1748122Amend0006dwg_CIVIL_030326.pdf

PDF 3 MB Posted

Attached to
N4008526R0037 P1574/P1591/P1592 MCB CAMP LEJEUNE
Solicitation number
N4008526R0037
Issued by

About this file

This is a set of construction design plans and technical specifications for a stormwater management and erosion control project at a federal facility. The documents consist of detailed site plans, cross-sections, construction notes, and storm structure data sheets for implementing stormwater management facilities, erosion and sediment control measures, and related infrastructure.

The project includes construction of multiple storm structures (numbered SD1-SD49) with specified dimensions and outlet configurations, pipe installations with various diameters and slopes, and temporary and permanent erosion control measures. Key construction specifications address stormwater management facility design with sediment chambers and filter systems, rock check dams and outlet stabilization structures, temporary sediment fencing and construction entrances, tree preservation and protection protocols, topsoil stockpiling with designated areas not exceeding 30 feet in diameter, and maintenance access routes. The plans specify requirements for filter fabric installations, perforated pipe installations in filter sand, cleanout provisions for sediment chambers, and flared outlet structures with stabilization. Erosion control sequencing requirements include coordination with North Carolina Department of Environmental Quality, pre-construction conferences, stabilization of disturbed areas within 7 days, and ongoing maintenance inspections at least weekly and after rainfall events. The project encompasses permanent ground cover seeding using North Carolina-approved seed mixes and temporary ground cover options. All materials must be sourced from permitted sites, and the contractor must conduct daily inspections of temporary erosion control measures and remove accumulated sediment within specified timeframes throughout construction.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
1717488Amend006dwg_CIVIL_030326.pdf PDF
1748122Amendment0006_Specs_030326.pdf PDF
1748123Amendment0006_Specs_030326.pdf PDF
1717488Amend0006dwg_STRUCTURAL_030326.pdf PDF
1717488Amendment0006_Specs_030326.pdf PDF
1717488Amend0006dwg_ARCHITECTURAL_030326.pdf PDF
1748123Amend006dwg_CIVIL_030326.pdf PDF
1717488Amendment0006_Specs.pdf PDF
1748123Amendment0006_Specs.pdf PDF
1748123Amend006dwg_CIVIL.pdf PDF
1717488Amend0006dwg_ARCHITECTURAL.pdf PDF
1717488Amendment0006.pdf PDF
Amendment 0008.pdf PDF
1717488Amend0006dwg_STRUCTURAL.pdf PDF
1748123Amendment0006.pdf PDF
1748122Amendment0006_Specs.pdf PDF
1748122Amendment0006.pdf PDF
1717488Amend006dwg_CIVIL.pdf PDF
1748122Amend0006dwg_CIVIL.pdf PDF
1717488Amend006dwg_CIVIL.pdf PDF
1717488Amend0006dwg_ARCHITECTURAL.pdf PDF
1748122Amendment0006_Specs.pdf PDF
1748122Amend0006dwg_CIVIL.pdf PDF
1717488Amend0006dwg_STRUCTURAL.pdf PDF
1717488Amendment0006_Specs.pdf PDF
Amendment 0007_.pdf PDF
1748123Amend006dwg_CIVIL.pdf PDF
1748123Amendment0006_Specs.pdf PDF
26R0037 Amendment 0006 REV.pdf PDF
Revised PRICE SCHEDULE_P1574 P1591 P1592. 25 Feb 2026 (00A).docx DOCX document
26R0037 Amendment 0005 REV.pdf PDF
Revised PRICE SCHEDULE_P1574 P1591 P1592. 19 Feb 2026.docx DOCX document
26R0037 Amendment 0004 1 1(REVIEWED JB).pdf PDF
PRICE SCHEDULE BLANK.docx DOCX document
Notice of Intent -Manufacturer Brand Name.pdf PDF
26R0037 Amendment 0003 (AutoRecovered).pdf PDF
Amendment 0001.pdf PDF
26R0037 Amendment 0002(FINAL).pdf PDF
B_1748123spc01of01_1592.pdf PDF
MACC Coversheet Final.docx DOCX document
A_1748123dwg01of01_COMBINED_1592.pdf PDF
WD NC260010.pdf PDF
PPI Form.xlsx XLSX spreadsheet
B_1748122spc01of01_1591.pdf PDF
B_1717488spc01of01_1574.pdf PDF
Attachment H - PIEE Vendor Access Ins..pdf PDF
A_1748122dwg01of01_COMBINED_1591.pdf PDF
PRICE SCHEDULE-BLANK.docx DOCX document
A_1717488dwg01of01_COMBINED_1574.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-005 SITE LOCATION PLAN/ HAUL ROUTES/ ACCESS

C-101 OVERALL EROSION AND SEDIMENT CONTROL PLAN INITIAL PHASE
CG503 SAND FILTER DETAILS
CG506 DETAILS
CG601 STORM SEWER SCHEDULE - BASE BID
CG601-C STORM SEWER SCHEDULE - BASE BID + BID OPTION
C-501 EROSION & SEDIMENT CONTROL NOTES
C-502 EROSION AND SEDIMENT CONTROL DETAILS
C-503 EROSION AND SEDIMENT CONTROL DETAILS
2026-03-03T13:20:05-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:06-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:06-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:07-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:07-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:08-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:09-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:09-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.
2026-03-03T13:20:10-0500
Norfolk, VA
James E. Donahue R.A.
I, James E. Donahue R.A., am signing this document to confirm that it has been reviewed.

2026-03-03T13:21:03-0500

2026-03-03T13:21:03-0500

2026-03-03T13:21:04-0500

2026-03-03T13:21:04-0500

2026-03-03T13:21:05-0500

2026-03-03T13:21:05-0500

2026-03-03T13:21:05-0500

2026-03-03T13:21:06-0500

2026-03-03T13:21:06-0500

File details come from the government source that posted it. Updated .