Section Equipment Type Ref. Date Issue Document No. Page 5 Installation Senitec M 1000 Tni /Man 080111 1 91 974 022 00E 1(8)
DELIVERY
InFORMATIOn
Wärtsilä Sweden AB Box 8006 SE-402 77 Göteborg, Sweden Telephone: +46-31 744 46 00 Fax: +46-31 744 46 70
Assembling instructions
These instructions should be followed if the unit has been delivered split in three pieces.
Unit assembly schematics
The unit must be assembled according to below figure:
Pieces 1 and 2 must be assembled together. Piece 3 can either be connected together with 1 and 2 or be installed not farther than 15 meters from 1 and 2.
Note! Piping, electrical cables and hoses must adjusted and in some cases be replaced if piece 3 is not connected together with 1 and 2.
2 (8) 2 Delivery Information – 91 974 022 00E (Issue 1) Wärtsilä Sweden AB
Fixing
The frames must be fixed together with the delivered screws according to below figure
Mount the holding plates between piece 1 and 2 on both sides.
Solids ramp
Assemble the ramp on the flotation tank according to above figure. When as-sembling the ramp, silicone must be used between the ramp and the flotation tank walls (all three sides). Mount the nuts on the inside of flotation tank to fix the ramp.
Wärtsilä Sweden AB 2 Delivery Information – 91 974 022 00E (Issue 1) 3 (8)
Scrape cylinder
Mount the scrape cylinder according to above figure. When mounting the cylinder, make sure that the cylinder is turned the right way.
PPM-meter outlet hose
Connect the outlet hose for the PPM-meter to the flotation tank. Use the upper left lead trough.
Flocculant tank.
4 (8) 2 Delivery Information – 91 974 022 00E (Issue 1) Wärtsilä Sweden AB
Piping
Connect the piping between the pieces according to below figure.
D200 outlet pipe.
Piping
Connect the piping between the pieces according to below figure.
Filter inlet pipe.
Wärtsilä Sweden AB 2 Delivery Information – 91 974 022 00E (Issue 1) 5 (8)
Piping
Connect the piping between the pieces according to below figure.
Water pipe to flotation stage.
Piping
Connect the piping between the pieces according to below figure.
Solids drain pipe.
6 (8) 2 Delivery Information – 91 974 022 00E (Issue 1) Wärtsilä Sweden AB
Pneumatic connections
Roll out and tie up the pneumatic hoses according to below figures. Connect them to matching devices according to appendix for pneumatic drawings.
Back side.
Front side.
Wärtsilä Sweden AB 2 Delivery Information – 91 974 022 00E (Issue 1) 7 (8)
Electrical connections
Roll out and tie up the cables according to below figures. Connect them to matching devices ac-cording to appendix for electrical drawings.
Internal electrical points
Covers
Mount the covers
Covers locations
M205 - Chemical mixer stirrer motor
L401 - Position switch, back
L300 - Dissolved air tank level switch
M500 - Outlet pump D500
M300 - Dissolved air pump D300 16 - Fresh water valve Y001 L500 - Pressure transmitter
300 - Flocculant dosing pump D203 301 - Flocculant stirrer motor Y204 302 - Power supply PPM-meter Q500 303 - Control signals PPM-meter Q500 304 - Low level switch flocculant tank L203 305 - Pressure switch filter P501
M203 M204 L203 P501
CB001
8 (8) 2 Delivery Information – 91 974 022 00E (Issue 1) Wärtsilä Sweden AB
Flocculant dosing hose
Tie up the dosing hose according to below figure and connect the hose to the flocculant valve.
Flocculant dosing valve
Tie up the dosing hose according to below figure and connect the hose to the flocculant dosing pump.
Flocculant pump