USNS CHARLES DREW
(T-AKE 10)
MACHINERY, AUXILIARY SYSTEMS
RFP NO. N40442-10-R-3012
23 FEBRUARY 2010
ITEM NO. 0547
Van Vleck/N43C//French HP air Crossover to EDG start air system (TRANSALT T-AKE 09-120)
1.0 ABSTRACT
1.1 This item describes installation of a reducing station and cross over piping between the HP Air System and the EDG start air system.
2.0 REFERENCES/ENCLOSURES:
2.1 References:
2.1.1 NAVSEA DWG. 342-7488747 Rev B (NASSCO 471-342-7137) Rev B, Emergency Diesel Generator Services Diagram
2.1.2 NAVSEA DWG. 551-7488862 Rev C (NASSCO 471-342-7173) Rev C, High Pressure Air System Diagram
2.1.3 NAVSEA DWG. 802-7488866 Rev N (NASSCO 471-341-7008) Rev N, GENERAL ARRANGEMENT
2.1.4 MSC Dwg 551-8195625 Rev B EDG Start Air Crossover
2.2 Enclosures:
2.2.1 Enclosure 1; HP Air X-Over to EDG Start Air (guidance)
2.2.2 Enclosure 2; UNREP Station 8 Tie In (guidance)
3.0 ITEM LOCATION AND DESCRIPTION
3.1 Locations/Quantity
3.1.1 Location:
· EDG Room 02-73-1 (03 level mezzanine level)
· Station 8 Motor Control Room 02-74-0
3.1.2 Quantity: 1 each HP air to EDG Start Air Cross Connect Station.
3.2 Bill of Material:
| Description |
| Specification |
| QTY |
Isolation Valves
· SA-V-114
· SA-V-115
· SA-V-116
¾” CPV O-Seal System 6000 PSi Vale
W/socket weld Union end tail piece.
O-ring to be provided.
3 each
| Piping |
| ¾” IPS CUNI 70-30 |
MIL-T-16420 CL 3300 , SML
Approx 75 Lft
| Fittings |
| Per Ref 2.1.2 High pressure Air System |
| As Required |
| Gauge Valves |
| CPV or Hoke 3/8” |
| 2 each |
| Gauges |
| 0-3000 PSI |
Dial face 5” dia minimum 2 each
| Gage Tubing |
| 0.065 thk, 3/8” 316 Stainless |
| Approx 10 ft. |
| Deck Penetration |
| ¾” – Steel Welded |
| 1 each |
3.2.1 All components and piping shall be rated for use in the High Pressure Air System with the design characteristics as per drawing ref 2.1.2.
3.2.2 Quantities given in the List of Materials are considered estimates and for reference only. These quantities shall be verified and revised based on actual piping run and equipment location in subject spaces. The Contractor shall provide these quantities and reasonable additional material in order to install a fully functional system that meets the requirements of this specification.
3.2.3 Additional material/components necessary to accomplish work required by this work item, such as hangers, weld material, etc. are not included below in section 4.0, and shall be provided by the Contractor.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES:
4.1 Reducing Valve CASHCO 0B5-ks37-13000000B
4.2 Relief Valve Farris Engineering 27EA45-170
5.0 NOTES
5.1 The contractor and subcontractors must consult Military Sealift Command’s General Technical Requirements, (GTR’s), to determine applicability to this work item. The contractor and all subcontractors must comply with all applicable GTR requirements.
5.2 The contractor and subcontractors shall review other work items under this contract, including but not limited to Work Item 021, to determine their effect on the work required by this item. Based on this review the contractor shall plan and schedule work to minimize conflicts between work items.
5.3 The definitions of many terms used in this work item are found in Work Item 001.
5.4 This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area with out proper authorization.
5.5 THE USNS T-AKE ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional
7.0 STATEMENT OF WORK
7.1 Piping Modifications:
7.1.1 Install piping cross connect between the HP air system and the EDG Start air system as follows:
7.1.1.1 Prior to start, a working drawing shall be developed, and approved by the Port Engineer.
7.1.1.2 New piping and components shall meet requirements of ABS class I piping system.
7.1.1.3 All new piping shall be designed and installed to meet the system design requirements for high pressure air plant piping listed on reference 2.1.2.
7.1.1.4 Tee into UNREP Station 8 high pressure air flask piping. See Enclosure (2) for guidance.
7.1.1.5 Piping shall run from Station 8 Unrep Motor Control Room to the EDG room above. This will require approximately 75’ of piping.
7.1.1.6 Where piping goes through the deck a deck penetration collar shall be installed. 100% welded pipe to collar and collar to deck.
7.1.1.7 Install piping hangers. Assume 25 each ¾” pipe strap hangers will be required.
7.1.1.8 Install reducing station on the 03 level of the EDG room. This station shall be in the vicinity of the EDG start air bottles. See Enclosure (1) for guidance.
7.1.1.9 The reducing station shall have a pressure reducing valve. 3000/435 psi. Cashco Model 345.
7.1.1.10 The reducing station shall have isolation valves on each side of the pressure reducing valve. Valves to be CVP 6000 psi o-ring seal type.
7.1.1.11 The reducing station shall have bypass piping with valve. The valve shall be a CVP 6000 psi o-ring
7.1.1.12 Inlet and outlet gauges shall be installed on the reducing station. Each gage shall have isolation valves. Gauges shall be installed using 3/8” 316 stainless tubing 0.065 wall thk. Gauges shall have minimum 5” Diameter face.
7.2 Preparation of Drawings:
7.2.1 Develop “Working Drawings” based on conceptual design presented by Enclosures (1) and (2).
7.2.2 Prepare and submit “red-lined” markups of references 2.1.1, and 2.1.2, system drawings. Drawings shall include one hard copy with the original hand written red lines. In addition this shall be electronically scanned and a CD with the scanned red line drawing submitted to the COR.
7.2.3 Upon completion of work, submit updated Working Drawings, these shall be called the “As-Built” drawings. They shall be submitted to the COR in AutoCAD format on CD.
7.3 Testing/Inspection:
7.3.1 Preliminary Tests
Contractor shall conduct preliminary tests on all completed work before calling for an official test.
7.3.2 Completion Test
The Contractor shall conduct a completion test that verifies that all aspects of the work item have been completed. A completion test may include a series of functional, operational, and hydrostatic tightness tests.
7.3.3 Welding and Brazing Test
Visually inspect new, modified, or repaired welds or brazed materials in accordance with Regulatory Body requirements.
7.3.4 Tightness Test
Verify that all structural work including any structural attachments, which would affect the tightness of the structure, is complete and ready for service.
7.3.5 Clean and Flush
The Contractor shall clean the entire piping systems after completion of all new piping installation by flushing with fresh water in the presence of the MSC Representative.
7.3.6 Hydrostatic Test
a. The Contractor shall hydrostatically test the new Air piping installation per Regulatory body requirements and based on design conditions indicated in reference 2.1.2.
b. Perform a shop valve seat leak test on new valves. Test at system operating pressure. No leakage allowed.
7.3.7 Painting Test and Inspection
a. The Contractor and MSC Representative shall conduct a joint inspection of areas disturbed by the installations. These areas are to be prepared and primed before final painting begins to ensure that protective measures are implemented.
b. The Contractor shall perform inspections after completion of each stage of surface preparation, each coat, and each stripe coat, to verify surface condition, DFT and space cleanliness, and before requesting final inspection by the MSC representative.
7.3.8 Operational Test
In the presence of the ABS Surveyor and COR/MSC Representative, verify that:
· All work has performed satisfactorily and to the specific instructions and requirements of the work item, manufacturer, and regulatory bodies.
· The equipment, material, machinery, or system performs its intended purpose.
7.4 Painting
Clean and prepare the disturbed areas and apply a primer and two topcoats of paint to all areas disturbed to match the surrounding areas.
7.5 Markings
Install nameplates, notices, and markings for all new and modified systems. Valve label plates shall read as follows:
7.5.1 For SA-V-114: “SA-V-114 HP X-Connect Reducer Isolation”
7.5.2 For SA-V-115: “SA-V-115 HP X-Connect Bypass”
7.5.3 For SA-V-116: “SA-V-116 HP X-Connect Reducer”
7.5.4 For SA-V-117: “SA-V-117 HP X-Connect Reducer Isolation”
7.6 Manufacturer's Representative: None.
8.0 GENERAL REQUIREMENTS: None additional
547-1
_1328590624.pdf
A
B
7 6 5
C
D
FSCM NO.
4 3 2
SCALE
SIZE DWG NO.
SHEET
REV
ZONE REV
REVISIONS
DESCRIPTION
APPROVED
DATE
PS PT
PT
P
NC
M OIST.
SEP.
CONN @ START AIR MOTOR
20SA01 -051
S
-0
2 0SA01 -051
4 0SA01 -052
4 0SA01 -053
2 0SA01 -057
20SA01 -056
1 5SA01 -060
25SA01 -058
25SA01 -059
EDG START AIR SYSTEM
471 -342-7137
NASSCO DRAWING NUMBER
NAVSEA DRAWING NUMBER
342-7488747
SA-V -1 01
SA-V -1 08
SET @ 30 BAR
0 .2 M 3 0 .2 M 3
SA-V -1 03 SA-V -1 04
SA-V -1 06 SA-V -1 07
SA-V -1 05
SA-V -1 09
SET @ 30 BAR
SA-V -1 02
SA-G A-1 1
RESERVE
START AIR
FLASK
(SEE NOTE S1 1 )
PRIM ARY
START A IR
(SEE NOTE S1 1 )
SKID M OUNTED CONTROLLER
FOR LOCAL START/STOP AND
AUTOM ATIC UNLOADING
SYSTEM OPERATIONS
AUTOM ATIC OPERAT ION
(START/CUT-OUT) V IA
SA-PS -1 0
REM OTE SUM M ARY
FAULT ALARM AND
RUN STATUS AT M CCS
SA-F-51
SA-F-53
LED TO DECK
LED TO DECK
LED TO DK DRAIN
(SEE NOTES S7 & S8)
DRAIN TO OILY WASTE
HOLDING TANK (REF. 19)
20SA01 -057
SA-PT-1 1 RESERVE AIR FLASK PRESS
INDICATION & LOW PRESS ALARM
SET @ 1 5 BAR
EDG START A IR
COM PRESSOR ROOM
EM ERG ENCY DIESEL
G ENERATOR
LED TO DK DRAIN
SA-V -1 1 0
25SA01 -062
PS
SA-G A-1 0
(LOCAL)
SA-PS-1 0 FOR REMOTE COMPRESSOR
CONTROL START @ 28 BAR & STOP
@29.3 BAR (SEE NOTE S10)
LOCATE MOISTURE
SEPARATOR NEAR
STRUCTURE TO
FACILITATE GRADE
A SHOCK MOUNTING
SA-PT-10, REMOTE PRIMARY AIR FLASK
PRESS INDICATION & LOW PRESS ALARM
IN MCCS, SET @ 15 BAR
SA-PS-1 1
SET @ 14 BAR (RISING) TO ACTIVATE START AIR
READY LIGHT AND ALARM ON THE EDG CONTROL
PANEL SET TO ENSURE SUFFICIENT AIR FOR 6
CONSECUTIVE START ATTEMPTS.
LP RELIEF VALVESET AT
9. BAR ATTACHED TO
COMPRESSOR
HP RELIEF VALVE
ATTACHED TO COMPRESSOR
SET @ 31 .5 BAR
TS
VENDOR SUPPLIED
STARTING AIR
COMPRESSOR SKID
EDG SKID
SA-V -1 1 4 SA -V -1 1 6
SA -V -1 1 7
N C
SA-V -1 1 5
From HP A ir -U N REP S ta tion #8
20m m (3 /4 ")
20m m (3 /4 ")
HP CROSSOVER TO EDGE
START AIR---SEE SERVICE ORDER
SO-08-009
HP AIR X-OVER TO EDG START AIR
TAKE-1 VRR 07-1 5
SERVICE ORDER SO-08-009
MODIFIED
ENCLOSURE 1
19FEB08
_1328590650.pdf
FSCM NO.
SCALE
SIZE DWG NO.
SHEET
REV
ZONE REV
REVISIONS
DESCRIPTION
APPROVED
DATE
UNREP STATION 8 TIE IN
TAKE-1 VRR 07-15
SERVICE ORDER SO-08-009
ENCLOSURE 2
NO. 8
RAM TENSIONER
CHARGING PANEL
NO. 8 DETAIL 12-B
40AH01 -038
UNREP STATION
NO. 8
UNREP STATION
NO. 7
SHIP CL
RESERVE
HP AIR FLASK BANK &
CHARGING VALVE PANEL
SEE DETAIL 15-B
40AH01 -038 FROM
AIR FLASK BANK
BELOW
40AH01 -038 DN TO
RT PANEL NO. 8
15AH01 -023 FROM
HP AIR MAIN BLW
STA NO 8
MOT CONT RM
02-74-0
NASSCO DRAWING NUMBER
NAVSEA DRAWING NUMBER
551 -7488862
471 -342-7173
HP AIR
(T Y
1 5 MM FROM HIGH
PRESSURE AIR MAIN
VALVE C
VALVE J
FITTING A
20 PIPE A
40 PIPE A
20 PIPE A
15 PIPE A
15 PIPE A
IP
E
G
20 PIPE F
20 PIPE E
20 PIPE D
20 PIPE C
15 PIPE B
8 PIPE L 8 PIPE K 8 PIPE J 8 PIPE H
8 PIPE H
32/50
DECK
AIR BANK CHARGING STATION ASSEMBLY
(PROVIDE ADEQUATE
SWAY BRACING
FOR SILENCER)
ENTIRE LENGTH OF PIPE A
IS 1 5 DIA FOR RESERVE
AIR BANK ONLY
GAUGE A
(VISIBLE FROM THE
AIR BANK CHARGING
STATION ASSEMBLY)
40 MM PIPE "M"
TO RAM TENSIONER
CHARGING STATION
(NOT REQUIRED FOR
RESERVE AIR BANK)
VALVE N
N.C.
VALVE M
VALVE L
VALVE K
VALVE B
VALVE A
VALVE D
N.O.
VALVE O
SET AT 17,200 kPa
FOR MAIN AIR BANKS
(SET AT 20,700 kPa
FOR RESERVE AIR BANK)
LED TO WEATHER DECK
03 DECK
EDG ROOM 02-73-1 MEZZANINE
20 MM (3/4") PIPE
TO EDG NEW REDUCING STATION
DECK SLEEVE
MODIFIED FROM
UNREP STATION 8
NEW PIPING
NEW PIPING
19FEB08