10-R-3012 amendment 3.doc

DOC document 62 KB Posted

Attached to
PSA of USNS MATTEW PERRY (T-AKE 9) and USNS CHARLES DREW (T-AKE 10)
Solicitation number
N40442-10-R-3012
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
10-R-3012 amendment 5.doc DOC document
SM1000-01_A-REV.pdf PDF
SM1000-02_A-REV.pdf PDF
SM1000-03_A-REV.pdf PDF
350-000-01.pdf PDF
1INFORMATION DATA.doc DOC document
10-R-3012 amendment 4.doc DOC document
SM1000_TP.pdf PDF
0109_A_ Bilge Well Preservation.doc DOC document
0021_A_CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS.doc DOC document
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
WI 560 Calcium Carbonate Dosing System.docx DOCX document
GFM List for WI Index Amend 3.xls XLS spreadsheet
References for WI Index T-AKE 9 PSA Amend 2.xls XLS spreadsheet
0003_NSP_ APPROACH BERTH AND MOORING.doc DOC document
10-R-3012 amendment 2.doc DOC document
0622_A_Second Deck Cargo Hold Modifications.doc DOC document
GFM List for WI Index T-AKe 9 PSA Amend 2.xls XLS spreadsheet
WI 501 Ref 2.4 Drew Technical Product Sheet MC-PD-46.pdf PDF
WI 501 Ref 2.5 Drew Removal of Corrosion Products T-AKE.doc DOC document
261-7488730_D 1.DWG DWG drawing
7488748_B.doc DOC document
WI 0561 Senitec OWS Sys Installation.doc DOC document
Ref for WI Index T-AKE 10 PSA Amend 1.xls XLS spreadsheet
0547_A_HP Crossover to EDG Start Air System.doc DOC document
2.7 Attachment 7 Ball Valve Removal Photo.pdf PDF
0617_A_06 Lvl Vent Trunk Door Install.doc DOC document
261-7488730_D 2.DWG DWG drawing
7488951_L.pdf PDF
479-341-7012_--_SRD_Appendix A.DOC DOC document
GFM List for WI Index.xls XLS spreadsheet
8390078 Senitec OWS Installation .pdf PDF
7488736_D Distilled Water Transfer Sys Diagram.pdf PDF
T6435-CM-MMC-010.pdf PDF
261-7488730_D 3.DWG DWG drawing
7488736_D.pdf PDF
529-74 3.DWG DWG drawing
261-8389758 B - Mn Diesel Gen Remote Fuel Isolation Valve Install.pdf PDF
2.2 Attachment 2 471-342-7126_C-SRD_004.dwg DWG drawing
479-341-7012_--_SRD_Appendix D.xls XLS spreadsheet
2.6 Attachment 6 On Line and Recirc Manifold locations photos.pdf PDF
20001700 REV C Transmitter Installation Man.pdf PDF
479-341-7012_--_SRD_Appendix C.DOC DOC document
20002298REV C F-Series Meter Install Manual.pdf PDF
261-7488730_D 5.DWG DWG drawing
529-74 1.PDF PDF
WI 205 FO Meter Replacement.doc DOC document
9197402200E Senitec M1000 Assembling Instructions.pdf PDF
GFM List for WI Index.xls XLS spreadsheet
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - MODIFICATION

The following have been added by full text:

AMENDMENT 0003

1. Subject Solicitation deadline for Request for Clarification will be extended to 24 March 2010.

2. The following are responses to contractors request for specification clarification.

1. SPECIFICATION ITEM NO.: Solicitation Section L

PARA. NO.: N/A (page 58 of 65)

TITLE: Specification Clarification

QUESTION: Solicitation Section L requires all requests for clarification to be received by MSFSC NLT 3/11/10. Given new items in amendments and an extended due date, contractor requests an extension to the clarification time requirements ANSWER: Period for submitting requests for clarification is extended to 24 March 2010.

2. SPECIFICATION ITEM NO.: Amend 1, New Work Items

PARA. NO. All

TITLE: All Amend 1 New Work Item Descriptions

QUESTION: Amend 1 incorporated four (4) new items to the above referenced solicitation and was issued after the scheduled vessel inspection period of 2/24/10 - 2/25/10.

1) Contractor requests an additional vessel inspection opportunity;

2) Contractor request an extension to the current due date (3/19/10) to accommodate additional estimating requirements.

ANSWER: An extension was given in Amendment 2.

3. SPECIFICATION ITEM NO.: ___________021_______

PARA. NO.___7.3, 7.4, ENC 2.2.1_________________

TITLE: _CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES

QUESTION: Paragraph 7.3 requires Contractor to “Provide a clean storage facility with a capacity of approximately enclosure 2.2.1 of this specification.”

