This is a Hazardous Building Materials Survey Report prepared by Mabbett & Associates, Inc. for pre-renovation services at Portsmouth Naval Shipyard Building 300 (B300) in Kittery, Maine, under Contract No. N40085-21-D-0005. The survey was conducted June 26-28, 2023, and October 11, 2023, by licensed Maine asbestos inspectors to assess the 168,900 square-foot mixed-use industrial manufacturing building for hazardous and regulated building materials prior to planned upgrades and repairs to electrical, HVAC, and fire protection systems, and roof replacement.

The survey identified asbestos-containing materials (ACM) in three locations: gray sealant (0.60%-5% chrysotile, 650 linear feet) on HVAC units HV6-HV9 and associated ducts; square head stick pin adhesive (0.65%-30% chrysotile, 3,000 square feet) on HVAC units HV1-HV12; and red sealant (1.29%-3.13% chrysotile, 50 linear feet) on ducts DH3 and HV5. Twenty-nine paint chip samples were analyzed for lead, cadmium, and hexavalent chromium, with zero samples exceeding the HUD threshold of 0.5 percent lead by weight. Fifteen dust wipe samples were analyzed for RCRA 8 metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver). Eight PCB building material samples were collected and confirmed non-detect for PCBs above regulated thresholds. The report includes an inventory of universal waste and other hazardous materials and recommends that any unsampled or new suspect materials discovered during demolition activities must be sampled and analyzed.

View the file

Other files

File Type Posted
N4008525R0029 0012.pdf PDF
N4008526R0029 0011.pdf PDF
N4008526R0029 0010.pdf PDF
N4008526R0029 0009.pdf PDF
N4008526R00290008.pdf PDF
N4008526R00290007.pdf PDF
Attachment N - PNSY B300 MOD 1 HAZMAT Report.pdf PDF
N4008526R0029 0006.pdf PDF
N4008526R0029 0005.pdf PDF
N4008526R0029 Site Visit Log.pdf PDF
N4008526R0029 0004.pdf PDF
N4008526R0029 0003.pdf PDF
N4008526R0029 0002.pdf PDF
Attachment M - Pass Office Virtual Line Guidance.pdf PDF
Attachment K - SECNAV 5512.pdf PDF
N4008526R0029 0001.pdf PDF
Attachment L - DBIDS 5500b.docx DOCX document
N4008526R0029.pdf PDF
Attachment A1 - PNSY B300 Roof and HVAC Repairs - Final - Plans.pdf PDF
Attachment H - Small Business Participation Commitment.pdf PDF
Attachment G - Historical Small Business Utilization.pdf PDF
Attachment C - PIEE Vendor Access Instructions.pdf PDF
Attachment J - Contractor Exempt Purchase Certificate.pdf PDF
Attachment I - Small Business Subcontracting Plan.pdf PDF
Attachment E - Construction Experience Project Data.pdf PDF
Attachment D - Price Proposal Form.pdf PDF
Attachment F - Past Performance Questionnaire.pdf PDF
Attachment B -Pre-Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment A2 - PNSY B300 Roof and HVAC Repairs - Specifications.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

p

HAZARDOUS BUILDING MATERIALS

SURVEY REPORT

B300 Roof and HVAC Repair Pre-Renovation Services

B300, Portsmouth Naval Shipyard Kittery, ME 03904

Mabbett Project No. R2023006.000

September 11, 2024_Rev 1

Prepared For:

Weston & Sampson 55 Walkers Brook Drive , Suite 100 Reading, MA 01867

Mabbett & Associates, Inc. www.mabbett.com 105 Central Street, Suite 4100 Stoneham, MA 02180-1260 T. 781-275-6050 F: 781-954-5155 Massachusetts | Virginia | Rhode Island | New York

© 2024, Mabbett & Associates, Inc.

B300 ROOF AND HVAC REPAIR

B300, Portsmouth Naval Shipyard, Kittery, ME

© 2024, Mabbett & Associates, Inc. Page i September 11, 2024 Project No. R2023006.000 PNSY B300 HAZMAT Report Revised September 2024

ACKNOWLEDGEMENT

This Hazardous Building Materials Survey Report has been prepared by Mabbett & Associates, Inc. (Mabbett®) for the Pre-Renovation Services at the Portsmouth Naval Shipyard, Building 300 (B300) located in Kittery, Maine, Contract No. N40085-21-D-0005. The information presented herein is based on the facts and information conveyed to or received by Mabbett during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.

Mabbett does not claim to have identified all hazardous materials that could be present in the building. Mabbett has conducted this assessment with reasonable care and has performed this project in accordance with industry standards. There can be no assurances, and Mabbett makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.

The attached Hazardous Building Materials Survey Report was prepared by Mr. Jacob T. Walsh, Environmental, Health & Safety Specialist of Mabbett & Associates, Inc.

This report has been reviewed and approved by:

Michael F. Delaney Director, Building Sciences Group

JTW/MFD/fmz

© 2023, Mabbett & Associates, Inc. Page ii September 11, 2024

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION

1.1 Purpose and Objectives

1.2 Background Information

1.3 Summary of Survey Results

2.0 ASBESTOS CONTAINING MATERIAL SURVEY

2.1 Sampling Methodology

2.2 Analytical Methodology

2.3 ACM Results

3.0 LEAD, Cadmium, and Chromium CONTAINING PAINT SAMPLING

3.1 Sampling Methodology

3.2 Analytical Methodology

3.3 Sampling Results

4.0 DUST SAMPLING (RCRA 8 METALS)

4.1 Sampling Methodology

4.2 Analytical Methodology

4.3 Dust Sampling Results

5.0 BUILDING MATERIAL PCB EVALUATION

6.0 INVENTORY OF OTHER HAZARDOUS MATERIALS

7.0 RECOMMENDATIONS

7.1 Asbestos

7.2 Paint

7.3 Dust Sampling (RCRA 8 Metals)

7.4 Polychlorinated Biphenyls

7.5 Other Hazardous Materials

TABLES

Table 1 - Estimated Quantities of Asbestos Containing Materials Table 2 - Paint Chip Analytical Results Table 3 - Dust Sampling (RCRA 8 Metals) Analytical Results Table 4 - PCB Analytical Results Table 5 - Inventory of OHMs

FIGURES

RBM-1 – First Floor Regulated Building Materials Sampling Location Plan RBM-2 – Second Floor Regulated Building Materials Sampling Location Plan RBM-3 – Second Floor Regulated Building Materials Sampling Location Plan RBM-4 – Roof Regulated Building Materials Sampling Location Plan

APPENDICES

APPENDIX A - ACM Bulk Sample Results APPENDIX B - ACM Laboratory Report and Chain of Custody Documentation APPENDIX C - Paint Chip Laboratory Report and Chain of Custody Documentation APPENDIX D - Dust Sampling (RCRA 8 Metals) Laboratory Report and Chain of Custody Documentation APPENDIX E - PCB Laboratory Report and Chain of Custody Documentation APPENDIX F - Photo Log

© 2023, Mabbett & Associates, Inc. Page 1 September 11, 2024

1.0 INTRODUCTION

Mabbett and Associates, Inc. (Mabbett®) performed a survey for hazardous building materials as part of the pre-renovation evaluations of building materials for the B300 Roof and HVAC Repair project at the Portsmouth Naval Shipyard located in Kittery, Maine, Contract No. N40085-21-D-0005. The purpose of the survey was to assess the building for the presence of hazardous and regulated building materials, including asbestos-containing materials (ACMs), lead containing paint (LCP), RCRA 8 metals and other hazardous materials (OHMs). The survey was performed by Mr. Kevin M. Donovan and Mr. Jacob T. Walsh of Mabbett on June 26th, 27th, and 28th, 2023.

