SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - MODIFICATION
The following have been added by full text:
AMENDMENT 0004
1. Contractors will be allowed to submit their proposals via email by the closing time listed in the Solicitation, 4:00 PM local time, March 31, 2010 with a hard copy to follow within a 48 hour period, by COB 4:00 PM, April 2, 2010.
2. Any further request for specification clarification will be addressed during Items for Negotiation.
3. The following are responses to contractors request for specification clarification.
1.
SPECIFICATION ITEM NO.: N/A_
PARA. NO.N/A
TITLE: Various QUESTION: As of this date (13:30 hrs 03/23/10) this contractor has five (5)RFCs that remain unanswered by MSFSC; some of which, once answered by MSFSC, must be then distributed to subcontractors for estimating and quoting. This contractor, recognizing that Wednesday, 03/24 is the cut-off date for RFCs and that further changes to the SOL may be forthcoming as a result of our and other contractor’s outstanding RFCs, is concerned due to the fact that, in order to meet the current 31 March submission date, proposals must be shipped NLT Monday, 29 March. Even assuming the RFC responses were received today, the remaining 4 work day window does not allow sufficient time to incorporate the GFI RFC responses, distribute for review, develop/revise estimates and perform the tasks necessary to complete the Cost and Technical proposals.
Therefore, this contractor respectfully requests that the submission date for proposals be extended to 09 April 2010 in order to allow MSFSC time to answer and all contractors time to incorporate the changes resulting from outstanding GFI.
ANSWER: No further extension in the closing date can be accomodated. Offerors are advised that if MSFSC determines that it is necessary to conduct discussions, additional business and technical issues will be addressed at that time. Offerors will then be afforded the opportunity to submit a best and final proposal.
2.
SPECIFICATION ITEM NO.: All
PARA. NO. All
TITLE: Proposal Due Date Extension
QUESTION: Contractor requests an extension to the proposal due date to facilitate estimating requirements of the solicitation, including new items introduced in Amend 2, and responses to requests for clarifications pending.
ANSWER: No further extension in the closing date can be accomodated. Offerors are advised that if MSFSC determines that it is necessary to conduct discussions, additional business and technical issues will be addressed at that time. Offerors will then be afforded the opportunity to submit a best and final proposal.
3.
SPECIFICATION ITEM NO.: 011
PARA. NO. 7.1.1.1
TITLE: Furnish General Services
QUESTION: Item paragraph requires 8000 Amps @ 505 Volts shore power. Request clarification if shore power requirement is for 8000 Amps per leg or for the total load.
ANSWER: 8,000 Amps is the total.
4.
SPECIFICATION ITEM NO.: 021
PARA. NO. 7.11, Amend 3 Clarification (P. 3 of 7)
TITLE: Clean & Gas Free Tanks, Voids, Cofferdams & Spaces
QUESTION: Par. 7.11, as clarified by Amendment 3, requires contractor to clean, for gas free certification, all tanks in enclosure 2.2.1 within seven (7) days of the availability. Tank cleaning subcontractors are declining to quote the item due to the 7 day time constraint. Contractor requests MSC review and reconsider the scope of the item versus the time requirement. Contractors Note: Subcontractors have indicated 12 – 14 days is more viable considering the scope.
Contractor requests an extension to the due date pending clarification to this and pending requests for clarification.
ANSWER: Previously answered in Amendment 3. All Tanks must be cleaned in 7 days.
5.
SPECIFICATION ITEM NO.: ______021____________
PARA. NO._7.3,_ENCLOSURE 2.2.1________
TITLE: CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES_
QUESTION: In order to obtain a quote to barge and store the Fuel oil listed in enclosure 2.2.1. Contractor requests the following information. The specification of the fuel will determine the barge requirements.
1.) Is the Fuel oil in the Cargo Fuel tanks the same specification/type as that in the Fuel Oil Storage Tanks?
2.) What are the Specifications/type of the Fuel oil in the Cargo Tanks and Fuel oil Storage Tanks?
ANSWER: All fuel is MGO.
6.
SPECIFICATION ITEM NO.: 021
PARA. NO. 7.3
TITLE: Clean & Gas Free Tanks, Voids, Cofferdams & Spaces
QUESTION: Item paragraph requires storage of ships fuel. Request clarification if ship will arrive with #2 grade diesel for removal, storage, and restoration to the vessel. Contractors Note: Costs associated with contractor provided fuel storage are contingent on fuel type.
ANSWER: All fuel is MGO.
7.
SPECIFICATION ITEM NO.: 206
PARA. NO. 7.7.5
TITLE: Fuel Isolation to Main Diesel Engines
QUESTION: Item paragraph requires contractor to “…clean the entire piping systems after all new piping is installed by flushing…” Request clarification if flushing requirement pertains to only the new piping installed or if intent is to flush the entire MDE fuel piping system on the vessel.
ANSWER: The flushing applies to the newly installed piping.
8.
SPECIFICATION ITEM NO.: ______501____________
PARA. NO._7.1.1.Bthru 7.1.1.1E________
TITLE: HT/LT Fresh Water and Chill Water System Flush._
QUESTION: IAW Para’s 7.1.1.Bthru 7.1.1.1E of work item# 501 contractor is tasked to install high point & low point vent lines in the HT/LT freshwater system on the jacket water heater.
Is it the governments intent to install the vent lines at each engine (i.e. 4 Ea high & 4 Ea low vent lines on the HT/LT freshwater piping) or 1 set of each on the main header piping?
Please Clarify.
ANSWER: One high and low vent line per engine is required.
9.
SPECIFICATION ITEM NO.: ______501____________
PARA. NO._7.3.2_____
TITLE: HT/LT Fresh Water and Chill Water System Flush._
QUESTION: IAW Para’s 7.3.2 contractor is tasked to flush al HT FW, LT FW, HT CW and LT CW systems. Is it the governments intention to flush piping of these systems only or is it the intention of the government to flush components of these system (i.e. flushing of engines)?
Please Clarify.
ANSWER: Flushing of the piping and engines is required.
10.
SPECIFICATION ITEM NO.: ______533__________
PARA. NO._7.1.1__
TITLE: Distilling Plant Feed Pump Suction Strainer (Transalt T-AKE 067).
QUESTION: IAW Para’s 3.3.1 of work item# 533 contractor is tasked to provide 2 Ea Simplex Strainers (Hayward Industrial Products Inc.) Model# ST072060BF1024, Drawing# SD072032 Rev-C (with Monel Yoke) or Equal and 2 Ea additional baskets.
Contractor has solicited several companies for a quote. The only response contractor has received is from Albert Sterling Co. with a lead time of 22 Weeks.
Is there another know vendor source?
Please Provide
ANSWER: The Manufacturers Website lists numerous venders. W&O Supply Inc. in Virginia Beach, VA is also a distributor.
11.
SPECIFICATION ITEM NO.: 534
PARA. NO. 3.2.1, 4.1
TITLE: Cargo Fuel Recirculation Piping
QUESTION: Item describes installation of one (1) GFM 6” actuated butterfly valve, using reference 2.1 for guidance. Reference 2.1 indicates two each (2 ea) GFM valves for installation. Request confirmation that reference 2.1 valve quantity is not relevant to this installation.
ANSWER: One GFM 6” actuated butterfly valve is required as per work item.
12.
SPECIFICATION ITEM NO.: 542
PARA. NO. 2.3, 7.3.2 a - g
TITLE: High Temp Fresh Water Cooling System Mod’s
QUESTION: Item reference 2.3 is for a piping material schedule WC02. Contractor received material schedule HV02 with the solicitation. Various paragraphs require installation of piping system components in accordance with references 2.2 & 2.3 materials: Ref. 2.2, Dwg 532-7488723, is apparently for carbon steel materials. Ref. 2.3, Dwg 505-7488988, as received is material schedule HV02, for 316 stainless steel. Paragraphs 7.3.2 a – g require piping installations, with sizing ranging to 10” diameter, but no lengths of piping are provided with modification requirements (please see Par. 7.3.2f for non-definitive requirements).
Contractor requests correct material schedule and approximate quantity of piping required for installation, based on sizing, per paragraph.
ANSWER: Material is Stainless Steel as per Reference 2.2 and the material schedule of 2.2.
Measurements can be scaled from the References for this item and the General Arrangement drawing provided in Work Item 003 and other work items. The ship was made available for two shipchecks.
13.
SPECIFICATION ITEM NO.: 561
PARA. NO._7.1.1__
TITLE: Senitec Oily Water Separator System Installation.
QUESTION: IAW Para’s 7.1.1 of work item# 561 contractor is tasked to design and make all necessary arrangements(i.e. access cuts, rig path etc.).
None of the references listed in work spec give any overall dimensions of the 3 individual components of the 1000, the ONSYS pumping and sensing unit or the SOLIDPAC unit.
In order to determine labor needed to disassemble/reassemble units or to determine size of access cut(s) please provide overall dimensions (height, length and width) of the largest of the 5 Ea components listed in Para 3.1.2
Please Provide ANSWER: Additional Manufacturer information is included in this amendment
OFFERORS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMNET ON PAGE 1 (STANDARD FORM 33) OF ITS PROPOSAL, AND MUST INDICATE THAT THE OFFER IS BASED ON RFP NO. N40442-10-R-3012 AND AMENDMENTS NO. 0001 - NO. 0004.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .