Attachment A2 - PNSY B300 Roof and HVAC Repairs - Specifications.pdf
PDF 16 MB Posted
- Solicitation number
- N4008526R0029
About this file
This is a comprehensive specification document for Building 300 Roof and HVAC Repair at Portsmouth Naval Shipyard, a manufacturing and machining facility requiring extensive system replacement and renovation. The project scope includes removal and replacement of the existing ballasted membrane roof with a fully adhered 0.080 TPO roof membrane assembly; demolition and replacement of HVAC systems installed between 1979-1984 that contain RCRA 8 metal deposits; replacement of the steam-to-hot-water plant with new unit heaters and dedicated outdoor air systems with destratification fans; complete removal and replacement of fire alarm, mass notification, and sprinkler systems; replacement of the existing 2500 kVA main service transformer, 15 kV service switch, and 480V switchgear; and associated utility work including electrical distribution, sanitary sewerage installation, and site restoration. Hazardous material abatement including asbestos remediation and RCRA 8 dust containment is required throughout the project.
The specifications establish comprehensive administrative and technical requirements including: cost-loaded network analysis schedules with monthly updates, earned value reporting, detailed quality control procedures with defined definable features of work, a comprehensive accident prevention plan with site safety and health officer requirements, facility/utility/service outage coordination with 15-calendar-day advance notice, extensive environmental controls including indoor air quality management and 60-percent construction waste diversion from landfills, critical infrastructure risk analysis for work near shipyard facilities, work sequencing phased by half-bay increments with Government-provided escorts required, operation and maintenance manuals with training requirements, record drawings and as-built documentation, and warranty management extending through a one-year construction warranty period plus manufacturer-specific extended warranties. Work is restricted to specific hours (11 PM to 7 AM weekdays, 7 AM Saturday to 11 PM Sunday with bay-specific variations), must maintain all building utilities to the occupied facility, and requires compliance with Portsmouth Naval Shipyard regulations including DBIDS credentialing, radiological controls, fire prevention protocols, and security requirements.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO.
At the
PREPARED BY:
Architectural: Mechanical:
Civil: Electrical:
Structural:
APPROVED BY:
For Commander, NAVFAC:
Date:
Submitted By: Date:
B300 Roof and HVAC Repair Delivery Order #: N40085-23-F-5097
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 22 02/24 SUMMARY OF WORK (PWD ME)
01 14 00.00 22 11/22, CHG 3: 08/24 WORK RESTRICTIONS (PWD ME)
01 20 00.00 22 11/20, CHG 4: 08/24 PRICE AND PAYMENT PROCEDURES (PWD ME)
01 30 00.00 22 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS (PWD ME)
01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 11/23, CHG 1: 08/24 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 10 02/24 SUBSTITUTIONS
01 35 26.00 22 05/24 GOVERNMENTAL SAFETY REQUIREMENTS (PWD
ME)
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 44 00.00 22 10/23 ARCHAEOLOGICAL MONITORING (PWD ME)
01 45 00.00 22 08/23, CHG 1: 05/24 QUALITY CONTROL (PWD ME)
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00.00 22 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS (PWD ME)
01 57 19.00 22 08/22 TEMPORARY ENVIRONMENTAL CONTROLS -
PORTSMOUTH NAVAL SHIPYARD (PWD ME)
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00.00 22 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS (PWD ME)
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 22 05/23, CHG 1: 11/23 ELECTRONIC OPERATION AND MAINTENANCE
SUPPORT INFORMATION (eOMSI) FACILITY
DATA WORKBOOK (FDW)
01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION AND DECONSTRUCTION
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00.00 22 09/21 ASBESTOS REMEDIATION (PNS PROJECTS)
02 83 00.00 22 09/21 MANAGEMENT OF LEAD, CADMIUM, AND
CHROMIUM DURING RENOVATION,
DEMOLITION, REMOVAL, AND ABATEMENT
(PNS PROJECTS)
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 11/22 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 2: 05/21 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
PROJECT TABLE OF CONTENTS Page 1
05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 16 08/23 MINERAL FIBER BLANKET INSULATION
07 54 23 09/24 THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING
07 60 00 08/23 FLASHING AND SHEET METAL
07 72 00 12/24 ROOF ACCESSORIES
