References for WI Index T-AKE 9 PSA Amend 2.xls
XLS spreadsheet 4 MB Posted
- Solicitation number
- N40442-10-R-3012
About this file
References for WI Index
View the file
Other files
Show 40 more
Latest 50 of 69 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
References & Enclosures
| W.I | Description | References and Enclosures | |
| 001 | Intent, Scope, General Conditions and Definitions | 2.1 MSC Drawing 803-7081122, “Military Sealift Command General Technical Requirements (GTRs)” | |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | None. | |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | 2.1 MIL. STD. MIL-C-28628D, dtd. July 1991; Camels. | |
| 2.2 MIL. STD. MIL-F-29248, dtd. 21 November 1986; Fenders, Marine, Foam Filled, Netless | |||
| 2.3 MSC Drawing No. 801-7488869, General Arrangement Plan | |||
| 2.4 NAVSEA Drawing No. 835-7489033 Mooring Analysis | |||
| 004 | TESTING AND QUALITY ASSURANCE | 2.1 MIL-I-45208 (series), Inspection Systems | |
| 2.2 ANSI/ISO/ASQ Q9001-2000, Quality Management Systems – requirements | |||
| 005 | ELECTRICAL SAFTEY PROCEDURE REQUIREMENTS | 2.1 MSC Safety Management System Procedure 2.1-004-ALL, Lock-out/Tag-out | |
| 2.2 MSC Safety Management System Procedure 2.1-016-AKE, High Voltage Systems | |||
| 006 | HEAVY WEATHER PLAN | 2.2.1 MSC Drawing No. 479-341-7012, USNS Matthew Perry Trim and Stability Booklet. | |
| Enclosures: | |||
| 2.2.1 Beaufort Wind Scale | |||
| 007 | COLD WEATHER PLAN | 2.1 MSC Drawing No. 479-341-7012, USNS Matthew Perry Trim and Stability Booklet | |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | None. | |
| 011 | FURNISH GENERAL SERVICES (T-AKE) | 2.1.1 NAVSEA Drawing No. 802-8194711 General Arrangements | |
| 2.1.2 MSC Chemical Treatment Handbook | |||
| Enclosures: | |||
| 2.2.1 Heat Lamp List Motors, Generators and Exciters | |||
| 012 | TELEPHONE SERVICES | None. | |
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | None. | |
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | None. | |
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | 2.1 Department of Defense Security Manual for Safeguarding Classified Information, DOD Manual 5220.22-M | |
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | 2.1 National Fire Protection Association 312, Standard for Fire Protection of Vessels During Construction, Repair and Lay-up | |
| 2.2 National Fire Protection Association 51B, Standard for Fire Prevention in Use of Cutting and Welding Processes | |||
| 017 | HANDLING SHIP'S STORES | None. | |
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | 2.1 NAVMED P-5010-6, Manual of Naval Preventive Medicine, Chapter 6, Water Supply Afloat | |
| 019 | SHIPBOARD ACCESS AND SECURITY | 2.1 COMSCINST 5530.3C, MSC Shipboard AT/FP Program | |
| 020 | GAS FREE CERTIFICATES | None. | |
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES | 2.1.1 NAVSEA Drawing 830-8193654, Capacity Plan | |
| 2.1.2 NAVSEA Drawing 479-341-7012, USNS Matthew Perry Trim & Stability Booklet | |||
| Enclosures: | |||
| 0021.1 USNS Matthew Perry (T-AKE-9) List of Applicable Tanks, Voids and Cofferdams | |||
| 022 | DOCK TRIALS AND SEA TRIALS | None. | |
| 023 | HAZARDOUS WASTE DISPOSAL AT CONTRACTORS FACILIITY | 2.1.1 Resource Conservation and Recovery Act (RCRA) as amended | |
| 2.1.2 10 U.S.C. §731 | |||
| 2.1.3 Applicable Uniform Hazardous Waste Manifest Form | |||
| 2.1.4 Test Methods for Evaluating Solid Waste, Physical/Chemical Methods; EPA Document, SW-846; the official compendium of analytical and sampling methods that have been evaluated and approved for use in complying with the RCRA regulations. | |||
| 2.1.5 OPNAVINST 5090.1C | |||
| 030 | CONTINUATION OF SERVICES | None. | |
| 106 | BRINE STORAGE RACK INSTALLATION (TRANSALT T-079) | 2.1 MSC Drawing No. 671- 8194032 Rev_, Calcium Chloride Storage Rack Installation. | |
| 107 | L.O. TANK PARTITION & PIPING MODIFICATIONS (TRANSALT T-001) | 2.1 MSC Drawing No. T-AKE 1 100-8193898 Rev F, Lube Oil Storage Tank Modifications | |
| 2.2 MSC Drawing No. T-AKE 1 262-8193891 Rev G, Lube Oil Storage Tank Piping Mods | |||
| 2.3 MSC Drawing No. T-AKE 1 202-8193895 Rev D, Lube Oil Storage Tank 3-82.5-1 Pressure Transducer BWD | |||
| 108 | VENT TRUNK COATING | 2.1 Belzona 5811 (Immersion Grade) Information Sheet | |
| 109 | BILGE WELL PRESERVATION | 2.1 Belzona 5811 (Immersion Grade) Information Sheet | |
| 110 | ELEVATOR PIT COATING | 2.1 Belzona 5811 (Immersion Grade) Information Sheet | |
| 111 | MAGAZINE SPRINKLER SECURITY CAGES (TRANSALT NO. T-AKE-07-080) | 2.1 MSC Dwg 111-8194248 Rev D Magazine Sprinkler Security Cage Fabrication & Install | |
| 115 | STARBOARD HAWSE PIPE RAILING MODIFICATION (TRANSALT T-AKE-07-081) | None. | |
| 116 | 03 DECK LADDER INSTALLATION (TRANSALT T-AKE-07-082) | None. | |
| 117 | BOSUN LOCKER ACCESS HATCH LADDER (TRANSALT T-AKE-07-083) | None. | |
| 123 | HAWSE PIPE SECURITY SCREENS (TRANSALT T-AKE-07-087) | None. | |
| 124 | 02 EXTERIOR DECK LADDER INSTALLATION | 2.1 NASSCO Standard Drawing 77-87-486, Ladder, Inclined, Exterior, with Open Grating Treads | |
| 130 | Sounding Tube Installation | 2.1 NASSCO DWG No. 479-341-7012, Trim and Stability Booklet | |
| 2.2 NAVSEA DWG No. 541-7488765_E, NASSCO DWG No. 471-342-7159, Cargo Fuel Systems Diagram. | |||
| 2.3 NAVSEA DWG No. 506-7488734_C, NASSCO DWG No. 471-342-7122, Vents, Sounds and Overflow System Diagram | |||
| 2.4 MSC GTR No. 23 | |||
| 131 | STAGING AREA RAMP EXTENSION | None. | |
| 132 | LOAD CENTER #3 AND 4 SECURITY CAGES (T-ALT 159) | Imbedded in W.I. | |
| 135 | INSTALL SIDEPORT PILOT ACCESS DOORS | 2.1 MSC Dwg 602-8195654 Rev C, Side Port, Pilot Access Structural & Mechanical Mods | |
| 2.2 NAVSEA Dwg 635-7489069 Rev F,(NASSCO Dwg 471-332-4707) Arrangement and Details of Refrigerated Cargo Hold #3 | |||
| 136 | INSTALL GUN MOUNTS | 2.1 MSC DWG 8195934 REV (-), Gun Mount Installation | |
| 205 | FUEL OIL METER REPLACEMENT T/A 228 | 1.1 NAVSEA Drawing: No. 261-7488730, Rev D, “Selected Record Drawing Diesel Generator Fuel Service System Diagram” | |
| 1.2 Emerson Installation Manual No. 20002298, Rev C, “Micro Motion F-Series Sensor Installation Manual” | |||
| 1.3 Emerson Installation Manual No. 20001700, Rev C, “Micro Motion Model 1700 and Model 2700 Transmitters Installation Manual” | |||
| 1.4 Emerson Configuration and Use Manual No. 20001715, Rev B, “Micro Motion Series 1000 and Series 2000 Transmitters” | |||
| 206 | FUEL ISOLATION TO MAIN DIESEL ENGINES T/A 162 | 2.1.1 MSC Drawing No. 261-8389758 Rev B Main Diesel Generator Remote Fuel Isolation Valve Installation | |
| 2.1.2 NAVSEA Drawing No. 551-7488733 Rev D T-AKE 1 Class Ship Service and Control Air System Diagram | |||
| 2.1.3 NAVSEA Drawing No. 261-7488730 Rev D T-AKE 1 Class Diesel Generator Fuel Service System Diagram | |||
| 2.1.4 TECHNICAL MANUAL No. T6435-CM-MMC-010 T-AKE 1 Class Quick Closing Valves, Fuel Oil & Lube Oil | |||
| 302 | ANCHOR WINDLASS CONTROLLER RELOCATION (TRANSALT T-011) | 2.1 MSC Drawing No. 320-8194255 Rev D, Windlass Controls Relocation | |
| 2.2 MSC Tech Manual TG813-BV-MMC-010, Electrically Driven Deck Machinery | |||
| 2.3 List of Connections Database (Microsoft Access 2002 or higher is required to read this database) | |||
| 2.4 NAVSEA Dwg 324-7488783 Rev B BWD Deck Machinery | |||
| 2.5 MSC Dwg 100-8194254 Rev E, USNS LEWIS AND CLARK T-AKE 1 Miscellaneous Structural Details | |||
| 304 | RESCUE BOAT ENGINE BLOCK HEATER INSTALL (TRANSALT T-089) | 2.1 MSC Dwg 300-8195618 Rev C Motor heaters RHIB boats and life boats. | |
| 2.2 STEYR Motors Marine Engines Manual | |||
| 2.3 NAVSEA Drawing No. 631-7488891 Rev G, “Paint Schedule” | |||
| 2.4 NAVSEA Drawing No. T-AKE 1 Class 320-7488777 Rev G, “Electrical System One Line Diagram” | |||
| 2.5 MSC Dwg 300-8195618 Rev C STEYR Motors Marine Engines Manual | |||
| 305 | LIFEBOAT ENGINE BLOCK HEATER INSTALLATIONS (TRANSALT T-090) | 2.1 MSC Dwg 300-8195618 Rev C Motor Heaters RHIB Boats and Life Boats. | |
| 2.2 SABB Motor A-S Technical Manual | |||
| 2.3 NAVSEA Drawing No. 631-7488891 Rev G, “Paint Schedule” | |||
| 2.4 NAVSEA Drawing No. T-AKE 1 Class 320-7488777 Rev G, “Electrical System One Line Diagram” | |||
| 307 | UNREP STATIONS 3 AND 4 LIGHTING (Transalt No. TAKE-064) | 2.1 NASSCO Dwg No. 471-346-0105SK, Lighting Sketch Topside Lighting | |
| 2.2 NAVSEA Dwg No. 320-7488777_G, NASSCO DWG NO.471-346-0002, Electrical System One Line Diagram | |||
| 2.3 NASSCO Test Procedure No. 471-344-8613 Rev C, Lighting System Operational Tests | |||
| 310 | HELO HANGAR FOAM SYSTEM - INSTALL TWO ADDITIONAL ACTUATION CONTROLLERS (TRANSALT T-AKE 115) | 2.1 NAVSEA Drawing No. 324-7488790 Rev B, “Fire Main, Foam, Sprinkling, FM-200 System” (Sheet 10) | |
| 2.2 NASSCO Engineering Change Notice (ECN) No. 0025 of 16 Dec 2004 | |||
| 2.3 MSC Dwg 300-8195614 Rev B National Foam, Inc Drawing No. D-2002046-1 “Combination C/B Marine Starter NEMA 4X Enclosure, 3/60/460” | |||
| 2.4 NAVSEA Technical Manual 0910-LP-104-3003 (MSC No. T9555-99-MMC-0), “Foam Fire Protection Manual” | |||
| 2.5 NAVSEA Drawing No. 801-7488867 Rev E, “Fire Control Plan” | |||
| 2.6 NAVSEA Drawing No. 802-7488866 Rev N, “General Arrangement” | |||