Paragraph 7.4 states that “The ship will pump down tanks to low suction, either to other tanks onboard or to shore storage facilities”

Enclosure 2.2.1 only lists the tanks 95% capacity (gallons). Contractor does not believe that these Tank Arrival Conditions are realistic. There are not enough barges or storage facilities available for the amount of fuel listed in 2.2.1.

Please provide Contractor with more accurate anticipated gallons required for storage.

ANSWER: Revised Work Item 021 will be included in Amendment #003 and will include a revised enclosure 2.2.1 listing the estimated quantities. Contractor shall provide separate clean storage containers for each type of liquid product.

4. SPECIFICATION ITEM NO.: 021

PARA. NO.: 7.3, 7.4, 7.11

TITLE: Clean and Gas Free Tanks, Voids, Cofferdams & Spaces

QUESTION: Par. 7.3 requires provisioning of a “…clean storage facility with a capacity of approximately enclosure 2.2.1 of this specification”. Par. 7.4 indicates ships force will “…pump down to low suction, either to other tanks onboard or to shore facilities”. Par. 7.11 does not appear to be a complete sentence and infers that some of the tanks in enclosure 2.2.1 are to be cleaned within 7 days of the availability.

Regarding Par. 7.3 & 7.4:

a) request clarification regarding anticipated type and quantities of fuel onboard upon arrival at the contractor facility—to accommodate the apparent option to shift on board—and/or if storage is a requirement;

b) given a 75 calendar day period of performance, is selling existing marine diesel fuel at arrival and reloading with new is an acceptable alternative to storage if required.

Regarding Par. 7.11, request clarification which tanks in enclosure 2.2.1 will require cleaning within 7 days of arrival.

ANSWER:

a) New Work Item 021 is issued with Amendment 3. Contractor shall provide separate clean storage containers for each type of liquid product.

b) Selling existing products and replacing with new is acceptable, at no additional cost to the Government/MSFSC. All MSC quality requirements for new products must be met.

All tanks must be cleaned within 7 days of arrival.

5. SPECIFICATION ITEM NO.: 109

PARA. NO.

3.2.1 TITLE: USNS Matthew Perry (T-AKE 9) – Bilge Well Preservation

USNS Charles Drew (T-AKE 10) – Bilge Well Preservation

QUESTION: Contractor finds that the surface area identified in WI 109, paragraph 3.2.1, on the USNS Matthew Perry (2,400ft2) is different than the surface area stated in WI 109, paragraph 3.2.1, on the Charles Drew specification (2,600ft2). Are the work areas specified for each ship similar? Please confirm surface area for paragraph 3.2.1. for each ship.

ANSWER: Work Item 109 for Matthew Perry T-AKE 9 issued in Amendment 3.

6. SPECIFICATION ITEM NO.: 109

PARA. NO.

3.2.2

TITLE: USNS Matthew Perry (T-AKE 9) – Bilge Well Preservation QUESTION: Paragraph 3.2.2 on the Matthew Perry specification indicates “Approximately 28 gallons of Belzona 5811” (will be required to accomplish the coating specified in the WI).

The same WI for the Charles Drew does not have a paragraph indicating the quantity of Belzona 5811 required. Based on previous experience gained with the similar work scope using Belzona 5811 product, contractor finds the manufacturer’s specified spread rate advertized for the 5811 coating is inaccurate. The quantity of product specified in paragraph 3.2.2 of this work item (28 gallons) is insufficient to accomplish the coating required in the work item. Contractor recommends that the quantity identified in paragraph 3.2.2 be deleted to avoid confusion.

ANSWER: Work Item 109 for T-AKE 9 Matthew Perry is issued in Amendment 3.

7. SPECIFICATION ITEM NO.: _______135___________

PARA. NO.______7.1.1__________

TITLE: _INSTALL SIDEPORT PILOT ACCESS DOORS T-ALT 073

QUESTION: This paragraph requires a canvas tarp under the 3/8 plywood covering Cargo Hold #3. Will a Herculite 10oz deck covering suffice in lieu of a Canvas Tarp?

ANSWER: The Tarp shall be canvas as specified.

8. SPECIFICATION ITEM NO.: _205____________________

PARA. NO. 4.1

TITLE: Fuel Oil Meter Replacement (T-ALT 09-228R) QUESTION: Para 4.1 of work item 205 lists the Flow meters, transmitters and cable as GFE. There is no GFE listed material in the revised GFM List for work item# 205 Will the materials in Para 4.1 be GFE? Please Clarify.

ANSWER: Material listed in Paragraph 4.1 will be GFE. A new GFM List for the Work Item Index is issued in Amendment 3.

9. SPECIFICATION ITEM NO.: _205____________________

PARA. NO. 7.3.2, 7.3.3 & 7.4.3

TITLE: Fuel oil meter replacement (T-ALT 09-228R)

QUESTION:

IAW Para 7.3.2 of work spec 205 contractor is to modify piping to fit new fuel oil meters. Contractor is tasked to install new bypass valve so there will be no interferences.

IAW Para 7.3.3 contractor is tasked to install the transmitter brackets on the supply and return systems, close to but not on the engines. IAW Para 7.4.3 contractor is tasked install new cable from fuel oil meter core processor to the transducers. This item was release and received after the initial ship check. In order to determine interferences, exact actual cable runs, any staging requirements, etc, contractor requests a second ship check

Please Provide.

ANSWER: A secondary ship check was scheduled for March 17 and March 18, 2010 in Amendment 2.

10. SPECIFICATION ITEM NO.: _206____________________

PARA. NO. ALL

TITLE: Fuel Isolation to Main Diesel Engines (T-ALT 09-162)

QUESTION: This item (206) was release and received after the initial ship check.

In order to determine interferences, exact actual piping runs, any staging requirements, etc, contractor requests a second ship check Please Provide.

ANSWER: A secondary ship check was scheduled for March 17 and March 18, 2010 in Amendment 2.

11. SPECIFICATION ITEM NO.: _560____________________

PARA. NO. 2.13 and 4.1 TITLE: Calcium Carbonate Dosing System Installation (T-ALT 09-212)

QUESTION: Para 4.1 of work item 560, lists the bill of materials for ref 2.13 as GFE.

There is no GFE listed material in the revised GFM List for work item# 560.

Will the materials in ref 2.13 be GFE? Please Clarify.

ANSWER: New Work Item 560 is issued in Amendment 3. Material described in Reference 2.3, drawing 656-D-9723 Rev 1, is provided as GFM. A new GFM List for the Work Item Index is issued in Amendment 3.

12. SPECIFICATION ITEM NO.: _560____________________

PARA. NO. 2.13

TITLE: Calcium Carbonate Dosing System Installation (T-ALT 09-212)

QUESTION: Work item 560 was added to Amendment One. The references listed in Para’s 3.1 thru 2.12 have been received. However Ref 2.13 (Bill of Materials) has not been received. This item also was release after the ship check dates. In order to determine interferences, exact actual piping runs, temporary accesses, any staging requirements, etc, contractor requests a second ship check Please Provide.

ANSWER: A secondary ship check was scheduled for March 17 and March 18, 2010 in Amendment 2.

13. SPECIFICATION ITEM NO.: _561____________________

PARA. NO. 7.1.1

TITLE: Senitec Oily Water Separator System Installation

QUESTION: IAW Para 7.1.1 of work spec 561 contractor shall design and make all necessary arrangements (temporary access, install padeyes and lifting gear, rigging path, etc) to safely install the new OWS system and it components. This item was release and received after the initial ship check. In order to determine interferences, exact actual piping runs, staging requirements, etc, contractor requests a second ship check Please Provide.

ANSWER: A secondary ship check was scheduled for March 17 and March 18, 2010 in Amendment 2.

14. SPECIFICATION ITEM NO.: _561____________________

PARA. NO. 3.1.2 and 4.1 TITLE: Senitec Oily Waste Separator System Installation QUESTION: Para 4.1 of work item 561 lists the materials for Para 3.1.2 as GFE..

There is no GFE listed material in the revised GFM List for work item# 561

Will the materials in Para 3.1.2 be GFE? Please Clarify.

ANSWER: Material in paragraph 3.1.2 will be GFE. A new GFM List for the Work Item index is issued in Amendment 3.

15. SPECIFICATION ITEM NO.: 608

PARA. NO.3.1.2

TITLE: Scullery and fast Serve Line Conversion and Installation

QUESTION: Gaylord Hood Model #NAC-24 identified in paragraph 3.1.2 is listed on Bill of Materials for Reference 2.4 Pc 13 as GFE. This Hood is also identified on Bill of Materials for Ref 2.8 Pc 6 as Installing Activity Furnished. This Same Hood is identified on Item 804 Ref 2.1 Pc 6 as GFE. This Hood is not listed as GFE on

Either Specification 608 or 804. It is also not listed on the Latest GFM Listing

Provided in Amendment 0002. For estimating purposes is this Gaylord Hood being provided as GFM?

ANSWER: The Gaylord Hoods are GFM for both Work Item 608 and Work Item 804.

OFFERORS MUST ACKNOWLEDGE RECEIPT OF THIS AMENDMNET ON PAGE 1 (STANDARD FORM 33) OF ITS PROPOSAL, AND MUST INDICATE THAT THE OFFER IS BASED ON RFP NO. N40442-10-R-3012 AND AMENDMENTS NO. 0001 - NO. 0003.

(End of Summary of Changes)