This is a price schedule template for a federal construction contract covering three Operational Support Facility (OSF) projects at Marine Corps Base Camp Lejeune, North Carolina. Offerors must provide unit prices and total prices for base line items across three projects (P-1574, P-1591, and P-1592), with work including removal and disposal of unsuitable soil, replacement with structural fill material, aggregate base course material, and select fill material. Project P-1591 includes an additional base line item for Prefabricated Vertical Drains (PVD) totaling 36,478 linear feet. All three projects share a common base line item for demolition work across all projects. Award will be made on the total sum of base Contract Line Items (CLINs) 0001-0004, with the government reserving the unilateral right to exercise optional CLINs 0005-0017 within 365 calendar days of contract award.

Optional line items include storage area work, additional soil replacement, expanded PVD installation for P-1591, Audio-Visual system equipment and installation, and Furniture, Fixtures, and Equipment (FF&E) packages for each project with government-estimated costs of $386,202 per project. Offerors may propose a Handling and Administration Rate (HAR) not to exceed 5 percent for FF&E coordination and processing. The government is not obligated to exercise any optional items. Firm fixed prices are required for all CLINs, with no economic price adjustment provisions. If unit price and extended total differ, the unit price will be considered the intended bid. The government reserves the right to reject offers determined to be materially unbalanced between base requirement and option quantities.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
1717488Amend006dwg_CIVIL_030326.pdf PDF
1748123Amend006dwg_CIVIL_030326.pdf PDF
1748123Amendment0006_Specs_030326.pdf PDF
1748122Amend0006dwg_CIVIL_030326.pdf PDF
1717488Amend0006dwg_ARCHITECTURAL_030326.pdf PDF
1748122Amendment0006_Specs_030326.pdf PDF
1717488Amendment0006_Specs_030326.pdf PDF
1717488Amend0006dwg_STRUCTURAL_030326.pdf PDF
1717488Amend006dwg_CIVIL.pdf PDF
1748122Amend0006dwg_CIVIL.pdf PDF
Amendment 0008.pdf PDF
1717488Amendment0006_Specs.pdf PDF
1748122Amendment0006_Specs.pdf PDF
1717488Amend0006dwg_STRUCTURAL.pdf PDF
1748123Amendment0006_Specs.pdf PDF
1748123Amendment0006.pdf PDF
1748123Amend006dwg_CIVIL.pdf PDF
1717488Amend0006dwg_ARCHITECTURAL.pdf PDF
1748122Amendment0006.pdf PDF
Amendment 0007_.pdf PDF
1748123Amendment0006_Specs.pdf PDF
1748123Amend006dwg_CIVIL.pdf PDF
1717488Amend0006dwg_ARCHITECTURAL.pdf PDF
1717488Amend0006dwg_STRUCTURAL.pdf PDF
1717488Amendment0006_Specs.pdf PDF
1748122Amendment0006_Specs.pdf PDF
1717488Amend006dwg_CIVIL.pdf PDF
1748122Amend0006dwg_CIVIL.pdf PDF
26R0037 Amendment 0006 REV.pdf PDF
26R0037 Amendment 0005 REV.pdf PDF
Revised PRICE SCHEDULE_P1574 P1591 P1592. 25 Feb 2026 (00A).docx DOCX document
26R0037 Amendment 0004 1 1(REVIEWED JB).pdf PDF
Revised PRICE SCHEDULE_P1574 P1591 P1592. 19 Feb 2026.docx DOCX document
26R0037 Amendment 0003 (AutoRecovered).pdf PDF
Notice of Intent -Manufacturer Brand Name.pdf PDF
Amendment 0001.pdf PDF
26R0037 Amendment 0002(FINAL).pdf PDF
B_1748123spc01of01_1592.pdf PDF
C_1717488_1748122_1748123_Hazardous Material Report_RTA.pdf PDF
A_1717488dwg01of01_COMBINED_1574.pdf PDF
PRICE SCHEDULE-BLANK.docx DOCX document
A_1748123dwg01of01_COMBINED_1592.pdf PDF
PPI Form.xlsx XLSX spreadsheet
B_1717488spc01of01_1574.pdf PDF
Attachment H - PIEE Vendor Access Ins..pdf PDF
WD NC260010.pdf PDF
MACC Coversheet Final.docx DOCX document
A_1748122dwg01of01_COMBINED_1591.pdf PDF
B_1748122spc01of01_1591.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
0001
BASE PRICE: Total Price for P-1574 Operational Support Facility (OSF) Line Item 1 (includes subtotal of 0001A-0001C) the entire work for Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
1
EA
0001A
Unit Price for removal, disposal, and replacement of unsuitable soil with structural fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
650
tons
0001B
Unit Price for removal, disposal, and replacement of unsuitable soil and providing and compacting aggregate base course material complete in accordance with drawings and specifications and in accordance with the following schedule.
100
tons
0001C
Unit Price for removal, disposal, and replacement of unsuitable soil with select fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
50
CY
0002
BASE PRICE: Total Price for the entire work for P-1591 Operational Support Facilities (OSF) Line Item 1 (includes subtotal of 0002A-0002C) the entire work for Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
1
EA
0002A
Unit Price for removal, disposal, and replacement of unsuitable soil with structural fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
650
tons
0002B
Unit Price for removal, disposal, and replacement of unsuitable soil and providing and compacting aggregate base course material complete in accordance with drawings and specifications and in accordance with the following schedule.
100
tons
0002C
Unit Price for removal, disposal, and replacement of unsuitable soil with select fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
50
CY
0002D
Price for Prefabricated Vertical Drains (PVD) in accordance with drawings for Base Bid on sheet CS002 and specifications, but excluding work described in another line Item.
36,478
LF
0003
BASE PRICE: Total Price for the entire work for P-1592 Operational Support Facility (OSF) Line Item 1 (includes subtotal of 0003A-0003C) the entire work for Project in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
1
EA
0003A
Unit Price for removal, disposal, and replacement of unsuitable soil with structural fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
650
tons
0003B
Unit Price for removal, disposal, and replacement of unsuitable soil and providing and compacting aggregate base course material complete in accordance with drawings and specifications and in accordance with the following schedule.
100
tons
0003C
Unit Price for removal, disposal, and replacement of unsuitable soil with select fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
50
CY
0004
BASE PRICE: Total Price for the entire work for P-1574, P-1591, and P-1592 Operational Support Facilities (OSFs) Line Item 1, the entire demolition work for all 3 Projects in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
1
EA

P1574 OPTIONS

0005
Option Item No. 1 P1574 Price for providing work in connection with Storage Area, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
1
EA
0006
Option Item No. 2P1574 Unit Price for removal, disposal, and replacement of unsuitable soil with structural fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
950
tons
0007
Option Item No. 3 P1574 Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications but excluding work provided in another Priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codes, microphones, speakers and communication cables connecting these devices together.

Include the price for supporting permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections.

1
EA

P1591 OPTIONS

0008
Option Item No. 4: P1591 Price for providing work in connection with Storage Area, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
1
EA
0009
Option Item No. 5: P1591 Unit Price for removal, disposal, and replacement of unsuitable soil with structural fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
950
tons
0010
Option Item No. 6: P1591 Price for Prefabricated Vertical Drains (PVD) in accordance with drawings for Base Bid plus Bid Option on sheet CS002 and specifications, but excluding work described in another line Item.
49,499
LF
0011
Option Item No. 7: P1591 Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications, but excluding work provided in another Priced line item.. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together.

Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections.

1
EA

P1592 OPTIONS

0012
Option Item No. 8: P1592 Price for providing work in connection with Storage Area, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
1

EA

0013
Option Item No. 9: P1592 Unit Price for removal, disposal, and replacement of unsuitable soil with structural fill material complete in accordance with the drawings and specifications, but excluding work provided in another line item.
950
tons
0014
Option Item No. 10: P1592 Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications, but excluding work provided in another Priced line item.. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together.

Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections.

1
EA

P1574/P1591/P1592 OPTIONS:

0015
Option Item No. 11: P1574 Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Government Estimated Price: $386,202
HAR Percent (NTE 5%)

HAR Subtotal

Total FF&E Estimated Price

0016
Option Item No. 12: P1591 Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Government Estimated Price: $386,202
HAR Percent (NTE 5%)

HAR Subtotal:

Total FF&E Estimated Price:

0017
Option No. 13: P1592 Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item
Government Estimated Price:

$386,202 HAR Percent (NTE 5%)

HAR Subtotal

Total FF&E Estimated Price

General Bid Notes:

1. Award will be made on the total sum of Contract Line Items CLINs) 0001-0004If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

2. The Government reserves the unilateral right to award CLINs 0005 through 0017 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for CLINs 5, 7, 8, 11, 12, and 14. No provision is made for economic price adjustment. FAR 52.217-5, Evaluation of Options (Jul 1990) - Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interest, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

3. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

FF&E & AV Bid Notes These notes apply to CLINs 0007, 0011, 0014, 0015, 0016, and 0017

1. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.

2. If awarded, line items will be funded separately after completion of FF&E design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in Specification 12 00 01.00 20 Furniture, Fixtures and Equipment (FF&E) Package.

3. Bonding

i. No Bonding for FFE at Time of Construction Contract Award FAR 28.102-1(a) requires that performance and payment bonds be included in all construction contracts exceeding the SAT, except under the conditions listed. Since the FF&E is not part of the original contract award, the Construction Contractor must not be required to secure bond for the FF&E at the time the basic contract is awarded

ii. Additional Bond at FF&E Option Item Award FAR 28.102-2(d) requires the Government to secure additional bond from the Construction Contractor for any contract price increases. Therefore, an increase to the original contract bond is required at the time of the FF&E Option Items award, to protect the Government against the Construction Contractor not providing FF&E ordered and to ensure that the vendor(s) receive payment if the Construction Contractor goes out of business. The increased cost of the bond must come from the FF&E funding source and is not a part of the Construction Contractor’s HAR.

iii. Bonds Required by the Construction Contractor If the Construction Contractor requires bonding from the FF&E subcontractor(s), the cost must be covered in the Construction Contractor’s HAR.

4. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The Contractor’s proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.

5. The Government is not obligated to award the Option line item(s). Should the Government choose to award CLINS 23 and/or 24 (Option 21 and/or Option 22), the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.

6. The Government is not obligated to award the FF&E and A/V line items. Should the Government choose to award the FF&E and A/V, the line items will be awarded as a negotiated modification to the contract/task order. The contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and A/V. The FF&E and A/V modifications shall be awarded at least six months prior to the contract completion date. A minimum of six months is required for the contractor to purchase, deliver and install the FF&E and A/V without impacting the overall completion date of the project. The contractor’s schedule should assume the award of the FF&E and A/V as a modification. No schedule extensions shall be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contract completion date, the contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the prime contractor demonstrates that accepted Final FF&E and A/V packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and A/V is not available and the Government’s award of the modification is in the last six months of the contract.