WI 501 Ref 2.5 Drew Removal of Corrosion Products T-AKE.doc

DOC document 499 KB Posted

Attached to
PSA of USNS MATTEW PERRY (T-AKE 9) and USNS CHARLES DREW (T-AKE 10)
Solicitation number
N40442-10-R-3012
Issued by

About this file

WI 501 Reference

View the file

Other files

File Type Posted
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
10-R-3012 amendment 5.doc DOC document
SM1000-01_A-REV.pdf PDF
SM1000-02_A-REV.pdf PDF
SM1000-03_A-REV.pdf PDF
350-000-01.pdf PDF
1INFORMATION DATA.doc DOC document
10-R-3012 amendment 4.doc DOC document
SM1000_TP.pdf PDF
0109_A_ Bilge Well Preservation.doc DOC document
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
10-R-3012 amendment 3.doc DOC document
WI 560 Calcium Carbonate Dosing System.docx DOCX document
GFM List for WI Index Amend 3.xls XLS spreadsheet
References for WI Index T-AKE 9 PSA Amend 2.xls XLS spreadsheet
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
10-R-3012 amendment 2.doc DOC document
0622_A_Second Deck Cargo Hold Modifications.doc DOC document
GFM List for WI Index T-AKe 9 PSA Amend 2.xls XLS spreadsheet
WI 501 Ref 2.4 Drew Technical Product Sheet MC-PD-46.pdf PDF
261-7488730_D 1.DWG DWG drawing
7488748_B.doc DOC document
WI 0561 Senitec OWS Sys Installation.doc DOC document
Ref for WI Index T-AKE 10 PSA Amend 1.xls XLS spreadsheet
0547_A_HP Crossover to EDG Start Air System.doc DOC document
2.7 Attachment 7 Ball Valve Removal Photo.pdf PDF
0617_A_06 Lvl Vent Trunk Door Install.doc DOC document
261-7488730_D 2.DWG DWG drawing
7488951_L.pdf PDF
479-341-7012_--_SRD_Appendix A.DOC DOC document
GFM List for WI Index.xls XLS spreadsheet
8390078 Senitec OWS Installation .pdf PDF
7488736_D Distilled Water Transfer Sys Diagram.pdf PDF
T6435-CM-MMC-010.pdf PDF
261-7488730_D 3.DWG DWG drawing
7488736_D.pdf PDF
529-74 3.DWG DWG drawing
261-8389758 B - Mn Diesel Gen Remote Fuel Isolation Valve Install.pdf PDF
2.2 Attachment 2 471-342-7126_C-SRD_004.dwg DWG drawing
479-341-7012_--_SRD_Appendix D.xls XLS spreadsheet
2.6 Attachment 6 On Line and Recirc Manifold locations photos.pdf PDF
20001700 REV C Transmitter Installation Man.pdf PDF
479-341-7012_--_SRD_Appendix C.DOC DOC document
20002298REV C F-Series Meter Install Manual.pdf PDF
261-7488730_D 5.DWG DWG drawing
529-74 1.PDF PDF
WI 205 FO Meter Replacement.doc DOC document
9197402200E Senitec M1000 Assembling Instructions.pdf PDF
GFM List for WI Index.xls XLS spreadsheet
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIQUIDEWT to DREWGARD CWT Conversion Procedure

For

Military Sealift Command Vessel T-AKE Class

1. Ensure adequate time and resources are available for the job. To clean and treat a typical cooling system will require three complete volumes of water one of which must be distilled. Typical cleaning time including draining will take between 14-24 hours. Determine the expected degree of cleaning that will occur. Agree upon the time frame to perform the cleaning. Ascertain that there are sufficient and proper equipment and labor resources to achieve the outcome. If heating is required, determine that there are sufficient sources of heating and that the heating can be maintained throughout the cleaning period.

2. Drain the cooling system and dispose of in accordance to MSC policy. Note that storage totes or other suitable storage tanks may be required to hold the spent cooling solution for proper disposal.

Cleaning Cooling Systems (Out of Service) A. Where possible, connect the discharge side of the circulating pump to the lowest practical point on the cooling system using a length of flexible hose and the appropriate fittings. Using a second section of flexible hose with fittings, connect a cleaning solution return with a valve from the highest point on the cooling jacket system to the top of the mixing tank, which is the suction supply for the circulating pump. Refer to Cleaning Specification for exact piping configuration B. Fill and leak test the circuit prior to adding FERROCLEAN. If the system is tight commence cleaning procedure as follows

C. Heat the water before adding the FERROCLEAN and commencing the cleaning until it reaches a temperature of 60-82°C (140-180°F). The heat can be provided by a heating coil or steam line in the cleaning solution mixing tank or a system heat exchanger.

D. Add the 2% FERROCLEAN solution as per attached table for the system being cleaned. Note; it is best to cross connect the HT and LT chill water as well as the HT and LT Freshwater. In this way, only two flushes are required. This will save on man hours and set up time required for draining and filling multiple systems. Note; FERROCLEAN cleaning treatment will be added to the mixing tank to prepare the required proportions of cleaning solution based on the water volume in the system. An equal amount of water will need to be drained from the system before adding the FERROCLEAN cleaning treatment.

E. Be sure all valves in the mixing tank, pump, return and vent system are open. Ensure all coolers and heat exchangers in the cleaning loop. Start the chemical circulating pump and adjust the flow rate so that the level of the solution in the mixing tank remains constant.

F. Continue circulation and maintain the cleaning solution temperature for a minimum of 12 hours. As the cleaning progresses after adding FERROCLEAN cleaning treatment, the system water may start to change to a dark green/black color. The system pH will initially drop to 5.0 - 6.0. If foaming should occur, DREWPLUS L-474 may be added tot eh solution mixing tank in 250 ml increments to control foaming. The result of this product is almost immediate and as such can be managed manually as needed.

G. Throughout the circulation period, pH of the solution should be checked periodically to ensure the solution has adequate reserve for the cleaning. If the pH reaches 7.0 or higher the solution may be “spiked” one time with an additional 0.5% FERROCLEAN. If the cleaning time is approaching 12 hours and the pH is reaching neutral (pH 7.0) the flush is considered complete.

H. Drain the system then refill with fresh water and approximately 0.1% solution of GC (refer to Table 2). This solution will neutralize any remaining FERROCLEAN in the system and aid in the flushing process. Circulate the GC solution for a period of at least one hour but not more than three. Once this time has elapsed continue flushing the system with fresh water while draining until the discharge water is completely clear.

I. Inspect the cooling system interior for cleanliness. Repeat the procedures if the system is not completely clean.

J. Disconnect the vent system and the cleaning system from the circuit. Secure all inlet and outlet cleaning points.

K. Once flushing operation is completed fill cooling system with good quality make up (less than 10µmhos conductivity).

L. Add DREWGARD CWT at 8.0 liters/ton of system capacity. This should provide a silica level of +/- 350-450 ppm

Table 1

Product
Quantity
Function
FERROCLEAN
1875 L (75 x 25L)
Removes oxides, transition flush recommend 2% concentration based on sample analysis results
DREWPLUS L-474
100 L (4 x 25L)
Anti-foam to reduce foaming of cleaning solution during circulation
GC
50L (1 x 25L)
Caustic soda rinse, to remove all traces of cleaning chemical, ensure waste effluent is neutral pH
DREWGARD CWT
750 L (30 x 25)
Non-nitrite corrosion inhibitor, provides protection at 350-450 ppm SiO2

Table 2

System
Capacities in Ltr
Cleaning strength2
Liters of FERROCLEAN Required
Liters of GC Required
LT FW
55,834
2%
1,117
56
HT FW
9,281
2%
186
9
LT CW
22,600
2%
452
23
HT CW
7,080
2%
142
7
Total
94,795
1,896
95
Total Pails
76
4

2 Cleaning strength based on relative iron content seen in lab analyses from AMELIA EARHART samples

DREWGARD CWT requirement

94.8
tons capacity
8
liters/ton
758
liters
30
Pails total