1748123Amend006dwg_CIVIL_030326.pdf
PDF 2 MB Posted
- Attached to
- N4008526R0037 P1574/P1591/P1592 MCB CAMP LEJEUNE
- Solicitation number
- N4008526R0037
About this file
This is a set of construction design and specification documents for a federal project at what appears to be a military installation. The documents comprise detailed engineering plans and construction specifications for site development work, including erosion and sediment control measures, stormwater management infrastructure, and temporary construction features.
The project specifications detail extensive stormwater management requirements with multiple storm structures (over 50 structures documented with specific dimensions and pipe connections), roof drainage systems, and erosion control measures. Key construction elements include temporary sediment fences, construction entrances, inlet protection devices, and rock pipe inlet protection. The documents specify requirements for permanent ground cover using North Carolina seeding specifications, along with detailed maintenance protocols for all temporary and permanent erosion control features. General construction notes mandate contractor compliance with vehicle access restrictions, equipment operation limitations, material sourcing from permitted sites, power requirements for contractor operations, and detailed pavement and material handling procedures. Specific construction specifications address temporary construction entrances with steel road plates, temporary silt fencing with specific fabric and stake requirements, tree preservation and protection measures, temporary inlet and dewatering protection, and outlet stabilization structures. The documents include comprehensive maintenance requirements for segment inspection, damage repair, and material removal protocols, along with detailed roof drain specifications requiring inspection at minimum weekly intervals and after rainfall events. Notably, the specifications require the contractor to obtain annual rock permit fees and comply with NC Department of Environmental Quality regulations regarding erosion control prior to construction commencement.
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C-005 SITE LOCATION PLAN/ HAUL ROUTES/ ACCESS
| C-101 OVERALL EROSION AND SEDIMENT CONTROL PLAN INITIAL PHASE |
| CG601 STORM SEWER SCHEDULE - BASE BID |
| CG601-C STORM SEWER SCHEDULE - BASE BID + BID OPTION |
| C-501 EROSION & SEDIMENT CONTROL NOTES |
| C-502 EROSION AND SEDIMENT CONTROL DETAILS |
| C-503 EROSION AND SEDIMENT CONTROL DETAILS |
| 2026-03-03T13:44:33-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
2026-03-03T13:45:15-0500
| 2026-03-03T13:44:34-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:34-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:34-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:35-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:35-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-03-03T13:44:36-0500 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
2026-03-03T13:45:15-0500
2026-03-03T13:45:16-0500
2026-03-03T13:45:16-0500
2026-03-03T13:45:16-0500
2026-03-03T13:45:17-0500
2026-03-03T13:45:17-0500
File details come from the government source that posted it. Updated .