(J) Pre-Proposal Conference Presentation.pdf
PDF 20 MB Posted
- Attached to
- P-759, FAMILY HOUSING NEW CONSTRUCTION VILLAGGIO SW & CAMP EDERLE NORTH - VICENZA, ITALY
- Solicitation number
- N62470-20-R-4007
About this file
This document provides details on a pre-proposal conference presentation for solicitation number N62470-20-R-4007 from the Naval Facilities Engineering Command. The solicitation is for the construction of new family housing at Villaggio Southwest and Camp Ederle North in Vicenza, Italy. Interested offerors can find additional information on products, services, response dates and other requirements in the solicitation and associated attachments. The pre-proposal conference presentation would provide an overview of the opportunity and allow potential offerors to ask questions before submitting proposals.
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC EUROPE AFRICA CENTRAL
Overall Classification: UNCLASSIFIED/FOR OFFICIAL USE ONLY
P759 FAMILY HOUSING NEW CONSTRUCTION
VILLAGGIO SW & CAMP EDERLE NORTH
VICENZA, ITALY - PHASE 1
Pre-Proposal Conference and Site Walk Solicitation N62470-20-R-4007
CAPT J.J. Kilian Commanding Officer, NAVFAC EURAFCENT
24 November 2020
AGENDA
Welcome Conference Ground Rules Introductions Vicenza Army Family Housing Recapitalization
Program (Phases 1 - 4) Overview Existing Conditions (all phases) P759 - Phase 1 Project Plan Scope P759 - Solicitation Overview/ Contents of RFP
CONFERENCE GROUND RULES
Minutes of this meeting will not be published.
No questions are permitted.
Participant microphones will remain muted.
Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation.
The terms and conditions of the solicitation remain unchanged unless the solicitation is amended in writing (SF-30).
Cameras, photography, screenshots, video or audio recording, and/ or any other forms of recording are not permitted during this presentation.
ITEMS TO NOTE
All documents associated with this solicitation can be found on the Beta.Sam.Gov Contract Opportunities site.
Subsequent to this Conference, the PowerPoint presentation and the list of attendees will be posted.
All prospective offerors are advised that the solicitation will remain unchanged unless it is amended in writing.
INTRODUCTIONS
NAVFAC ATLANTIC
Vivienne Moore Contracting Officer
Chad Aaby Project Manager
Melody Osborne Design Manager
NAVFAC EURAFCENT
CAPT J.J. Kilian Commanding Officer
NAVFAC EURAFCENT
Renee Comfort, Chief of Contracts
Geoffrey Chun, Counsel
LCDR Jon Angle, AOPS
LCDR Ethan Moeckl, ROICC
Barry Forbes, DCBLL
VILLAGGIO SW & CAMP EDERLE NORTH
Vicenza Army Family Housing Recapitalization Program
Overview of Phases 1 - 4
FAMILY HOUSING NEW CONSTRUCTION VILLAGGIO
SW & CAMP EDERLE NORTH - VICENZA, ITALY
PROJECT LOCATION MAP
VILLAGIO
VILLAGGIO RECAPITALIZATION
Phase 1 - 4
UNITS BY PHASE AND TYPE
Phase 1 Phase 2 Phase 3 Phase 4 Total
EDERLE
3 Bed Apt 50 0 0 0 50 Total 50 0 0 0 50
VILLAGGIO
3 Bed Apt 12 64 63 38 177 4 Bed Apt 4 15 22 9 50 5 Bed Apt 2 0 3 0 5 Total 18 79 88 47 232
3 Bed TH 24 32 23 25 104 4 Bed TH 4 19 10 15 48 5 Bed TH 10 0 9 0 19 Total 38 51 42 40 171
K&E SFH
O-6 SFH 5 0 0 18 23
GFOQ SFH 0 0 0 2 2
Total 5 0 0 20 25
Total 111 130 130 107 478
VILLAGGIO PHASE 1
CAMP EDERLE RECAPITALIZATION
(PHASE 1)
VILLAGGIO PHASE 2
VILLAGGIO PHASE 3
VILLAGGIO PHASE 4
EXISTING CONDITIONS
VILLAGGIO EXISTING SITE PLAN
Typical 4-Unit Townhouses
Front Door
Entryway
Storage Area
Bathroom
Closet
Living Room
Kitchen
Upstairs Bathroom
Upstairs Bedrooms
Upstairs Bedroom 1
Upstairs Bedroom 2
Upstairs Bedroom 3
Houses behind High School - Villaggio
Houses behind High School - Villaggio
Backside of house
ADN site by Water Tower - Villaggio
Caserma Ederle Existing Site
ADN site by BLDG 305 - Ederle
RECAPITALIZATION
NEW CONSTRUCTION
Phase 1 Project Plan Scope
VILLAGIO & EDERLE
HOUSING UNITS Phase 1 Bid Options
Building 3 Bedroom
Bedroom
Bedroom
Total Units
Bid Option Quantity
BASE BID:
Townhouse Block 1 8 2 3 13 0 Townhouse Block 2 7 0 5 12 0 Townhouse Block 3 3 1 0 4 0 Ederle Apartments 50 0 0 50 0 Total Base Bid Units 68 3 8 79 0
BID OPTIONS:
*Option 1 Townhouse Block 4 3 0 2 5 5 *Option 2 Townhouse Block 5 3 1 0 4 4 *Option 3 Apartment Building 2 6 2 1 9 9 *Option 4 K&E Houses 0 5 0 5 5 *Option 5 K&E Houses Site Work 0 0 0 0 0 *Option 6 Apartment Building 1 6 2 1 9 9 Total Bid Option Units 18 10 4 - 32 Total Housing Unit Summary 86 13 12 111 -
* Bid Options
VILLAGIO & EDERLE
Contract Line Item Summary & Options
CLIN 0001AA
Price for the entire work to construct 79 housing units at Villaggio and Casserma Ederle complete to the 1.5 meter line outside of the building, in accordance with the drawings and specifications, and excludes all other contract line items (CLINs)
CLIN 0001AB
Price for the entire project Site Work at Villaggio and Casserma Ederle, outside each buildings 1.5 meter line, complete in accordance with the drawings and specifications, and excludes all other contract line items (CLINs)
CLIN 0001AC
Price for the design and construction of the off- installation gas main at Ederle, and excludes all other contract line items (CLINs).
The gas main is to be designed and installed by SAR. Includes the pressure reducing valve, all SAR fees and General Contractor mark-up and coordination.
*Option 1 - Construction of Townhouse Block 4 – Villaggio
*Option 2 - Construction of Townhouse Block 5 – Villaggio
*Option 3 - Construction of Apartment Building 2 – Villaggio
*Option 4 - Construction of Five (5) K&E Single Family Homes – Villaggio
*Option 5 - Construction of All Site work for Five (5) K&E Single Family Homes – Villaggio
*Option 6 - Construction of Apartment Building 1 – Villaggio
*IN ACCORDANCE WITH SEPARATE BID
SCHEDULE
VILLAGGIO – PHASE 1
BID OPTION 1, 2, 3 & 6 LOCATIONS
VILLAGGIO – PHASE 1
BID OPTION 4 and 5 LOCATIONS
VILLAGGIO PHASE 1
ALL BID OPTIONS - LOCATIONS
VILLAGGIO SW & CAMP EDERLE
UNIQUE ELEMENTS
Foundations Deep foundations will be used to support the apartments, townhouses, and K&E house structures.
Foundation will consist of 600 mm diameter augur cast pile with continuous pile cap supporting structural load bearing walls. A matt foundation system will be used for the Villaggio and Ederle ADN and the substations.
Framing Systems The building roof framing will be constructed using cast -in- place concrete roof slab supported by exterior load-bearing concrete walls for the Ederle site, while the Villaggio site will use the Predalle system with 2 inches of cast- in- place concrete. The floor framing will consist of a cast-in-place concrete slab supported by exterior and interior load-bearing walls. The building enclosure will be reinforced cast in place concrete wall.
Roofs There are three types of roof systems for the project, consisting of:
1) a lowslope roof type (white multi-ply SBS modified bitumen roofing system)
2) a steep slope roof type over conditioned space (mechanically attached clay roof tiles)
3) vegetative roof assembly typically used over unconditioned parking garages at the Ederle apartment buildings
VILLAGGIO SW & CAMP EDERLE
UNIQUE ELEMENTS
Doors
- Apartments There are primarily two types of exterior doors at the apartment buildings.
1) The exterior personnel doors to mechanical spaces are painted galvanized steel stiffened insulated metal doors and one piece frames.
2) The exterior personnel doors for use by residents are full glass insulated medium stile hollow metal doors in hollow metal frames.
- Townhouses and detached houses
1) The exterior entry doors will be factory finished, full glass, insulated steel doors. The vision lites will be patterned glass with an obscure texture to provide natural light to the interior while giving visual privacy.
2) The exterior flush mechanical room doors will be painted galvanized steel stiffened insulated hollow metal doors and frames.
The exterior patio (terrace) doors at apartment and townhouse residential dwelling units will be insulated glazed units with thermally broken anodized aluminum frames.
Windows The typical exterior windows at residential dwelling units (apartments, townhouses, and detached houses) will be insulated glazed units with thermally broken anodized aluminum casement type.