07 84 00.00 22 07/24 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 91 00 08/20 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 08/20 INTERIOR SIGNAGE
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 10 06/24 MODULAR BREAKROOM
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND
SEISMIC CONTROL
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 05/22 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
PROJECT TABLE OF CONTENTS Page 2
23 05 15 05/22 COMMON PIPING FOR HVAC
23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00.00 20 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 09 53.00 20 02/10, CHG 2: 08/17 SPACE TEMPERATURE CONTROL SYSTEMS
23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
23 21 23 08/17 HYDRONIC PUMPS
23 22 26.00 20 02/10, CHG 1: 05/15 STEAM SYSTEM AND TERMINAL UNITS
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 54 19 08/21 BUILDING HEATING SYSTEMS, WARM AIR
23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER
WATER PIPING SYSTEMS
23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS
23 73 13.00 40 05/17 MODULAR OUTDOOR CENTRAL-STATION
AIR-HANDLING UNITS
23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 05 11.02 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR
FACILITY-RELATED CONTROL SYSTEMS
25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 11 16 11/21 SECONDARY UNIT SUBSTATIONS
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 23 00 02/24 LOW-VOLTAGE SWITCHGEAR
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
PROJECT TABLE OF CONTENTS Page 3
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00.00 22 08/2024 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 13.62 11/23 BITUMINOUS SURFACE TREATMENT
32 11 23 05/22 AGGREGATE BASE COURSE AND GRADED
CRUSHED AGGREGATE BASE COURSE FOR
FLEXIBLE PAVING
32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
DIVISION 33 - UTILITIES
33 30 00 05/18 SANITARY SEWERAGE
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
DIVISION 40 - PROCESS INTERCONNECTIONS
40 17 26.00 20 04/06 WELDING PRESSURE PIPING
40 17 30.00 40 02/23 WELDING GENERAL PIPING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11, CHG 1: 08/14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING NO. NAVFAC DWG NO. TITLE
G-001 12919653 COVER SHEET
G-002 12919654 DRAWING LIST 1 OF 2
G-003 12919655 DRAWING LIST 2 OF 2
G-004 12919656 OVERALL BID OPTIONS KEY PLAN FIRST FLOOR
G-005 12919657 OVERALL BID OPTIONS KEY PLAN SECOND FLOOR
G-006 12919658 GENERAL CONSTRUCTABILITY NOTES
G-101 12919659 CODE SUMMARY & GENERAL PROJECT NOTES
G-102 12919660 LIFE SAFETY PLANS 1
G-103 12919661 LIFE SAFETY PLANS 2
G-104 12919662 LIFE SAFETY PLANS 3
GC101 12919663 LAYDOWN AREA SITE PLAN
HA101 12919664 FIRST FLOOR ABATEMENT PLAN
HA103 12919665 MECHANICAL PLATFORM ABATEMENT PLAN
HA104 12919666 ROOF ABATEMENT PLAN
C-100 12919667 FIRE PUMP ROOM UTILITIES PLAN AND PROFILE
C-500 12919668 CIVIL DETAILS
S-001 12919669 GENERAL STRUCTURAL NOTES
S-002 12919670 TYPICAL DETAILS PART 1 OF 2
S-003 12919671 TYPICAL DETAILS PART 2 OF 2
S-100 12919672 FLOOR SLAB PLAN
DOCUMENT 00 01 15 Page 1
DRAWING NO. NAVFAC DWG NO. TITLE
S-104 12919673 OVERALL ROOF FRAMING PLAN
S-111 12919674 BAY 2 WEST ROOF FRAMING PLAN
S-112 12919675 BAY 2 EAST ROOF FRAMING PLAN
S-113 12919676 BAY 3 WEST ROOF FRAMING PLAN
S-114 12919677 BAY 4 WEST ROOF FRAMING PLAN
S-115 12919678 BAY 4 EAST ROOF FRAMING PLAN
S-116 12919679 BAY 5 WEST ROOF FRAMING PLAN
S-117 12919680 BAY 5 EAST ROOF FRAMING PLAN
S-120 12919681 TRUSS REINFORCING DETAILS PART 1 OF 2
S-121 12919682 TRUSS REINFORCING DETAILS PART 2 OF 2
S-122 12919683 ROOFTOP UNIT SUPPORT DETAILS
S-130 12919684 FIRE PUMP ROOM PLANS
S-131 12919685 FIRE PUMP ROOM SECTIONS & DETAILS PART 1 OF 3
S-132 12919686 FIRE PUMP ROOM SECTIONS & DETAILS PART 2 OF 3
S-133 12919687 FIRE PUMP ROOM SECTIONS & DETAILS PART 3 OF 3
S-201 12919688 WEST FRAME ELEVATION
S-301 12919689 STEEL SECTIONS & DETAILS
AD001 12919690 DEMOLITION NOTES
AD105 12919691 DEMOLITION OVERALL ROOF PLAN
AD110 12919692 DEMOLITION FIRST FLOOR PLAN BAY 1 WEST
AD112 12919693 DEMOLITION FIRST FLOOR PLAN BAY 2 WEST
AD119 12919694 DEMOLITION FIRST FLOOR PLAN BAY 5 EAST
AD128 12919695 DEMOLITION SECOND FLOOR PLAN BAY 5 WEST
AD129 12919696 DEMOLITION SECOND FLOOR PLAN BAY 5 EAST
AD140 12919697 DEMOLITION ROOF PLAN BAY 1 WEST
AD141 12919698 DEMOLITION ROOF PLAN BAY 1 EAST
AD142 12919699 DEMOLITION ROOF PLAN BAY 2 WEST
AD143 12919700 DEMOLITION ROOF PLAN BAY 2 EAST
AD144 12919701 DEMOLITION ROOF PLAN BAY 3 WEST
AD145 12919702 DEMOLITION ROOF PLAN BAY 3 EAST
DOCUMENT 00 01 15 Page 2
DRAWING NO. NAVFAC DWG NO. TITLE
AD146 12919703 DEMOLITION ROOF PLAN BAY 4 WEST
AD147 12919704 DEMOLITION ROOF PLAN BAY 4 EAST
AD148 12919705 DEMOLITION ROOF PLAN BAY 5 WEST
AD149 12919706 DEMOLITION ROOF PLAN BAY 5 EAST
AD166 12919707 DEMOLITION REFLECTED CEILING PLAN 2ND FLOOR
MEZZANINE BAY 4 WEST
AD168 12919708 DEMOLITION REFLECTED CEILING PLAN 2ND FLOOR BAY 5
WEST & EAST
AD201 12919709 DEMOLITION OVERALL ELEVATIONS
A-001 12919710 ABBREVIATIONS & SYMBOLS
A-002 12919711 GENERAL NOTES & LEGENDS
A-003 12919712 PARTITION, CEILING & ROOF TYPES
A-004 12919713 OVERALL KEY PLAN
A-005 12919714 ARCHITECTURAL FIRST FLOOR PHASING PLAN
A-006 12919715 ARCHITECTURAL SECOND FLOOR PHASING PLAN
A-007 12919716 ARCHITECTURAL FIRST FLOOR RIGGING PLAN
A-008 12919717 ARCHITECTURAL SECOND FLOOR RIGGING PLAN
A-107 12919718 OVERALL ROOF PLAN
A-110 12919719 FIRST FLOOR PLAN BAY 1 WEST
A-112 12919720 FIRST FLOOR PLAN BAY 2 WEST
A-114 12919721 FIRE FLOOR PLAN BAY 3 WEST
A-119 12919722 FIRST FLOOR PLAN BAY 5 EAST
A-128 12919723 SECOND FLOOR PLAN BAY 5 WEST
A-129 12919724 SECOND FLOOR PLAN BY 5 EAST
A-140 12919725 ROOF PLAN BAY 1 WEST
A-141 12919726 ROOF PLAN BAY 1 EAST
A-142 12919727 ROOF PLAN BAY 2 WEST
A-143 12919728 ROOF PLAN BAY 2 EAST
A-144 12919729 ROOF PLAN BAY 3 WEST
A-145 12919730 ROOF PLAN BAY 3 EAST
A-146 12919731 ROOF PLAN BAY 4 WEST
DOCUMENT 00 01 15 Page 3
DRAWING NO. NAVFAC DWG NO. TITLE
A-147 12919732 ROOF PLAN BAY 4 EAST
A-148 12919733 ROOF PLAN BAY 5 WEST
A-149 12919734 ROOF PLAN BAY 5 EAST
A-166 12919735 REFLECTED CEILING PLAN 2ND FLOOR MEZZANINE BAY 4 WEST
A-168 12919736 REFLECTED CEILING PLAN 2ND FLOOR BAY 5 WEST & EAST
A-201 12919737 OVERALL ELEVATIONS
A-231 12919738 3D VIEWS
A-401 12919739 PARTIAL PLANS AT FIRE PUMP ROOM - BAY 1 WEST
A-402 12919740 PARTIAL PLANS AT MODULAR OFFICE - BAY 1 WEST
A-403 12919741 PARTIAL PLANS AT MODULAR OFFICE - BAY 2 WEST
A-501 12919742 DETAILS
A-502 12919743 DETAILS
A-503 12919744 DETAILS
A-521 12919745 ROOF DETAILS
A-522 12919746 ROOF DETAILS
A-523 12919747 ROOF DETAILS
A-524 12919748 ROOF DETAILS
A-801 12919749 DOOR & FINISH SCHEDULE AND DETAILS
FA001 12919750 FIRE ALARM GENERAL NOTES AND LEGEND
FA002 12919751 FIRE ALARM AND MASS NOTIFICATION LIFT ACCESS ZONES
FA003 12919752 FIRE ALARM AND MASS NOTIFICATION LIFT ACCESS ZONES -
LEVEL 2
FD101 12919753 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 1 WEST - DEMOLITION
FD102 12919754 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 1 EAST - DEMOLITION
FD103 12919755 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 2 WEST - DEMOLITION
FD104 12919756 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 2 EAST - DEMOLITION
FD105 12919757 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 3 WEST - DEMOLITION
FD106 12919758 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 3 EAST - DEMOLITION
FD107 12919759 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 4 WEST - DEMOLITION
FD108 12919760 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 4 EAST - DEMOLITION
DOCUMENT 00 01 15 Page 4
DRAWING NO. NAVFAC DWG NO. TITLE
FD109 12919761 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 5 WEST - DEMOLITION
FD110 12919762 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 5 EAST - DEMOLITION
FD111 12919763 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE
BAY 3 EAST - DEMOLITION
FD112 12919764 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE
BAY 4 WEST - DEMOLITION
FD113 12919765 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 3 WEST - DEMOLITION
FD114 12919766 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 3 EAST - DEMOLITION
FD115 12919767 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 4 WEST - DEMOLITION
FD116 12919768 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 4 EAST - DEMOLITION
FD117 12919769 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 5 WEST - DEMOLITION
FD118 12919770 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 5 EAST - DEMOLITION
FD119 12919771 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
MEZZANINE - BAY 4 WEST - DEMOLITION
FD120 12919772 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
MEZZANINE - BAY 5 WEST - DEMOLITION
FD121 12919773 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 WEST -
DEMOLITION
FD122 12919774 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 EAST -
DEMOLITION
FD123 12919775 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 WEST -
DEMOLITION
FD124 12919776 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 EAST -
DEMOLITION
FD125 12919777 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 WEST -
DEMOLITION
FD126 12919778 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 EAST -
DEMOLITION
FD127 12919779 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 WEST -
DEMOLITION
FD128 12919780 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 EAST -
DEMOLITION
FD129 12919781 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 WEST -
DEMOLITION
FD130 12919782 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 EAST -