| 2.7 NAVSEA Drawing No. 631-7488891 Rev G, “Paint Schedule” | |||
| 401 | VOYAGE DATA RECORDER CERTIFICATION | 2.1 TM TE03-AD-MMC-010; Voyage Data Recorder VDR Model JA IT6-8033 Operation and Maintenance | |
| Enclosures: | |||
| 2.2 Certification of Compliance | |||
| 402 | Analog Shaft RPM and Rudder Monitoring System | None. | |
| 403 | SHIP'S WHISTLE MODIFICATIONS (Transalt No. TAKE-028) | 2.1 MSC Drawing No. T-AKE 1 100-8193899 Rev D, 2nd Deck Ship’s Whistle and Radar Structural Details | |
| 2.2 MSC Drawing No. T-AKE 1 400-8193913 Rev D, Ship’s Whistle Electrical Mods | |||
| 404 | X-BAND RADAR INSTALLATION (Transalt No. TAKE-006) | 2.1 MSC Drawing No. T-AKE 1 100-8193899 Rev D, 2nd Deck Ship’s Whistle and Radar Structural Details | |
| 2.2 MSC Drawing No. T-AKE 1 400-8193912 Rev C, X-Band Radar Electrical Installation | |||
| 2.3 NAVSEA Drawing No. T-AKE 1 Class 320-7488777 Rev G, (NASSCO 471-346-0002) Electrical System One Line Diagram | |||
| 2.4 NAVSEA Drawing No. T-AKE 1 Class 423-7488815 Rev C, (NASSCO 471-346-0301) Radar BWD | |||
| 406 | INMARSAT FOUNDATION MODS | Enclosure - Inmarsat Foundation | |
| 407 | INSTALL 08 RADHAZ BARRIERS (TRANSALT TAKE-137) | 2.1.1 Grating Pacific LLC RADHAZ Handrail Barrier protection Drawing # GP324 | |
| 2.1.2 NAVSEA/NSWC Technical Report for Hazards of Electromagnetic radiation to Personnel (HERP) and Fuel (HERF) Survey of Lewis and Clark (T-AKE 1) Class ship revision 1, Dated 17 OCT 2007 | |||
| 2.1.3 MIL-STD-1310G Shipboard Bonding, Grounding, and other Techniques for Electromagnetic Safety and Compatibility. | |||
| 2.1.4. Photos of previous install | |||
| 427 | INMARSAT B ANTENNA INSTALL (T-ALT 146) | 2.1.1 NERA INMARSAT B TECHNICAL MANUAL | |
| 2.2.1 INMARSAT PEDESTAL DRAWING | |||
| 2.2.2 Figures 1, 2 and 3 (Antenna Patch panel drawings) | |||
| 501 | HT/LT FRESHWATER AND CHILL WATER SYSTEM FLUSH | 2.1 NAVSEA DWG 514-7488755 Rev (C), A/C Chilled Water System Diagram | |
| 2.2 NAVSEA DWG 532-7488722 Rev (E), Diesel Generator High Temperature Freshwater Cooling System Diagram | |||
| 2.3 NAVSEA DWG 532-7488723 Rev (C), Low Temperature Freshwater Cooling System Diagram | |||
| 2.4 Attachment 1, Drew Marine FERROCLEAN Technical Product Sheet. | |||
| 2.5 Attachment 2, Drew Marine Diesel Engine/FW Cooling System Removal of Corrosion products using FERROCLEAN. | |||
| 502 | FUEL SERVICE SIGHT GLASSES (T-ALT-08-194) | 2.1 MSC Drawing 261-8389610 Fuel Oil Sight Glass Installation | |
| 2.2NAVSEA Drawing 529-8194710 Sludge Drainage and Transfer System Drawing | |||
| 503 | SHIP SERVICE AIR RECIEVER PIPING MODIFICATION(TRANSALT T-AKE 010) | 2.1 NAVSEA Drawing No. 551-7488733 Rev D, (NASSCO 471-342-7118) “Ships Service and Control Air System Diagram” | |
| 2.2 WI 503 Guidance Drawing, “Ships Service Air Piping Modification” (2 sheets) | |||
| 2.3 NAVSEA Drawing No. 6965791, “Flushing Procedure for New, Repaired and Disturbed Piping Sections on Surface Ships” | |||
| 2.4 NAVSEA Drawing No. 802-7488866 Rev N, “General Arrangement” | |||
| 2.5 NAVSEA Drawing No. 631-7488891 Rev G, “Paint Schedule” | |||
| 2.6 MSC Dwg 500-8195632 Rev C Service Air Receiver piping modifications | |||
| 504 | CARGO AND SHIP'S POTABLE WATER CROSS CONNECT(TRANSALT T-AKE-030) | 2.1.1 NAVSEA DWG. 532-7488763 Rev B (NASSCO 471-342-7157) Rev B, Cargo Potable Water System Diagram | |
| 2.1.2 NAVSEA DWG. 532-7488742 Rev C (NASSCO 471-342-7131) Rev D, Ship’s Service Potable Water | |||
| 2.1.3 Guidance DWG 1 (Potable Water Suction Cross Connect) | |||
| 2.1.4 MSC Dwg 500-8195658 Rev C Cargo Potable Water Cross-connect | |||
| 505 | INCENERATOR SLUDGE TANK HEARER INSTALLATION (TRANSALT T-AKE 218) | 2.1 Atlas Drawing No. 11969-01 | |
| 506 | CHILLED WATER ISOLATION VALVES (TRANSALT TAKE-029) | 2.1 NAVSEA DWG No. 514-7488755 Rev E, (NASSCO 471-342-7149) Chilled Water System Diagram | |
| 2.2 ASTM STD F 683-03 A, Insulation and Lagging Material for Pipe, Tubing and Fittings used for Interior Piping Systems | |||
| 2.3 MSC Dwg 500-8195620 Rev B AC Chill water piping mods. | |||
| 511 | SPRINKLER TEST CONNECTION (TRANSALT TAKE-033) | 2.1 MSC Drawing No. T-AKE 1 555-8193892 Rev “C”, Sprinkler Test Connection | |
| 517 | CARGO REFRIGERATION DEFROST VALVES (TRANSALT T-AKE 093) | 2.1NAVSEA DWG. 516-7488756 Rev C (NASSCO 471-342-7150) Rev B; Cargo Refrigeration Secondary Coolant Circulation System Diagram | |
| 518 | DECK LOW PRESSURE AIR COMPRESSOR(TRANSALT T-AKE-040) | 2.1 NAVSEA DWG No. 100-8194770 Rev B USNS ALAN SHEPARD LP Air Compressor Structural Installations | |
| 2.2 NAVSEA DWG No. 500-8194766 Rev D, USNS ALAN SHEPARD LP Air and Chill Water Piping Mods | |||