Additional survey work was conducted on October 11th, 2023, and consisted of the following activities:

▪ An Asbestos Containing Material (ACM) survey of suspect materials (analysis using polarized light microscopy [PLM]) and PLM NOB with gravimetric reduction preparation method for analysis of Non- Friable Organically Bound (NOB) materials.

▪ Lead Containing Paint (LCP) sampling (analysis by atomic absorption [AA] spectroscopy).

▪ Paint sampling for Cadmium and Chromium (analysis by Inductively Coupled Plasma [ICP]).

▪ Polychlorinated Biphenyls (PCB) Containing Building Materials Sampling (analysis performed by SW-846 Method 8082A).

▪ Dust wipe sampling for RCRA 8 (Resource Conservation and Recovery Act) metals (arsenic, barium, cadmium, chromium, lead, mercury, selenium, and silver (analysis by ICP); and

▪ A visual estimation and inventory of universal waste and other hazardous materials (OHM).

At the time of the survey B300 was occupied. Areas that could be affected by upgrades and repairs to the electrical, HVAC and fire protection systems and replacement of the roof were surveyed. Areas and materials outside of this scope of work were not surveyed by Mabbett. All hazardous material investigations, surveying, testing, and reporting comply with Mabbett’s, Hazardous Materials Sampling Plan (HMSP) dated June 15, 2023_Rev 2.

1.1 Purpose and Objectives

This hazardous building material survey was comprised of four primary project tasks including:

▪ Evaluation of existing site conditions and formulation of a sampling plan.

▪ Site survey to collect building material samples for laboratory analysis.

▪ Conduct visual assessment and develop inventory of universal waste and other hazardous materials.

▪ Development of this Hazardous Building Materials Survey Report.

This inspection was designed to accomplish three primary objectives: (1) to collect a representative number of building materials for laboratory analysis and reporting (2) conduct visual assessment and develop an inventory of universal waste and other hazardous material; and (3) to use data from the laboratory analysis efforts to estimate the volume of hazardous and regulated building materials present within the building’s interior and roof for subsequent use in development of an abatement scope. These three objectives were met through a combination of a site inspection to collect building material samples and dust wipe samples for laboratory analysis;

interpretation of qualitative data collected in the field; and the quantitative laboratory data generated from analysis of the building materials samples as summarized in this survey report and create a universal waste inventory.

1.2 Background Information

B300 is a mixed-use building used primarily for industrial manufacturing with an overall area of 168,900 square feet. Plans for the building include upgrades and repairs to the electrical, HVAC and fire protection systems and replacement of the roof.

© 2023, Mabbett & Associates, Inc. Page 2 September 11, 2024

1.3 Summary of Survey Results

As required by State and Federal regulations, bulk samples of suspected ACM were collected by Mabbett and submitted using chain of custody (COC) procedures to Aerobiology of Woburn, Massachusetts. Aerobiology is a Maine certified asbestos analysis laboratory that is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200090-0).

The Maine Department of Environmental Protection (Maine DEP) define any material that contains greater than or equal to one percent (>1%) asbestos as ACM.

Paint chip samples and dust wipe samples were collected by Mabbett for analysis using AA spectroscopy and ICP and submitted using COC procedures to Scientific Analytical Institute, Inc (SAI) of Greensboro, North Carolina. 19 paint chip samples were not analyzed for Chromium of Hexavalent Chromium and 3 samples were not analyzed for Cadmium due to insufficient amounts of material being collected during initial survey efforts. Follow up visits were conducted with additional tools in order to ensure that the required amount of material was collected for each sample. Similar paint colors and substrates indicated that initial results provided a sufficient amount of data to identify the appropriate level of information for waste characterization and worker protection needed prior to the disturbance of the material during construction/renovation activities, and therefore additional sampling was not warranted during this survey.

PCB building material samples were collected and submitted under COC procedures for PCB extraction using Analytical method 3660B to Alpha Analytical of Westborough, Massachusetts. Alpha is certified by the National Environmental Laboratory Accreditation Program (NELAP).

Current survey efforts yielded the following results:

▪ Ninety-nine-nine (99) bulk samples for suspect ACM were collected for laboratory analysis and reporting.

Two (2) materials were determined to contain asbestos.

▪ Twenty-nine (29) paint chip samples were collected from painted building surfaces for laboratory analysis and reporting. Zero (0) revealed concentrations of lead in paint that exceed the U.S. Department of Housing and Urban Development (HUD) threshold of 0.5 percent by weight.

▪ 15 Dust wipe samples analyzed for RCRA 8 metals.

▪ Eight (8) suspect PCB building material samples were collected and submitted for laboratory analysis as part of this survey. Based on laboratory analysis the materials were non-detect for PCBs above the TSCA regulated material threshold.

▪ An Inventory of universal waste and other hazardous materials was developed and provided in this inspection report in Section 5. An Inventory of other hazardous materials can be found in Table 4, Inventory of OHMs.

© 2023, Mabbett & Associates, Inc. Page 3 September 11, 2024

2.0 ASBESTOS CONTAINING MATERIAL SURVEY

The asbestos survey was performed from June 26th to June 28th 2023, and on October 11th, 2023 by Mabbett’s Maine licensed asbestos inspectors, Mr. Kevin M. Donovan (AI-0415) and Mr. Jacob T. Walsh (AI-0917). Prior to collecting samples, a visual screening assessment was conducted to identify locations of suspect ACM and develop a sampling plan. Only areas that were accessible during the field work phase were included in the survey, with reasonable efforts made to access areas needed to complete the asbestos survey and sampling program. Any unsampled or new suspect materials discovered during demolition activities must be sampled and submitted to a laboratory for analysis. Destructive investigation of operating equipment was not conducted.

2.1 Sampling Methodology

Mabbett complied with the following requirements:

▪ Samples were collected in accordance with applicable EPA, OSHA, and state regulations preventing airborne exposure to asbestos fibers to the extent possible. The sampling locations were repaired by Mabbett.

▪ The amount of sample collected was of sufficient size for analysis. Each layer was analyzed separately.

▪ Field personnel properly donned and doffed appropriate PPE where hazards existed and were identified.

▪ Mabbett performed the inspection between normal duty hours of 8:00 a.m. and 4:00 p.m.

▪ Bulk samples for asbestos analysis were collected using EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 763, and Asbestos Hazard Emergency Response Act (AHERA) protocols. Bulk suspect ACM sampling was conducted according to the following standard sampling protocol:

▪ Friable surfacing material:

▪ At least three bulk samples shall be collected from each homogeneous area of surfacing material that is 1,000 ft2 or less.

▪ At least five bulk samples shall be collected from each homogeneous area of surfacing material that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.

▪ At least seven bulk samples shall be collected from each homogeneous area of surfacing material that is greater than 5,000 ft2.

▪ Thermal system insulation:

▪ At least three bulk samples shall be collected from each homogeneous area of thermal system insulation.

▪ At least three bulk samples shall be collected from each homogeneous patched area of thermal system insulation.

▪ Sufficient samples shall be collected from elbows and fittings.

▪ Bulk samples shall not be collected from any homogeneous area where the state-licensed asbestos inspector determines that the thermal system insulation is fiberglass, foam glass, rubber, or other non-

ACM.

▪ Miscellaneous material (e.g., joint compound, roofing, gaskets, floor coverings, decorative coatings, wire insulation):

▪ At least three bulk samples shall be collected from each homogeneous area of miscellaneous material that is less than 100 ft2.

▪ At least three bulk samples shall be collected from each homogeneous area of miscellaneous material that is greater than 100 ft2.

© 2023, Mabbett & Associates, Inc. Page 4 September 11, 2024

The survey included accessible interior areas, the roof, and materials associated with the upgrades and repairs to the electrical, HVAC, and fire protection systems of the building.

Areas with limited access or where the survey was limited to visual observation only:

▪ within enclosed pipe/duct chases

▪ inside mechanical equipment

▪ energized electrical equipment

2.2 Analytical Methodology

Ninety-nine (99) bulk samples were collected from twenty (20) homogeneous areas from B300 and submitted using COC procedures to Aerobiology. Bulk samples were analyzed by PLM using EPA Method 600/R-93/116 using stop positive methodology and PLM NOB with gravimetric reduction preparation method for analysis of Non- Friable Organically Bound (NOB) materials, as required by the State of Maine Department of Environmental Protection. Sampling locations are depicted in Figures RBM-1, 2 ,3, & 4.

2.3 ACM Results

The EPA, Occupational Safety and Health Administration (OSHA), and the Maine Department of Environmental Protection (Maine DEP) define any material that contains greater than or equal to one percent (>1%) asbestos as ACM. Three (3) of the materials sampled and analyzed by PLM as part of this survey effort were found to contain greater than or equal to one percent (>1%) ACM. Bulk Sample Results are provided in Appendix A. The laboratory report and COC documentation are provided in Appendix B.

Estimated quantities of materials identified as ACM during this survey are presented in Table 1.

TABLE 1

Estimated Quantities of Asbestos Containing Materials

B300 Roof and HVAC Repair Kittery, ME

Sample Location Description of

Material Percent and Type of

Asbestos

Estimated Quantity

Amount Units

B300 Interior North, East, and West Sides: on

HV6, HV7, HV8, HV9

and associated ducts

Gray Sealant* .60% - 5% Chrysotile 650 LF

North, East, and West Sides: HV1, HV2, HV3, HV4, HV5, HV6, HV7 HV8 HV9, HV10, HV11 & HV12, behind fiberglass insulation on each HV system

Square Head Stick Pin Adhesive Associated with HV units .65% - 30% Chrysotile 3,000 SF

B300 Interior North, East, and West Sides: DH3, HV5, and associated ducts

Red Sealant** 1.29% - 3.13%

Chrysotile

50 LF

Notes: SF= Square Feet, LF= Linear Feet *all gray sealant is assumed to contain asbestos **all red sealant is assumed to contain asbestos

© 2023, Mabbett & Associates, Inc. Page 5 September 11, 2024

3.0 LEAD, Cadmium, and Chromium CONTAINING PAINT SAMPLING

Lead, Cadmium, and Chromium sampling was conducted by collecting and analyzing paint chips from painted surfaces and systems that may be impacted by the planned renovation.

3.1 Sampling Methodology

Paint chip samples were collected using a sharp hand tool to score and peel paint off an approximate 1 square inch area of the substrate. Different tools such as chisels, putty knives, and hammers may also be needed in the collection of paint chips. All tools were cleaned after each sample to prevent cross contamination. Collected paint chip samples were submitted under COC procedures to an accredited laboratory and analyzed via flame atomic absorption (AA).

3.2 Analytical Methodology

The regulations addressing Lead, Cadmium, and Chromium in non-residential buildings are focused on occupational exposures involved with paint-disturbing activities and related waste-disposal activities.

Occupational exposure to lead is regulated by OSHA regulation 29 CFR 1926.62, Lead in Construction, as well as other applicable state and local regulations.

A paint chip survey cannot determine a safe level of lead for the purpose of paint-disturbing/waste-disposal activities but is intended to provide guidance as to the locations of surfaces containing lead, cadmium, and hexavalent chromium.

Contractors may use this information to better determine where worker exposures to airborne lead and other hazards may occur. They can then assess the potential magnitude of exposure to their employees and identify the controls necessary to limit health risks. This information can also be used for pre-characterization of demolition waste streams prior to toxicity characteristic leaching procedure (TCLP) sampling in accordance with 40 CFR Part 261.

Twenty-nine (29) samples, each from a different homogenous areas were collected during this survey. Paint chip samples were submitted using COC procedures to Scientific Analytical Institute (SAI) for analysis. Analysis was conducted using EPA SW-846 Test Method 7000B: Flame Atomic Absorption Spectrophotometry and EPA SW-846 3050B: Inductively Coupled Plasma (ICP).

3.3 Sampling Results

OSHA regulations have no low-level threshold, therefore any result above the detection limit should be given proper consideration for worker safety and potential for risk. The results of this LCP sampling survey identify samples that indicate risk and are presented in Table 2. The laboratory report and COC documentation are provided in Appendix C.

TABLE 2

Paint Chip Analytical Results B300 Roof and HVAC Repair

Portsmouth Naval Shipyard, Kittery, ME

Sample No.

Location Substrate and

Component Color Element

Result

(% by weight)

Pb-01 First Floor Columns A2-A3 Concrete Wall Tan

Pb 0.013%

Cd <0.00026

Cr 0.0041%

© 2023, Mabbett & Associates, Inc. Page 6 September 11, 2024

TABLE 2

Paint Chip Analytical Results B300 Roof and HVAC Repair

Portsmouth Naval Shipyard, Kittery, ME

Sample No.

Location Substrate and

Component Color Element

Result

(% by weight)

Pb-02 First Floor Column A5 Metal Column Tan

Pb 0.026%

Cd 0.00038%

Cr NA

Pb-03 First Floor Column A5 Concrete Floor Gray

Pb 0.0080%

Cd <0.00044

Cr NA

Pb-04 First Floor Column A18 Metal Column Tan

Pb 0.17%

Cd 0.0026%

Cr NA

Pb-05 First Floor Column A17 Concrete Wall Gray

Pb 0.0068%

Cd <0.00013%

Cr NA

Pb-06 First Floor Column A18 Metal Duct Tan

Pb 0.079%

Cd 0.00054%

Cr 1.6%

Pb-07 First Floor Column B7 Metal Column Tan

Pb 0.015%

Cd 0.00043%

Cr NA

Pb-08 First Floor Column B8 Metal Duct Tan

Pb 0.040%

Cd 0.0011%

Cr 5.0%

Pb-09 First Floor Column B15 Metal Column Tan

Pb 0.024%

Cd 0.00060%

Cr NA

Pb-10 First Floor Column B15 Metal Duct Tan

Pb 0.032%

Cd <0.00013%

Cr 0.0067%

Pb-11 First Floor Column C3 Concrete Block Wall Tan

Pb 0.0072%

Cd 0.00032%

Cr NA

Pb-12 First Floor Column D19 Metal Duct Tan

Pb 0.015%

Cd 0.00030%

Cr 0.0030%

Pb-13 First Floor Column D10 Metal Column Tan

Pb 0.032%

Cd 0.00058%

Cr NA

Pb-14 First Floor Column D10 Metal Duct Tan

Pb 0.016%

Cd 0.0015%

Cr 0.22%

© 2023, Mabbett & Associates, Inc. Page 7 September 11, 2024

TABLE 2

Paint Chip Analytical Results B300 Roof and HVAC Repair

Portsmouth Naval Shipyard, Kittery, ME

Sample No.

Location Substrate and

Component Color Element

Result

(% by weight)

Pb-15 First Floor Columns E16-E17 Metal Duct White

Pb 0.11%

Cd 0.0016%

Cr 1.3%

Pb-16 First Floor Column E16-E17 Concrete Floor Red

Pb 0.10%

Cd 0.0053%

Cr NA

Pb-17 First Floor Column E9 Metal Truss Tan

Pb 0.092%

Cd NA

Cr NA

Pb-18 First Floor Column E9 Metal Duct Tan

Pb 0.053%

Cd 0.00031%

Cr 0.39%

Pb-19 First Floor Column E9 Concrete Floor Gray

Pb 0.0058%

Cd 0.00029%

Cr NA

Pb-20 First Floor Column E3 Concrete Wall Tan

Pb 0.0098%

Cd <0.000045

Cr NA

Pb-21 Second Floor Column D5 Metal Duct Tan

Pb 0.080%

Cd NA

Cr NA

Pb-22 Second Floor Column D5 Concrete Floor Gray

Pb <0.0063%

Cd 0.00069%

Cr NA

Pb-23 Second Floor Column 2.16 Metal Duct Tan

Pb 0.11%

Cd 0.00087%

Cr 0.014%

Pb-24 Second Floor Column 2.16 Metal Wall White

Pb 0.048%

Cd <0.00020

Cr NA

Pb-25 Second Floor Break Room Gypsum Wall Green

Pb <0.0075%

Cd <0.000063

Cr NA

Pb-26 Second Floor Hall by Men’s Room Gypsum Wall Blue

Pb <0.0063%

Cd 0.00013%

Cr NA

Pb-27 Catwalk - HV9 Metal Duct Tan

Pb 0.0073%

Cd 0.00022%

Cr 0.45%

© 2023, Mabbett & Associates, Inc. Page 8 September 11, 2024

TABLE 2

Paint Chip Analytical Results B300 Roof and HVAC Repair

Portsmouth Naval Shipyard, Kittery, ME

Sample No.

Location Substrate and

Component Color Element

Result

(% by weight)

Pb-28 Center Catwalk - HV5 Metal Truss Tan

Pb 0.043%

Cd NA

Cr NA

Pb-29 Catwalk West Side Metal Duct Tan

Pb 0.17%

Cd 0.00022%

Cr 2.2%

Notes: NA= Not Analyzed

© 2023, Mabbett & Associates, Inc. Page 9 September 11, 2024

4.0 DUST SAMPLING (RCRA 8 METALS)

Dust sampling for RCRA 8 metals was conducted by collecting and analyzing dust wipes from the interior, exterior, and on top of HVAC systems that may be impacted by the planned renovation.

4.1 Sampling Methodology

Dust wipe sampling for RCRA 8 metals was conducted on representative surface areas of the B300 ductwork utilizing a 10cm x 10cm template (100 square centimeters). Each sample was collected by wiping in a back and forth “S” pattern over a measured sampling area using a method approved “Ghost Wipe”. Then, the wipe was folded over itself, and the area was wiped again in a direction perpendicular to the first wipe orientation. The wipe sample was then placed into a labeled, clean bag for laboratory analysis. Samplers changed gloves between each sample. The proposed sampling scheme, the number of samples, the sample distribution and general methodology was developed by Mabbett and Associates and is documented in the Hazardous Materials Sampling plan. Specific sample locations were determined by field personnel while on-site prior to sample collection. Ducts were sampled approximately 10-15 feet off the ground and were accessed utilizing a step ladder and cordless drill.

Samples were taken inside of the duct and directly off the duct grille.

4.2 Analytical Methodology

Dust samples were analyzed utilizing Inductively Coupled Plasma (ICP) NIOSH 7303/EPA SW-846 3050B and Cold Vapor Atomic Absorption OSHA ID -145. The purpose of this testing was to characterize the presence and concentration of RCRA 8 metals in areas of the building that may impact the project.

4.3 Dust Sampling Results

Any surfaces with heavy metal containing dust present should be managed in accordance with PNSY guidelines, PSHA worker safety rules, and State and EPA regulations. OSHA construction rules do not specify acceptable levels of heavy metals within dust for occupational exposure. Construction work involving heavy metals in dust must be completed in accordance with OSHA regulations. Contractors conducting work in areas where heavy metals are present should be notified, and proper work protocols should be used. Sampling yielded the following results presented in Table 3.

TABLE 3

RCRA 8 Metals Analytical Results

B300 Roof and HVAC Repair Kittery, ME

Sample No.

Description Element Symbol Concentration (µg/ft2)

DW-01

1st Floor Column A2 Inside Duct Dry (No Oil)

Silver Ag 630

Arsenic As <2.3

Barium Ba 280

Cadmium Cd 110

Chromium Cr 260

Lead Pb 930

Selenium Se 15

© 2023, Mabbett & Associates, Inc. Page 10 September 11, 2024

TABLE 3

RCRA 8 Metals Analytical Results

B300 Roof and HVAC Repair Kittery, ME

Sample No.

Description Element Symbol Concentration (µg/ft2)

Mercury Hg <0.69

DW-02

1st Floor Column A18 Inside Duct Dry (No Oil)

Silver Ag 380

Arsenic As <2.3

Barium Ba 570

Cadmium Cd 60.

Chromium Cr 1600

Lead Pb 1500

Selenium Se 43

Mercury Hg <0.69

DW-03

1st Floor Column B9 Inside Duct Dry (No Oil)

Silver Ag 1300

Arsenic As <230

Barium Ba 4600

Cadmium Cd 690

Chromium Cr 1700

Lead Pb 1100

Selenium Se <460

Mercury Hg <0.69

DW-04

1st Floor Column B15 Inside Duct Dry (No Oil)

Silver Ag 1300

Arsenic As <2.3

Barium Ba 420

Cadmium Cd 390

Chromium Cr 640

Lead Pb 1800

Selenium Se 26

Mercury Hg <0.69

DW-05

1st Floor Column C3

Outside Duct on Grille Dry (No Oil)

Silver Ag 33

Arsenic As <2.3

Barium Ba 320

Cadmium Cd 200

Chromium Cr 130

Lead Pb 160

Selenium Se 17

Mercury Hg <0.69

DW-06

1st Floor Back Room

Column D19 Inside Duct Dry (Oily)

Silver Ag 30.

Arsenic As <2.3

Barium Ba 360

Cadmium Cd 77

Chromium Cr 270

© 2023, Mabbett & Associates, Inc. Page 11 September 11, 2024

TABLE 3

RCRA 8 Metals Analytical Results

B300 Roof and HVAC Repair Kittery, ME

Sample No.

Description Element Symbol Concentration (µg/ft2)

Lead Pb 320

Selenium Se 20.

Mercury Hg <0.69

DW-07

1st Floor Column D10

Outside Duct on Grille Dry (No Oil)

Silver Ag 210

Arsenic As <2.3

Barium Ba 1800

Cadmium Cd 400

Chromium Cr 340

Lead Pb 420

Selenium Se 38

Mercury Hg <0.69

DW-08

1st Floor Hydraulic Room

Column E17 Inside Duct

Fluffy (No Oil) Dry

Silver Ag 98

Arsenic As <230

Barium Ba 1600

Cadmium Cd 230

Chromium Cr 1100

Lead Pb 300

Selenium Se <460

Mercury Hg 1.4

DW-09

1st Floor Column E9 Inside Duct Dry (No Oil)

Silver Ag 490

Arsenic As <23

Barium Ba 1900

Cadmium Cd 3300

Chromium Cr 1500

Lead Pb 2500

Selenium Se <46

Mercury Hg 2.8

DW-10

1st Floor Main Walkway

Column E3 Inside Horizontal Duct

Dry (No Oil)

Silver Ag 370

Arsenic As <23

Barium Ba 3000

Cadmium Cd 1800

Chromium Cr 1600

Lead Pb 2400

Selenium Se 110

Mercury Hg 8.1

DW-11

2nd Floor Column D5 Inside Duct Dry (No Oil)

Silver Ag 12

Arsenic As <2.3

Barium Ba 420

Cadmium Cd 190

Chromium Cr 140

© 2023, Mabbett & Associates, Inc. Page 12 September 11, 2024

TABLE 3

RCRA 8 Metals Analytical Results

B300 Roof and HVAC Repair Kittery, ME

Sample No.

Description Element Symbol Concentration (µg/ft2)

Lead Pb 86

Selenium Se 19

Mercury Hg 8.2

DW-12

2nd floor Room 220 Column 2.16 Inside Duct Dry (No Oil)

Silver Ag 430

Arsenic As <23

Barium Ba 3500

Cadmium Cd 320

Chromium Cr 6500

Lead Pb 830

Selenium Se 300

Mercury Hg 0.74

DW-13

2nd Floor Men’s Room Duct Grille Outside Duct on Grille

Dry (No Oil)

Silver Ag 42

Arsenic As <2.3

Barium Ba 770

Cadmium Cd 140

Chromium Cr 170

Lead Pb 150

Selenium Se 33

Mercury Hg 2.3

DW-14

Middle Catwalk

HV6

Inside Air Handler Dry (No Oil)

Silver Ag 90.

Arsenic As <2.3

Barium Ba 710

Cadmium Cd 380

Chromium Cr 280

Lead Pb 380

Selenium Se 20

Mercury Hg 0.88

DW-15

Middle Catwalk

HV5

Outside Duct Dry (No Oil)

Silver Ag 370

Arsenic As <23

Barium Ba 2600

Cadmium Cd 520

Chromium Cr 4000

Lead Pb 3300

Selenium Se 72

Mercury Hg 4.2

© 2023, Mabbett & Associates, Inc. Page 13 September 11, 2024

5.0 BUILDING MATERIAL PCB EVALUATION

Polychlorinated Biphenyls (PCBs) can be found in some common building materials manufactured during the1950s, 1960s and 1970s. If PCB concentrations in building materials exceed regulatory thresholds, abatement is typically required when the use of PCBs in building materials is defined by the EPA to be an “unauthorized use”.

Disposal of materials with regulated concentrations of PCBs is governed by TSCA regulations. In many cases, if PCBs are discovered in building materials, a remediation work plan for these materials must be approved by the EPA prior to implementation. Based upon the age of the buildings, the building materials most likely to contain PCBs are window or other caulking materials, and waterproofing paints or sealants. PCBs in transformer fluid represent an authorized use under the TSCA regulations and must also be disposed of as PCB waste. Releases of transformer fluids to building materials must be assessed, and remediation plans developed and approved by the EPA prior to implementation.

Inspection and representative sampling of suspect building materials was conducted as part of this hazardous building materials survey. The survey for PCBs included the sampling of paint and mastic materials that may be impacted by the proposed work. Collected samples were submitted using COC procedures to Alpha. Analysis was conducted using Extraction Method EPA 3540C. Laboratory analytical reports are included in Appendix E. Results of the PCB sampling are presented in Table 4.

TABLE 4

PCB Sampling Results

B300 Roof and HVAC Repair Kittery, ME

Sample No. Sample Location Description of Material Total PCB Content (mg/kg)

PCB-01 Bay 3, Catwalk DH3 Red Sealant ND

PCB-02 Bay 3, Catwalk by DH3 Tan Metal Duct Paint 0.481

PCB-03 Bay 2, Catwalk (West) Tan Metal Duct Paint 0.93

PCB-04 Bay 1, Column 1A1 Tan Duct Paint 1.14

PCB-05 Bay 2, Column C18 Tan Duct Paint 0.744

PCB-06 Bay 3, Column D8 Tan Duct Paint 0.988

PCB-07 Bay 4, Room 3143 White Duct Paint ND

PCB-08 Bay 5, Welders Room Tan Wall Paint 2.89

Note: ND = None Detected

The existing roof was replaced in 2006. Original roofing materials and coatings may be present that were not removed in 2006. The following materials require sampling, by the contractor, for asbestos and PCB if discovered during roof replacement and equipment removal; Existing insulated curb, if being removed or significantly disturbed evaluate if material requires testing for asbestos and PCBs, existing roof top ventilation unit, paint coatings must be evaluated for PCBs if being removed, existing adhesives or caulks associated with roofing insulation must be evaluated for asbestos and PCBs if being removed; existing flashings and any adhesives used to adhere to the original structure, existing coatings and paints on steel roof deck, paints on existing smoke and access hatches or new roof hatches and original mastics, if present, all must be evaluated for asbestos and PCBs if being disturbed or removed.

© 2023, Mabbett & Associates, Inc. Page 14 September 11, 2024

6.0 INVENTORY OF OTHER HAZARDOUS MATERIALS

A visual screening was conducted by Mabbett to identify quantities of universal waste and other potential hazardous materials in order to define an inventory of these materials for future relocation or disposal purposes.

The survey included a visual estimation of the following suspect materials:

▪ Light Ballasts (associated with fluorescent light tubes)

▪ Light Tubes (e.g., fluorescent light tubes and HID lamps that may contain mercury or lead)

▪ Switches (i.e., mercury switches or gauges)

A summary of this visual inventory is presented in Table 5.

TABLE 5

Inventory of OHMs

B300 Roof and HVAC Repair Kittery, ME

Material Quantity Unit

First Floor

4 - 2 Lamp Light Fixtures and Ballasts 523 EA

Fire Pull 3 EA

Fire Strobe 15 EA

Fire Extinguisher 10 EA

Halogen Hex Lights 3 EA

Second Floor

4 - 2 Lamp Light Fixtures and Ballasts 68 EA

Fire Pull 2 EA

Fire Strobe 18 EA

Fire Extinguishers 16 EA

High Pressure Sodium Lights 12 EA

Exit Signs 4 EA

Notes: EA= Each

© 2023, Mabbett & Associates, Inc. Page 15 September 11, 2024

7.0 RECOMMENDATIONS

This section presents a summary of the conclusions and recommendations from the pre-renovation hazardous building materials survey at the Portsmouth Naval Shipyard, B300. Prior to initiating plans for renovation activities, survey results for the Pre-Renovation Services presented herein should be reviewed to determine whether any of the identified regulated building materials will be disturbed by proposed work activities.

7.1 Asbestos

The planned renovation of B300 will disturb the ACM listed in Table 1 and will require removal of these materials by a licensed asbestos abatement contractor prior to being disturbed. The survey included accessible interior areas, the roof, and materials associated with the upgrades and repairs to the electrical, HVAC, and fire protection systems of the building. Any suspect materials encountered during renovation activities that were not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise.

7.2 Paint

The purpose of the Lead, Cadmium, and Chromium screening survey was to identify patterns of lead, cadmium, and chromium containing paint. For the purpose of this screening survey a limited amount of representative interior building components were tested. The regulations addressing heavy metals in paint in non-residential buildings are focused on protecting workers involved with paint-disturbing activities and related waste-disposal activities.

Occupational exposure to lead in construction is regulated by OSHA regulation 29 CFR 1926.62 “Lead in Construction”, as well as other applicable state and local regulations. These regulations involve the air monitoring of workers to determine exposure levels when disturbing paint containing measurable concentrations of heavy metals. A paint chip survey cannot determine the safe level of lead for the purpose of paint-disturbing activities but is intended to provide guidance as to the locations of heavy metals in paint. Exposure to heavy metals may cause a wide range of health effects, from behavioral problems, learning disabilities, seizures, and death.

Employers and contractors may use this information to better determine where worker exposures to airborne heavy metals may occur and, through the interpretation of heavy metals concentration data, assess the potential magnitude of exposure to their employees and identify the controls necessary to limit health risk.

Representative samples of heavy metals waste to be generated during building renovation, or following demolition but prior to disposal, should be collected and analyzed using toxicity characteristic leaching procedure (TCLP) in accordance with 40 CFR Part 261. Management and disposal of lead containing waste must be done in accordance with all applicable local, state, and federal regulations. OSHA regulations may require certain procedures for any paint that contains heavy metals, even if it is below these levels. All materials identified, regardless of their heavy metals content, should either be sampled and analyzed by TCLP and then handled/disposed of accordingly, or segregated from other large-scale debris and then managed as hazardous waste in accordance with federal, state, and local hazardous waste disposal regulations.

7.3 Dust Sampling (RCRA 8 Metals)

Surfaces sampled contained varying amounts of lead, cadmium, chromium, and other hazardous metals that may be regulated by RCRA and OSHA when disturbed by renovation, alteration, repair, or demolitions activities.

Thresholds, exposures, and engineering controls for cadmium, chromium, or other hazardous metals differ depending on factors including, but not limited to, whether paints are used in operational processes, are painted surfaces of building components or exterior coatings and are disturbed during construction activities. Most of the dust observed during sampling was observed to be non-oily. An image of the typical dust observed is provided in Appendix D. The sample collected at Column D19 was observed to be oily at the time of the investigation. No

© 2023, Mabbett & Associates, Inc. Page 16 September 11, 2024 other notable characteristics were observed during sampling efforts. When investigation, sampling, renovation, or demolition occurs, there are hazards associated with the generation of dust, debris, and fumes. The OSHA Standards cite requirements for work activities that can create an unsafe condition with regards to worker protection. These include, but are not limited to manual demolition, paint scraping, power tooling without dust collection, cleanup activities with dry abrasives, movement or removal of enclosures, abrasive blasting, welding, cutting, and burning on steel structures. Samples contained concentrations of RCRA 8 metals above laboratory reporting limits. Based on the dust wipes and lead sampling results and to limit personnel exposure to dust during duct removal activities a Mabbett’s staff CIH believe that, while we can’t say what the airborne concentrations of these metals will be during demolition, dust will present some hazards. Some recommendations that can be used in various combinations based on the chosen work will be the use of half-face respirators with P100 cartridges (purple) during activities where dust may be generated. Without conducting air sampling when the project starts, this would just cover the worst-case scenario of at least one metal’s concentration would be above OSHA’s PEL or any other government recommended levels. The use of HEPA-filtered vacuum cleaners to remove the dust without releasing back into the air and HEPA filtration for exhausted air. Wet methods for demolition, wetting the dust will keep most of it from becoming airborne. Sealing off the work area with appropriate sheeting (6-mil should be sufficient). After the work is completed, clean the area using wet mop methods and conduct clearance wipe sampling.

7.4 Polychlorinated Biphenyls

Materials containing PCBs were identified. None of the materials sampled contain greater than 50 parts per million PCB. These materials are considered non-TSCA regulated PCB Bulk Product Waste and to meet the TSCA Excluded PCB Product definition. Excluded PCB Product waste can be managed as solid waste at any landfill permitted to accept waste with PCB levels up to those observed.

7.5 Other Hazardous Materials

The purpose of the inventory for other hazardous materials as completed by Mabbett was to identify potential hazardous, and non-building material substances that may require special handling consideration prior to any planned building renovation. Mabbett identified items, that if removed, should be disposed of or recycled in accordance with applicable Federal and State rules for regulated materials. Examples of such materials are light ballasts and fluorescent light tubes.

© 2023, Mabbett & Associates, Inc. FIGURES September 11, 2024

FIGURES

LEGEND

NO ASBESTOS DETECTED (NAD)

SAMPLE POSITIVE FOR ASBESTOS

APPROXIMATE SAMPLE LOCATION

01A*

01A

01A

LEAD PAINT SAMPLE LOCATIONPb-01

GENERAL SURVEY NOTES:GENERAL SURVEY NOTES:

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL

(ACM) PRESENT IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR

IDENTIFYING ACM FOR FUTURE RENOVATION OR DEMOLITION PROJECTS,

ABATEMENT SPECIFICATIONS, ETC. MABBETTS SURVEY WAS PERFORMED WITH

LIMITATIONS INHERENT TO NON-DESTRUCTIVE VISUAL INSPECTIONS. ANY SUSPECT

MATERIAL ENCOUNTERED DURING RENOVATION/DEMOLITION THAT IS NOT

IDENTIFIED AS BEING NON-ACM SHOULD BE ASSUMED TO BE ACM UNLESS SAMPLE

RESULTS PROVE OTHERWISE. BASE PLAN OBTAINED FROM WESTON & SAMPSON

ENGINEERS, INC., B300 ROOF AND HVAC REPAIR - SIOP, B300 FOOTPRINT PLAN

DATED 20 AUGUST 2018 AND RECEIVED MAY 2023.

2. SURVEY COMPLETED JUNE 26, 2023 THROUGH JUNE 28, 2023 AND OCTOBER 12,

2023 BY MABBETT & ASSOCIATES, INC.

DUST WIPE SAMPLE LOCATIONDW-01

PCB SAMPLING LOCATIONPCB01

RBM-1

F I R

S T

F

L O

O R

E G

U L

A T

D

B

U I L

D I N

G

M

A T

E R

I A

L S

S A

M P

L I N

G

L

O C

A T

I O

N

P

L A

N

M F

D

D J A

M F

D

K M

D

- C

A T

E G

O R

Y

C

O D

E

F I L E

N A

M E

R B

M D

W G

S c i e n t i s t s

I

E n g i n e e r s

I

P r o g r a m

M n a g e r s

M a b b e t t

A s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

P R

O J E

C

N

S O

L I C

I T

A T

I O

N

N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

I L D

I N

G

P O

R T

S M

O U

H

V

A L

S

H I P

Y A

R D

K I T

T E

Y

I N

E

M A

Y

-C A

T E

G O

D

E

R

Pb-12

DW-06

DW-08

Pb-15 Pb-16

03B

04C

Pb-27

04B

DW-14

03A*

DW-15

Pb-28

04A

07A,07B,07C

DW-07

Pb-13 Pb-14

09A DW-10

Pb-20

Pb-17 Pb-18 Pb-19

DW-09

Pb-11

DW-05

04D

12E

Pb-29

Pb-07

03C*

DW-01

Pb-01

Pb-02

Pb-03

Pb-08

12A

DW-04

Pb-09 Pb-10

04E

Pb-05

DW-02

Pb-04 Pb-06

PCB 07PCB05

PCB06

PCB08

PCB04

BAY 3

BAY 2

BAY 1

BAY 4

BAY 5

05A,06A*

4D,14E,14F,14G

15A*,15B*

19A,19B.19C

20A,20B,20C

21A,21B,21C

22A,22B,22C

14A,16A,16B,16C

PCB02

PCB01

PCB03

14B,17A,17B,17C

05B,06B*,14C

18A*,18B*,18C*

05C, 06C*

14H,14I,14J,14K,14L

15C*,15D*,15E*,15F*

23A*,23B*,23C*

24A*,24B*,24C*

25A*,25B*,25C*

Pb-27

DW-03

SAMPLE POSITIVE FOR ASBESTOS

APPROXIMATE SAMPLE LOCATION

01A*

01A

01A

LEAD PAINT SAMPLE LOCATIONPb-01

GENERAL SURVEY NOTES:GENERAL SURVEY NOTES:

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM)

PRESENT IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR

FUTURE RENOVATION OR DEMOLITION PROJECTS, ABATEMENT SPECIFICATIONS, ETC.

MABBETTS SURVEY WAS PERFORMED WITH LIMITATIONS INHERENT TO NON-DESTRUCTIVE

VISUAL INSPECTIONS. ANY SUSPECT MATERIAL ENCOUNTERED DURING

RENOVATION/DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD BE

ASSUMED TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE. BASE PLAN OBTAINED

FROM WESTON & SAMPSON ENGINEERS, INC., MACHINE/CENTRAL TOOL SHOPS

MODERNIZATION (3RD INCREMENT) SECOND FLOOR PLAN DATED 14 OCTOBER 1980 AND

RECEIVED MAY 2023.

2. SURVEY COMPLETED JUNE 26, 2023 THROUGH JUNE 28, 2023 BY MABBETT & ASSOCIATES,

INC.

DUST WIPE SAMPLE LOCATIONDW-01

RBM-2

S E

C O

O

G

U L

A T

I L

D I N

G

M

A T

E R

I A

L S

S A

M P

L I N

G

L

O C

A T

I O

N

P

L A

N

M F

D

D J A

M F

D

K M

D

- C

A T

E G

O R

Y

C

O D

E

F I L E

N A

M E

R B

M D

W G

S c i e n t i s t s

I

E n g i n e e r o g r n a g e r s

M a b b e t s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

P R

O J E

S O

L I C

I T

A T

I O

N

N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

I L D

I N

G

P O

R T

S M

O U

V

A L

S

H I P

Y A

R D

K I T

T E

I N

E

M A

Y

-C A

T E

G O

D

E

R

DW-11

Pb-21 Pb-22

10B,11B

08B

09C,12B

10C,11C

Pb-23 Pb-24

08C,12C Pb-25

Pb-26

DW-1310A,11A

13A

08A

13B

09B,12B

13C

SAMPLE POSITIVE FOR ASBESTOS

APPROXIMATE SAMPLE LOCATION

01A*

01A

01A

LEAD PAINT SAMPLE LOCATIONPb-01

GENERAL SURVEY NOTES:GENERAL SURVEY NOTES:

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL (ACM)

PRESENT IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR IDENTIFYING ACM FOR

FUTURE RENOVATION OR DEMOLITION PROJECTS, ABATEMENT SPECIFICATIONS, ETC.

MABBETTS SURVEY WAS PERFORMED WITH LIMITATIONS INHERENT TO NON-DESTRUCTIVE

VISUAL INSPECTIONS. ANY SUSPECT MATERIAL ENCOUNTERED DURING

RENOVATION/DEMOLITION THAT IS NOT IDENTIFIED AS BEING NON-ACM SHOULD BE

ASSUMED TO BE ACM UNLESS SAMPLE RESULTS PROVE OTHERWISE. BASE PLAN OBTAINED

FROM WESTON & SAMPSON ENGINEERS, INC., MACHINE/CENTRAL TOOL SHOPS

MODERNIZATION (3RD INCREMENT) SECOND FLOOR PLAN DATED 14 OCTOBER 1980 AND

RECEIVED MAY 2023.

2. SURVEY COMPLETED JUNE 26, 2023 THROUGH JUNE 28, 2023 BY MABBETT & ASSOCIATES,

INC.

DUST WIPE SAMPLE LOCATIONDW-01

RBM-3

S E

C O

O

G

U L

A T

I L

D I N

G

M

A T

E R

I A

L S

S A

M P

L I N

G

L

O C

A T

I O

N

P

L A

N

M F

D

D J A

M F

D

K M

D

- C

A T

E G

O R

Y

C

O D

E

F I L E

N A

M E

R B

M D

W G

S c i e n t i s t s

I

E n g i n e e r o g r n a g e r s

M a b b e t s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

P R

O J E

S O

L I C

I T

A T

I O

N

N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

I L D

I N

G

P O

R T

S M

O U

V

A L

S

H I P

Y A

R D

K I T

T E

I N

E

M A

Y

-C A

T E

G O

D

E

R

DW12

SAMPLE POSITIVE FOR ASBESTOS

APPROXIMATE SAMPLE LOCATION

01A*

01A

01A

LEAD PAINT SAMPLE LOCATIONPb-01

GENERAL SURVEY NOTES:GENERAL SURVEY NOTES:

1. DRAWINGS DO NOT CLAIM TO IDENTIFY ALL THE ASBESTOS CONTAINING MATERIAL

(ACM) PRESENT IN THE BUILDING AND SHOULD NOT BE THE SOLE BASIS FOR

IDENTIFYING ACM FOR FUTURE RENOVATION OR DEMOLITION PROJECTS,

ABATEMENT SPECIFICATIONS, ETC. MABBETTS SURVEY WAS PERFORMED WITH

LIMITATIONS INHERENT TO NON-DESTRUCTIVE VISUAL INSPECTIONS. ANY SUSPECT

MATERIAL ENCOUNTERED DURING RENOVATION/DEMOLITION THAT IS NOT

IDENTIFIED AS BEING NON-ACM SHOULD BE ASSUMED TO BE ACM UNLESS SAMPLE

RESULTS PROVE OTHERWISE. BASE PLAN OBTAINED FROM WESTON & SAMPSON

ENGINEERS, INC., ROOF REPLACEMENT BUILDING 300 - AS-BUILT, PW # 300-06-624

AND RECEIVED MAY 2023.

2. SURVEY COMPLETED JUNE 26, 2023 THROUGH JUNE 28, 2023 BY MABBETT &

ASSOCIATES, INC.

RBM-4

R O

G

U L

A T

I L

D I N

G

M

A T

E R

I A

L S

S A

M P

L I N

G

L

O C

A T

I O

N

P

L A

N

M F

D

D J A

M F

D

K M

D

- C

A T

E G

O R

Y

C

O D

E

F I L E

N A

M E

R B

M D

W G

S c i e n t i s t s

I

E n g i n e e r o g r n a g e r s

M a b b e t s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

SHEET ID

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

S U

B M

I T

T E

D

B

Y

S I Z

E

C H

E C

K E

D

B

Y

A N

S I

D

I S

S U

E

D

A T

E

P R

O J E

S O

L I C

I T

A T

I O

N

N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R I P

T I O

N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

B U

I L D

I N

G

P O

R T

S M

O U

V

A L

S

H I P

Y A

R D

K I T

T E

I N

E

J U

-C A

T E

G O

D

E

R

01A

02A 01C 02C 01B

02B

02G

01G

01F02F02E

01E

01D

02D

© 2024, Mabbett & Associates, Inc. APPENDIX A September 11, 2024

APPENDIX A

ACM Bulk Sample Results

Appendix A Asbestos Containing Material Bulk Sample Results

B300 Roof and HVAC Repair Kittery, ME

Sample No.

Sample Location Description of Material Percent and Type of Asbestos

01A Roof Northwest Roof Field Cut NAD

01B Roof Northeast Roof Field Cut NAD

01C Roof North Center Roof Field Cut NAD

01D Roof West Center Roof Field Cut NAD

01E Roof Southwest Roof Field Cut NAD

01F Roof South Center Roof Field Cut NAD

01G Roof Southeast Roof Field Cut NAD

02A Roof Northwest Black Flashing NAD

02B Roof Northeast Black Flashing NAD

02C Roof North Center Black Flashing NAD

02D Roof West Center Black Flashing NAD

02E Roof Southwest Black Flashing NAD

02F Roof South Center Black Flashing NAD

02G Roof Southeast Black Flashing NAD

03A Center Catwalk HV6 Gray Sealant 5% Chrysotile

03B Center Catwalk HV8 Gray Sealant NAD

03C Center Catwalk HV9 Gray Sealant 5% Chrysotile

04A Center Catwalk HV5 Black Flex Connector NAD

04B Center Catwalk HV7 Black Flex Connector NAD

04C Center Catwalk HV8 Black Flex Connector NAD

04D Catwalk HV3 Black Flex Connector NAD

04E Catwalk HV4 Black Flex Connector NAD

05A Duct Above Catwalk Bay Door 2 Red Sealant NAD

05B Catwalk HV3 Red Sealant NAD

05C Catwalk HV5 Red Sealant NAD

06A Catwalk HV3 Stick Pin Adhesive 30% Chrysotile

06B Catwalk HV4 Stick Pin Adhesive 30% Chrysotile

06C Catwalk HV5 Stick Pin Adhesive 30% Chrysotile

07A 1st Floor Bathroom Brown Sealant NAD

07B 1st Floor Bathroom Brown Sealant NAD

07C 1st Floor Bathroom Brown Sealant NAD

08A 2nd Floor Main Office Gray Sealant NAD

08B 2nd Floor Vending Area Gray Sealant NAD

08C 2nd Floor Break Room Gray Sealant NAD

09A Mezzanine Office 2' x 4' White Ceiling Tile Fissured NAD

Appendix A Asbestos Containing Material Bulk Sample Results

B300 Roof and HVAC Repair Kittery, ME

Sample No.

Sample Location Description of Material Percent and Type of Asbestos

09B Hall by Stairs at Mezzanine 2' x 4' White Ceiling Tile Fissured NAD

09C 2nd Floor Hallway East 2' x 4' White Ceiling Tile Fissured NAD

10A 2nd Floor Main Office Gypsum Wallboard NAD

10B 2nd Floor Vending Area Gypsum Wallboard NAD

10C 2nd Floor Hall by Shop Area Gypsum Wallboard NAD

11A Main Office Joint Compound NAD

11B 2nd Floor Vending Area Joint Compound NAD

11C 2nd Floor Hall by Shop Area Joint Compound NAD

12A 1st Floor Column B10 Sprinkler Pipe Thread Sealant NAD

12B 2nd Floor Hall at Main Office Sprinkler Pipe Thread Sealant NAD

12C 2nd Floor Break Room Sprinkler Pipe Thread Sealant NAD

12D 2nd Floor Hall at Shop Sprinkler Pipe Thread Sealant NAD

12E Catwalk West Side Sprinkler Pipe Thread Sealant NAD

13A 2nd Floor Main Office 2' x 4' White Ceiling Tile Fissured

NAD

13B 2nd Floor Main Office 2' x 4' White Ceiling Tile Fissured

NAD

13C 2nd Floor Main Office 2' x 4' White Ceiling Tile Fissured

NAD

14A Bay 2, DH1 (North) Flex Connector NAD

14B Bay 2, DH2 (South) Flex Connector NAD

14C Bay 3, DH3 (West) Flex Connector NAD

14D Bay 2, HV1 (West) Flex Connector NAD

14E Bay 2, HV2 (North) Flex Connector NAD

14F Bay 2, HV3 (South) Flex Connector NAD

14G Bay 2, HV4 (North) Flex Connector NAD

14H Bay 3, HV5 Flex Connector NAD

14I Bay 3, HV6 Flex Connector NAD

14J Bay 3, HV7 Flex Connector NAD

14K Bay 3, HV8 Flex Connector NAD

14L Bay 3, HV9 Flex Connector NAD

15A Bay 2, HV1 (South) Stick Pin Adhesive 27% Chrysotile

15B Bay 2, HV2 (Southwest) Stick Pin Adhesive 32.55% Chrysotile

15C Bay 3, HV6 Stick Pin Adhesive .68% Anthophyllite

15D Bay 3, HV7 (North) Stick Pin Adhesive .67% Anthophyllite

15E Bay 3, HV8 Stick Pin Adhesive .65% Anthophyllite

15F Bay 3, HV9 (North) Stick Pin Adhesive .68% Anthophyllite

Appendix A Asbestos Containing Material Bulk Sample Results

B300 Roof and HVAC Repair Kittery, ME

Sample No.

Sample Location Description of Material Percent and Type of Asbestos

16A Ba 2, DH1 (North) Red Sealant NAD

16B Bay 2, DH1 (North) Red Sealant NAD

16C Bay2, DH1 (North) Red Sealant NAD

17A Bay 2, DH2 (North) Red Sealant NAD

17B Bay 2, DH2 (South) Red Sealant NAD

17C Bay 2, DH2 (North) Red Sealant NAD

18A Bay 3, DH3 (North) Red Sealant 3.13% Chrysotile

18B Bay 3, DH3 (South) Red Sealant 2.90% Chrysotile

18C Bay 3, DH3 (South) Red Sealant 1.61% Chrysotile

19A Bay 2, HV1 (North) Red Sealant NAD

19B Bay 2, HV1 (South) Red Sealant NAD

19C Bay 2, HV1 (West) Red Sealant NAD

20A Bay 2, HV2 (North) Red Sealant NAD

20B Bay 2, HV2 (South) Red Sealant NAD

20C Bay 2, HV2 (West) Red Sealant NAD

21A Bay 2, HV3 (North) Red Sealant NAD

21B Bay 2, HV3 (South) Red Sealant NAD

21C Bay 2. HV3 (West) Red Sealant NAD

22A Bay 2, HV4 (North) Red Sealant NAD

22B Bay 2, HV4 (South) Red Sealant NAD

22C Bay 2, HV4 (West) Red Sealant NAD

23A Bay 3, HV5 (North) Red Sealant 1.29% Chrysotile

23B Bay 3, HV5 (South) Red Sealant 1.87% Chrysotile

23C Bay 3, HV5 (West) Red Sealant 1.95% Chrysotile

24A Bay 3, HV7 (North) Gray Sealant .60% Chrysotile

24B Bay 3, HV7 (North) Gray Sealant .86% Chrysotile

24C Bay 3, HV7 (South) Gray Sealant 1.63% Chrysotile

25A Bay 3, HV8 (North) Gray Sealant 1.22% Chrysotile

25B Bay 3, HV8 (South) Gray Sealant .78% Chrysotile

25C Bay 3, HV8 (West) Gray Sealant .70% Chrysotile

Notes: NAD = No Asbestos Detected

© 2024, Mabbett & Associates, Inc. APPENDIX B September 11, 2024

APPENDIX B

Summary of ACM Sampling Results (Example of title for Appendix)

© 2024, Mabbett & Associates, Inc. APPENDIX C September 11, 2024

APPENDIX C

Paint Chip Laboratory Report and Chain of Custody Documentation

Analysis for Metals Concentration in Bulk Solids by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .