This is a Standard Form 30 (SF 30) amendment to a federal solicitation for a Design-Bid-Build project at Camp Lejeune, North Carolina. Amendment 0002, effective February 4, 2026, was issued by NAVFACSYSCOM Mid-Atlantic Contracting Core and is administered by the same office located in Norfolk, Virginia. The solicitation number is N4008526R0037, and the proposal due date remains unchanged at February 26, 2026, at 1400 EST. The contracting officer point of contact is Simone Arrington (simone.m.arrington.civ@us.navy.mil, 757-341-1978).
The amendment modifies Section 01 78 00 specifications by omitting paragraph 3.5 "Real Property Record" in its entirety and replacing it with paragraph 3.5 "Transfer and Acceptance of Military Real Property." The revised specifications establish detailed requirements for preparing DD Form 1354 documents (Transfer and Acceptance of DoD Real Property) and include comprehensive definitions for various facility types, cost categories, and submission timelines. Contractors must submit an Interim DD Form 1354 with estimated quantities and costs within 30 calendar days after the pre-construction conference (or 30 days after IFC drawings are submitted for Design-Build contracts), and a Final DD Form 1354 30 days prior to the beneficial occupancy date. The amendment also revises base access instructions, requiring prospective bidders to submit attendee names for site visits to brandon.a.williams.civ@socom.mil and Michael.Foy@socom.mil by February 5, 2026, at 1200, with contractors reporting to the MARSOC Visitor Center on February 9, 2026, at 1300. An appendix provides standardized unit of measure abbreviations for use in real property documentation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
1 6
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0002 04-Feb-2026
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N4008526R0037
9B. DATED (SEE ITEM 11)
04-Feb-2026
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N4008526R0037, DESIGN-BID-BUILD, CAMP LEJEUNE, NORTH CAROLINA
The proposal due date of 26 February 2026 at 1400 (EST) remains unchanged.
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Simone Arrington; Email: simone.m.arrington.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
N40085-24-R-2526
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Amendment to amend the below specifications for the subject RFP with the following:
SECTION 01 78 00; Omit paragraph 3.5 REAL PROPERTY RECORD in it’s entirety.
Replace with paragraph 3.5 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY (attached):
B_1717488spc01of01_1574
B_1748122spc01of01_1591
B_1748123spc01of01_1592
2. Revise/Update Site Visit Information
ATTACHMENTS:
The following information has been deleted and/or added/revised:
1. B_1717488spc01of01_1574(Section 01 78 00 Paragraph 3.5 TRANSFER AND ACCEPTANCE OF MILITARY REAL
PROPERTY)
2. B_1748122spc01of01_1591(Section 01 78 00 Paragraph 3.5 TRANSFER AND ACCEPTANCE OF MILITARY REAL
PROPERTY)
3. B_1748123spc01of01_1592(Section 01 78 00 Paragraph 3.5 TRANSFER AND ACCEPTANCE OF MILITARY REAL
PROPERTY)
SPECIFICATIONS
These revised specifications accompany this amendment:
SECTION 01 78 00 Paragraph 3.5 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY) Section will be revised. See revised Section attached with this amendment Form with this amendment.
SECTION 01 78 00; Omit paragraph 3.5 REAL PROPERTY RECORD in it’s entirety.
Replace with paragraph 3.5 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY
3.5 GENERAL
Requirements/information found in this paragraph is for the development and submitting the Interim DD Form 1354. The requirements/information may be in addition to requirements of other paragraphs/sections (or missing paragraphs/sections) and supersedes any discrepancies or conflicts with information or requirements in other paragraphs/sections. The intent of obtaining copies of Schedule of Values and base line schedule is to support and validate the development and submission of the DD form 1354 required by this paragraph.
3.5.a REFERENCES. The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
- FC 2-000-05N, FACILITY PLANNING FOR NAVY AND MARINE CORPS SHORE INSTALLATIONS
(current)
- UFC 1-300-08, CRITERIA FOR TRANSFER AND ACCEPTANCE OF DOD REAL PROPERTY (current)
- MCICOM REAL PROPERTY BUSINESS PROCESS NARRATIVE (current Fiscal Year)
3.5.b DEFINITIONS
DD Form 1354: Transfer and Acceptance of DoD Real Property. An instrument used by Military Services and WHS to document the acceptance and valuation of Real Property assets and the addition of the asset to the Accountable Property System of Record for acquisition by construction and capital improvement to existing facilities.
Draft DD Form 1354: Working document provided by government. Document includes facilities and related information (minus quantity and cost) within contract/project scope.
Interim DD Form 1354:
o Updated/provided by contractor indicating expected construction contract estimated quantities and costs for facilities listed on the Draft DD form 1354. Updates can also include adjustments to faculties constructed. The estimated quantities and costs are based upon the current construction contract scope of work at time of DD form 1354 submittal.
o For phased construction: Allows transfer of accountability for the DoD Real Property from the Contractor/Contracting Officer to the accountable Service on the placed-in-service date. An Interim DD Form 1354, based on the latest DD Form 1354 iteration, is prepared in advance of the placed-in-service date (also known as beneficial occupancy date) for facility acceptance or building occupancy.
The Interim DD Form 1354 includes actual quantities constructed and contract cost, at time of submittal, for work accepted.
Final DD Form 1354: Allows transfer of accountability for the DoD Real Property from the Contractor/Contracting Officer to the accountable Service on the placed-in-service date. A Final DD Form 1354 is prepared in advance of the placed-in-service date (also known as beneficial occupancy date) for facility acceptance or building occupancy. The Final DD Form 1354 includes actual quantities constructed and contract cost, at time of submittal, for work accepted.
NAVFAC Disposal Form: used to document demolition of existing facilities within the footprint for new construction or demolition of existing facilities no longer required outside footprint for new construction.
Facility: Building or supporting facility or utility listed on the DD Form 1354 Primary Facilities: work on an individual building and includes attendant construction, such as pad mounted
HVAC cooling equipment, cooling towers, and landscaping placed outside the face of exterior walls.
Building: A roofed and floored facility enclosed by exterior walls and consisting of one or more levels that is suitable for single or multiple functions.
Supporting Facilities: work on various type of buildings or structures supporting primary facilities such as canopies, dumpster pads, parking areas, utility buildings, and generators.
Structure: A facility, other than a building or linear structure, which is constructed above ground or below ground.
Supporting Utility Facilities: work on various type of utilities or linear structures and includes incidental work such as pavement removal and replacement for constructing the facility. Such as sidewalks, fencing, communication distribution, transformers, electrical distribution, sanitary, water, fire water, retaining walls, storm sewer and swales.
Beneficial Occupancy Date: the placed-in-service date after substantial completion of construction in preparation for facility acceptance or building occupancy. Government acceptance of overall contract or phased construction.
Phase construction: multiple facilities with different turnover dates, or when a portion of a single large facility, or a phase of a multi-phase construction project is placed into service.
Acquisition by Construction: A new real property facility (buildings, structures, or linear structures) in DoD inventory and accountability and valuation resulting in a new “footprint.”
Capital Improvement: any improvement of an existing asset that increases the useful life, capacity, or size; or modifies functionality.
Noncapitalized or Expensed Cost: Any work designated as repairs or maintenance or non-project funded equipment; includes temporary trailers provided for government use; FF&E and A/V.
Excluded Cost: Other Interim DD form 1354s and/or NAVFAC Disposal Forms for Project.
Furnishings, Fixtures, and Equipment (FF&E) and Audio Visual (A/V): Non-project funded equipment, shall include, but is not limited to; furniture, shop equipment, specialty equipment, projection equipment, monitors, appliances, and other miscellaneous items to support facility functions.
3.5.c REAL PROPERTY RECORD
1. Refer to UFC 1-300-08 for instruction on completing the DD Form 1354. Contact the Contracting Officer for any project specific information necessary to complete the DD Form 1354.
2. Government to provide the Draft DD Form 1354 at the pre-construction conference.
3.5.d SUBMITTALS The following shall be submitted in accordance with Section entitled SUBMITTAL PROCEDURES:
1) Interim DD Form 1354 with estimated quantities and costs and include supporting information.
i. Submit Interim DD Form 1354 thirty (30) calendar days after pre-construction conference. For Design
Build contracts submit thirty (30) calendar days after IFC drawings submitted and accepted by government.
ii. Include copy of the detailed breakdown of the contract price, as required in Specification section discussing “PRICE AND PAYMENT PROCEDURES”. Schedule of prices shall be separated by individual building, supporting facility, and supporting utilities with subtotals for each line item listed on Draft DD Form 1354.
iii. If overhead or other indirect costs (such as bonds, design, submittals) as a separate line item are included on Schedule of Prices and/or in the Cost-Loaded Network Analysis Schedule, these costs shall be prorated between each building, supporting facility, and supporting utilities listed on Draft DD Form 1354.
iv. Include copy of baseline schedule as required in Specification section discussing” COST-LOADED
NETWORK ANALYSIS SCHEDULES”.
2) Interim DD Form1354, Transfer & Acceptance of Military Real Property
i. Submit Interim DD-1354 thirty (30) days prior to beneficial occupancy date (or partial BOD for individual building/facilities).
ii. Include total cost and actual quantities installed/constructed, any additional assets, improvements, and alterations from the Draft DD Form 1354. Quantities for utilities should match data provided by GIS submittal (if required).
iii. Attach the High Performance and Sustainable Building (HPSB) Checklist for each applicable building to the completed DD 1354, in accordance with Section entitled “SUSTAINABILITY
REQUIREMENTS AND REPORTING”.
3.5.e Contractor responsible for providing quantities and cost for each facility listed on Draft DD Form 1354 provided by government. Abbreviations for Unit of Measure are listed in Appendix A attached.
3.5.f Contractor responsible for updating cost and quantity for each facility listed based upon current contract requirements when submitting Interim DD-1354 thirty (30) days prior to beneficial occupancy date (or partial BOD for phased construction) when government accepts work for use (or work is accepted for government possession and use).
Multiple Interim DD Forms 1354 may be required when a construction contract contains multiple facilities with different turnover dates.
3.5.g For cost load schedules, add unconstrained finish milestone, titled "DD-1354 - Interim" and scheduled 30 calendar days prior to Substantial Completion whenever an Interim or Final Form DD 1354 is required for individual building/facilities.
3.5.h Provide/verify FF&E/AV costs on back page in block 27.
3.5.i Total of line items, plus noncapitalized items and excluded cost items (other Interim DD Form 1354 and NAVFAC Disposal Form) to add up to contact amount funded by project (minus non-project cost of FF&E/AV).
Appendix A: Abbreviations for UNIT OF MEASURE CODES & DESCRIPTIONS
Unit of Measure Code Description
AC ACRES
BD HOSPITAL BEDS, NORMAL
CAPACITY
BL BARRELS (42 GALS EACH)
BX BOXES
CF CUBIC FEET
CM CUBIC FEET/MINUTE
CP CANDLE POWER
CY CUBIC YARDS
DS DEPTH OF WATER OVERSILL @
HIGH TIDE
DW DEPTH OF WATER OVERSILL @
LOW TIDE
EA EACH
FA FAMILY UNITS (HOUSING)
FB LINEAR FEET OF BERTHING
FP FIRING POINT (FIRING
RANGES)
GA GALLONS
GM GALLONS PER MINUTE
HO HOLES (GOLF COURSE)
IN INCHES
KG THOUSANDS OF GALLONS PER
DAY
KV KILOVOLT AMPERES
KW KILOWATTS
LA LANES (BOWLING)
LC LIGHT CARE, HOSPITAL SPACE
LF LINEAR FEET
LN SET OF FIRING POINTS
MB MILLIONS OF BTU PER HOUR
ME METERS
MG MILLIONS OF GALLONS
MI STATUTE MILES
MW MEGAWATTS
NF NET SQUARE FEET (HOUSING)
NS NET SQUARE FEET (STORAGE)
OL OUTLETS, NUMBER OF
OU OPERATING UNITS
PH POUNDS PER HOUR
PN PERSONS, DESIGN CAPACITY
SE SEATS, NUMBER OF
SF SQUARE FEET
SH STACKING HEIGHT
SI SITES
SP STARTING POINT
SY SQUARE YARDS
TC TOTAL CUBIC FEET
TH TONS PER HOUR
TN TONS
TR TONS, REFRIGERATION
VE NUMBER OF VEHICLES
-- End of Section -
Revised Base Access Instructions:
THE FOLLOWING NEEDS TO BE COMPLETED FOR ALL ATTENDEES THAT NEED BASE ACCESS:
Contractors that do not currently have access to the MARSOC Visitor Center at 34.583303, -77.453198 shall submit site visit requests to NAVFAC via email at Brandon Williams brandon.a.williams.civ@socom.mil and Michael Foy at Michael.Foy@socom.mil, Phone:
910-440-0725 to supply the names of all attendees (including any potential subcontractors) that wish to attend the site visit. All attendees shall e-mail Kurt Bezeau at kurt.d.bezeau.civ@us.navy.mil and Samuel Russo samuel.v.russo5.civ@us.navy.mil and CC Simone Arrington at simone.m.arrington.civ@us.navy.mil no later than 2/5/26 at 1200.
Base Access Instructions(If you require a base pass):
- The list of names received previously has already been provided to MARSOC
- Meet the Sponsor at the visitor center and you will receive further instructions from there.
- Please keep in mind that you will need to allot approximately 3 hours to arrive at the visitor center, get your base pass, and get to MARSOC. MARSOC is about 30 minutes away from the visitor center
- If you have any additional questions concerning Base Access please contact me via phone/email at least 24 hours prior to your visit.
Contractors will need to report the day of:
- February 09th 1300 to the specified location.