10-R-3012 amendment 4.doc

DOC document 61 KB Posted

Attached to
PSA of USNS MATTEW PERRY (T-AKE 9) and USNS CHARLES DREW (T-AKE 10)
Solicitation number
N40442-10-R-3012
Issued by

About this file

10-R-3012 amendment 4

View the file

Other files

File Type Posted
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
10-R-3012 amendment 5.doc DOC document
SM1000-01_A-REV.pdf PDF
SM1000-02_A-REV.pdf PDF
SM1000-03_A-REV.pdf PDF
350-000-01.pdf PDF
1INFORMATION DATA.doc DOC document
SM1000_TP.pdf PDF
0109_A_ Bilge Well Preservation.doc DOC document
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
10-R-3012 amendment 3.doc DOC document
WI 560 Calcium Carbonate Dosing System.docx DOCX document
GFM List for WI Index Amend 3.xls XLS spreadsheet
References for WI Index T-AKE 9 PSA Amend 2.xls XLS spreadsheet
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
10-R-3012 amendment 2.doc DOC document
0622_A_Second Deck Cargo Hold Modifications.doc DOC document
GFM List for WI Index T-AKe 9 PSA Amend 2.xls XLS spreadsheet
WI 501 Ref 2.4 Drew Technical Product Sheet MC-PD-46.pdf PDF
WI 501 Ref 2.5 Drew Removal of Corrosion Products T-AKE.doc DOC document
261-7488730_D 1.DWG DWG drawing
7488748_B.doc DOC document
WI 0561 Senitec OWS Sys Installation.doc DOC document
Ref for WI Index T-AKE 10 PSA Amend 1.xls XLS spreadsheet
0547_A_HP Crossover to EDG Start Air System.doc DOC document
2.7 Attachment 7 Ball Valve Removal Photo.pdf PDF
0617_A_06 Lvl Vent Trunk Door Install.doc DOC document
261-7488730_D 2.DWG DWG drawing
7488951_L.pdf PDF
479-341-7012_--_SRD_Appendix A.DOC DOC document
GFM List for WI Index.xls XLS spreadsheet
8390078 Senitec OWS Installation .pdf PDF
7488736_D Distilled Water Transfer Sys Diagram.pdf PDF
T6435-CM-MMC-010.pdf PDF
261-7488730_D 3.DWG DWG drawing
7488736_D.pdf PDF
529-74 3.DWG DWG drawing
261-8389758 B - Mn Diesel Gen Remote Fuel Isolation Valve Install.pdf PDF
2.2 Attachment 2 471-342-7126_C-SRD_004.dwg DWG drawing
479-341-7012_--_SRD_Appendix D.xls XLS spreadsheet
2.6 Attachment 6 On Line and Recirc Manifold locations photos.pdf PDF
20001700 REV C Transmitter Installation Man.pdf PDF
479-341-7012_--_SRD_Appendix C.DOC DOC document
20002298REV C F-Series Meter Install Manual.pdf PDF
261-7488730_D 5.DWG DWG drawing
529-74 1.PDF PDF
WI 205 FO Meter Replacement.doc DOC document
9197402200E Senitec M1000 Assembling Instructions.pdf PDF
GFM List for WI Index.xls XLS spreadsheet
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - MODIFICATION

The following have been added by full text:

AMENDMENT 0004

1. Contractors will be allowed to submit their proposals via email by the closing time listed in the Solicitation, 4:00 PM local time, March 31, 2010 with a hard copy to follow within a 48 hour period, by COB 4:00 PM, April 2, 2010.

2. Any further request for specification clarification will be addressed during Items for Negotiation.

3. The following are responses to contractors request for specification clarification.

1.

SPECIFICATION ITEM NO.: N/A_

PARA. NO.N/A

TITLE: Various QUESTION: As of this date (13:30 hrs 03/23/10) this contractor has five (5)RFCs that remain unanswered by MSFSC; some of which, once answered by MSFSC, must be then distributed to subcontractors for estimating and quoting. This contractor, recognizing that Wednesday, 03/24 is the cut-off date for RFCs and that further changes to the SOL may be forthcoming as a result of our and other contractor’s outstanding RFCs, is concerned due to the fact that, in order to meet the current 31 March submission date, proposals must be shipped NLT Monday, 29 March. Even assuming the RFC responses were received today, the remaining 4 work day window does not allow sufficient time to incorporate the GFI RFC responses, distribute for review, develop/revise estimates and perform the tasks necessary to complete the Cost and Technical proposals.

Therefore, this contractor respectfully requests that the submission date for proposals be extended to 09 April 2010 in order to allow MSFSC time to answer and all contractors time to incorporate the changes resulting from outstanding GFI.

ANSWER: No further extension in the closing date can be accomodated. Offerors are advised that if MSFSC determines that it is necessary to conduct discussions, additional business and technical issues will be addressed at that time. Offerors will then be afforded the opportunity to submit a best and final proposal.

2.

SPECIFICATION ITEM NO.: All

PARA. NO. All

TITLE: Proposal Due Date Extension

QUESTION: Contractor requests an extension to the proposal due date to facilitate estimating requirements of the solicitation, including new items introduced in Amend 2, and responses to requests for clarifications pending.

ANSWER: No further extension in the closing date can be accomodated. Offerors are advised that if MSFSC determines that it is necessary to conduct discussions, additional business and technical issues will be addressed at that time. Offerors will then be afforded the opportunity to submit a best and final proposal.

3.

SPECIFICATION ITEM NO.: 011

PARA. NO. 7.1.1.1

TITLE: Furnish General Services

QUESTION: Item paragraph requires 8000 Amps @ 505 Volts shore power. Request clarification if shore power requirement is for 8000 Amps per leg or for the total load.

ANSWER: 8,000 Amps is the total.

4.

SPECIFICATION ITEM NO.: 021

PARA. NO. 7.11, Amend 3 Clarification (P. 3 of 7)

TITLE: Clean & Gas Free Tanks, Voids, Cofferdams & Spaces

QUESTION: Par. 7.11, as clarified by Amendment 3, requires contractor to clean, for gas free certification, all tanks in enclosure 2.2.1 within seven (7) days of the availability. Tank cleaning subcontractors are declining to quote the item due to the 7 day time constraint. Contractor requests MSC review and reconsider the scope of the item versus the time requirement. Contractors Note: Subcontractors have indicated 12 – 14 days is more viable considering the scope.

Contractor requests an extension to the due date pending clarification to this and pending requests for clarification.

ANSWER: Previously answered in Amendment 3. All Tanks must be cleaned in 7 days.

5.

SPECIFICATION ITEM NO.: ______021____________

PARA. NO._7.3,_ENCLOSURE 2.2.1________

TITLE: CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES_

QUESTION: In order to obtain a quote to barge and store the Fuel oil listed in enclosure 2.2.1. Contractor requests the following information. The specification of the fuel will determine the barge requirements.

1.) Is the Fuel oil in the Cargo Fuel tanks the same specification/type as that in the Fuel Oil Storage Tanks?

2.) What are the Specifications/type of the Fuel oil in the Cargo Tanks and Fuel oil Storage Tanks?

ANSWER: All fuel is MGO.

6.

SPECIFICATION ITEM NO.: 021

PARA. NO. 7.3

TITLE: Clean & Gas Free Tanks, Voids, Cofferdams & Spaces

QUESTION: Item paragraph requires storage of ships fuel. Request clarification if ship will arrive with #2 grade diesel for removal, storage, and restoration to the vessel. Contractors Note: Costs associated with contractor provided fuel storage are contingent on fuel type.

ANSWER: All fuel is MGO.

7.

SPECIFICATION ITEM NO.: 206

PARA. NO. 7.7.5

TITLE: Fuel Isolation to Main Diesel Engines

QUESTION: Item paragraph requires contractor to “…clean the entire piping systems after all new piping is installed by flushing…” Request clarification if flushing requirement pertains to only the new piping installed or if intent is to flush the entire MDE fuel piping system on the vessel.

ANSWER: The flushing applies to the newly installed piping.

8.

SPECIFICATION ITEM NO.: ______501____________

PARA. NO._7.1.1.Bthru 7.1.1.1E________

TITLE: HT/LT Fresh Water and Chill Water System Flush._

QUESTION: IAW Para’s 7.1.1.Bthru 7.1.1.1E of work item# 501 contractor is tasked to install high point & low point vent lines in the HT/LT freshwater system on the jacket water heater.

Is it the governments intent to install the vent lines at each engine (i.e. 4 Ea high & 4 Ea low vent lines on the HT/LT freshwater piping) or 1 set of each on the main header piping?

Please Clarify.

ANSWER: One high and low vent line per engine is required.

9.

SPECIFICATION ITEM NO.: ______501____________

PARA. NO._7.3.2_____

TITLE: HT/LT Fresh Water and Chill Water System Flush._

QUESTION: IAW Para’s 7.3.2 contractor is tasked to flush al HT FW, LT FW, HT CW and LT CW systems. Is it the governments intention to flush piping of these systems only or is it the intention of the government to flush components of these system (i.e. flushing of engines)?

Please Clarify.

ANSWER: Flushing of the piping and engines is required.

10.

SPECIFICATION ITEM NO.: ______533__________

PARA. NO._7.1.1__

TITLE: Distilling Plant Feed Pump Suction Strainer (Transalt T-AKE 067).

QUESTION: IAW Para’s 3.3.1 of work item# 533 contractor is tasked to provide 2 Ea Simplex Strainers (Hayward Industrial Products Inc.) Model# ST072060BF1024, Drawing# SD072032 Rev-C (with Monel Yoke) or Equal and 2 Ea additional baskets.

Contractor has solicited several companies for a quote. The only response contractor has received is from Albert Sterling Co. with a lead time of 22 Weeks.

Is there another know vendor source?

Please Provide

ANSWER: The Manufacturers Website lists numerous venders. W&O Supply Inc. in Virginia Beach, VA is also a distributor.

11.

SPECIFICATION ITEM NO.: 534

PARA. NO. 3.2.1, 4.1

TITLE: Cargo Fuel Recirculation Piping

QUESTION: Item describes installation of one (1) GFM 6” actuated butterfly valve, using reference 2.1 for guidance. Reference 2.1 indicates two each (2 ea) GFM valves for installation. Request confirmation that reference 2.1 valve quantity is not relevant to this installation.

ANSWER: One GFM 6” actuated butterfly valve is required as per work item.

12.

SPECIFICATION ITEM NO.: 542

PARA. NO. 2.3, 7.3.2 a - g

TITLE: High Temp Fresh Water Cooling System Mod’s

QUESTION: Item reference 2.3 is for a piping material schedule WC02. Contractor received material schedule HV02 with the solicitation. Various paragraphs require installation of piping system components in accordance with references 2.2 & 2.3 materials: Ref. 2.2, Dwg 532-7488723, is apparently for carbon steel materials. Ref. 2.3, Dwg 505-7488988, as received is material schedule HV02, for 316 stainless steel. Paragraphs 7.3.2 a – g require piping installations, with sizing ranging to 10” diameter, but no lengths of piping are provided with modification requirements (please see Par. 7.3.2f for non-definitive requirements).

Contractor requests correct material schedule and approximate quantity of piping required for installation, based on sizing, per paragraph.

ANSWER: Material is Stainless Steel as per Reference 2.2 and the material schedule of 2.2.

Measurements can be scaled from the References for this item and the General Arrangement drawing provided in Work Item 003 and other work items. The ship was made available for two shipchecks.

13.

SPECIFICATION ITEM NO.: 561

PARA. NO._7.1.1__

TITLE: Senitec Oily Water Separator System Installation.

QUESTION: IAW Para’s 7.1.1 of work item# 561 contractor is tasked to design and make all necessary arrangements(i.e. access cuts, rig path etc.).

None of the references listed in work spec give any overall dimensions of the 3 individual components of the 1000, the ONSYS pumping and sensing unit or the SOLIDPAC unit.

In order to determine labor needed to disassemble/reassemble units or to determine size of access cut(s) please provide overall dimensions (height, length and width) of the largest of the 5 Ea components listed in Para 3.1.2

Please Provide ANSWER: Additional Manufacturer information is included in this amendment

OFFERORS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMNET ON PAGE 1 (STANDARD FORM 33) OF ITS PROPOSAL, AND MUST INDICATE THAT THE OFFER IS BASED ON RFP NO. N40442-10-R-3012 AND AMENDMENTS NO. 0001 - NO. 0004.

(End of Summary of Changes)