VILLAGGIO UTILITY PLAN
FIRE WATER
DOMESTIC WATER
SEWER
NATURAL GAS
ELECTRIC
COMMUNICATIONS
STORM DRAINAGE
VILLAGGIO FLOOR PLANS
3 BEDROOM APARTMENT
4 BEDROOM APARTMENT
5 BEDROOM APARTMENT
3 BEDROOM TOWNHOUSE
4 BEDROOM TOWNHOUSE
5 BEDROOM TOWNHOUSE
SINGLE FAMILY HOUSE
CAMP EDERLE
CAMP EDERLE – PHASE 1 - UTILITY PLAN
DOMESTIC AND FIRE WATER COMBINED SYSTEM
CAMP EDERLE UTILITY PLAN
PHASE 1 – SANITARY SEWER
PHASE 1 – NATURAL GAS
PHASE 1 – PRIMARY ELECTRIC
PHASE 1 – COMMUNICATIONS
PHASE 1 – STORM DRAINAGE
CAMP EDERLE FLOOR PLANS
3 BEDROOM APARTMENT
SOLICITATION OVERVIEW
Promoting full and open competition Anticipate Awarding One Contract Selection based on Best Value Statutory Cost of Limitation of
$69 Million (U.S.D.) applies to the base
Performance Guarantee is Required
CONTENTS OF RFP
SF1442 – Solicitation/ Basic Contract Section 00 10 00 – Description of Work and
Contract Line Items Section 00 21 00 – Instructions to Bidders
Including Evaluation Factors Section 00 45 00 – Representations and
Certifications Section 00 70 00 – Conditions of the Contract Section 01 00 00 – General Requirements
Clauses
LIST OF ATTACHMENTS
Attachment A – Pre-Proposal Inquiry Form Attachment B – One Day Pass Request Form Attachment C – Construction Experience Project
Data Sheet Attachment D – Past Performance Questionnaire Attachment E – Schedule B Price Proposal Form Attachment F – Vehicle Inspection Form for Proposal
Delivery Attachment G – Specification Project Package (RFP) Attachment H – Drawings
EVALUATION FACTORS
Non-Price Technical Evaluation Factors:
Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Past Performance Factor 4 – Technical Solution
Price
RELATIVE IMPORTANCE OF FACTORS
Factor 2-Safety will only be rated Acceptable or Unacceptable.
If an offeror is rated unacceptable for any factor, they will not be eligible for award, unless the deficiency(ies) is/are remediated through discussions (if held).
For the firms found Acceptable on Factor 2-Safety, the relative order of importance of the non-price evaluation factors is the technical factors (Factor 1-Corporate Experience and Factor 4-Technical Solution) are equal to each other and when combined are of equal importance to the performance confidence assessment (Factor 3- Past Performance).
When the proposal is evaluated as a whole, the technical factors and past performance (performance confidence assessment) combined (i.e., the non-price evaluation factors ) are approximately equal to price.
AWARD
Award will be made to the responsible Offeror whose offer conforms to the solicitation and represents the best value to the Government considering price and non-price factors.
THE GOVERNMENT INTENDS TO AWARD WITHOUT
DISCUSSIONS.
Submit your best offer with initial proposals.
PROCUREMENT MILESTONES
Solicitation, RFP, issued 26 October 2020
Amendment 0001, Pre-Proposal Confer. Detail 10/29/2020
Amendment 0002, Pre-Proposal Confer. Detail (revised) 11/10/2020
Pre-Proposal Inquiries are due no later than 15 calendar days before the proposal due date via email per solicitation instructions.
Proposal due: Thursday, December 10, 2020, NLT 2:00 (1400) Norfolk, VA (USA) local time unless extended via Amendment.
Hardcopy proposal packages shall be submitted.
Electronic/Facsimile submission of proposals will not be accepted.
REMINDERS
Offerors must be registered in the System for Acquisition Management (SAM). For more information, see the SAM website at https://www.sam.gov/SAM/
Please note that Offerors not currently registered in SAM must obtain a DUN & Bradstreet (DUNS) number and a CAGE or NCAGE prior to registering in SAM.
Entities registering from outside the United States MUST contact the Federal Service Desk as part of the registration process.
Offerors proposing as Joint Ventures must have an entry in the SAM database for the specific Joint Venture proposed. JVs require a separate DUNS number and CAGE/NCAGE code for the proposed joined entity.
NOTE: It is highly recommended for new registrants to check with SAM.GOV HelpDesk directly to ensure that all requirements for timely registration are met, especially given the updated procedures for registration.
https://www.sam.gov/SAM/
REMINDERS
Request for information and questions shall be in writing and then submitted using the Pre- Proposal Inquiry Form (Attachment A) as instructed in the solicitation.
Responses to these inquiries are found via amendment to the solicitation.
Offerors are highly encouraged to routinely monitor the website for updates to the solicitation.
WE ANCTICIPATE GOOD COMPETITION
AND LOOK FORWARD TO RECEIVING
YOUR PROPOSALS!
Thank you for your participation!
| Slide Number 1 |
| AGENDA |
| CONFERENCE GROUND RULES |
| ITEMS TO NOTE |
| INTRODUCTIONS |
| VILLAGGIO SW & CAMP EDERLE NORTH |
| FAMILY HOUSING NEW CONSTRUCTION VILLAGGIO �SW & CAMP EDERLE NORTH - VICENZA, ITALY�PROJECT LOCATION MAP |
| VILLAGIO |
| VILLAGGIO SW & CAMP EDERLE NORTH�UNITS BY PHASE AND TYPE |
| Slide Number 10 |
| CAMP EDERLE RECAPITALIZATION �(PHASE 1) |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| VILLAGGIO SW & CAMP EDERLE NORTH |
| Slide Number 16 |
| Typical 4-Unit Townhouses |
| Typical 4-Unit Townhouses |
| Typical 4-Unit Townhouses |
| Typical 4-Unit Townhouses |
| Typical 4-Unit Townhouses |
| Front Door |
| Entryway |
| Storage Area |
| Bathroom |
| Closet |
| Living Room |
| Living Room |
| Living Room |
| Kitchen |
| Upstairs Bathroom |
| Upstairs Bedrooms |
| Upstairs Bedroom 1 |
| Upstairs Bedroom 2 |
| Upstairs Bedroom 3 |
| Houses behind High School - Villaggio |
| Houses behind High School - Villaggio |
| Backside of house |
| ADN site by Water Tower - Villaggio |
| Caserma Ederle Existing Site |
| ADN site by BLDG 305 - Ederle |
| VILLAGGIO SW & CAMP EDERLE NORTH |
| NEW CONSTRUCTION �VILLAGGIO SW & CAMP EDERLE NORTH� |
| VILLAGIO & EDERLE�HOUSING UNITS Phase 1 Bid Options |
| VILLAGIO & EDERLE�Contract Line Item Summary & Options |
| �� |
| �� |
| Slide Number 48 |
| Slide Number 49 |
| Slide Number 50 |
| Slide Number 51 |
| Slide Number 52 |
| Slide Number 53 |
| �VILLAGGIO UTILITY PLAN�NATURAL GAS� |
| VILLAGGIO UTILITY PLAN�ELECTRIC |
| VILLAGGIO UTILITY PLAN�COMMUNICATIONS |
| VILLAGGIO UTILITY PLAN�STORM DRAINAGE |
| VILLAGGIO FLOOR PLANS�3 BEDROOM APARTMENT |
| VILLAGGIO FLOOR PLANS�4 BEDROOM APARTMENT |
| VILLAGGIO FLOOR PLANS�5 BEDROOM APARTMENT |
| VILLAGGIO FLOOR PLANS�3 BEDROOM TOWNHOUSE |
| VILLAGGIO FLOOR PLANS�4 BEDROOM TOWNHOUSE |
| VILLAGGIO FLOOR PLANS�5 BEDROOM TOWNHOUSE |
| VILLAGGIO FLOOR PLANS�SINGLE FAMILY HOUSE |
| CAMP EDERLE |
| CAMP EDERLE – PHASE 1 - UTILITY PLAN�DOMESTIC AND FIRE WATER COMBINED SYSTEM |
| CAMP EDERLE UTILITY PLAN�PHASE 1 – SANITARY SEWER |
| CAMP EDERLE UTILITY PLAN�PHASE 1 – NATURAL GAS |
| CAMP EDERLE UTILITY PLAN�PHASE 1 – PRIMARY ELECTRIC |
| CAMP EDERLE UTILITY PLAN�PHASE 1 – COMMUNICATIONS |
| CAMP EDERLE UTILITY PLAN�PHASE 1 – STORM DRAINAGE |
| CAMP EDERLE FLOOR PLANS�3 BEDROOM APARTMENT |
| �VILLAGGIO SW & CAMP EDERLE NORTH� |
| SOLICITATION OVERVIEW |
| CONTENTS OF RFP |
| LIST OF ATTACHMENTS |
| EVALUATION FACTORS |
| RELATIVE IMPORTANCE OF FACTORS |
| AWARD |
| PROCUREMENT MILESTONES |
| REMINDERS |
| REMINDERS |
| Slide Number 83 |