIMO # DI
STRINGHE
PV SYSTEM /
IMPIANTO FV
430W 26 11.18 kW 48 V 600 V 12.5 kW 13 2
Dlgs. 28-2011 ANNEX 3 RENEWABLE ENERGY REQUIREMENT CALCULATION / Dlgs. 28-2011 ANNESSO 3 CALCOLO DEI REQUISITI DI ENERGIA RINNOVABILE
S = BUILDING
FOOTPRINT /
AREA DI BASE
DELL'EDIFICIO
PRESCRIBED K…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .