Att_(1)_PWS_v1.3.pdf
PDF 593 KB Posted
- Attached to
- Advanced Helicopter Training System (AHTS) TH-XX Aircraft Federal contract opportunity
- Solicitation number
- N6134019R0007
About this file
This is an amendment to a solicitation for an Advanced Helicopter Training System. The Navy seeks to procure TH-XX aircraft, associated ground-based training systems, contractor logistics support, maintenance training, and curriculum development. Key requirements include delivery of 130 TH-XX aircraft and support equipment, instructor pilot training, maintenance training, development of technical publications and a NATOPS flight manual, engineering support, and working groups to produce an integrated training curriculum. The offer due date remains unchanged. The amendment disseminates responses to potential offeror questions and incorporates updates to the performance work statement and an access agreement.
Performance Work Statement
View the file
Other files for this federal contract opportunity
Show all 50
Advanced Helicopter Training System (AHTS) TH-XX Aircraft has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract N61340-19-R-0007 Attachment 1
Performance Work Statement for
TH-XX Aircraft Procurement
N61340-19-R-0007 v1.3
17 January 2019
Prepared by:
Program Executive Officer - Tactical Aircraft Programs (PEO(T))
Naval Undergraduate Flight Training Systems (PMA-273)
48187 Standley Road, Building 4010, Room 228
Patuxent River, MD 20670
Approved by:___________________
DISTRIBUTION A. Approved for public release: distribution unlimited.
CHANGE SUMMARY PAGE
This change summary page is provided to maintain a record of changes to the
PWS. Upon receipt of a change or revision, the holder of the SOW shall incorporate the change(s) and/or revision(s) into the basic PWS and make appropriate entries on the record of changes below.
Record of Changes
Revision
Date
Revised Title or Brief Description
1.1 2/19/19 Added Change Summary Page
Clarified 3.6.1 maintenance training requirements
Clarified 3.1.13.2 Government acceptance test flight requirements
1.2 3/5/19 Added reference to reusable engine storage and shipping containers in 3.2
1.3 3/19/19 Correction to the URL in
Appendix A, Paragraph 7 under
Section J, CAC and SAAR-N procedures
LIST OF ACRONYMS
AHTS Advanced Helicopter Training System
CAI Computer-Assisted Instruction
CAC Common Access Card
CDRL Contract Data Requirements List
CFR Code of Federal Regulations
CLIN Contract Line Item Number
CLS Contractor Logistics Support
CNATRA Chief of Naval Air Training
DCMA Defense Contract Management Agency
EI Engineering Investigation
ESOH Environmental, Safety, and Occupational Health
FAA Federal Aviation Administration
FL Florida
FMS Flight Management System
FPB Final Product Baseline
FST Fleet Support Team
FTD Flight Training Device
GAT Government Acceptance Testing
GBTS Ground Based Training System
HUMS Health and Usage Monitoring System
IAW in accordance with
ICA Instructions for Continued Airworthiness
ICW Interactive Courseware
IFR Instrument Flight Rules
IP Instructor Pilot
IPR Integrated Program Review
ISC Industry Steering Committee
MD Maryland
NAS Naval Air Station
NATOPS Naval Aviation Training and Operating Procedures Standardization
OGR On-Site Government Representative
PBS Performance Based Specification
PEO(T) Program Executive Office – Tactical Aircraft Programs
PKI Public Key Infrastructure
PMA Program Manager, Air
PWS Performance Work Statement
SCORM Shareable Content Object Reference Model
SMP Sustainment Management Plan
STC Supplemental Type Certificate
TC Type Certification
TCH Type Certificate Holder
USB Universal Serial Bus
Table of Contents
1.0 Scope
1.1 Objective
1.2 Background
2.0 References
3.0 Requirements
3.1 TH-XX
3.1.1 Contractor Responsibilities
3.1.2 FAA Airworthiness Certification
3.1.3 FAA IFR Certification
3.1.4 User Interface Configuration
3.1.5 Final Product Baseline
3.1.6 Government Furnished Equipment/Materiel
3.1.7 Military Aircraft Identification Information
3.1.8 TH-XX Flyaway Kit
3.1.8.1 Window Covers
3.1.8.2 Wheels for Skids
3.1.8.3 Blade Fold Kit
3.1.9 External Hoist and Sling Load Capabilities
3.1.9.1 External Hoist
3.1.9.2 External Sling Load
3.1.10 Software Subscriptions and Licenses
3.1.11 Software End Items
3.1.12 Aircraft Logs and Records
3.1.13 Acceptance Test Procedures
3.1.13.1 Contractor Acceptance Test Procedures
3.1.13.2 Government Acceptance Testing
3.2 Peculiar Support Equipment
3.3 Mission Planning System
3.4 Instructor Pilot Training
3.4.1 TH-XX IP Training Requirements
3.4.2 TH-XX IP Training Curriculum
3.4.3 Flight Hours for Currency
3.5 NATOPS Flight Manual
3.6 Maintenance Personnel Training
3.6.1 TH-XX Maintenance Training Requirements
3.6.2 TH-XX Maintenance Training Curriculum
3.7 Third Party Maintenance Training
3.8 Maintenance Technical Publications
3.8.1 Integrated Electronic Technical Manual
3.8.2 Ground Transportation Instructions
3.9 Contractor-Government Data Submission
3.9.1 Data Management
3.9.2 Data Deliverables
3.9.3 Data Access
a. Access Control
b. Interface
3.10 Instructions for Continued Airworthiness
3.11 Non-FAA ICA Data
3.12 Program Management Reviews
3.12.1 Post-Award Conference
3.12.2 Integrated Program Review
3.13 Program Progress/Status Reporting
3.14 Spectrum Management
3.15 Sustainment Engineering
3.15.1 Engineering/Logistics Reach Back
a. Engineering Investigations
b. Support Categories and Response Times
3.15.2 Field Service Representative
3.15.3 Non-Standard Repairs and Investigations
3.15.4 Sustainment Management Plan
3.15.5 Industry Steering Committee
3.16 Initial Sparing Analysis
3.17 Airframe Analysis
3.18 Structural Monitoring
3.19 Prognostics and Health Management Analysis
3.20 Obsolescence / Diminishing Manufacturing Sources & Material
Shortages
3.21 Environmental, Safety, and Occupational Health
3.22 Energetics List
3.23 Configuration Management
3.23.1 Configuration Data
3.23.2 Configuration Management Plan
3.23.3 Configuration Status Accounting
3.23.4 Request for Variance
3.23.5 Engineering Change Proposals
3.24 Cybersecurity
3.25 Operational Security
3.25.1 Contractor Identification Badges
3.25.2 Government Base Access
3.26 Training Curriculum Development
APPENDIX A - TH-XX Cybersecurity Plan
1.0 Scope
1.1 Objective. This Performance Work Statement (PWS) describes the production, delivery, engineering, and training curriculum support requirements for the Advanced Helicopter Training System (AHTS) TH-XX aircraft procurement.
1.2 Background
a. The mission of Chief of Naval Air Training (CNATRA) is to produce aviators and flight officers in sufficient quantity to meet Fleet requirements. Since 1981, CNATRA has utilized a fleet of more than 100 TH-
57B and TH-57C aircraft, corresponding Ground Based Training System (GBTS), and classroom and Computer-Assisted Instruction (CAI) and Interactive
Courseware (ICW) to conduct undergraduate advanced helicopter training.
Military instructors utilize the aircraft, and civilian instructors utilize
Flight Training Devices (FTDs) and academic testing, to evaluate Student
Naval Aviators (SNAs) in the skills required to qualify for designation as helicopter pilots and assignment to Fleet Replacement Squadrons with a standard instrument rating.
b. Since 2005, Training Wing FIVE has utilized the TH-57B/C and associated GBTS to conduct intermediate tilt-rotor training. Helicopter and tilt-rotor pilots now make up more than 50% of all Naval Aviators. Current and expected Pilot Training Requirements forecast an annual requirement of more than 600 rotary wing and tilt-rotor pilots, which is estimated to continue to increase through at least 2040.
c. AHTS is a system of systems approach to mitigate capability and capacity gaps in the current helicopter training components. The AHTS concept will meet advanced rotary wing and intermediate tilt-rotor training requirements for the Navy, Marine Corps, and Coast Guard through the year
2050.
d. AHTS consists of:
1. The helicopter, identified in this document as the TH-XX aircraft
2. GBTS, including Flight Training Devices (FTD), CAI, ICW, and classroom instruction.
3. Contractor Logistics Support (CLS), maintenance, and logistics
2.0 References. Table 1 provides expanded titles for the references contained in this PWS. The degree of applicability or regulation imposed by these references is dictated by the paragraphs elsewhere in the PWS.
Table 1: PWS References
FAA 8110.54 Instructions for Continued Airworthiness Responsibilities, Requirements, and Contents
FAA Form 8110-9 Statement of Compliance with Airworthiness Standards
FAA Advisory Circular 121-22C, Maintenance Review Boards, Maintenance Type
Boards, and OEM/TCH Recommended Procedures
FAA Standard Airworthiness Certificate (FAA form 8100-2)
GEIAHB859 Implementation Guide for Data Management
ASD-S1000D, Aerospace and Defence Industries of Europe (ASD) International
Specification for the Procurement and Production of Technical Publications
Title 14 Code of Federal Regulations Rotorcraft, Normal (CFR Part 27), Appendix B
DD Form 1494, Application for Frequency Authorization
CNATRAINST 5239.3 CHIEF OF NAVAL AIR TRAINING Command Cybersecurity Program
DODD 8500.01E Information Assurance (IA)
DODI 8520.02 Public Key Infrastructure (PKI) and Public Key (PK) Enabling
OPNAVINST 5239.1C NAVY INFORMATION ASSURANCE (IA) PROGRAM
SECNAVINST 5239.3B DEPARTMENT OF THE NAVY INFORMATION ASSURANCE POLICY
DOD 5220.22M National Industrial Security Program Operating Manual
AS9100 Quality Management Systems Standard for Aerospace
3.0 Requirements
3.1 TH-XX
3.1.1 Contractor Responsibilities. (CLINs 0X01) The Contractor shall provide all technical, planning, management and manufacturing efforts, as well as all materials, personnel, equipment, facilities, hardware, and software required to execute this contract.
3.1.2 FAA Airworthiness Certification. (CLINs 0X01) The
Contractor, as the Federal Aviation Administration (FAA) Type Certification
Holder (TCH), shall deliver to the Government the FAA Airworthiness
Certificate (FAA Form 8100-2) for each aircraft. (CDRL A001)
3.1.3 FAA IFR Certification. (CLINs 0X01) The Contractor shall maintain the currency of and deliver to the Government the FAA Certificate
(FAA Form 8110-9), Amended Type Certificate, and/or Supplemental Type
Certificates (STC) for Title 14 Code of Federal Regulations (CFR) Rotorcraft, Normal (CFR Part 27) Appendix B through the year 2050. (CDRL A001)
3.1.4 User Interface Configuration. (CLINs 0X01) All aircraft delivered under this contract shall have identical user interface, to include cockpit and cabin layout, functions, operations, procedures, and associated publications except for updates necessary to support FAA airworthiness and
Obsolescence/Diminishing Manufacturing Sources & Material Shortages.
3.1.5 Final Product Baseline. (CLINs 0X01) The Contractor Final
Product Baseline (FPB)(also known as Baseline Configuration) shall be based on the manufacturing baseline as established by the first aircraft of each of the full rate delivery lots. The Contractor shall deliver the documented FPB by lot to the Government. (CDRL A002)
3.1.6 (CLINs 0X01) Government Furnished Equipment/Material. The
Contractor shall provide all materials, personnel, equipment, facilities, and hardware/software required to produce aircraft for this contract. There will be no Government furnished equipment or materiel utilized in support of this contract.
3.1.7 (CLINs 0X01) Military Aircraft Identification Information.
The Government will provide military identification information such as type/model number, aircraft side numbers, unit designator, and radio call sign numbers, to the Contractor no later than 90 days prior to aircraft delivery to the Government to facilitate painting. The Contractor shall deliver to the Government the final paint schematic for the TH-XX aircraft.
(CDRL A027)
3.1.8 TH-XX Flyaway Kit. (CLINs 0X01) The Contractor shall provide a flyaway kit with each aircraft delivered. The flyaway kit shall contain the equipment normally required for aircraft handling and daily storage such as protective covers (inlet, antennas, displays, windshield), rotor blade tie-downs, equipment pins, blade fold kit, etc. The flyaway kit shall include, but is not limited to:
3.1.8.1 Window Covers. With each aircraft delivery, the
Contractor shall provide removable window cover devices capable of reducing ultraviolet radiation and heat damage for the protection of interior equipment when the aircraft is parked and not in use.
3.1.8.2 Wheels for Skids. If the TH-XX aircraft is capable
of having the skids removed and replaced with wheeled landing gear, or if the landing skids are capable of having wheels attached to the skids, then the
Contractor shall provide these alternate wheel attachments with each aircraft delivery.
3.1.8.3 Blade Fold Kit. With each aircraft delivery, the
Contractor shall provide a device capable of folding and securing the rotor blades for ease of transportation and to reduce the storage space requirement inside the hangar.
3.1.9 External Hoist and Sling Load Capabilities
3.1.9.1 External Hoist. (CLIN 0005) The Contractor shall
provide an external hoist capability on all TH-XX aircraft as described in the Performance Based Specification (PBS), Attachment 2. If the hoist capability requires an “A Kit” or fixed provision, it shall be installed on each aircraft prior to delivery. The contractor shall deliver 25 external hoist devices: hoist motor device, additional attaching hardware, and associated storage containers for the hoist when removed from the helicopter.
An external hoist shall be delivered with each of the first 25 aircraft.
3.1.9.2 External Sling Load. (CLIN 0011) The Contractor
shall provide an external sling load capability via cargo hook on all TH-XX aircraft as described in the Performance Based Specification (PBS), Attachment 2. If the external sling load capability requires an “A Kit” or fixed provision, it shall be installed on each aircraft prior to delivery.
The contractor shall deliver 25 external sling load devices: sling load device, additional attaching hardware, and associated storage containers for the sling load device when removed from the helicopter. An external sling load device shall be delivered with each of the first 25 aircraft.
3.1.10 Software Subscriptions and Licenses. (CLINs 0X01) The
Contractor shall deliver with each aircraft an active subscription or software license for any required support to the TH-XX aircraft, such as commercial navigational databases (Garmin or Jeppesen) for both civil and military airfields. The active subscription shall be provided to the
Government with the paid subscription along with any account or website login information associated with the subscription. The Contractor shall deliver active subscriptions or licenses for all software embedded in the aircraft, aircraft subsystems, support equipment, and any mission planning systems.
The active licenses or subscriptions for an aircraft shall be effective for at least one year following delivery of that aircraft. (CDRL A003)
3.1.11 Software End Items. (CLINs 0X01) In addition to software installed on required support equipment (referenced in paragraph 3.2), the
Contractor shall deliver to the Government an additional copy of all software required to support the TH-XX aircraft system, including, but not limited to, software required to conduct a system reboot; reinstall any operating systems, programs, or applications; perform system diagnostics; or perform system updates. The Contractor shall deliver one copy of all such software on the media utilized by the aircraft. The contractor shall deliver any peripheral hardware required to connect this media to a computer via
Universal Serial Bus (USB) or USB-compatible device as support equipment per paragraph 3.2. (CDRL A004)
3.1.12 Aircraft Logs and Records. (CLINs 0X01 and 0X02) The
Contractor shall deliver with each aircraft delivery an up-to-date Aircraft
Maintenance Log Book, and all other information documenting current airworthiness including but not limited to inspections and current weight and balance determination. (CDRL A005)
3.1.13 Acceptance Test Procedures (CLINs 0X02)
3.1.13.1 Contractor Acceptance Test Results. The
Contractor shall deliver a copy of the Contractor’s in-house acceptance testing results, 10 days prior to the Government Acceptance Test (GAT) of each aircraft. (CDRL A006)
3.1.13.2 Government Acceptance Testing. Inspection and
acceptance will be conducted in accordance with the Government approved acceptance test procedure delivered and accepted in accordance with CDRL
A007. The CDRL A007 shall address the TH-XX Aircraft, flyaway kits, spares, Peculiar Support Equipment (PSE), mission planning systems, hoists, and sling loads. The Government approved CDRL deliverable will be incorporated into the contract by attachment. Defense Contract Management Agency (DCMA) representatives (pilots and non-flying personnel) will conduct GAT including an acceptance test flight to demonstrate to the Government the function of the Aircraft and its equipment. In addition a limited verification of delivered aircraft, spares, and equipment will be conducted against the PBS and Configuration List as part of the DD250 acceptance.
The Contractor shall deliver each aircraft with all embedded software, operating systems, programs, and/or applications installed and operational.
Any required subscriptions, such as for commercial navigational databases, shall be activated by the contractor. The DCMA Government Flight
Representative will be the approval authority for all DD250 aircraft flights.
The Contractor shall provide all resources, manpower and supplies required to perform and support the GAT, including, but not limited to: spares, repair parts, consumables including petroleum, oil, and lubrication, and maintenance support (field and sustainment/depot level). (CDRL A007)
3.2 Peculiar Support Equipment. (CLINs 0X04) The Contractor shall provide appropriate tools, fixtures, support equipment, support and ground handling equipment, and maintenance stands. Tools and support equipment shall contain the equipment normally required for aircraft support, based upon the size of the fleet and predicted usage. Support equipment shall include, but is not limited to, reusable engine storage and shipping containers, fuel and power cart adapters, any equipment required for Health and Usage Monitoring System (HUMS) analysis, software loading peripheral hardware and cables.
3.3 Mission Planning System. (CLIN 0006) The Contractor shall deliver to the Government 25 mission planning systems, including any required hardware, software, and peripheral devices, that are compatible with the
Flight Management System (FMS) on the TH-XX. Refer to Appendix A TH-XX
Cybersecurity Plan for additional requirements.
3.4 Instructor Pilot Training. (CLIN 0007) The Government requires an initial cadre of instructor pilots (IP) to be trained on TH-XX aircraft prior to delivery of the first aircraft to the Government and flight hours for currency.
3.4.1 TH-XX IP Training Requirements. The Contractor shall
provide ground and flight training on the TH-XX aircraft for 25 Government IP at a Contractor-designated training facility. The Contractor shall schedule
TH-XX IP training with the concurrence of the Government. TH-XX IP training shall commence 45 days after contract award and complete all 25 Government IP no later than five months after contract award, with as many Government IP being trained simultaneously as possible. The Contractor shall provide one copy of the course materials to each IP (student) at the commencement of the
IP training. Contractor IP training shall be based on an aircraft that meets at least the TH-XX aircraft type and model configuration, and should meet the
TH-XX aircraft series configuration, if available. Contractor flight training shall include the following topics:
a. Aircraft systems
b. TH-XX aerodynamics
c. Normal procedures (day and night)
d. Emergency procedures
e. Aircraft familiarization (day, night-unaided, energy management)
f. FMS operation and instrument navigation
g. Formation flying
h. Night vision device systems and flight training
i. Aircraft-specific instructional procedures
j. Logistics familiarization (hoist, cargo hook, confined area and pinnacle operations)
k. Any differences between the training aircraft and the final configuration of the TH-XX aircraft purchased by the Government
3.4.2 TH-XX IP Training Curriculum and Student Materials. (CLIN
0007) The Contractor shall deliver to the Government the TH-XX IP training curriculum that will include the aircraft flight manuals and training publications supporting the TH-XX IP training. The Contractor shall provide one copy of any training curriculum materials and student course materials associated with the Contractor IP training course to the Government and one copy of course materials to each Government IP at the commencement of the training. (CDRL A008)
3.4.3 Flight Hours for Currency. The Contractor shall provide four hours of flight time per month to each of the 25 Government IPs in an OEM owned TH-XX representative aircraft in order to maintain IP currency. The
Contractor shall provide Flight Time Currency beginning three months after contract award and continuing until delivery of the first three aircraft.
3.5 NATOPS Flight Manual. (CLIN 0009) The Contractor shall establish a bi-weekly working group to produce a Naval Aviation Training and Operating
Procedures Standardization (NATOPS) Flight Manual for the TH-XX aircraft.
This working group will be supported by Contractor technical writers, pilots, and engineers as well as Government participation consisting of, but not limited to: pilots, NAVAIR engineers, and Government third party support, as required. The schedule for NATOPS Flight Manual development and working group meetings shall be incorporated into the contract schedule. The Contractor shall format the OEM flight manuals and additional information required by the MIL-DTL 85025B into NATOPS format such that FAA Airworthiness certification can be maintained. The Contractor shall deliver a baseline TH-
XX Flight Manual that adheres to the NATOPS format. (CDRLs A013 and A028)
3.6 Maintenance Personnel Training. (CLIN 0008) The Government requires an initial cadre of Government maintenance personnel to be trained on TH-XX aircraft prior to the first aircraft delivery to the Government.
3.6.1 TH-XX Maintenance Training Requirements. All maintenance training shall be completed no later than 30 days prior to delivery of first aircraft. The Contractor shall provide:
a. TH-XX Aircraft Familiarization training to four CNATRA
Detachment personnel. Aircraft familiarization training shall consist of two separate classes at different times, not overlapping, and each not to exceed two weeks. The TH-XX Aircraft Familiarization Course shall provide the student a basic understanding of the design features of the TH-XX to include all systems, avionics, power plant, blade fold, and ground handling requirements.
b. Full Type/Model/Series (TMS) technical maintenance training to 10 government maintenance personnel. The full TMS technical maintenance training shall not exceed nine weeks and shall include instructional courses to include, but not be limited to: maintenance instructions, principles of operations, and system diagnostics.
3.6.2 TH-XX Maintenance Training Curriculum. (CLIN 0008) The
Contractor shall provide one copy of any training curriculum materials and student course materials associated with the Contractor maintenance training course to the Government and one copy of course materials to each Government maintenance person at the commencement of the training. (CDRL A009)
3.7 Third Party Maintenance Training. The Contractor shall coordinate with the Government and the Government’s third-party CLS provider to establish a mutually agreed upon plan for training CLS maintenance personnel on the TH-XX aircraft. (Note: The Third Party Maintenance Training is not priced as part of this contract.)
3.8 Maintenance Technical Publications (CLINs 0X02)
3.8.1 Integrated Electronic Technical Manual (IETM). The
Contractor shall provide to the Government an IETM, as defined in ASD-S1000D, or commercially available equivalent system. (CDRL A010)
3.8.2 Ground Transportation Instructions. (CLIN 0002) Contractor shall provide instructions for ground transportation of a TH-XX aircraft.
These instructions shall include, at a minimum: system size and weight limits, power requirements, safety procedures, trailer roll on/roll off procedures, and identify any peculiar support equipment required. (CDRL
A011)
3.9 Data Submissions (CLINs 0002)
3.9.1 Data Management. The Contractor shall maintain a data
management program IAW the requirements of this PWS and GEIAHB859
Implementation Guide for Data Management as guidance. The Contractor shall maintain an Integrated Data Environment to automate the management and exchange of data products with Government.
3.9.2 Data Deliverables. The Contractor shall deliver all
Controlled Unclassified Information (CUI) data items electronically utilizing
PKI certificates issued by an approved External Certificate Authority (ECA)
IAW Appendix A. This data item delivery method shall be operational within
30 days after contract award. The NAVAIR External Sharepoint Site (Team
Connect) may be utilized, and if so, the Government will provide and approve access as required. The Contractor shall ensure that the proper PKI credentials for all individuals responsible for submissions or receipt.
3.9.3 Data Access
a. Access Control. The Government requires no less than access to data and the commercial license rights to that data as described in
DFARS 252.227-7015 Technical Data Commercial Items, such that the Government can establish and maintain:
- training programs for a Navy training capability
- operation of any procedural trainer owned by the Navy
- capability to perform field level maintenance actions
The Contractor shall provide to the Government and third party contractors supporting the AHTS system access to the data required to establish and maintain the above listed functions and any other data consistent with what the Contractor provides to commercial customers. Data access shall be through a portal that employs access control to enforce data rights. The contractor shall maintain access authority and provide the Government and third party support contractor accounts that can be transferred when personnel changes.
b. Interface. The primary interface shall support user access via Internet Explorer, Google Chrome, or Mozilla Firefox. The utilization of any “Cloud” services in support of this contract requires prior written authorization by the Government Program Information System
Security Manager in writing (see Cybersecurity Appendix A). No classified data shall be exchanged on this deliverable submission system. The
Contractor shall provide any unique software applications required to access/utilize the data.
3.10 Instructions for Continued Airworthiness. (CLIN 0X02) The
Contractor shall deliver all Instructions for Continued Airworthiness (ICA)
IAW FAA 8110.54 (Series) through the year 2050. (CDRL A012)
3.11 Non-FAA ICA Data. (CLIN 0010) In accordance with Section J, Attachment 3, Specially Negotiated License/Access Agreement, the Contractor shall provide access and use of the following, through the year 2050:
3.11.1 TH-XX engineering design data and analysis to the
Government for development of repairs outside the scope of FAA 8110.54
(Series) ICA. TH-XX repair procedures developed by the Government will be provided to the Contractor for disposition under the Contractor’s TCH authority and formal issuance IAW FAA 8110.54 (Series) ICA procedures.
3.11.2 New and revised product baseline drawings including wiring harnesses and diagrams, models, product baseline specifications, and associated lists implementing approved Class I ECPs.
3.11.3 Source data (beyond that provided to commercial customers as part of Contractor’s standard commercial practice) pertaining to sustainment and improvement of products including maintenance plans, technical publications, training material, reliability and maintainability data, and spares modeling predictions.
3.12 Program Management Reviews
3.12.1 Post award Conference. The Contractor shall host a post award conference at the Contractor TH-XX production facility no later than 30 days after contract award. The Contractor shall coordinate, via email, the conference date and an agenda with the Government Program Manager’s office 10 days prior to the conference.
3.12.2 Integrated Program Review. The Contractor shall
participate in two Integrated Program Reviews (IPR) each year of the contract. Each IPR will be tailored to include the current program status and current issues. The Contractor shall be prepared to host one IPR each year at the Contractor facility. The other bi-annual IPR will be conducted at NAS Patuxent River, MD, or NAS Whiting Field, FL, at the Government’s discretion. The Contractor shall coordinate review dates and the with the
Government Program Manager’s office prior to all IPRs.
3.13 Program Progress/Status Reporting. The Contractor shall deliver to the Government a program status report. (CDRL A013)
3.14 Spectrum Management. The Contractor shall prepare and deliver to the Government Standard Form DD Form 1494, Application for Frequency
Authorization. (CDRL A014)
3.15 Sustainment Engineering (CLINs 0X01)
3.15.1 Engineering/Logistics Reach Back. The Contractor shall provide 4,000 engineering and logistics support reach back hours, per lot, to support PMA-273 Class Desk, APML, NAVAIR Engineering and Logistics, and the
Fleet Support Team (FST). The Contractor shall provide access to source data
IAW 3.9.3 Data Access pertaining to sustainment and improvement products including Maintenance Plans, Technical Publications, Training Material, Reliability and Maintainability Data, and Spares Modeling predictions consistent with what the Contractor’s standard commercial practice. The
Logistics Manager shall provide quarterly recommendations to the Government team regarding the Contractor Product Support Analysis outputs.
a. Engineering Investigations. The Contractor shall establish procedures to respond to more in-depth analyses associated with basic design engineering/logistics analysis, using the same procedures for support of currently fielded commercial fleet customers. These procedures shall provide a level of support for immediate and standard inquires through this life of this contract.
b. Support Categories and Response Times. The Contractor shall establish conditions and procedures for immediate support (24-hour response), standard support (24 to 80-hour response), and Basic Design engineering analysis (analysis beyond 80 hours required). The Contractor shall ensure these procedures encompass approval and review of non-standard repairs for TH-XX aircraft. (CDRL A015)
3.15.2 Field Service Representative. The Contractor shall
provide an on-site Field Service Representative (FSR) to perform engineering and logistics support, aligned with the continued FAA Airworthiness
Certification of the TH-XX. The Field Service Representative (FSR) shall have reach back capabilities to the Contractor Designated Engineering
Representative or Other Designated Authority, to ensure continued support to the FST and maintenance activity at NAS Whiting Field, FL. The FSR shall be on-site no later than 30 days prior to first aircraft delivery.
3.15.3 Non-Standard Repairs and Investigation Process. In the event of a non-standard TH-XX repair requirement, procedures developed by the
Government will be provided to the Contractor for disposition under the
Contractor’s TCH authority and formal issuance IAW FAA 8110.54 (Series) ICA procedures. The Contractor shall establish procedures that allow the
Government FST and NAVAIR engineering to coordinate with the Contractor for repair and maintenance support, Engineering Investigations (EIs), and mishap investigations. These procedures shall maintain the Contractor as the engineering authority and TCH for execution of all FAA requirements related to implementing the analysis in support of continued airworthiness resulting from these cooperative engineering efforts.
3.15.4 Sustainment Management Plan. The Contractor shall provide and implement a Sustainment Management Plan (SMP) that establishes roles, responsibilities, and processes for cooperative engineering support of the
TH-XX Helicopter and its supporting systems. The Contractor shall provide a
SMP that incorporates Government representation in the process established by
FAA Order 8110.54 (Series), Instructions for Continued Airworthiness (ICA), as applied to the TH-XX. The Government will operate a fleet of 130 helicopters in a controlled environment generating data to assist the
Contractor investigating ICA deficiencies such as airworthiness concerns, assessments of potential unsafe conditions, major repairs, or special certification reviews. The SMP shall describe how the Contractor will notify the Government of service bulletins, grounding events, etc. (CDRL A016)
3.15.5 Industry Steering Committee. The Contractor shall
maintain an Industry Steering Committee (ISC) or Maintenance Steering Group comprised of representatives from aircraft, engine, and avionics manufacturers within the guidelines FAA Advisory Circular 121-22C. The
Contractor shall allow the Government and requested representatives of maintenance organizations to be part of the ISC, including the Government third party CLS provider.
3.16 Initial Sparing Analysis. (CLIN 0002) The Contractor shall deliver to the Government an initial, predictive analysis of the spares required to be on hand for operation for 130 TH-XX aircraft, based on the aircraft delivery schedule in Section F and 89,918 flight hours per year. (CDRL A017)
3.17 Airframe Analysis. (CLIN 0002) The Contractor shall update the airframe static, dynamic, and fatigue analysis based on the TH-XX Mission
Profiles and Usage Spectrum provided in Appendices B and C of the PBS, respectively. The Contractor shall deliver to the Government the results of this analysis. The Contractor shall update and deliver to the Government TH-
XX maintenance documentation, periodic inspection content and frequency, operating envelope limits, changes to structural design margins, and any additional recommendations. (CDRL A018)
3.18 Structural Monitoring. (CLINs 0X01 and 0X02) The Contractor shall implement a structural monitoring program for TH-XX aircraft based upon the airframe analysis of PWS Para 3.17 for any airframe components not monitored under normal TCH responsibilities for continued airworthiness. The
Contractor shall deliver to the Government the data and results of structural monitoring analysis, and recommendations to prevent structural fatigue.
(CDRL A019)
3.19 Prognostics and Health Management Analysis. (CLINs 0X01) The
Contractor shall implement a prognostics and health management analysis program for all TH-XX aircraft delivered under this contract. The
Prognostics and Health Management Analysis Program shall collect, download, analyze, and archive HUMS data. The Contractor shall deliver to the
Government the prognostics and health management analysis data and results, and any recommendations to improve sustainment and logistics supportability products. (CDRL A020)
3.20 Obsolescence / Diminishing Manufacturing Sources & Material
Shortages. (CLINs 0X02) As part of the Program Status Report, the Contractor shall notify the Government upon identification of obsolescence or
Diminishing Manufacturing Sources & Material Shortages issues that will impact production. (CDRL A013)
3.21 Environmental, Safety, and Occupational Health. (CLINs 0X01 and
0X02) The Contractor shall support the Government with Environmental, Safety, and Occupational Health (ESOH) assessments and data requirements that ensure Program compliance with applicable ESOH laws, regulations, and
Executive Orders. The Contractor shall deliver to the Government TH-XX
Noise/Sound Characteristics and Engine Emission Data. (CDRL A021)
3.22 Energetics List. (CLINs 0X02) The Contractor shall provide a list of energetics material used to maintain the TH-XX platform and peculiar support equipment. (CDRL A022)
3.23 Configuration Management (CLINs 0X01)
3.23.1 Configuration Data. IAW para 3.9.3, Data Access, the
Contractor shall prepare a report identifying the As-Built Configuration List
(ABCL) in accordance with standards for a commercial sale for each as-delivered TH-XX aircraft by Serial and Tail number IAW DI-CMAN-81516.
However, at a minimum the ABCL shall contain the Bill of Materials with part numbers, quantities, and descriptions. In addition, the ABCL shall indicate all Alert Service Bulletins and Service Bulletins that have been applied to the aircraft. (CDRL A023)
3.23.2 Configuration Management Plan. The Contractor shall
perform Configuration Management IAW an AS9100 compliant manner. The
Contractor shall deliver a Configuration Management Plan (CMP) to the
Government. The Contractor shall ensure that all configuration changes comply with the requirements below and are documented to ensure continuous (without interruption) adherence to the PBS, Attachment 2. The Contractor shall provide any aircraft configuration updates filed with the FAA for the helicopters being produced under this contract. The Contractor shall ensure that CM issues affecting the TH-XX are addressed in the Progress / Status
Report. (Progress / Status Report CDRL, A013)(Configuration Management Plan, CDRL A024)
3.23.3 Configuration Status Accounting. The Contractor shall
maintain an audit trail of the configuration control activity for
Configuration Items to ensure establishment of a product baseline and future
Government audits. The DD250 for each delivery shall document any variances from the approved baseline in the “as delivered” product. The Contractor CSA system shall identify the current approved configuration identification associated with the TH-XX by part number and serial number, as applicable.
3.23.4 Request for Variance (RFV). A RFV is a specific written authorization to depart from a particular requirement(s) of an item’s current approved configuration documentation for a specific number of units or a specified period of time for issues discovered prior to, during or after manufacture. The Contractor shall not tender for acceptance items that incorporate a variance unless a RFV (DD Form 1694) has been approved by the
Procuring Contracting Officer.
3.23.5 Engineering Change Proposals (ECP). In the event an RFV incorporates a change to the configuration of the aircraft, the Contractor shall prepare and deliver Class I or II ECPs, as applicable. The Contractor shall provide a written request for a change and obtain Procuring Contracting
Officer (PCO) written approval via a contract modification prior to incorporating any Class I change. The request shall include a summary description of each anticipated change, the impacts and shall also describe effects and mitigation efforts on contract performance requirements. Changes shall only be incorporated after the required notification has occurred.
(CDRL A025)
3.24 Cybersecurity. (CLINs 0X01) The Contractor shall execute TH-XX
Cyber Security Plan provided in Appendix A (A026).
3.25 Operational Security (CLIN 0X01)
3.25.1 Contractor Identification Badges. Contractor
identification badges will be issued by the Government and shall be worn visibly at all times IAW CNATRAINST 5239.3, DODD 8500.01E, DODI 8520.02, OPNAVINST 5239.1C, SECNAVINST 5239.3B, DOD 5220.22M, and while Contractor personnel are at the Government sites. The Contractor shall furnish all requested information required to facilitate issuance of identification badges to the On-Site Government Representative (OGR). The Contractor shall ensure that all identification badges issued to their employees are returned to the Security Department at the Government site, following completion of the contract, relocation or termination of an employee, or upon request from the OGR.
3.25.2 Government Base Access. Contractor Employees in
possession of a valid Common Access Card (CAC) may utilize their CAC for base access. For employees that do not require or possess a CAC, the Contractor shall be responsible for the cost of enrolling its company and registering its employees through the RAPIDGate Program. A daily one-day pass will be required for employees who are not enrolled in the RAPIDGate Program or do not have a CAC.
3.26 Training Curriculum Development. (CLINs 0X01 and 0101) The
Contractor shall support the creation of an integrated training curriculum for the TH-XX that incorporates emerging technologies and best-in-practice training solutions. The Contractor shall participate in a working group to produce the integrated training curriculum. The Contractor shall provide technical writers, pilots, and engineers to the Working Group, with
Government participation. The new training curriculum will provide a modernized training capability that consists of Interactive Multimedia
Instruction for Instructor Led Training/CAI, and self-paced ICW. The final products will be owned, updated, and maintained by the Government. The schedule for training curriculum development and working group meetings shall be incorporated into the contract schedule and provided via CDRL A013.
(CDRLs A013)
APPENDIX A: TH-XX Cybersecurity Plan
The content of this Cyber Security Plan (CSP) is established for the protection of Government data and all information exchanged within this contract. Per DFARS 252.204-7008, 252.204-7012, Subpart 204.73, and
Department of Defense Instruction (DoDI) 8582.01, industry partners are subject to the requirements in this CSP in order to establish a consistent and unified strategy for Government data protection. These requirements must be flowed down to any subcontractors, suppliers, and organizations that process Government data under this contract.
This CSP also identifies the data required by the Government to routinely assess the cybersecurity risk to the TH-XX aircraft and associated support equipment purchased under this contract.
The Government will provide all necessary reference documents or electronic links to those documents not generally available to the industry partner, as required. Throughout the life of the contract, if any instruction or document is replaced or superseded, the replacement or superseding instruction or document shall be applicable to the requirements defined in this CSP.
All CS authority within a program office rests with the civilian Program
Information System Security Manager (PISSM). This authority has been designated via an appointment letter by the CS competency and the Program
Manager. Questions regarding the requirements set forth in this CS Plan must be directed to the PISSM.
A. CYBER SECURITY
Cyber Security (CS) is the discipline that protects and defends information and information systems by ensuring their availability, integrity, authentication, confidentiality, and non-repudiation. These measures include providing for restoration of information systems by incorporating protection, detection, and reaction capabilities. The following paragraphs contain
United States Public Law as well as Department of Defense (DoD) and
Department of the Navy (DON) CS requirements. These CS requirements stem from various DoD, Secretary of the Navy (SECNAV), Office of the Chief of
Naval Operations (OPNAV), and Naval Air Systems Command (NAVAIR) policies, directives, and instructions. United States Government herein described as
"Government" officials have the authority to review and examine, in conjunction with contractor personnel, the CS controls on any contractor operated system containing government information for the purposes of ascertaining proper CS posture and implementation.
B. NMCI COMPATIBILITY
The Contractor shall ensure that any applications, websites, etc., utilized for Government data access and/or delivery are compatible with and accessible by the Government via Navy/Marine Corps Internet (NMCI) IT/IS assets.
C. CYBER SECURITY PRACTICES
The Contractor shall provide to the Government a System Security Plan that describes the security standards and controls in place or planned for meeting commercial cybersecurity requirements for the TH-XX aircraft and peculiar support equipment acquired under this contract. The Contractor shall also provide to the Government an Information System Continuous Monitoring
Strategy for the TH-XX aircraft and peculiar support equipment. If this cybersecurity compliance data is already provided in other CDRLs under this contract, such as FAA ICA data, the Contractor shall provide to the
Government the location of that data. The Government will utilize cybersecurity data to support Government cybersecurity risk analysis and reporting processes. (CDRL A026)
D. PUBLIC KEY INFRASTRUCTURE (PKI)
1. Public Key Infrastructure (PKI) encryption is the chosen compliant DoD standard for protecting Controlled Unclassified Information (CUI) during transmission. Failure to encrypt CUI during electronic transmission is considered a security weakness and must be corrected upon discovery via the contractor personnel responsible for CS.
Multiple violations by individuals must be reported to the PISSM by the contractor for resolution. The contractor shall require its personnel to adhere to the required PKI policies stated herein when transmitting CUI.
2. The contractor shall implement DoD PKI policy per DoDI 8520.02. The contractor shall obtain and utilize PKI certificates issued by an approved External Certificate Authority (ECA) for the purposes of protecting all CUI. Approved PKI will be utilized by the contractor, its subcontractors, and suppliers when transmitting CUI via electronic means. Public Key Enablement (PKE) is the chosen DoD standard for authentication at the application level. The contractor shall utilize
PKI when interacting with DoD PKI/PKE information systems and accessing DoD CUI or sensitive information.
E. ELECTRONIC MAIL (E-MAIL)
The contractor shall utilize digital signature and encryption via DoD PKI or
ECA digital certificates on all electronic mail (e-mail) messages containing
CUI or e-mail messages that discuss any matter that may serve as an
Operations Security (OPSEC) indicator, per DoDI 8520.02. If contractor personnel support multiple email addresses for use under this contract, then a separate PKI certificate is required for each email address. Unapproved accounts, such as AOL, HOTMAIL or YAHOO, will not be used for official business under this contract unless specifically authorized to do so by the
Government per CJCSI 6510.01F.
F. DATA AT REST: Not applicable to this contract.
G. ASSESSMENT AND AUTHORIZATION (A&A): Not applicable to this contract.
H. Cyber Security (CS) Point of Contact (POC)/Cyber Security Workforce (CSWF)
The contractor shall provide a counterpart point of contact to the Program
Information System Security Manager (PISSM); herein identified as the CS
Point of Contact (POC). The CS POC shall ensure all CS requirements are adhered to. The CS POC will ensure that the contractor team is aware of all
CS requirements. The CS POC shall coordinate with the PISSM in all matters related to CS.
I. WEB SITES, ELECTRONIC ROOMS (E-ROOMS), COLLOBORATION TOOLS, & CLOUD SERVICES
1. The contractor shall utilize DoD compliant PKI digital certificates to use as authenticators for accessing all DoD web sites and/or e-rooms and collaboration tools.
2. The Contractor shall utilize existing Government hosting tools and services, such as VTC websites, e-rooms, and SharePoint sites, as much as possible. In the event that existing Government hosting tools and services cannot be utilized, the contractor shall obtain government approval prior to implementing or utilizing non-Government hosting tools or services. If such services are deemed necessary by the government then, these tools shall be web based applications that enhance data delivery and distribution to include electronic collaboration and management tools. These efforts shall supplement existing legacy systems, and the Navy’s goals of web enablement of new technology and applications. Any developed systems shall utilize DoD
PKI and PKE digital certificates as an authenticating mechanism and utilize existing encryption methods (i.e. Secure Sockets Layer (SSL) or Transport Layer Security (TLS) for the protection of CUI data.
3. The utilization of any “Cloud” services in support of this contract requires prior written authorization by the Government PISSM.
4. For secure large electronic file exchange requirements, the NAVAIR
External Sharepoint Site (Team Connect) may be utilized. The
Government will provide and approve access to this site on a required basis. The industry partner shall ensure that the proper PKI credentials are utilized by individuals per section “D” of this CSP.
J. COMMON ACCESS CARDS (CAC) & SAAR-N FORMS
1. The government may approve and issue common access cards (CAC) to personnel supporting this contract on a case by case basis. CAC request shall be initiated using the Trusted Associate Sponsorship
System Consent to Monitor (TASS) (https://www.dmdc.osd.mil/TASS/). A
Trusted Agent (TA) will be identified by the Government to the
Contractor for CAC issuance.
2. CAC applicants shall submit an initial request for a CAC or government credential to the Trusted Agent (TA) and log in to TASS to complete and submit the online application for government credentials. The sponsoring DoD Agency will provide the Applicant Request Form which is the necessary information and appropriate paperwork required for obtaining a government credential. The contractor shall then vet the
Applicant using the DoD approved process. Once the Applicant, Contracting Agency, and Sponsoring Agency provide the necessary information, the Applicant shall submit the required information to the TA.
3. The TA will verify that the contractor has vetted the Applicant and establish the affiliation of the Applicant with the service or agency.
Once the TA confirms the vetting and ensures all other requirements have been satisfied, he or she creates an application in TASS for submission.
4. Once the TA submits a new application for an Applicant, the TA will provide the Applicant (via secure means) the TASS weblink and his or her user ID and temporary password. The Applicant shall then log in to
TASS to complete and submit the application. Once the TA submits the application, the Applicant has seven days to complete an initial log in to TASS and begin the application process, or TASS will automatically disable the Applicant's application.
5. Per DTM 08-003, the Next Generation CAC Implementation Guidance document, initial CAC issuance requires, at a minimum, the completion of FBI fingerprint check with favorable results and submission of a
National Agency Check with Inquiries (NACI) to the Office of Personnel
Management (OPM), or a DoD-determined equivalent investigation. Per
DoD Manual 1000.13, Volume 1 (Enclosure 2, Section 6C) only an official government email address (e.g., .mil, .gov, .edu) may be entered into a CAC.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .