This is an amendment to a solicitation seeking proposals for an Advanced Helicopter Training System. The Navy is seeking to procure up to 130 TH-XX aircraft over five production lots to support naval aviator training. Offerors must propose an aircraft quantity within the ranges provided that conforms to the Navy's estimated budget by CLIN. Proposals are due on April 12, 2019 and will be evaluated based on technical merit and price. The technical factor is more important than price. The amendment updates the performance work statement and access agreement attachment. It also provides the Navy's responses to questions from potential offerors.

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Helicopter Training System (AHTS) TH-XX Aircraft, newest first.
File Type Posted
Att_L-5_Access_Agreement_Amendment_0005.docx DOCX document
TH-XX_Amendment_0005_Questions_&_Answers.pdf PDF
Att_(1)_PWS_v1.3.pdf PDF
Amendment_0005.pdf PDF
Conformed_through_Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
TH-XX_Amendment_0004_Questions_&_Answers.pdf PDF
Conformed_through_Amendment_0004.pdf PDF
TH-XX_Amendment_0003_Questions_&_Answers.pdf PDF
Amendment_0003.pdf PDF
Att_L-1_Technical_CRM_Amendment_0003.xlsx XLSX spreadsheet
Conformed_through_Amendment_0003.pdf PDF
Conformed_Through_Amendment_0002.pdf PDF
TH-XX_Amendment_0002_Questions_&_Answers.pdf PDF
Att_L-4_Configuration.xlsx XLSX spreadsheet
Exhibit_A_-_CDRLS.pdf PDF
Att_(1)_PWS_v1.2.pdf PDF
Att_(2)_AHTS_PBS_v.1.83PR.pdf PDF
Conformed_Through_Amendment_0001.pdf PDF
Att_L-13_Workload_Analysis_Form.xlsx XLSX spreadsheet
TH-XX_Amendment_0001_Questions_and_Answers.pdf PDF
Competition_Library_Part_3.zip ZIP file
Competition_Library_Part_1.zip ZIP file
N6134019R0007_RFP.pdf PDF
Section_J_Attachments_&_Exhibits.zip ZIP file
Question_and_Answers.xlsx XLSX spreadsheet
Competition_Library_Part_4.zip ZIP file
P-402.pdf PDF
181217_Industry_Day_Brief(2).pptx PPTX presentation
DRAFT_Sections_L&M.pdf PDF
Att_L-8_PSE_List.pdf PDF
Att_L-5_Access_Agreement.pdf PDF
Att_L-1_Technical_CRM.pdf PDF
Att_L-9_Unit_Pricing_Matrix.xlsx XLSX spreadsheet
Att_L-2_SPD_110918.pdf PDF
Att_L-7_Spare_Parts_List.pdf PDF
Att_L-3_SPD_Team_Experience.pdf PDF
Att_L-6_Flyaway_Kits_List.pdf PDF
Att_L-10_Prime_Contractor_Price_Summary_11072018.xlsx XLSX spreadsheet
Att_(10)_Hoist_List.pdf PDF
Exhibit_A_AHTS_CDRL.pdf PDF
Att_(2)_AHTS_PBS_Main_Body.10.31_(v.1.5PR).pdf PDF
Att_(3)_Specially_Negotiated_License_Access_Agreement.pdf PDF
Att_(5)_Subscriptions.pdf PDF
Att_(4)_Configuration.pdf PDF
Att_(7)_Spare_Parts_List.pdf PDF
Att_(9)_Mission_Planning_System_List.pdf PDF
Att_(11)_Small_Business_Sub_Plan.pdf PDF
Att_(8)_Peculiar_Support_Equipment_List.pdf PDF
DRAFT_THXX_PWS.docx DOCX document
Show all 50

Advanced Helicopter Training System (AHTS) TH-XX Aircraft has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6134019R0007

X 9B. DATED (SEE ITEM 11)

28-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Feb-2019

CODE

NAWCTSD 253

CODE 2.5.3.7

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

N61340 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6134019R0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

DESCRIPTION OF AMENDMENT 0002

The purpose of Amendment 0002 is to:

1. Update Section J, List of Attachments, to incorporate a revised Attachment 1, Performance Work Statement for Advanced Helicopter Training System, from version 1.1 to version 1.2.

2. Update Section J, List of Attachments, to incorporate a revised Exhibit A, Contract Data Item Deliverables, from version 1.0 to version 1.1. This update revises CDRL A026, Risk Management Framework Products.

This update also includes administrative edits, including the removal of duplicative Exhibit A “Instructions for Completing DD Form 1423” and the addition of a revision tracking page.

3. Provide clarifying language under Section L, Part A General Instructions, Paragraph 2.2 to allow for the use of either Arial or Times New Roman font.

4. Update Section L Attachment L-4, Configuration, to align with changes made to Section L Table T-1, Cross Reference Matrix.

5. Update Section L Table T-1, Cross Reference Matrix, to better align traceability of Section L paragraphs to requirements.

6. Remove the Section L, Part B Specific Instruction, Volume 2, Paragraph 2.1.1, Overall Compliance requirement to conduct the System Performance Demonstration in accordance with the “HX-21 Standard Operating Procedures (SOP)(provided in the Competition Library)”.

7. Update Section L, Part B Specific Instruction, Volume 2, Paragraph 2.2.2, Initial Sparing Approach, to reorganize the information offerors shall consider when estimating spares vice engines.

8. Update Section L, Part B Specific Instruction, Volume 3, Paragraph 3.2.6, Operation and Support- Contractor Contribution Cost, to reflect the use of Version 19.1 of the Conklin & de Decker product.

9. Update language under Section M.1.II.A.1, Aircraft System.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

Attachments # Title Effective Date # Pages 1 Performance Work Statement for Advanced Helicopter Training System

(AHTS), Version 1.2 17 Jan 19 26

2 Performance Specification for AHTS, Version 1.83PR 11 Jan 19 37 3 Access Agreement Date of Award 3 4 Configuration Date of Award 5 Small Business Subcontracting Plan Date of Award 6 Warranty Date of Award

Exhibits # Title Effective Date # Pages A Contract Data Item Deliverables, Version 1.1 24 Jan 19 31

B Flyaway Kits List Date of Award C Spare Parts List Date of Award D Peculiar Support Equipment List Date of Award

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO OFFERORS

L

L.1 PROPOSAL INSTRUCTIONS

PART A GENERAL INSTRUCTIONS

1.0 GENERAL

1.1 Offerors are required to submit sufficient information concerning all evaluation factors to enable Government personnel to fully assess the capabilities of the Offeror to perform all requirements. The proposal must be sufficient in detail and scope to enable evaluation and provide the evaluators a clear understanding of the Offeror’s approach, expertise, and capability as required by the solicitation. The Offeror shall not alter or rearrange the solicitation (SF-1449). Offerors are advised that the Government may incorporate any part of the Offeror’s proposal deemed beneficial to the Government into the final contract, without discussions. Price information (e.g., dollar values and/or hourly rates) shall appear only in Annex A (Small Business (SB) Subcontracting Plan) and Volume 3 (Price). Alternate proposals are not acceptable.

1.2 In presenting material in the proposal, the Offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. The burden of proof for all substantiation within the proposal rests with the Offeror. Unsubstantiated statements that the prospective Offeror understands, can, or will comply with the specifications, or paraphrasing the requirements or parts thereof are considered inadequate and may result in a rating of unacceptable.

1.3 The Offeror shall include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions. There is no need to repeat information in more than one volume. The detailed information must be included in the most logical place and summarized and referenced in other areas if an overlap exists. Do not provide elaborate brochures or other presentation material beyond that sufficient to present a complete and effective proposal.

1.4 As used in this RFP, the following terms are defined: “Offeror” means the prime contractor with its CAGE code identified in Block 17A on Standard Form (SF) 1449 Solicitation, Offer, and Award. “Joint Venture” (JV) means a partnership or teaming arrangement that is formed for the purpose of responding to this solicitation when the prime contractor consists of more than one legal entity. “JV Team Members” means the entities that make up a Joint Venture. “Entity” means any of the following: prime contractor, JV, JV team members, any subcontractor, and corporate parent, division, subsidiary, or affiliate (e.g., any contractor with a different CAGE Code/DUNS than the Offeror). “Principal Entities” means (a) the prime contractor; (b) JV Team Members; and (c) other entities that are proposed to perform at least 15.00% of the proposed total cost/price for the contract.

2. PROPOSAL FORMAT

2.1 The Offeror shall provide one folder for each volume or annex, containing all electronic files requested within the volume or annex. Please submit the information contained within each volume or annex as one file if possible. Do not provide separate files for each section/paragraph.

2.2 All pages shall be sequentially numbered. Only material allocated to a specific section shall be contained in that section. Within each volume, printed material shall be shown on both sides of a sheet; each side of the sheet shall be counted as 1 page in the page count. Foldouts (front side only) shall be counted as two pages. Foldouts (front and back) shall be counted as four pages. All documentation shall be provided in the English language. The font shall be either Arial or Times New Roman, whichever one is selected shall be used throughout the entire proposal. The font size for the Volumes shall be 12-point font, the font size in Tables shall be no smaller than 10-point type, and the font size for Figures and Charts shall be no smaller than 9-point type. Pages in all Volumes shall be 8 1/2 by 11 inches (11 x 17 inches for foldouts) in size and shall have at least a 1"margin on all four sides.

2.3 Each set of CD/DVD(s) shall contain an individual CD/DVD(s) for each volume submitted; annexes may be submitted together, with the exception of Annex A which must be on a separate CD/DVD. The following requirements apply to all digital submissions:

2.3.1 The Offeror shall submit all volumes and annexes of its proposal electronically on CD/DVD(s) compatible with the operating system and applications defined in Section 2.3.2 (Operating System and Applications).

CD/DVDs shall be clearly marked with the Offeror's name and address, the point of contact's name and phone number, the proposal volumes contained therein, and “Source Selection Information – See FAR 2.101 and 3.104.”

Table G-1 (Proposal Structure) identifies the proposal structure.

2.3.2 Operating System and Applications. The proposals will be accessed utilizing the Microsoft Windows 10 Operating System. Proposal information shall be submitted using the following applications: Microsoft Word 2016, Microsoft Excel 2016, Microsoft PowerPoint 2016, and Microsoft Project 2016; however, letters, other signed documents, and evidence of compliance shall be provided as a fully searchable Portable Document Format (.pdf) file. Use of other application software for submission of proposals is prohibited except where specific instructions for non-.pdf or Office 2016 applications are provided.

2.3.3 The Offeror is responsible for ensuring that its electronic proposal is virus free. The Offeror shall certify, in its proposal cover letter, that all electronic proposal information delivered throughout the evaluation (e.g., original proposal submission, responses to evaluation notices, Final Proposal Revisions) has been checked for viruses and certify that its files are virus free. The Offeror shall specify the software, version, and virus definition used to check the data.

2.3.4 The Offeror shall ensure that the electronically submitted files are directly traceable to the paper copy submittal. If a discrepancy exists between the original paper copy of the proposal and the original electronic copy on the CD-ROM disk, the original electronic copy shall take precedence.

Table G-1 Proposal Structure Table

Volume Number

Volume/Annex Title # of Hardcopies and CD ROM Copies

File naming convention

1 Certifications 2 & 2 Vol 1 Cert#.docx and Vol 1 Cert#.pdf

2 Technical

2 Book 1 – Aircraft System 2 & 2 Vol 2 B1 Tech#.docx and Vol 2 B1 Tech#.pdf

2 Book 2 – Management and Support 2 & 2 Vol 2 B2 Tech#.docx and Vol 2 B2 Tech#.pdf

3 Price 2 & 2 Vol 3 Price#.docx and Vol 3 Price#.pdf

Attachment L-9 Unit Pricing Matrix 2 & 2 Vol 3 Att L-9.xlsx and Vol 3 Att L-9.pdf

Attachment L-10 Prime Price Summary 2 & 2 Vol 3 Att L-10.xlsx and Vol 3 Att L-10.pdf

Attachment L-11 O&S - Contractor Contribution - provided for reference

2 & 2 Vol 3 Att L-11.xlsx and Vol 3 Att L-11.pdf

4 Contract Administration 2 & 2 Vol 4 CA.docx and Vol 4 CA.pdf

Annexes Annex A

SB Subcontracting Plan 2 & 2 Ann A SBSP.docx and Ann A SBSP.pdf

Annex B

Technical CRM 2 & 2 Ann B TCRM.xslx and Ann B TCRM.pdf

Annex C

Configuration 2 & 2 Ann C Config.xslx and Ann C Config.pdf

Annex D

Access Agreement 2 & 2 Ann D Access.docx and Ann D Access.pdf

Annex E

Flyaway Kits List 2 & 2 Ann E FlyKit.docx and Ann E FlyKit.pdf

Annex F

Spare Parts List 2 & 2 Ann F Spares.docx and Ann F Spares.pdf

Annex G

PSE List 2 & 2 Ann G PSE.docx and Ann G PSE.pdf

Annex H

Compliance Support 0 & 2 Ann H CS.pdf

Annex I Warranty(ies) 2 & 2 Ann I Warr.docx and Ann I Warr.pdf

Annex J Workload Analysis 2 & 2 Ann J WA.xlsx and Ann J WA.pdf

The original paper copy must be paginated and contain the following information using tabs and dividers:

a. Cover and title page;

b. Title of proposal and proposal number as applicable;

c. Offeror’s name, address, and POC;

d. Solicitation number;

e. Proposal volume/ annex number;

f. Copy number; and Table of Contents (The table of contents must provide sufficient detail to easily locate important elements). At a minimum it must include the paragraphs identified in the CRM; and

g. A cross-reference matrix that traces proposal information to the appropriate RFP document: Section B, PWS, PBS, Section L, Section M, or other areas.

Please note: Each volume shall be provided within a separate binder. All annexes, with the exceptions of Annex A and Annex H may be submitted within a single binder. Annex A shall be submitted within a separate binder. Annex H shall only be submitted electronically via CD/DVD(s).

3. PROPOSAL SUBMISSION

3.1 Clearly mark all packages with the solicitation number. The submission date for all Volumes of the proposal is specified on Standard Form 1449 (Block 8).

3.2 Method of delivery shall be by United States Postal Service, commercial carrier, courier, or hand-delivery.

The Offeror shall coordinate delivery details via e-mail with the Contract Specialist or the Contracting Officer, using their respective contact information. Proposals shall be submitted using the address provided below.

Proposals shall not be submitted by facsimile or electronically via email.

NAVAL AIR SYSTEMS COMMAND

ATTN: Mr. Blake Strickland, AIR-2.2.4.4 or Ms. Hayley Graham, AIR-2.2.2.3.3 Solicitation Number: N61340-19-R-0007 47123 Buse Road BLDG 2272, Room 453 Patuxent River, MD 20670-1547

4. NOTICES TO OFFERORS

Notice Concerning Organizational Conflicts of Interest: Any Contractor having participated in the development of any requirements for this contract must identify the degree of participation and any recommended steps to be taken to mitigate any competitive advantage that may have resulted from said performance. Without the identification and mitigation recommendation, proposals submitted by Offerors having prior knowledge of the contract requirements will not be considered for award.

5. CHANGES TO SOLICITATION

For any changes and additional information to the solicitation please go to website: https://www.fbo.gov/

Search the database for the solicitation number N61340-19-R-0007.

6. COMPETITION LIBRARY

A competition library of information related to AHTS TH-XX activities is available at https://www.fbo.gov/ and can be found by searching solicitation number N61340-19-R-0007. The data contained in the competition library is for informational purposes only. The Government does not guarantee the accuracy or completeness of the information.

PART B SPECIFIC INSTRUCTIONS

1.0 VOLUME 1 CERTIFICATIONS

Note: This volume shall not contain any reference to price aspects of the offer.

Further, no additional information shall be provided within this volume outside of that requested. As stated in more detail below, this volume is not due on the initial proposal due date.

The Government intends to conduct oral discussions with all Offerors who submit a timely proposal. The fact that an Offeror may be initially included in the competitive range does not preclude the Government from excluding the Offeror’s proposal from further consideration if the proposal is found to no longer have a reasonable chance of receiving award. Offerors who have been determined to be within the competitive range will be required to submit the Volume 1, Certifications as a part of its final proposal revision, as defined under Federal Acquisition Regulation https://www.fbo.gov/ https://www.fbo.gov/ part 15.307(b). For planning purposes, the Government anticipates requesting Volume 1 mid 4QFY19. The Offeror shall provide the following information for the proposed Type/Model aircraft within its Volume 1, Certifications:

(1) A copy of the FAA Instrument Flight Rules (IFR) Certification (FAA Form 8110-9).

If the FAA IFR certificate is not received or is incomplete, the Offeror’s proposal may be deemed ineligible for award.

2.0 VOLUME 2 TECHNICAL

Note: This volume shall not contain any reference to price aspects of the offer.

The following is a list of Section L Attachments that the Offeror shall use to provide information for this volume:

Attachment L-1 Technical Cross Reference Matrix (CRM) Attachment L-2 System Performance Demonstration (SPD) Attachment L-3 SPD Team Experience Attachment L-4 Configuration Attachment L-5 Access Agreement Attachment L-6 Flyaway Kits List Attachment L-7 Spare Parts List Attachment L-8 Peculiar Support Equipment (PSE) List Attachment L-12 Workload Analysis Instructions Attachment L-13 Workload Analysis Form

The Offeror shall complete Table T-1 (Technical CRM), provided in Attachment L-1, and submit it as the first page of Volume 2 (Technical) Book 1 and Volume 2 (Technical) Book 2 and as Annex B (Technical CRM). The Technical CRM is included to help the Offeror develop its proposal and to ensure traceability of Section L paragraphs to the requirements. The Offeror’s Technical CRM may be identical to the sample provided or revised to add information. For example, the Offeror’s Technical CRM may cross-reference its proposal volumes, paragraph numbers, and pages to specific solicitation requirements identified within the table, as well as other parts of the proposal that contain relevant information.

Table T-1 Cross Reference Matrix

Section L – Proposal

Instructions Volume or Paragraph Numbers

Section L - Proposal

Instructions Volume or

Paragraph Title

RFP

Section

M

PWS PBS CLIN

2.1 Book 1 - Aircraft

System

II.A.

2.1.1 Overall

Compliance

II.A. 3.1.2 AV-001, AV-002, AV-

004, AV-005, AV-006,

AV-007, AV-008, AV-

009, AV-010, AV-011,

AV-012, AV-013, AV-

014, AV-017, AV-018,

AV-020, AV-023, AV-

024, AV-025,

AV-027, AV-029, AV-

030, AV-032, AV-033,

AV-034, AV-035, AV-

036, AV-037, AV-039,

0X01

2.1 Book 1 Aircraft System

AV-040, AV-043, AV-

044, AV-045, AV-046,

AV-047, AV-048, AV-

049, AV-051, AV-052,

AV-053, AV-055, AV-

056, AV-057, AV-058,

AV-059, AV-060, AV-

061, AV-062, AV-063,

AV-064, AV-065, AV-

066, AV-067, AV-068,

AV-069, AV-070, AV-

071, AV-072, AV-073,

AV-074, AV-075, AV-

076, AV-077, AV-078,

AV-079, AV-081, AV-

082, AV-084, AV-085,

AV-086, AV-087, AV-

088, AV-090, AV-091,

AV-092, AV-093, AV-

094, AV-097, AV-098,

AV-100, AV-102, AV-

103, AV-104, AV-105,

AV-106, AV-108, AV-

109, AV-112, AV-118,

AV-120, AV-121, AV-

122, AV-123, AV-124,

AV-125, AV-127, AV-

128, AV-129, AV-134,

AV-135, AV-136, AV-

137, AV-138, AV-139

2.1.2 Instrument

Training N/A

N/A

AV-050, AV-054,

AV-140

2.1.3 Navigation N/A AV-89,AV-95, AV-96

2.1.4 Warfighting N/A AV-80, AV-119

2.1.5 Safety N/A AV-019, AV-111, AV-142

2.2 Book 2 -

Management and Support

II.A.

2.2.1 Data Submission 3.11 N/A 0010

2.2.2 Initial Sparing

Approach 3.16 N/A 0X03

2.2.3 Support

Infrastructure N/A N/A

2.2.4 Sustainment

Approach 3.8.2, 3.15, 3.18, 3.19

AV-031, AV-130,

AV-131, AV-132,

AV-133

2.2.5 SB Utilization

Strategy

N/A N/A

Volume 2 Book 1 shall contain documentation (e.g., flight manuals, pilot operating manual, performance manual, or other information) demonstrating how the Offeror’s proposed aircraft meets or exceeds the system attributes as identified below and in the respective paragraphs of the PBS. To the extent an Offeror believes that additional information is required to enable the Government to evaluate its proposed aircraft system, the Offeror shall provide it as part of the proposal.

The Offeror shall also provide all documentation required by 14 CFR Part 27.1529, 14 CFR Part 27 Appendix A, and the FAA approved ICA distribution plan (14 CFR Part 27.A27.1(c)), which the Government will use to evaluate the Offeror’s compliance with the Government’s PBS.

The Offeror shall provide sufficient information in the Offeror’s written proposal to enable the Government to assess the existence and functionality of such capabilities.

2.1.1 Overall Compliance

The Offeror shall, for each system and requirement designated in Attachment L-4 (Configuration), provide the system description, manufacturer, model number, and evidence of compliance with the PBS [AV-XXX] requirements as a completed Annex C (Configuration). Annex C (Configuration) shall be incorporated into the awarded contract as Attachment J-4 as the final functional configuration for contractual purposes. The Offeror will document compliance with all performance values required in Section 3.1.4 and Appendix B profiles of the PBS using the Rotorcraft Operation and Performance Manuals. The Offeror’s proposal shall comprehensively address compliance with all requirements in the CRM. The Offeror’s evidence of compliance shall be submitted electronically as fully searchable .pdf files within Annex H (no hardcopy required). Please note Annex H may contain separate files (e.g., contractor manuals) to provide evidence of compliance.

System Performance Demonstration Offerors are advised that all proposed aircraft shall undergo a System Performance Demonstration (SPD), in accordance with Attachment L-2 (SPD). Three business days prior to the beginning of the SPD, the Government will provide to the Offeror a set of cards specific to the SPD aircraft system that implements the matrix provided in Attachment L-2, which will be used to guide the ground and flight events and record data. The Offeror shall review and revise the cards to ensure procedural accuracy prior to flight. This SPD will be considered as an aspect of the verification of Element 2.1.1, to demonstrate the proposed aircraft’s ability to support the Appendix B Mission Profiles called out in AV-008 of the PBS that represent the CNATRA training curriculum (provided in the Competition Library). The Government will not assign an independent technical rating for the SPD, as the SPD is only intended to inform the Government’s evaluation of Element 2.1.1. Offerors are advised that requirements specified in the SPD that cannot be evaluated and that are not adequately addressed in the written proposal may receive a significant weakness or deficiency. Simulator, static displays, and other ground training devices shall not be used for the SPD.

The Offeror may use one aircraft for the SPD flight demonstration and no more than three aircraft for the SPD ground demonstration, including anthropometric. The aircraft used in the SPD shall be as close as possible to the final configuration of the Offeror’s proposed TH-XX helicopter, and shall be at least of the same type and model.

The Government will provide four Government helicopter pilots and one Flight Test Engineer (FTE), whose experience will be provided in Attachment L-3, to conduct the SPD. Additionally, the Government will provide some personnel and all required equipment to conduct the anthropometric evaluation. The Contractor may be asked to supplement the Government provided personnel in order to perform a complete anthropometric assessment.

The Government will conduct one SPD per week between the following dates: 4/22/2019 - 5/17/2019. The Offeror shall rank those weeks in order of preference within that period, which the Government will attempt to accommodate. The Government requests that the Offeror provide its ranking of these weeks 21 calendar days prior to the proposal due date. The Government desires to complete SPDs for all aircraft offered within a continuous period, dependent on the total number of aircraft offered. Offerors will be notified of their SPD date after receipt of proposals. Once the SPD is scheduled, the Government will not reschedule except for weather delays or force majeure.

In addition to providing its timing preferences, the Government requests that 21 days before proposal due date the Offeror provide the Government the following information for each aircraft that will be used to conduct the SPD:

1. One copy of the current FAA-approved OEM Flight Manual and any supplements, and any additional operating limits beyond the scope of these manuals;

2. A copy of the FAA Airworthiness Certification (FAA Form 8100-2) and type certificates;

3. Any additional descriptions of the aircraft and applicable systems to support aircraft familiarization;

4. Airfield and course rules training materials;

5. Location, access, and administration instructions for the site at which the Offeror plans to hold the SPD;

6. A detailed configuration list of the demonstration aircraft with explicit breakdown of any anticipated configuration differences between the demonstration aircraft and the production representative aircraft (prospective TH-XX); and

7. Recent engine power assurance data and weight and balance information.

The Government will conduct only one SPD for each aircraft proposed. The Government requires a continuous five-day period to conduct each SPD. The five-day SPD evolution will be conducted at the Offeror’s designated facility, during which the Offeror’s aircraft, support equipment, and facilities shall be available to support the SPD.

The Offeror will provide a qualified pilot to serve as Pilot-in-Command. Government pilots should be pilot-at-the-controls for the ground and flight demonstration points. Each SPD shall include the following (see Attachment L-2):

• Aircraft ground training and airfield familiarization

• Approximately 15 hours of ground demonstration

• Approximately 12 hours of anthropometric ground evaluation

• Approximately six hours of total flight time across day and night demonstration flights

Additional flight or ground demonstration time may be required in the event of weather delays or other force majeure. By participating in the SPD, the Offeror understands and accepts all liability for the demonstration, including, but not limited to, damage or wear and tear on the SPD aircraft.

The events will be conducted within the limits of the FAA approved OEM Flight Manual and the Offeror’s Standard Operating Procedure. Demonstration data will be collected by Government personnel from production gauges and Government provided portable instrumentation equipment. Portable instrumentation may include cloth measuring tapes, ruler, smartphone or tablet data acquisition application, portable data acquisition unit, voice recorder, video recorder (GoPro), hand-held stopwatch, and a still camera. Handheld instrumentation will only be used by the non-flying crewmembers and will be stowed when not in use. Test data will be manually recorded.

2.1.2 Instrument Training

The Offeror shall describe the capability of its proposed configuration to conduct simulated and actual instrument condition training for student naval aviators using a variety of instrument approach procedures in FAA airspace.

The Offeror shall also explain the capabilities of its proposed configuration to conduct Tactical Air Navigation (TACAN), Very-high Frequency Omni-directional Radio (VOR), Global Positioning System (GPS), and Instrument Landing System (ILS) with the ability to conduct communications on Very-High Frequency (VHF) and Ultra-High Frequency (UHF) communication bands simultaneously. The Offeror shall describe how its proposed configuration enables conducting simulated emergency procedures with simulated system failures during instrument flight training. The Offeror shall explain the system level implementation of the following proposed attributes: Integrated Display Control (AV-050), Redundant Dual Band Radios (AV-054), and Independent Declutter (AV-140).

2.1.3 Navigation Training

The Offeror shall describe the capability of its proposed system to enable navigation training in visual meteorological conditions at various altitudes including low level flight altitudes in both single aircraft and formation operations. The Offeror shall detail how its configuration allows the combination of aircraft systems, visual references, and appropriate navigation data during navigation training, where such training requires crew resource management in the execution of pilot and copilot duties from either crew position, simultaneously, while conducting navigation and flight duties.

The Offeror shall explain the system level implementation of the following proposed attributes: Lockable Saved Flight Plan Database (AV-089), Map Overlay Capability (AV-095), and FMS (AV-096).

2.1.4 Warfighting Skills Training

The Offeror shall describe the ability of its proposed configuration to enable warfighting skills training which includes confined area landings, external load operations, search and rescue operations, energy management, and night vision (single ship and formation) operations. The Offeror shall explain its proposed aircraft system’s compatibility with external load, hoist, and search and rescue training where aircrew will be restrained using an aircrew harness attached to an airframe hard point, conducting aircrew duties from either side of the aircraft, and continuously connected to the internal communications system. The Offeror shall explain its proposed configuration’s ability to fly consistent profiles terminating in a stable hover out of ground effect over a defined reference point in support of search and rescue operations. The Offeror shall explain the system level implementation of the following proposed attributes: Autonomous Approach to a HOGE (AV-080) and Configurable Passenger Cabin (AV-119).

2.1.5 Safety

The Offeror shall explain its proposed aircraft system with respect to the requested functionality identified in the ECS (AV-019) and Emergency Landing Conditions (AV-111 and AV-142). The Offeror shall provide information to demonstrate compliance.

2.2 Book 2 –Management and Support

Volume 2 Book 2 shall contain information on the Offeror’s proposed management and support approach to delivering the aircraft system in accordance with the RFP. The Offeror’s proposal shall provide additional information to enable the Government to evaluate the proposed management and support approach, as follows:

2.2.1 Data Submission

If proposed, the Offeror shall complete Attachment L-5 (Access Agreement) describing the Offeror’s proposed Government access to data and access to any applicable management information systems that house data. The completed Access Agreement shall be provided as Annex D (Access Agreement) and will be incorporated into the contract at Section J Attachment 3. Pursuant with DFARS 227.7102-1(a), the Government may only require specific types of technical data be provided with the procurement of a commercial item. However, the Government encourages the Offeror to provide additional technical data and technical data rights/access consistent with paragraph 3.11 of the Performance Work Statement and Attachment L-5 (Access Agreement). If no access is proposed, the Offeror shall state such within Section 2.2.1 of its proposal. If the successful Offeror does not propose Attachment L-5, then OPTION CLIN 0010, clause H.4, and PWS paragraph 3.11 will be excluded from the awarded contract. Note: providing the Government with greater information, technical data, or technical data rights than the Offeror is otherwise required to provide under the DFARS is voluntary and is not a condition to award.

2.2.2 Initial Sparing Approach

The Offeror shall provide the item description, manufacturer part number, manufacturer CAGE code, and quantity of commensurate spares (CLIN 0X03) to support aircraft delivery (CLIN series 0X01). The Offeror shall propose its initial predictive analysis pertaining to the Spares Modeling predictions to support its proposed spares using PBS Appendix B (Profiles) and Appendix C (Usage Spectrum) and annual flight hours of 692 per aircraft for a period of 24-months after aircraft delivery. Additionally, the offeror shall provide its analysis supporting the proposed number of engine spares necessary to establish a pool, for the life of the program, based on Contractor proposed time between overhauls.

Attachments L-6 (Flyaway Kits List), L-7 (Spare Parts List), and L-8 (Peculiar Support Equipment List) shall be populated by the Offeror and returned as Annexes E, F, and G, which shall be incorporated into the awarded contract as Exhbit B, Exhibit C, and Exhibit D, respectively.

2.2.3 Support Infrastructure

The Offeror shall provide a description of the state of the Offeror's specific supplier/vendor base and supply chain management process and metrics; quantity; and use of 14 CFR Part 145 certified repair stations; quantity and use of parts distribution centers; and relationship with maintenance entities to include the quantity and geographical location to determine adequacy of proposed spares.

2.2.4 Sustainment Approach

a. The Offeror shall describe the process for HUMS data analysis exchange with the Government for managing reliability to meet the requirements in PWS Paragraph 3.19. In addition, the Offeror shall explain the system level implementation of the following PBS attributes: Diagnostics and health monitoring (AV- 130), Single access retrieval (AV-131), Independent recoverability of decoded raw data (AV-132), and HUMS data elements (AV-133).

The Offeror shall describe its approach to meeting the Government’s required response times for engineering and logistics reach back, and non-standard repairs and investigation support to meet the requirements in PWS Paragraph 3.15.

b. The Offeror shall describe the TH-XX unique usage profile impacts to standard commercial sustainability practices and procedures, including an analysis of any workload or inspection impacts to the Offeror’s cycle based on the usage profiles within the PBS (Appendix B and Appendix C) and annual flight hours of 89,918. Workload analysis shall be provided using the instructions in Attachment L-12 to complete the form provided in Attachment L-13. The completed form shall be provided as Annex J. Further, the Offeror shall provide a table within this section to cross reference between any “Generic” inspection used within the form to detail the actual inspection that is occurring.

The Offeror shall provide its procedures and requirements for blade fold and details of any associated maintenance requirements including removal of blades (AV-031), functional check flights, and ground transportation methodology in PWS Paragraph 3.8.2.

2.2.5 Small Business Utilization Strategy

All Offerors (Large and Small Businesses) shall address their strategies for utilizing SB Concerns in the performance of this contract, whether as a joint venture, teaming arrangement or subcontractor. SB Offerors may meet this requirement using work they perform themselves. For purposes of this solicitation, the term SB Concern shall also include the subcategories of Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), HUBZone Small Business (HUBZone), Small Disadvantaged Business (SDB), and Women-Owned Small Business (WOSB). Each subcategory of SB shall be addressed. This strategy is separate from, but shall be consistent with, the SB Subcontracting Plan or Commercial Subcontracting plan, if such a Plan is required. Offerors are advised that while the SB Subcontracting Plan or Commercial Subcontracting plan must be submitted to be eligible for award, the acceptability of the content of that plan is part of the responsibility determination assessment and not part of the evaluation. In describing its SB Utilization Strategy for this solicitation, the Offeror shall, as applicable:

(1) Describe its approach to identifying SB Concerns;

(2) Describe the extent of participation of SB Concerns on this contract, including a detailed description of the supplies and services for each SB Concern subcategory, and the complexity and variety of the work SB Concerns are to perform. For each SB Concern specifically identified in the proposal, provide the SB Concern's CAGE Code, or, if the SB Concern is not registered in the System for Award Management (SAM), at a minimum provide evidence of self-certification in accordance FAR 19.703(b) as an SB Concern. Where possible, provide documentation regarding enforceable commitments to utilize each SB Concern.

(3) Identify what processes have been implemented to correct past inabilities to meet proposed goals and any validated improvements;

(4) Demonstrate (Large Businesses only) that its SB Utilization Strategy is consistent with its SB Subcontracting Plan or Commercial Subcontracting plan. If the Offeror is a participant in the DoD Comprehensive Subcontracting Test Program specified in DFARS 219.7, or if the Offeror submits a

Commercial Subcontracting Plan for this proposal, then the Offeror shall describe how SB participation on this contract will contribute to its overall Comprehensive or Commercial Subcontracting Plan goals.

(5) The Offeror shall submit its SB Subcontracting Plan or Commercial Subcontracting plan as Annex A (SB Subcontracting Plan), which shall be incorporated into the awarded contract, pursuant to FAR 52.219-9, as Attachment J-5.

3.0 VOLUME 3 PRICE

The following guidelines and instructions are provided to assist the Offeror in preparing clear, concise, comprehensive, and traceable proposals.

Below is a list of Section L Attachments that the Offeror shall utilize to provide information required for this volume:

Attachment L-9 Unit Pricing Matrix Attachment L-10 Prime Contractor Price Summary Attachment L-11 Operations and Support – Contractor Contribution (O&S-CC) - provided for reference

3.1 Price Proposal Guidelines

(a) This Volume shall contain the information requested below.

(b) All price and price supporting information shall be contained in the price proposal as specified in

Attachment L-9 Unit Pricing Matrix. No price or pricing information shall be included in any other technical volume including cover letters. The Offeror is responsible for submitting sufficient information to enable the Government to fully evaluate its price proposal.

(c) The Offeror shall provide sufficient information to support its price in accordance with Attachment L-9

Unit Pricing Matrix as well as an explanation of all ground rules and assumptions that affect the price proposal. Any apparent imbalances in the pricing or any other anomalies should be fully explained.

(d) As this is a competitive acquisition with adequate price competition anticipated, submission of certified cost or pricing data in accordance with FAR 15.406-2 is not required. However, in the event that adequate price competition does not exist after receipt of proposals, the Government reserves the right to request data other than certified cost or pricing data as necessary from both the Offeror and subcontractors and may conduct negotiations with the Offeror, pursuant to FAR Part 15.403-3, in order to ensure a reasonable price. The Offeror shall acknowledge the requirement to provide additional pricing information prior to award if/when requested by the Government.

(e) Any numerical data shall be in an MS Excel 2016 spreadsheet; and any narrative shall be in MS Word 2016 format. Files received in a format other than requested are unacceptable. Portable Document Format (.pdf) is not acceptable, except when provided in addition to MS Excel and MS Word formats. Within all Excel spreadsheets, the Offeror shall use formulas and functions to the maximum extent possible and avoid using “value only” cells. If external links are utilized, supply those referenced files. Spreadsheets shall not be protected. The price proposal shall be unprotected and unlocked, with formulas intact to show mathematical operations.

(f) Price information shall be submitted in Then Year dollars (TY$) based on the Government’s fiscal year (1

October through 30 September). All prices shall be submitted in United States Dollars (USD).

3.2 Price Volume Content:

3.2.1 General Instructions

The Offeror’s Price Volume shall be constructed in the following format and shall contain all information applicable to the entire contract, to include all contract options.

Proposed Price for all FFP CLINs:

1. Price Narrative

2. Ground Rules and Assumptions

3. Attachment L-9 Unit Pricing Matrix

4. Attachment L-10 Prime Contractor Price Summary

3.2.2 Specific Instructions – Proposed Price:

For proposal development purposes, the Government has identified a range of acceptable aircraft quantity and the Government’s estimated budget, by CLIN, as identified by the below TH-XX Production Lots:

CLIN Description Range (each) Government’s Estimated

Budget Low High 0001 Base 32 36 $215,213,000 0101 Option I 31 36 $213,328,000 0201 Option II 31 36 $218,228,000 0301 Option III 15 26 $108,105,000 0401 Option IV 0 21 $158,708,000

The Offeror shall propose an aircraft quantity by CLIN that conforms to the Government’s Estimated Budget and is within the stated quantity ranges. The Offeror shall input this information into L-9, Unit Pricing Matrix, for purposes of calculating the TH-XX proposed instant procurement price (i.e., FFP CLINs 0X01). In addition, the contractor shall populate quantities by month for CLINs 0101, 0201, 0301, and 0401 under Section F-1, TH-XX Production Lot Delivery. At contract award, the ranges will be deleted and the proposed quantities will be placed on contract.

The Offeror’s proposed quantity per CLIN shall equal a total of 130 aircraft over the base and option periods of the contract.

The proposed spares under the CLIN 0X03 series shall be commensurate with the Offeror’s proposed aircraft quantities.

The Offeror shall complete Attachment L-9 Unit Pricing Matrix and ensure that values are traceable to Attachment L-10 Prime Contractor Price Summary.

3.2.3 FFP CLINs 0X01: TH-XX Full Rate Production Lots I-V (including Engineering Reach back) Provide a completed Attachment L-10 Prime Contractor Price Summary. The sum of the CLIN shall correspond to the Offeror's total proposed price shown in the proposed Attachment L-9 Unit Pricing Matrix. Information required in this section includes total program prices for principal entities. For CLINs 0X01 provide the aircraft unit price for the principal entities.

3.2.4 FFP CLINs 0X03 Lots I-V Spare Parts; CLINs 0004 and 0104 Peculiar Support Equipment; CLIN

0005 Hoist and CLIN 0006 Mission Planning System; and CLIN 0011 Sling Load Provide a completed Attachment L-10 Prime Contractor Price Summary. The sum of the CLIN shall correspond to the Offeror's total proposed price shown in the proposed Attachment L-9 Unit Pricing Matrix. Information required in this section includes total program prices for the principal entities. For CLINs 0X03, 0004, 0104, 0005, 0006, and 0011, provide the component unit price and quantity for each proposed part for the principal entities. In the event that any PSE, hoist, or sling are part of the standard aircraft package, please note that it has already been included in the CLIN 0X01 price.

3.2.5 FFP CLIN 0007 Instructor Pilot Training; CLIN 0008 Maintenance Personnel Training; OPTION

CLIN 0009 NATOPS Development; and OPTION CLIN 0010 Data in Excess of FFF/OMIT Provide a completed Attachment L-10 Prime Contractor Price Summary. The sum of the CLIN shall correspond to the Offeror's total proposed price shown in the proposed Attachment L-9 Unit Pricing Matrix. Information required in this section includes total program prices for the principal entities. For CLINs 0007, 0008, 0009, and 0010 provide the proposed price for the principal entities.

3.2.6 Operation and Support-Contractor Contribution (O&S-CC))

For evaluation purposes, the Government will generate the Offeror’s aircraft Operation and Support-Contractor Contribution (O&S-CC) cost using Version 19.1 of the Conklin and de Decker (C&dD) Life Cycle Cost (LCC) product. Within Volume 3.0 Price, the Offeror shall specify the variant of the aircraft within C&dD that is most closely representative to the model proposed; this variant will be used to determine the 10-year O&S Cost. The Government will use the scenario inputs found in Attachment L-11 O&S-CC, which is provided for informational purposes. In Attachment L-11, the scenario inputs can be found in the following locations:

1. Tab 1 Titled “Aircraft Selection” Excel rows 24 – 39;

2. Tab 2 Titled “Program Data” Excel rows 38 – 57;

3. Tab 3 Titled “Financial Data” Excel rows 38 – 45; and

4. Tab 4 Titled “Maintenance Data” Excel rows 34 – 43.

4.0 VOLUME 4 CONTRACT ADMINISTRATION

The Offeror shall provide the following contract administration information.

Offeror Representatives and Information: The Offeror shall provide a summary sheet comprised of the information listed below for the entities:

a. PRIME CONTRACTOR

i. Business Name;

ii. Address;

iii. Principal point of contact for this solicitation (Name, title, phone number, email);

iv. Secondary point of contact for this solicitation (Name, title, phone number, email);

v. Individuals authorized to negotiate with the Government and contractually bind the Offeror (Name, title, phone number, email);

vi. Establishment Taxpayer Identification Number (TIN);

vii. TIN of Parent Corporation (if applicable);

viii. DUNS;

ix. CAGE code;

x. Business size for this effort (large or small); and

xi. Percentage of work and role and responsibility performing.

(1) ALL OTHER ENTITIES

i. Business Name; Address; DCMA point of contact and telephone number, if applicable;

ii. DCAA point of contact and telephone number, if applicable;

iii. DUNS;

iv. CAGE code; and

v. Percentage of work and role and responsibility performing.

b. Government Agency Information: Provide the mailing address, telephone, fax numbers, email address, and facility codes for the Offeror’s local Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and Government Paying Office. In addition, provide the name, telephone number, fax number, and email address for the Administrative Contracting Officer (ACO) at DCMA.

c. The SB Subcontracting Plan or Commercial SB Subcontracting plan, submitted as Annex A, of the successful Offeror(s) will be reviewed as well as approved by the PCO prior to contract award as part of the responsibility determination. See FAR 19.702(a) (1) Statutory requirements, regarding failure of the apparent successful Offeror to negotiate and submit a SB Subcontracting Plan acceptable to the Contracting Officer. The successful Offeror’s approved SB Subcontracting Plan will be incorporated into the resultant contract and contractor performance against the plan will be monitored by the Government during contract execution.

d. The Offeror shall provide a copy of its warranty(ies) as Annex I. Annex I will be incorporated into the contract at Section J, Attachment J-6.

e. Terms and Conditions:

An exception occurs if/when an Offeror states it will not comply with a solicitation requirement, usually involving contract terms and conditions. A deviation is where an Offeror states it will not comply with a solicitation requirement but proposes an alternative to meet the intent of the requirement, usually involving a PBS and/or PWS requirement. An exception or deviation may be considered a deficiency.

The Offeror shall provide one of the following two statements in this section. If the Offeror takes any exceptions or deviations to the provisions of the solicitation and its applicable documents, the Offeror shall provide the following statement: “All exceptions and deviations taken from the solicitation terms, conditions or requirements, including any applicable documents, are included in this section”. If the Offeror does not take any such exceptions or deviations, then the Offeror shall provide the following statement: “No exceptions or deviations are taken to the terms and conditions or any requirement of the solicitation.”

If proposing an exception or deviation, the Offeror shall provide a detailed description for each in this section.

Indicate the difficulty with the applicable requirement and the proposed solution. Specifically identify the portion of the solicitation and the proposal, which are affected. Also, identify any proposed H-clauses containing unique contract terms and conditions not covered by clauses in this solicitation and associated with an exception or deviation identified in this section. The Government will review the information and may elect to clarify the requirement via an amendment or clarify the requirement by holding discussions.

f. Two signed copies of the SF 1449 with all fill-in clauses completed.

SECTION M - EVALUATION FACTORS FOR AWARD

EVALUATION OF OFFERORS

M

M.1. EVALUATION FACTORS FOR AWARD

I. GENERAL INFORMATION

The Government expects to select one Offeror on the basis of its proposal providing the best value to the Government, all factors considered. "Best value" means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit in response to the requirement.