1748123Amend006dwg_CIVIL.pdf
PDF 2 MB Posted
- Attached to
- N4008526R0037 P1574/P1591/P1592 MCB CAMP LEJEUNE
- Solicitation number
- N4008526R0037
About this file
These are construction design and specification drawings for a federal construction project at what appears to be a military or government installation. The documents include site plans, general notes, storm structure data tables, erosion and sediment control specifications, and detailed construction details for temporary and permanent drainage features.
The project encompasses site preparation, erosion control measures, stormwater management infrastructure, and landscape restoration. Key construction elements include temporary sediment fences, rock check dams, outlet stabilization structures, tree preservation and protection measures, temporary construction entrances, dewatering and inlet protection systems, and topsoil stockpile management. Specifications address maintenance requirements for all installed features, including regular inspection and cleaning of sediment control devices, removal of accumulated sediment, repair of damaged vegetation and structures, and final site stabilization. The drawings reference multiple control sections (E & S Control Measures, Erosion Control Construction Sequence, and Erosion Control Notes for Off-Site Areas) and include detailed pipe schedules with specifications for storm structure dimensions, catch basin and outlet configurations, and roof drain specifications. General notes specify that contractor non-POV vehicles require controlled access, equipment staging areas must be pre-approved, and all imported materials must come from permitted sources. The project requires compliance with North Carolina seeding requirements for permanent and temporary ground cover, adherence to erosion and sediment control specifications, and proper dewatering and maintenance protocols throughout construction and post-construction phases.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C-005 SITE LOCATION PLAN/ HAUL ROUTES/ ACCESS
| C-101 OVERALL EROSION AND SEDIMENT CONTROL PLAN INITIAL PHASE |
| CG601 STORM SEWER SCHEDULE - BASE BID |
| CG601-C STORM SEWER SCHEDULE - BASE BID + BID OPTION |
| C-501 EROSION & SEDIMENT CONTROL NOTES |
| C-502 EROSION AND SEDIMENT CONTROL DETAILS |
| C-503 EROSION AND SEDIMENT CONTROL DETAILS |
| 2026-03-03T13:44:33-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
2026-03-03T13:45:15-0500
| 2026-03-03T13:44:34-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:34-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:34-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:35-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:35-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:36-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
2026-03-03T13:45:15-0500
2026-03-03T13:45:16-0500
2026-03-03T13:45:16-0500
2026-03-03T13:45:16-0500
2026-03-03T13:45:17-0500
2026-03-03T13:45:17-0500
File details come from the government source that posted it. Updated .