0109_A_ Bilge Well Preservation.doc

DOC document 46 KB Posted

Attached to
PSA of USNS MATTEW PERRY (T-AKE 9) and USNS CHARLES DREW (T-AKE 10)
Solicitation number
N40442-10-R-3012
Issued by

About this file

Revised WI 0109

View the file

Other files

File Type Posted
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
10-R-3012 amendment 5.doc DOC document
SM1000-01_A-REV.pdf PDF
SM1000-02_A-REV.pdf PDF
SM1000-03_A-REV.pdf PDF
350-000-01.pdf PDF
1INFORMATION DATA.doc DOC document
10-R-3012 amendment 4.doc DOC document
SM1000_TP.pdf PDF
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
10-R-3012 amendment 3.doc DOC document
WI 560 Calcium Carbonate Dosing System.docx DOCX document
GFM List for WI Index Amend 3.xls XLS spreadsheet
References for WI Index T-AKE 9 PSA Amend 2.xls XLS spreadsheet
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
10-R-3012 amendment 2.doc DOC document
0622_A_Second Deck Cargo Hold Modifications.doc DOC document
GFM List for WI Index T-AKe 9 PSA Amend 2.xls XLS spreadsheet
WI 501 Ref 2.4 Drew Technical Product Sheet MC-PD-46.pdf PDF
WI 501 Ref 2.5 Drew Removal of Corrosion Products T-AKE.doc DOC document
261-7488730_D 1.DWG DWG drawing
7488748_B.doc DOC document
WI 0561 Senitec OWS Sys Installation.doc DOC document
Ref for WI Index T-AKE 10 PSA Amend 1.xls XLS spreadsheet
0547_A_HP Crossover to EDG Start Air System.doc DOC document
2.7 Attachment 7 Ball Valve Removal Photo.pdf PDF
0617_A_06 Lvl Vent Trunk Door Install.doc DOC document
261-7488730_D 2.DWG DWG drawing
7488951_L.pdf PDF
479-341-7012_--_SRD_Appendix A.DOC DOC document
GFM List for WI Index.xls XLS spreadsheet
8390078 Senitec OWS Installation .pdf PDF
7488736_D Distilled Water Transfer Sys Diagram.pdf PDF
T6435-CM-MMC-010.pdf PDF
261-7488730_D 3.DWG DWG drawing
7488736_D.pdf PDF
529-74 3.DWG DWG drawing
261-8389758 B - Mn Diesel Gen Remote Fuel Isolation Valve Install.pdf PDF
2.2 Attachment 2 471-342-7126_C-SRD_004.dwg DWG drawing
479-341-7012_--_SRD_Appendix D.xls XLS spreadsheet
2.6 Attachment 6 On Line and Recirc Manifold locations photos.pdf PDF
20001700 REV C Transmitter Installation Man.pdf PDF
479-341-7012_--_SRD_Appendix C.DOC DOC document
20002298REV C F-Series Meter Install Manual.pdf PDF
261-7488730_D 5.DWG DWG drawing
529-74 1.PDF PDF
WI 205 FO Meter Replacement.doc DOC document
9197402200E Senitec M1000 Assembling Instructions.pdf PDF
GFM List for WI Index.xls XLS spreadsheet
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS Matthew Perry

(T-AKE 10)

HULL STRUCTURE

N40442-10-R-3012 12 March 2010

ITEM NO. 109

Category "A" MSFSC/Johnson/MARTIN

BILGE WELL PRESERVATION

1.0 ABSTRACT

This item describes the coating of the Bilge Wells in Main Machinery and Cargo Spaces.

2.0 REFERENCES

2.1 Belzona 5811 (Immersion Grade) Information Sheet

3.0 ITEM LOCATION AND DESCRIPTION

3.1 Quantity/Location:

3.1.1 Four (4) bilge wells in the Auxiliary Machinery Room (AMR) (5-58-0).

-AMR Starboard Forward (5-58-1)

-AMR Port Forward (5-58-2)

-AMR Starboard Aft (5-65-1)

-AMR Port Aft (5-65-2)

3.1.2 Three (3) bilge wells in the Main Machinery Room (MMR) (5-66-0).

-MMR Starboard Forward (5-66-1)

-MMR Port Forward (5-66-2)

-MMR Aft (5-75-0)

3.1.3 One (1) bilge well in the Propulsion Motor Room (5-75-0).

-Propulsion Motor Room (5-77-0)

3.1.4 One (1) bilge well in the Shaft Alley (5-79-1).

-Shaft Alley (5-80-0)

3.1.5 Two (2) bilge wells in Cargo and Auxiliary Pump Room (5-34-2).

-Cargo & Aux Pump room Starboard (5-35-1)

-Cargo & Aux Pump room Port (5-35-2)

3.1.6 One (1) Bilge Well in the Emergency Fire Pump Room (4-74-2).

3.1.7 Eight (8) bilge wells in the Cargo Holds.

-No. 1 Cargo Hold Starboard Forward (5-40-1)

-No. 1 Cargo Hold Port Forward (5-40-2)

-No. 1 Cargo Hold Starboard Aft (5-49-1)

-No. 1 Cargo Hold Port Aft (5-49-2)

-No. 2 Cargo Hold Starboard Forward (5-49-1)

-No. 2 Cargo Hold Port Forward (5-49-2)

-No. 2 Cargo Hold Starboard Aft (5-58-1)

-No. 2 Cargo Hold Port Aft (5-58-2)

3.2 Quantity:

3.2.1 Each Bilge well is approximately 130 square feet for a total of 2600 square feet.

3.3 Item Description/ Manufacturers Data:

3.3.1 Belzona 5811

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIALS/ SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 24, 25, and 29.

5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area with out proper authorization.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional

7.0 STATEMENT OF WORK:

7.1 Pump all fluids from bilge pockets. Use shipyard provided hoses and pumps. Transfer effluent off ship. Dispose of in accordance with all Federal, State, and local regulations.

7.2 Temporary remove, redirect or cap any piping that may drain into bilge pockets.

7.3 Test all bilge level alarms prior to removing and verify they function properly. Submit an "as found" condition report to the MSCREP.

7.4 Electrically isolate and tag out bilge alarm floats in each of the bilge wells identified in 3.0.

7.5 Disconnect bilge alarms/floats, temporarily remove and store for reuse. Remove all interferences from bilge well.

7.6 Temporarily install 5/8” thick plywood containment around each bilge well. Containment shall be sealed to the tank tops with RTV to maintain a dry surface. Containment shall fully enclose the well.

7.7 Containment shall have ventilation to main deck with sufficient capacity to evacuate paint fumes.

7.8 On surfaces to be coated, thoroughly remove oily residues using a commercial degreaser such as Klenzstone Superb.

7.9 Prepare all surfaces to a SSPC SP-11 condition prior to paint application.

7.10 Pump dry and clean bilge wells.

7.11 Solvent wipe bilge wells and piping extending into bilge wells. Belzona tech representative to approve wipe down.

7.12 If priming is necessary and approved by the Belzona Consultant, apply Belzona 3921 as a holding primer IAW product IFU. It is advised that Belzona Immersion Grade be applied directly to the substrate.

7.13 Perform a thinner wipe down on primed areas. Belzona representative shall approval surface prior to application of Belzona 5811. Contractor shall take surface temp readings, Testex tape readings, and ensure surface is free of oil and chloride contaminants.

7.14 Apply Belzona 5811 coating to all surfaces within the bilge well (i.e. piping, valves, grating, etc.) in accordance with Belzona representatives’ instructions.

7.14.a Stripe coat hard to access areas, inside and outside edges, and weld seams.

7.14.b Apply two complete coats of Belzona Immersion Grade IAW product IFU. Use contrasting colors between each Belzona application.

7.14.c Thoroughly inspect completed coating. Use inspection mirrors when necessary. Complete repairs as necessary. Contractor shall take random dry mil readings after each application of Belzona 5811. Five readings every 100sq ft.

7.15 Remove Containment and ventilation.

7.16 Remove all plugs and restore any removed piping.

7.17 Reinstall all bilge well level alarms.

7.18 Preparation of Drawings: None additional

7.19 Inspection/Testing

7.19.1 Belzona Technical Representative will observe application to insure proper application, keeping a log and attaching pictures of spaces completed, before and after.

7.19.2 Test bilge alarms in the presence of MSCREP.

7.19.3 Test all motor operated valves in presence of MSCREP.

7.20 Painting

7.20.1 Clean and prepare the disturbed areas and apply a primer and two topcoats of paint to all areas disturbed as a result of this spec item to match the adjacent surroundings.

7.22 Marking

7.22.1 Install nameplates, notices, and markings for all new and modified systems.

7.23 Manufacturer's Representative

7.23.1 Provide Belzona representative to oversee all aspects of surface preparation and product application. For bidding purposes assume 80 hours of manufacturer’s representative services

8.0 GENERAL REQUIREMENTS: None additional

109-5