| 2.3 NAVSEA DWG No. 300-8194767 Rev B, USNS ALAN SHEPARD Air Compressor Electrical Installations | |||
| 2.4 NAVSEA DWG No. 551-7488733 Rev D, NASSCO DWG No. 471-342-7118, Ships Service and Control Air Diagram | |||
| 2.5 NAVSEA DWG No. 514-7488755 Rev E, (NASSCO 471-342-7149) AC Chilled Water System Diagram | |||
| 2.6 Quincy Air Co245 Drawing Dwg 140205-01A Rev B | |||
| 2.7 Vertical Air Receiver Information | |||
| 2.8 General Arrangement DWG No.800-748866 | |||
| 519 | INSTALL TWO CHEMICAL TREATMENT TANKS IN HT & LT CW SYS(TRANSALT TAKE-068 | 2.1 MSC Drawing No. T-AKE 1 519-8194280 E, Chilled Water Chemical Treatment System Installation | |
| 520 | LUBE OIL TANK PURIFIER RECIRCULATION PIPING (TRANSALT TAKE-002) | 2.1 MSC DWG No. 264-8194035 Rev C, Lube Oil Storage Tank Batch Purification Piping Modification | |
| 2.2 NAVSEA DWG. No. 262-7488720 Rev D, Lube Oil Fill, Xfer & Purification Sys Diagram (SRD)(NASSCO 471-342-7105) | |||
| 521 | DISTILLED WATER PIPING MODIFICATION (TRANSALT TAKE-026) | 2.1 NAVSEA 531-7488736 Rev C (NASSCO 471-342-7124) Distilled Water Transfer System Diagram | |
| 2.2 MSC Dwg 521-8195656 Rev C Distilled Water Piping Mods. | |||
| 523 | AFFF STORAGE TANK RADAR TRANSDUCERS (TRANSALT T-AKE 151) | None. | |
| 524 | FUEL OIL FILTER PIPING MODIFICATION (TRANSALT TAKE-062) | 2.1 NAVSEA Dwg No. 541-7488729 Rev D (NASSCO 471-342-7114), Fuel Fill, Transfer and Purification System Diagram | |
| 2.2 NAVSEA Dwg No. 529-7489031 Rev D (NASSCO 471-342-7119), Sludge Drainage and Transfer System Diagram | |||
| 2.3 NAVSEA Dwg No. 261-7488730 Rev C (NASSCO 471-342-7115), Diesel Generator Fuel Service System Diagram. | |||
| 2.4 MSC Dwg 500-8195627 Rev B Fuel Oil Filter Back Flush Piping Reroute to F. O. leak Coll Tk | |||
| 530 | JP-5 PUMP ROOM DRAIN MODIFICATION (TRANSALT T-AKE 13) | 2.1 MSC DWG No. 529-8194031 REV A, JP-5 Pump Room Drain Piping Modification | |
| 2.2 NAVSEA DWG No. 542-7488764 Rev E, (NASSCO 471-342-7158) Aviation F-44 Xfer and Service Sys Diagram | |||
| 2.3 NAVSEA DWG No. 529-7489031 Rev D, (NASSCO 471-342-7119) Sludge Drainage and Transfer Diagram | |||
| 2.4 NAVSEA DWG No. 500-8194764, USNS ALAN SHEPHARD T-AKE 3 JP-5 PUMP ROOM DRAIN PIPING MODS | |||
| 533 | DISTILLING PLANT FEED PUMP SUCTION STRAINER (TRANSALT T-AKE 067) | 2.1 NAVSEA Drawing No. 531-7488738 Rev C, “Distilling Plant System Diagram” (NASSCO 471-342-7124) | |
| 2.2 NAVSEA Drawing No. 256-7488724 Rev B, “Central Seawater Cooling System Diagram” | |||
| 2.3 NAVSEA Drawing No. 802-7488866 Rev N, “General Arrangement” | |||
| 2.4 NAVSEA Drawing No. 6965791, “Flushing Procedure for New, Repaired and Disturbed Piping Sections on Surface Ships” | |||
| 2.5 NAVSEA Drawing No. 631-7488891 Rev G, “Paint Schedule” | |||
| 2.6 MSC Dwg 533-8194271 Rev G Evaporator Feed Suction Strainer Installation. | |||
| 2.7 MSC Drawing No. 803-7081122 | |||
| 534 | CARGO FUEL RECIRCULATION PIPING (TRANSALT T-AKE 074) | 2.1 MSC Drawing 541-8194245, "Cargo Fuel Oil Piping Mod" | |
| 2.2 NAVSEA Drawing No. T-AKE 1 Class 320-7488777 Rev G, “Electrical System One Line Diagram” (Sheet 83) | |||
| 2.3 NAVSEA Drawing No. 541-7488765 Rev E, “Cargo Fuel Systems Diagram” | |||
| 2. NAVSEA Drawing No. T-AKE 1 Class 521-7489026 Rev B, “MOV, BWD and Control Valves” | |||
| 2.5 NAVSEA Drawing No. 802-7488866 Rev N, “General Arrangement” | |||
| 2.6 NAVSEA Drawing No. 6965791, “Flushing Procedure for New, Repaired and Disturbed Piping Sections on Surface Ships” | 65 | ||
| 2.7 NAVSEA Drawing No. 631-7488891 Rev G, “Paint Schedule” | |||
| 2.8 MSC Dwg 300-8195613 Rev C Cargo Fuel MOV Valves | |||
| 2.9 MSC Dwg 500-8195607 Rev C Cargo Transfer pump Recirculation Line Installation. | |||
| 535 | MDG FW HT VENT Line Isolation Valve Install (TRANSALT T-AKE 124) | 2.2 NAVSEA DWG No. 532-7488723 Rev C, (NASSCO 471-342-7108), Diesel Generator High Temperature Freshwater Cooling System Diagram. | |
| 2.3 MSC Dwg 535-8194278 Rev A MDG HT FW Vent Isolation Installation | |||
| 536 | DRAIN LINES FOR CARGO REFRIGERATIN SYSTEM | 2.1 NAVSEA DWG No. 516-7488756 Rev C, (NASSCO 471- 42-7150), Cargo Refrigeration Secondary Coolant Circulation System Diagram | |
| 542 | High Temperature Fresh Water Cooling System Modifications (TRANSALT T-AKE 103) | 2.1 Attachment 1 – Diesel Generator High Temperature Freshwater Cooling System Diagram “red-lined” Detail. | |
| 2.2 NAVSEA Drawing No. 532-7488723 Rev C (NASSCO 471-342-7108) T-AKE 1 Class Selected Record Drawing Diesel Generator High Temperature Freshwater Cooling System Diagram. | |||
| 2.3 NAVSEA Drawing No. 505-7488988 Rev B T-AKE 1 Class Piping Material Schedule; System Material Schedule No. WC02. | |||
| 2.4 NAVSEA Drawing No. 201-7488951 Rev L (NASSCO 471-351-4950) | |||
| 2.5 T-AKE 1 Class Selected Record Drawing Machinery Arrangement | |||
| 2.6 NAVSEA Drawing No. 505-7488748 Rev B T-AKE 1 Class Flushing Procedures. | |||
| 543 | BOW THRUSTER CHILLED WATER PIPING MODIFICATION T-ALT T-AKE 227 | 2.1.1 NAVSEA Dwg. 256-7488735 Rev B (NASSCO 471-342-7123) Rev A, Bow Thruster Cooling System | |
| 2.1.2 NAVSEA Dwg. 514-7488755 Rev E(NASSCO 471-342-7149) Rev B, A/C Chilled Water System Diagram | |||
| 2.1.3 NAVSEA Dwg. 521-7488717 D (NASSCO 471-342-7102) Rev B, Firemain System Diagram, Detail 49-C, Bow Thruster Cooling Supply | |||
| 2.1.4 NAVSEA Dwg. 802-7488866 N (NASSCO 471-341-7008) Rev J, GENERAL ARRANGEMENT | |||
| 2.1.5 MSC Dwg. 532-8389858 Rev A, Bow Thruster Cooling Temperature Regulator Installation | |||
| 2.1.6 KAMEWA Dwg. 129495 Rev H, Tunnel Thruster Control System Cable Connection Drawing | |||
| 2.1.7 Technical Manual T9568-AY-MMC-010, Bow Thruster Controls, Tunnel Thruster Type for USNS LEWIS AND CLARK (T-AKE 1) Class | |||
| 547 | HP AIR CROSSOVER TO EDG START AIR SYSTEM (TRANSALT T-AKE 120) | 2.1.1 NAVSEA DWG. 342-7488747 Rev B (NASSCO 471-342-7137) Rev -, Emergency Diesel Generator Services Diagram | |
| 2.1.2 NAVSEA DWG. 551-7488862 Rev C (NASSCO 471-342-7173) Rev A, High Pressure Air System Diagram | |||
| 2.1.3 NAVSEA DWG. 802-7488866 Rev N (NASSCO 471-341-7008) Rev J, GENERAL ARRANGEMENT | |||
| 2.1.4 MSC Dwg 551-8195625 Rev B EDG Start Air Crossover | |||
| Enclosures: | |||
| 2.2.1 Enclosure 1; HP Air X-Over to EDG Start Air (guidance) Imbedded in Spec | |||
| 2.2.2 Enclosure 2; UNREP Station 8 Tie In (guidance) Imbedded in Spec | |||
| 548 | CHT-MSD TANK RADAR LEVEL INDICATORS (T-ALT 139) | 2.1.1 NAG Dwg. NAG-ST-TAKE 1; Radar TLI Install CHT/MSD Tank | |
| 2.1.2 NAG Dwg. NAG-ELEM-TAKE 1; CHT & MSD Radar TLI Install Elementary Diagram | |||
| 2.1.3 NAVSEA Dwg. 528-7488743 Rev F (NASSCO 471-342-7132); Vacuum Sewage and Plumbing System Diagram | |||
| 2.1.4 TM T9593-AC-MMC-010, MSD/CHT Unit | |||
| 2.1.5 VRR-08-009 Fire Main Back Flush | |||
| 2.1.6 Navsea Dwg. 521-8389619A MSD Vacuum Manifold Fireman Flush Install | |||
| 549 | FIREMAIN CHARGING PUMP INSTALLATION (TRANSALT TAKE-117) | 2.1 TNA DWG No. 1070-06-H01 Rev: B, Fire main Charging Pump Install AMR 5-58-01 Structural Arrangement and Details | |
| 2.2 TNA DWG No. 1070-06-P01 Rev: B, Fire main Charging Pump Install AMR 5-58-01 Piping Installation | |||
| 2.3 TNA DWG No. 1070-06-E01 Rev: B, Fire main Charging Pump Install AMR 5-58-01 Electrical Installation | |||
| 2.4 TNA DWG No. 1070-06-E02 Rev: A, Fire main Charging Pump And Isolation Valve Controller Wiring and Assembly | |||
| 2.5 SIMS PUMP VALVE CO., INC. DWG No. N18297-75_overall Rev: -, Pump: SIMS 4x3x10 (75HP) Service: Charging Fire Pump | |||
| 2.6 PIMA VALVE, INC. DWG No. 999-0164 Rev: -, 4” and 6”, 250 LB, Bronze, Flanged, Gate Valve with Motor Pad for DOD electric actuator | |||
| 2.7 EIM COMPANY, INC. DWG No. N21-14S, Rev: A, Navy I 5.50” (5/8) | |||
| 2.8 NASSCO DWG No. 342-7102 Ref: B, Fire main System Diagram | |||
| 560 | Calcium Carbonate Dosing System Installation (Transalt T-AKE 212) | 2.1 Selected Records Drawing 471-342-7126_C-SRD_002. | |
| 2.2 Selected Records Drawing 471-342-7126_C=SRD_004 | |||
| 2.3 Attachment 3 – Aqua-Chem Drawing No. 656-D-9723 Rev. 1 dtd 10/23/09, On-Line and Recirc CaCO3 pH Adjuster Model pH-53 for SPD35-53 – T-AKE | |||
| 2.4 pH Adjuster location overview photo | |||
| 2.5 On-line and Recirc cylinder location photo | |||
| 2.6 On-line and Recirc pH Adjuster manifold locations photos | |||
| 2.7 Ball valve removal photo. | |||
| 2.8 Aqua-Chem Drawing No. 506-D-8534 Rev. 2, Pump Assembly Recirc Brominator Pump | |||
| 2.9 NAVSEA Drawing No. 531-7488738 Rev C T-AKE 1 Class Selected Record Drawing Distilling Plant System Diagram. | |||
| 2.10 NAVSEA Drawing No. 505-7488988 Rev B T-AKE 1 Class Piping Material Schedule; System Material Schedule No. DU01. | |||
| 2.11 NAVSEA Drawing No. 201-7488951 Rev L T-AKE 1 Class Selected Record Drawing Machinery Arrangement | |||
| 2.12 NAVSEA Drawing No. 505-7488748 Rev BT-AKE 1 Class Flushing Procedures. | |||
| 2.13 Aqua-Chem Dosing Unit Bill of Materials | |||
| 561 | Senitec Oily Water Separator System Installation (No T/A) | 1.1 MSC Drawing 800-8390078, Rev -, Contract Guidance Drawing, T-AKE 8, Senitec Oily Water Separator Installation | |
| 1.2 MSC Drawing 529-7488725 Rev E, Selected Record Drawing, T-AKE Class, Bilge and Oily Waste Transfer System in Machinery Rooms | |||
| 1.3 MSC Drawing 529-7488762 Rev D, Selected Record Drawing, T-AKE Class, Cargo Hold and Miscellaneous Bilge and Oily Waste Transfer System Diagram | |||
| 1.4 MSC Drawing 531-7488736 Rev D, Selected Record Drawing, T-AKE Class, Distilled Water Transfer System Diagram | |||
| 1.5 MSC Drawing 551-7488733 REV D, Selected Record Drawing, T-AKE Class, Ship Service and Control Air System Diagram | |||
| 1.6 No. 9197402200E, SENITEC M1000 Assembling Instructions | |||
| NAVSEA Drawing No. 505-7488748 T-AKE 1 Class Flushing | |||
| 601 | PASSAGE (02-58-01) WATERTIGHT DOOR (TRANSALT T-AKE-009) | 2.1 DWG. No. 802-7488866 Rev N,(NASSCO 471-341-7008) General Arrangement | |
| 2.2 DWG. No. 624-7489144 Rev B, Typical Joiner Door and Passing Window Details | |||
| 2.3 DWG. No. 624-7488977 Rev E, Joiner Door and Passing Window Schedule | |||
| 2.4 DWG. No. 640-7488960, Color Scheme | |||
| 2.5 NASSCO Std Dwg 77-87-486 Rev B Ladder inclined exterior with open grating treads | |||
| 2.6 MSC Dwg 100-8194253 Rev D Ladder inclined 02 to deck installation | |||
| 2.7 DWG. No. 621-7489062, Typical Joiner Details | |||
| 2.8 MSC Dwg 601-8194272 Rev F Passage 02-58-01 Watertight door installation | |||
| 607 | BAKERY, DRY PROVISIONS STORE ROOM AND GALLEY CONVERSION, MODIFICATIONS AND INSTALLATIONS (B) (Transalt No. TAKE-059 & 060) | 2.1 MSC Drawing No. 600-8195078 Rev A Ship’s Store Removal | |
| 2.2 MSC Drawing No. 600-8195079 Rev B, Galley, Serving Annex, Serving Line Removals | |||
| 2.3 MSC Drawing No. 600-8195077 Rev A Dry Provision Store Rm Removal | |||
| 2.4 MSC Drawing No. 600-8194772 Rev A General Arrangement 01 LVL Food Service Mods | |||
| 2.5 MSC Drawing No. 600-8195075 Rev B, Trash Room Removal | |||
| 2.6 MSC Drawing No. 600-8194739 Rev B, New Dry Provision Annex Installation | |||
| 2.7 MSC Drawing No. 600-8194740 Rev C, Galley, Serving Annex, Serving Line Installation | |||
| 2.8 MSC Drawing No. 600-8194741 Rev C, Dry Provision Store Rm/New Bakery Installations | |||
| 2.9 MSC Drawing No. 600-8194743 Rev C, Trash Room Mods / New CG Locker | |||
| 2.10 MSC Drawing No. T-AKE 1 500-8194744 Rev C HVAC System Mods | |||
| 2.11 MSC Drawing No. 100-8194745 Rev C, Miscellaneous Structural Details | |||
| 2.12 MSC Drawing No. 500-8194746 Rev B Galley, Serving Annex, and Bakery Piping Mods | |||
| 2.13 MSC Drawing No. 500-8194747 Rev A Trash Room/CG LKR and Crew Messroom Piping Mods | |||
| 2.14 MSC Drawing No. 300-8194748 Rev A Galley, Serving Annex, Serving Line Electrical Mods | |||
| 2.15 Drawing No. 300-8194749 Rev A Trash Room/CG Locker Electrical Mods | |||
| 2.16 MSC Drawing No. 300-8194750 Rev A Bakery Electrical Installations | |||
| 2.17 MSC Drawing No. 300-8194742 A Dry Provision Annex Electrical Mods | |||
| 608 | SCULLERY AND FAST SERVE LINE CONVERSION AND INSTALLATION (Transalt No. TAKE-057 & 058) | 2.1 MSC Drawing No. 600-8195076 Rev A Scullery Removal | |
| 2.2 MSC Drawing No. 600-8195081 Rev A Duty Mess Removal | |||
| 2.3 MSC Drawing No. 600-8194752 Rev C New Scullery | |||
| 2.4 MSC Drawing No. 600-8194751 Rev D Fast Serve Line Installation | |||
| 2.5 MSC Drawing No. 600-8194772 Rev A General Arrangement 01 LVL Food Service Mods | |||
| 2.6 MSC Drawing No. 100-8194753 Rev C Fast Serve Line Structural Mods | |||
| 2.7 MSC Drawing No. 500-8194754 Rev C Scullery and Fast Serving Line Piping Mods | |||
| 2.8 MSC Drawing No. 300-8194755 Rev A Scullery/Fast Serve Line Electrical Mods | |||
| 2.9 MSC Dwg. No. 500-8194763 Rev B USNS Lewis and Clark T-AKE 1 Scullery, fast serve and duty mess HVAC Mods. | |||
| 2.10 MSC Drawing No. 300-8194760 Rev A Scullery, Crew, Officer, CPO and Duty Messroom Electrical Mods | |||
| 2.11 MSC Drawing No. 100-8194745 Rev C Miscellaneous Structure | |||
| 2.11 MSC Drawing No. 300-8194762 Rev A Chief Steward Office / Duty Mess Electrical Mods | |||
| 2.12 MSC Dwg. No. 600-8194743 Rev C Trash room Mods. | |||
| 2.13 MSC Dwg. No. 600-8195075 Rev B Trash room removal | |||
| 2.14 MSC Dwg. No. 500-8194747 Rev A Trash room/cleaning gear locker and crews messroom piping mods | |||
| 2.15 MSC Dwg. No. 300-8194749 Rev A Trash room/cleaning gear locker electrical Mods | |||
| 2.16 MSC Dwg. No. 500-8194744 Rev A USNS Lewis and Clark T-AKE 1 HVAC system Mods | |||
| 612 | 04 LEVEL VENT TRUNK DOOR INSTALLATION (Transalt No. TAKE 041) | 2.1 COSMO CO., LTD Drawing No.CD-X630009CD-2, A-0 CLASS Fire Proof Cabin Door | |
| 2.2 NAVSEA Standard Drawing 100-7489122 Rev C, Standard Structural Details | |||
| 2.3 NAVSEA Standard Drawing 085-7488877 Rev H, House Scantling Plan | |||
| 2.4 MSC Dwg 600-8195608 Rev B 04 Level Vent Trunk Mods | |||
| 2.5 NAVSEA 624-7489144 Rev B (NASSCO 471-332-4716) | |||
| 613 | COMMUNICATIONS ROOM DOOR REPLACEMENT (TRANSALT T-AKE 094) | 2.1 NAVSEA Drawing No. 830-7488878 Rev D, “Booklet of General Plans” | |
| 2.2 NAVSEA Drawing No. 624-7488977 Rev E, “Joiner Door and Passing Window Schedule” | |||
| 2.3 CORNELL-CARR Co. Drawing CC-805-1643220 | |||
| 2.4 NAVSEA Drawing No. 802-7488866 Rev N, “General Arrangement” | |||
| 2.5 NAVSEA Drawing No. 631-7488891 Rev G, “Paint Schedule” | |||
| 615 | MESS ROOM MODIFICATIONS | 2.1 MSC Drawing No. 600-8195082 Rev A Crew, Officer, and CPO Messroom Removals | |
| 2.2 MSC Drawing No. 600-8194757 Rev B Officer and CPO Messroom Installation | |||
| 2.3 MSC Drawing No. 600-8194769 Rev C Crew Messroom Installation | |||
| 2.4 MSC Drawing No. 500-8194747 Rev A Trash Room/CG LKR And Crew Messroom Piping Mods | |||
| 2.5 MSC Drawing No. 500-8194759 Rev B CPO, Officer’s and Crew Messroom Piping Mods | |||
| 2.6 MSC Drawing No. 300-8194760 Rev A Scullery, Crew, Officer, CPO and Duty Messroom Electrical Mods | |||
| 2.7 MSC Drawing No. 300-8194762 CHIEF STEWARD OFFICE / DUTY MESS ELECTRICAL MODS | |||
| 2.8 MSC Dwg 300-8194755 Rev A Scullery/Fast Serve Line Electrical Mod | |||
| 2.9 MSC Dwg 500-8194747 Rev A Trash Room/CG LKR and Crew Messroom piping Mods | |||
| 616 | CHIEF STEWARD OFFICE & DUTY MESS CONVERSION (B) | 2.1 MSC Drawing No. 600-8195080 Rev A Chief Steward Office Removal | |
| (TRANSALT TAKE-061) | 2.2 MSC Drawing No. 600-8194761 Rev B Chief Steward Office and New Duty Mess room Installation | ||
| 2.3 ,MSC Drawing No. 300-8194762 Rev A Chief Steward Office Electrical Mods | |||
| 2.4 MSC Drawing No. 600-8194772 Rev A General Arrangement 01 Level Food Service Mods | |||
| 2.5 MSC Dwg 600-8195080 Rev A Chief Steward Office Removal | |||
| 2.6 MSC Dwg 600-8194772 Rev A General Arrangement 01 Level Food Service Mod | |||
| 617 | 06 LEVEL VENT TRUNK DOOR INSTALLATION (Transalt No. TAKE-041) | 2.0 NAVSEA 624-7489144 Rev B (NASSCO 471-332-4716) | |
| 2.1 COSMO Co., LTD Dwg No. CD-X630009CD-2, SUS Weather Door | |||
| 2.2 NAVSEA Standard Drawing 100-7489122, Standard Structural Details | |||
| 2.3 NAVSEA Standard Drawing 085-7488877, House Scantling | |||
| 2.4 MSC Dwg 600-8195609 Rev B Plan | |||
| 2.5 NAVSEA 624-7489144 Rev B (NASSCO 471-332-4716) | |||
| 618 | PURSER OFFICE MODIFICATION (TRANSALT T-AKE 096) | 2.1 US Joiner DWG. J102 02 Level, Joiner Arrangement, Sheet 7 | |
| 2.2 MSC Dwg. No 600-8195610 Rev A. Pursers Office | |||
| 619 | MEDICAL SERVICES OFFICER (MSO) OFFICE MODS (TRANSALT T-AKE 076) | Enclosures: | |
| 2.2.1 Sketch 1- MSO Office 02-64.5-1 Existing | |||
| 2.2.2 Sketch 2- MSO Office 02-64.5-1 Modified | |||
| 2.2.3 Sketch 3- Bath 02-62-3 Existing | |||
| 2.2.4 Sketch 4- Bath 02-62-3 Modified | |||
| 2.2.5 Sketch 5- Exam Room 02-62-1 Existing | |||
| 2.2.6 Sketch 6- Exam Room 02-62-1 Modified | |||
| 620 | CONVERT CLEANING GEAR LOCKER 01-61-1 TO A SALAD PREP AREA | 2.1 NAVSEA Dwg. 802-7488866 rev N, (NASSCO 471-341-7008) General Arrangement | |
| 2.2 Cospolich Dwg. 91975, Vegetable Prep Space | |||
| 2.3 NAVSEA DWG 621-7489062 General Arrangement | |||
| 621 | SHIPYARD SUPPORT FOR CARGO HOLD 3 OVERHEAD INSULATION INSTALLATION | 2.1 NAVSEA Dwg 635-7489069 Rev F (NASSCO 417-332-4707) | |
| 622 | SECOND DECK CARGO HOLD MODIFICATIONS (T-ALT 071) | 2.1.1 US Joiner Drawing J166, Grating Arrangement and Details | |
| 2.1.2 US Joiner Drawing J250-2, Storerooms and Workshops 2nd Deck | |||
| 2.1.3 NAVSEA Dwg 631-7488891 Rev G, Paint Schedule | |||
| 2.1.4 NAVSEA Dwg 631-7489177 Rev B, Non-skid Arrangement | |||
| 2.1.5 MSC dwg 651-8195889 SECOND Deck Cargo Hold Mods | |||
| 624 | QUICK RELEASE PIN ASSEMBLIES FOR UNREP LADDER SAFETY RAILS TRANSALT T-AKE 07-133) | None. | |
| 801 | FIRE DAMPER ACCESS DOORS (TRANSALT T-AKE 066) | None. | |
| 803 | GALLEY, SERVING ANNEX, BAKERY AND DRY PROVISION STOREROOM HVAC MODIFICATIONS (A)(TRANSALT T-AKE059/060) | 2.1 MSC Drawing No. T-AKE 1 500-8194744 Rev C USNS LEWIS & CLARK T-AKE 1 HVAC System Mods | |
| 804 | FAST SERVE LINE, SCULLERY, DUTY MESSROOM AND CHIEF STEWARD OFFICE HVAC MODIFICATIONS (TRANSALT T-AKE 057/058) | 2.1 MSC Drawing No. T-AKE 1 500-8194763 Rev C USNS LEWIS & CLARK T-AKE 1 Scullery, Fast Serve, and Duty Mess HVAC Mods | |
| 1001 | STAINLESS STEEL HELO NETS (TRANSALT T-AKE 037) | 2.1 NAVSEA Dwg. 803-5000902 Rev B, Safety Nets, Deck Edge Cres Net Stl/Cres Frame |
&C&"Times New Roman,Bold"&14DRAWING INDEX
USNS MATTHEW PERRY
(T-AKE 9)&"Arial,Regular"&10 &C&14&P christopher.french3:
MBD016E7013.pdf
MBD01CDB888.pdf robert mcmanus
Line
Text Box
3'-0"
MBD01CDBE5D.pdf
Voyage Repair Request A1. SHIP NAME....: Lewis and Clark
A2. HULL NUMBER..: 1
A3. DATE.........: 2008-03-17
A4. VRR NUMBER...: VR08-008
A5. PRIORITY.....: A-Severe A6. TITLE........: LC3&4 Security A7. DEPARTMENT...: Engine A8. VRR TYPE.....: SAMM / PM / CM Requirement A9. CATEGORY.....: Industrial Assistance Required
B1. Abstract Contractor to provide material, fabricate and install metal framed expanded metal security barrier to prevent unintentional access to the Load centers in 2-38-1 and 2 38-2.
B2. REFERENCE
B2.1
NOMEN...........: POWER SUBSTATION LC 3
APL.............: X231912ANPG
MANUFACTURER....: POINT EIGHT POWER INC
Location........: 2-39-1
Model Number....: 2839-L3
Serial Number...:
B3. PARTS/MATERIAL REQUIRED
Part Number Part Description Required
B4. NOTES:
No Data
B5. QUALITY ASSURANCE REQUIREMENTS:
B6. STATEMENT OF WORK
1. Contractor to Weld two 0.25” thick pads to inboard bulkhead in 2-38-1 to receive header and footer plates for proposed bulkheads. Also remove existing door stop and relocate existing wire way 6 inches forward of existing location.
2. Contractor to install by bolting a 15 foot long 3”x3”x ¼” angle in each of the two spaces to act as a foot plate for the proposed bulkhead. Plate is to be bolted on inboard and outboard ends to either existing bulkhead stiffeners or to installed pads installed in item (1) above.
Wire way to be moved forward
Door stop to be removed
Rectangle
Weld tabs to bulkhead to mount header and footer plates
2-38-1
3. Contractor to install by bolting a 15 foot long 3”x3”x ¼” angle in each of the two spaces to act as a header plate for the proposed bulkhead. Plate is to be bolted on inboard and outboard ends to either existing bulkhead stiffeners or to installed pads installed in item (1) above.
4. Install two braces to the Header plate in 2-38-1 to affix it to exiting pipe hangars extending down from the overhead.
5. Install two braces to the Header plate in 2-38-2 to affix it to the existing beam above the header
6. Fabricate 8 each 3’-0” x 8’-0” panels from 1.5”x1.5”x 1/4” angle iron frames and 0.210” thick expanded metal sheeting as per attached drawing.
7. Fabricate 2 each 3’-0” x 8’-0” panels from 1.5”x1.5”x 1/4” angle iron frames. Fabricate 2’8” swinging door to fit within frame from 1.5”x1.5”x 3/8” angle and 0.210” thick expanded metal sheeting as per attached drawing. Provide door with sliding bolt designed to accept pad lock. All panels to be bolted to header
Weld or bolt tabs to support Header plate
Weld tabs to support Header plate and footer plates.with 304SS 3/8” bolts with lock washers. All panels to be bolted with 304SS 3/8” bolts and lock washers to adjacent panels with bolts spacing at 2 foot centers.
8. All fabrications to be done off shop and fabricated components assembled on board.
9. All panels to be spray painted white with fire retardant paint prior to delivery to ship.
10.All plates, headers and footers to be painted white.
11.Contactor to provide two each break glass front lock boxes and install them adjacent to the swinging doors.
MBD01CDAB60.pdf
Polygon
Polygon
MBD016E596A.pdf
SECTION 2
MBD016E596D.pdf
A1. SHIP NAME....: Lewis and Clark
A2. HULL NUMBER..: 1
A3. DATE.........: 2008-03-18
A4. VRR NUMBER...: VR08-009
A5. PRIORITY.....: A-Severe A6. TITLE........: Vacuum System firemain crossover A7. DEPARTMENT...: Engine A8. VRR TYPE.....: Equipment / System Degradation A9. CATEGORY.....: Industrial Assistance Required
B1. Abstract Vacuum System requires regular flushing with fire main to dislodge clogs and debris. Firemain is provided in space for use in flushing vacuum tank, gray water tank and food waste tank. The requirement is to add a hard piped crossover from the existing CUNI firemain flushing line to the vacuum manifold over the vacuum pumps.
B2. REFERENCE
B3. PARTS/MATERIAL REQUIRED
Part Number Part Description Required
B4. NOTES:
No Data
B5. QUALITY ASSURANCE REQUIREMENTS:
B6. STATEMENT OF WORK
1. Tee into existing 1.5” copper nickel fire main flushing line located in sewage treatment room.
2. Route approximately 12 foot of 1.5” CUNI pipe to a FLANGED bronze or stainless steel Ball valve located on aft bulkhead of Sewage treatment room adjacent to the food waste tank/ gray water tank bulkhead.
3. route approximately 3 foot of 1.5” CUNI pipe from flanged ball valve to existing blind flange on aft end of vacuum sewage collection manifold
4. Paint all surfaces to match existing paint scheme.
Valve to be painted red.
Oval
MBD016E5969.pdf