DEMOLITION
FD131 12919783 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 WEST -
DEMOLITION
FD132 12919784 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 EAST -
DEMOLITION
FA101 12919785 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 1 WEST
FA102 12919786 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 1 EAST
FA103 12919787 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 2 WEST
FA104 12919788 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 2 EAST
FA105 12919789 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 3 WEST
DOCUMENT 00 01 15 Page 5
DRAWING NO. NAVFAC DWG NO. TITLE
FA106 12919790 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 3 EAST
FA107 12919791 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 4 WEST
FA108 12919792 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 4 EAST
FA109 12919793 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 5 WEST
FA110 12919794 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR
- BAY 5 EAST
FA111 12919795 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -
BAY 1 WEST
FA112 12919796 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -
BAY 2 WEST
FA113 12919797 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -
BAY 3 WEST
FA114 12919798 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -
BAY 3 EAST
FA115 12919799 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -
BAY 4 WEST
FA116 12919800 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 4 WEST
FA117 12919801 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 4 EAST
FA118 12919802 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 5 WEST
FA119 12919803 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
- BAY 5 EAST
FA120 12919804 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR
MEZZANINE - BAY 4 WEST
FA121 12919805 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL
PENTHOUSE
FA122 12919806 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -
BAY 2 WEST
FA123 12919807 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -
BAY 2 EAST
FA124 12919808 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -
BAY 3 WEST
FA125 12919809 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -
BAY 4 EAST
FA126 12919810 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -
BAY 5 WEST
FA201 12919811 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
FIRST FLOOR - BAY 1 AND 2 EAST AND WEST
FA202 12919812 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
FIRST FLOOR - BAY 3 AND 4 EAST AND WEST
FA203 12919813 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
FIRST FLOOR - BAY 5 EAST AND WEST
FA204 12919814 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
MEZZANINE - BAY 1 AND 2 EAST AND WEST
FA205 12919815 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
MEZZANINE - BAY 3 AND 4 EAST AND WEST
FA206 12919816 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
SECOND FLOOR - BAY 3, 4 AND 6 EAST AND WEST
FA207 12919817 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
SECOND FLOOR - BAY 5 EAST AND WEST
FA208 12919818 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -
THIRD FLOOR - ROOF LEVEL PENTHOUSE
DOCUMENT 00 01 15 Page 6
DRAWING NO. NAVFAC DWG NO. TITLE
FA401 12919819 FIRE ALARM AND MASS NOTIFICATION PLAN - ENLARGED
FIRE PUMP ROOM
FA501 12919820 FIRE ALARM DETAILS
FA601 12919821 FIRE ALARM SCHEDULES AND DIAGRAMS
FA602 12919822 FIRE ALARM SCHEDULES AND DIAGRAMS
FX001 12919823 FIRE SUPPRESSION GENERAL NOTES
FX002 12919824 FIRE SUPPRESSION SMBOLS & ABBREVIATIONS
FX003 12919825 FIRE PROTECTION LIFT ACCESS ZONES
FX004 12919826 FIRE PROTECTION LIFT ACCESS ZONES - LEVEL 2
FX005 12919827 FIRE SUPPRESSION ZONE PLAN
FX006 12919828 FIRE SUPPRESSION PHASE PLAN - LEVEL 2
FX007 12919829 FIRE SUPPRESSION PHASE PLAN - LEVEL 1
FX101 12919830 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 WEST
FX102 12919831 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 EAST
FX103 12919832 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 WEST
FX104 12919833 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 EAST
FX105 12919834 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 WEST
FX106 12919835 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 EAST
FX107 12919836 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 WEST
FX108 12919837 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 EAST
FX109 12919838 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 WEST
FX110 12919839 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 EAST
FX111 12919840 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 1 WEST
FX112 12919841 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 2 WEST
FX113 12919842 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 3 WEST
FX114 12919843 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 3 EAST
FX115 12919844 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 4 WEST
FX116 12919845 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 5 EAST
FX117 12919846 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 1 WEST
FX118 12919847 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 1 EAST
DOCUMENT 00 01 15 Page 7
DRAWING NO. NAVFAC DWG NO. TITLE
FX119 12919848 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 2 WEST
FX120 12919849 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 2 EAST
FX121 12919850 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 3 WEST
FX122 12919851 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 3 EAST
FX123 12919852 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 4 WEST
FX124 12919853 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 4 EAST
FX125 12919854 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 WEST
FX126 12919855 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 EAST
FX127 12919856 FIRE SUPPRESSION PLAN - SECOND FLOOR MEZZANINE - BAY
4 WEST
FX128 12919857 FIRE SUPPRESSION PLAN - ROOF LEVEL PENTHOUSE
FX401 12919858 FIRE PROTECTION - ENLARGED PLANS
FX402 12919859 FIRE PROTECTION - ENLARGED PLANS
FX403 12919860 FIRE SUPPRESSION STORAGE CALCULATION
FX501 12919861 FIRE PROTECTION DETAILS
M-001 12919862 LEGENDS, NOTES, AND ABBREVIATIONS
M-002 12919863 LEGENDS, NOTES, AND ABBREVIATIONS
M-003 12919864 OVERALL KEY PLAN
M-101 12919865 PHASING PLAN - PHASE A
M-102 12919866 PHASING PLAN - PHASE B
M-103 12919867 PHASING PLAN - PHASE C
M-104 12919868 PHASING PLAN - PHASE D
M-105 12919869 PHASING PLAN - PHASE E
M-106 12919870 PHASING PLAN - PHASE F
M-107 12919871 PHASING PLAN - PHASE G
M-108 12919872 PHASING PLAN - PHASE H AND I
M-109 12919873 PHASING PLAN - PHASE J
M-201 12919874 RIGGING PLAN - FIRST FLOOR
M-202 12919875 RIGGING PLAN - SECOND FLOOR
MD110 12919876 FIRST FLOOR DEMO PLAN BAY 1 WEST
DOCUMENT 00 01 15 Page 8
DRAWING NO. NAVFAC DWG NO. TITLE
MD111 12919877 FIRST FLOOR DEMO PLAN BAY 1 EAST
MD112 12919878 FIRST FLOOR DEMO PLAN BAY 2 WEST
MD113 12919879 FIRST FLOOR DEMO PLAN BAY 2 EAST
MD114 12919880 FIRST FLOOR DEMO PLAN BAY 3 WEST
MD115 12919881 FIRST FLOOR DEMO PLAN BAY 3 EAST
MD116 12919882 FIRST FLOOR DEMO PLAN BAY 4 WEST
MD117 12919883 FIRST FLOOR DEMO PLAN BAY 4 EAST
MD118 12919884 FIRST FLOOR DEMO PLAN BAY 5 WEST
MD119 12919885 FIRST FLOOR DEMO PLAN BAY 5 EAST
MD120 12919886 SECOND FLOOR DEMO PLAN BAY 1 WEST
MD121 12919887 SECOND FLOOR DEMO PLAN BAY 1 EAST
MD122 12919888 SECOND FLOOR DEMO PLAN BAY 2 WEST
MD123 12919889 SECOND FLOOR DEMO PLAN BAY 2 EAST
MD124 12919890 SECOND FLOOR DEMO PLAN BAY 3 WEST
MD125 12919891 SECOND FLOOR DEMO PLAN BAY 3 EAST
MD126 12919892 SECOND FLOOR DEMO PLAN BAY 4 WEST
MD127 12919893 SECOND FLOOR DEMO PLAN BAY 4 EAST
MD128 12919894 SECOND FLOOR DEMO PLAN BAY 5 WEST
MD129 12919895 SECOND FLOOR DEMO PLAN BAY 5 EAST
MD140 12919896 ROOF DEMO PLAN BAY 1 WEST
MD141 12919897 ROOF DEMO PLAN BAY 1 EAST
MD142 12919898 ROOF DEMO PLAN BAY 2 WEST
MD143 12919899 ROOF DEMO PLAN BAY 2 EAST
MD144 12919900 ROOF DEMO PLAN BAY 3 WEST
MD145 12919901 ROOF DEMO PLAN BAY 3 EAST
MD146 12919902 ROOF DEMO PLAN BAY 4 WEST
MD147 12919903 ROOF DEMO PLAN BAY 4 EAST
MD148 12919904 ROOF DEMO PLAN BAY 5 WEST
MD149 12919905 ROOF DEMO PLAN BAY 5 EAST
DOCUMENT 00 01 15 Page 9
DRAWING NO. NAVFAC DWG NO. TITLE
MH110 12919906 FIRST FLOOR PLAN BAY 1 WEST
MH111 12919907 FIRST FLOOR PLAN BAY 1 EAST
MH112 12919908 FIRST FLOOR PLAN BAY 2 WEST
MH113 12919909 FIRST FLOOR PLAN BAY 2 EAST
MH114 12919910 FIRST FLOOR PLAN BAY 3 WEST
MH115 12919911 FIRST FLOOR PLAN BAY 3 EAST
MH116 12919912 FIRST FLOOR PLAN BAY 4 WEST
MH117 12919913 FIRST FLOOR PLAN BAY 4 EAST
MH118 12919914 FIRST FLOOR PLAN BAY 5 WEST
MH119 12919915 FIRST FLOOR PLAN BAY 5 EAST
MH120 12919916 SECOND FLOOR PLAN BAY 1 WEST
MH121 12919917 SECOND FLOOR PLAN BAY 1 WEST
MH122 12919918 SECOND FLOOR PLAN BAY 1 EAST
MH123 12919919 SECOND FLOOR PLAN BAY 2 WEST
MH124 12919920 SECOND FLOOR PLAN BAY 2 EAST
MH125 12919921 SECOND FLOOR PLAN BAY 3 WEST
MH126 12919922 SECOND FLOOR PLAN BAY 3 EAST
MH127 12919923 SECOND FLOOR PLAN BAY 4 EAST
MH128 12919924 SECOND FLOOR PLAN BAY 5 WEST
MH129 12919925 SECOND FLOOR PLAN BAY 5 EAST
MH140 12919926 ROOF PLAN - BAY 1 WEST
MH141 12919927 ROOF PLAN - BAY 1 EAST
MH142 12919928 ROOF PLAN - BAY 2 WEST
MH143 12919929 ROOF PLAN - BAY 2 EAST
MH144 12919930 ROOF PLAN - BAY 3 WEST
MH145 12919931 ROOF PLAN - BAY 3 EAST
MH146 12919932 ROOF PLAN BAY 4 WEST
MH147 12919933 ROOF PLAN BAY 4 EAST
MH148 12919934 ROOF PLAN BAY 5 WEST
DOCUMENT 00 01 15 Page 10
DRAWING NO. NAVFAC DWG NO. TITLE
MH149 12919935 ROOF PLAN BAY 5 EAST
MH201 12919936 ARU ELEVATIONS
MH202 12919937 ARU ELEVATIONS
MP110 12919938 FIRST FLOOR PLAN BAY 1 WEST
MP111 12919939 FIRST FLOOR PLAN BAY 1 EAST
MP112 12919940 FIRST FLOOR PLAN BAY 2 WEST
MP113 12919941 FIRST FLOOR PLAN BAY 2 EAST
MP114 12919942 FIRST FLOOR PLAN BAY 3 WEST
MP115 12919943 FIRST FLOOR PLAN BAY 3 EAST
MP116 12919944 FIRST FLOOR PLAN BAY 4 WEST
MP117 12919945 FIRST FLOOR PLAN BAY 4 EAST
MP118 12919946 FIRST FLOOR PLAN BAY 5 WEST
MP119 12919947 FIRST FLOOR PLAN BAY 5 EAST
MP120 12919948 SECOND FLOOR PLAN BAY 1 WEST
MP121 12919949 SECOND FLOOR PLAN BAY 1 EAST
MP122 12919950 SECOND FLOOR PLAN BAY 2 WEST
MP123 12919951 SECOND FLOOR PLAN BAY 2 EAST
MP124 12919952 SECOND FLOOR PLAN BAY 3 WEST
MP125 12919953 SECOND FLOOR PLAN BAY 3 EAST
MP126 12919954 SECOND FLOOR PLAN BAY 4 WEST
MP127 12919955 SECOND FLOOR PLAN BAY 4 EAST
MP128 12919956 SECOND FLOOR PLAN BAY 5 WEST
MP129 12919957 SECOND FLOOR PLAN BAY 5 EAST
MP401 12919958 ENLARGED PLANS
MP402 12919959 ENLARGED PLANS
MP403 12919960 ENLARGED PLANS
M-501 12919961 DETAILS
M-502 12919962 DETAILS
M-503 12919963 DETAILS
DOCUMENT 00 01 15 Page 11
DRAWING NO. NAVFAC DWG NO. TITLE
M-504 12919964 DETAILS
M-505 12919965 DETAILS
M-506 12919966 DETAILS
M-507 12919967 DETAILS
M-508 12919968 DETAILS
M-509 12919969 DETAILS
M-600 12919970 SCHEDULES
M-601 12919971 SCHEDULES
M-602 12919972 SCHEDULES
M-603 12919973 SCHEDULES
M-604 12919974 SCHEDULES
M-605 12919975 PIPING DIAGRAMS STEAM HX
M-606 12919976 PIPING DIAGRAMS HW BAYS 1, 2, 3
M-607 12919977 PIPING DIAGRAMS HW BAYS 4 & 5
M-608 12919978 PIPING DIAGRAMS CHW BAYS 4 & 5
M-609 12919979 AIRFLOW DIAGRAMS BAYS 1, 2, 3
M-610 12919980 AIRFLOW DIAGRAMS BAYS 4 & 5
M-701 12919981 AUTOMATIC TEMPERATURE CONTROLS
M-702 12919982 AUTOMATIC TEMPERATURE CONTROLS
M-703 12919983 AUTOMATIC TEMPERATURE CONTROLS
M-704 12919984 AUTOMATIC TEMPERATURE CONTROLS
M-705 12919985 AUTOMATIC TEMPERATURE CONTROLS
M-706 12919986 AUTOMATIC TEMPERATURE CONTROLS
M-707 12919987 AUTOMATIC TEMPERATURE CONTROLS
M-708 12919988 AUTOMATIC TEMPERATURE CONTROLS
M-709 12919989 AUTOMATIC TEMPERATURE CONTROLS
M-710 12919990 AUTOMATIC TEMPERATURE CONTROLS
M-711 12919991 AUTOMATIC TEMPERATURE CONTROLS
M-712 12919992 AUTOMATIC TEMPERATURE CONTROLS
DOCUMENT 00 01 15 Page 12
DRAWING NO. NAVFAC DWG NO. TITLE
M-713 12919993 AUTOMATIC TEMPERATURE CONTROLS
E-001 12919994 LEGENDS, GENERAL NOTES, AND ABBREVIATIONS
ED101 12919995 OVERALL FIRST FLOOR DEMO PLAN
ED102 12919996 OVERALL SECOND FLOOR DEMO PLAN
ED103 12919997 OVERALL MECH PLATFORM DEMO PLAN
ED104 12919998 OVERALL ROOF DEMO PLAN
ED105 12919999 OUTSIDE CABLE DEMOLITION PLAN
ED110 12920000 LARGE SCALE DEMO PLAN FLOOR 1 BAY 1 WEST
ED111 12920001 LARGE SCALE DEMO PLAN FLOOR 1 BAY 1 EAST
ED112 12920002 LARGE SCALE DEMO PLAN FLOOR 1 BAY 2 WEST
ED113 12920003 LARGE SCALE DEMO PLAN FLOOR 1 BAY 2 EAST
ED114 12920004 LARGE SCALE DEMO PLAN FLOOR 1 BAY 3 WEST
ED115 12920005 LARGE SCALE DEMO PLAN FLOOR 1 BAY 3 EAST
ED117 12920006 LARGE SCALE DEMO PLAN FLOOR 1 BAY 4 EAST
ED118 12920007 LARGE SCALE DEMO PLAN FLOOR 1 BAY 5 WEST
ED119 12920008 LARGE SCALE DEMO PLAN FLOOR 1 BAY 5 EAST
ED126 12920009 LARGE SCALE DEMO PLAN FLOOR 2 BAY 4 WEST
ED127 12920010 LARGE SCALE DEMO PLAN FLOOR 2 BAY 4 EAST
ED128 12920011 LARGE SCALE DEMO PLAN FLOOR 2 BAY 5 WEST
ED129 12920012 LARGE SCALE DEMO PLAN FLOOR 2 BAY 5 EAST
ED132 12920013 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 2 WEST
ED134 12920014 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 3 WEST
ED136 12920015 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 4 WEST
ED137 12920016 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 4 EAST
ED144 12920017 LARGE SCALE DEMO PLAN ROOF BAY 3 WEST
ED146 12920018 LARGE SCALE DEMO PLAN ROOF BAY 4 WEST
ED148 12920019 LARGE SCALE DEMO PLAN ROOF BAY 5 WEST
ED401 12920020 ENLARGED DEMO PLAN ROOF BAY 3 WEST
ED402 12920021 ENLARGED DEMO PLAN FLOOR 1 BAY 3 EAST - PUMP TEST
DOCUMENT 00 01 15 Page 13
DRAWING NO. NAVFAC DWG NO. TITLE
ED600 12920022 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 1 OF 6
ED601 12920023 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 2 OF 6
ED602 12920024 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 3 OF 6
ED603 12920025 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 4 OF 6
ED604 12920026 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 5 OF 6
ED605 12920027 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 6 OF 6
ED606 12920028 ONE LINE DIAGRAM - DEMO WORK - SWGR4 SLD
E-101 12920029 OVERALL FIRST FLOOR INSTALL PLAN
E-102 12920030 OVERALL SECOND FLOOR INSTALL PLAN
E-103 12920031 OVERALL MECH PLATFROM INSTALL PLAN
E-104 12920032 OVERALL ROOF INSTALL PLAN
E-105 12920033 OUTSIDE CABLE TEMPORARY AND SEQUENCING PLAN
E-106 12920034 OUTSIDE CABLE FINAL INSTALLATION PLAN
E-110 12920035 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 1 WEST
E-111 12920036 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 1 EAST
E-112 12920037 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 2 WEST
E-113 12920038 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 2 EAST
E-114 12920039 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 3 WEST
E-115 12920040 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 3 EAST
E-116 12920041 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 4 WEST
E-117 12920042 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 4 EAST
E-118 12920043 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 5 WEST
E-119 12920044 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 5 EAST
E-120 12920045 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 1 WEST
E-121 12920046 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 1 EAST
E-122 12920047 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 2 WEST
E-123 12920048 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 2 EAST
E-124 12920049 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 3 WEST
DOCUMENT 00 01 15 Page 14
DRAWING NO. NAVFAC DWG NO. TITLE
E-126 12920050 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 4 WEST
E-127 12920051 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 4 EAST
E-128 12920052 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 5 WEST
E-129 12920053 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 5 EAST
E-130 12920054 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 1 WEST
E-131 12920055 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 1 EAST
E-132 12920056 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 2 WEST
E-133 12920057 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 2 EAST
E-134 12920058 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 3 WEST
E-135 12920059 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 3 EAST
E-136 12920060 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 4 WEST
E-137 12920061 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 4 EAST
E-138 12920062 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 5 WEST
E-139 12920063 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 5 EAST
E-142 12920064 LARGE SCALE INSTALL PLAN ROOF BAY 2 WEST
E-143 12920065 LARGE SCALE INSTALL PLAN ROOF BAY 2 EAST
E-144 12920066 LARGE SCALE INSTALL PLAN ROOF BAY 3 WEST
E-145 12920067 LARGE SCALE INSTALL PLAN ROOF BAY 3 EAST
E-146 12920068 LARGE SCALE INSTALL PLAN ROOF BAY 4 WEST
E-147 12920069 LARGE SCALE INSTALL PLAN ROOF BAY 4 EAST
E-148 12920070 LARGE SCALE INSTALL PLAN ROOF BAY 5 WEST
E-149 12920071 LARGE SCALE INSTALL PLAN ROOF BAY 5 EAST
EL121 12920072 LIGHTING PLAN
E-301 12920073 SECTIONS
E-302 12920074 SECTIONS
E-303 12920075 SECTIONS
E-304 12920076 SECTIONS
E-305 12920077 SECTIONS
E-306 12920078 SECTIONS
DOCUMENT 00 01 15 Page 15
DRAWING NO. NAVFAC DWG NO. TITLE
E-307 12920079 SECTIONS
E-308 12920080 SECTIONS
E-401 12920081 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST -
TRANSFORMER
E-402 12920082 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST - 13.2 KV
E-403 12920083 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST - B80, 400A
& E6
E-404 12920084 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST - PUMP TEST
E-405 12920085 ENLARGED INSTALL PLAN GROUND ROUTING
E-406 12920086 ENLARGED INSTALL PLAN ROOF BAY 3 WEST
E-407 12920087 OVERALL 480V CONDUIT PLAN
E-501 12920088 DETAILS
E-502 12920089 DETAILS II
E-600 12920090 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 1 OF 6
E-601 12920091 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 2 OF 6
E-602 12920092 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 3 OF 6
E-603 12920093 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 4 OF 6
E-604 12920094 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 5 OF 6
E-605 12920095 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 6 OF 6
E-606 12920096 ONE-LINE DIAGRAM - NEW WORK - SWGR4 SLD INTERIM 1
E-607 12920097 ONE-LINE DIAGRAM - NEW WORK - SWGR4 SLD INTERIM 2
E-608 12920098 ONE-LINE DIAGRAM - NEW WORK - SWGR4 SLD FINAL
E-609 12920099 GROUNDING DIAGRAMS
E-610 12920100 GROUNDING DIAGRAMS
E-650 12920101 SCHEDULES
E-651 12920102 SCHEDULES
E-652 12920103 SCHEDULES
E-653 12920104 SCHEDULES
E-654 12920105 SCHEDULES
DOCUMENT 00 01 15 Page 16
DRAWING NO. NAVFAC DWG NO. TITLE
E-655 12920106 SCHEDULES
E-656 12920107 SCHEDULES
E-657 12920108 SCHEDULES
E-658 12920109 SCHEDULES
E-659 12920110 SCHEDULES
E-660 12920111 SCHEDULES
ET101 12920112 TELECOMMUNICATIONS PLAN
ET501 12920113 TELECOMMUNICATIONS DETAILS
-- End of Document --
DOCUMENT 00 01 15 Page 17
SECTION 01 11 00.00 22
SUMMARY OF WORK (PWD ME)
02/24
PART 1 GENERAL
This Section applies to Design-Bid-Build projects at the Portsmouth Naval Shipyard and PWD ME AOR Facilities.
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Cross Disciplinary Coordination Drawings; G
Work Sequencing and Preparation Plan; G
Salvage Plan; G
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes replacement or upgrade to specific building systems in Building 300, including:
Removal of the existing ballasted membrane roof down to the existing steel deck and replacement with a fully adhered 0.080 thermoplastic polyolefin (TPO) roof membrane assembly;
Removal or abandonment-in-place of the existing air-handling equipment serving the manufacturing/machining areas in Building 300 Bays 1 through 5, including but not limited to door heaters, heating and ventilating units, and exhaust fans, and removal or abandonment-in-place of existing ductwork, piping, and controls associated with the equipment;
Removal and replacement of existing unit heaters;
Installation of floor mounted air rotation units (ARUs) and roof mounted energy recovery units (ERVs) to serve the manufacturing/machining areas in Building 30 Bays 1 through 5, including associated ductwork, piping, and controls;
Replacement of the existing steam to hot water plant, including pumps, expansion tank, air separator, piping, and controls;
Removal of existing fire alarm and mass notification system, including conduit, backboxes, wire, and devices and installation of a fire alarm and mass notification system, including conduit, back boxes, raceway, and wiring;
Removal of existing fire sprinkler system, including sprinkler heads, SECTION 01 11 00.00 22 Page 1 escutcheons, main and branch lines, drop pipe, and fittings in all sections of Building 300 except for the Office Areas on the Second Floor of Bay 5 East and West, where work includes inspection of existing fire sprinkler piping, and replacement of sprinkler heads only;
Installation of a new wet-pipe sprinkler system including construction of a 2-hour fire rated interior room to support a diesel fire pump, fire pump test headers, and associated piping and equipment;
Utility work to install sanitary sewerage piping from the floor drain inside the 2-hour fire rated interior room to the sanitary sewerage main on the exterior of Building 300, including installation of an oil/water separator and all excavation, backfill, shoring, and paving;
Removal and replacement of portions of the 480V electrical distribution system to support the HVAC work, including but not limited to demolition of existing panelboards, conduit, wiring, and control components and installation of new panelboards, transformers, conduit, junction boxes, wiring, and control components;
Electrical and lighting work in support of the new fire sprinkler system, including a new 480V circuit to a transformer and 480V distribution panelboard and all associated conduits, wiring, and controls;
Temporary removals/relocations/installations required to install the equipment detailed by other disciplines;
Removal and replacement of the 2500 kVA main service transformer for Building 300, feeding Switchgear 4; replacement of the existing ungrounded delta system with a wye grounded system; replacement of the 15 kV service switch feeding this transformer, as well as the 480V main and feeder switchgear; new design will include a high resistance grounded system and electronic trip units on the draw out power circuit breakers to incorporate phase and ground fault protection; installation of the new transformer on the first floor with cable bus extended from the new transformer up into the penthouse where the new feeder switchgear will be installed; and abandonment in place of the existing Switchgear 4 in the penthouse, to be used as a splice box for connections between new switchgear and existing feeder cables;
Structural reinforcement of existing trusses and purlins to support new mechanical HVAC rooftop equipment;
New structural framing for support of new mechanical HVAC rooftop equipment curb;
Hazardous material (Asbestos, Lead, Cadmium, Chromium, PCBs) abatement, testing, handling, disposal, and/or removal efforts related to the aforementioned work items;
and all incidental related work.
Project Options Include:
Option 1: Modular Building in Bay 1 West Option 1 work includes installation of a two-story pre-manufactured modular facility in Bay 1 West within Building 300, consisting of a break room on the ground floor, office space on the second deck, and a single stair on the exterior of the modular building, including electrical, HVAC, SECTION 01 11 00.00 22 Page 2 fire protection, and telecommunication utilities to support the installation of a complete and usable modular space. Electrical shall include 100A breaker box and all wiring, circuits, handy boxes, conduit, etc.; HVAC shall include a new VRF system with indoor heat pumps for each room, a single remote outdoor unit (mounted on the roof), and an energy recovery unit for ventilation to each indoor heat pump; fire protection shall include all piping, sprinklers, and notification devices; all provided by the modular building company.
Option 2: Modular Building in Bay 2 West Option 2 work includes installation of a two-story pre-manufactured modular facility in Bay 2 West within Building 300, consisting of a break room on the ground floor, office space on the second deck, and a single stair on the exterior of the modular building, including electrical, HVAC, fire protection, and telecommunication utilities to support the installation of a complete and usable modular space. Electrical shall include 100A breaker box and all wiring, circuits, handy boxes, conduit, etc.; HVAC shall include a new VRF system with indoor heat pumps for each room, a single remote outdoor unit (mounted on the roof), and an energy recovery unit for ventilation to each indoor heat pump; fire protection shall include all piping, sprinklers, and notification devices; all provided by the modular building company. Work also includes demolition and removal of the existing modular facility in the same location in Bay 2 West, including associated hazardous material abatement, testing, handling, disposal, and/or removal efforts. Demolition of the existing modular facility also includes demolition of all support utilities (electrical, telecom, mechnical, plumbing, etc.) to the existing modular facility back to the utility source.
Option 3: HVAC in Precision Cooled Spaces Option 3 work includes:
Removal or abandonment-in-place of the existing air-handling equipment serving the precision cooled spaces in Building 300, including removal or abandonment-in-place of existing ductwork and piping;
Installation of a chiller outside of Building 300, within the CIA fencing clear zone, variable air volume (VAV) boxes and rooftop units (RTUs) to serve these areas, including associated ductwork, piping, and controls;
Removal of all existing power and controls to support the removed or abandoned HVAC equipment, including but not limited to the conduit, wiring, and junction boxes back to the source;
and installation of all new electrical distribution and controls to support the new HVAC equipment.
Option 4: HVAC in 2nd Floor Offices Option 4 work includes:
Removal or abandonment-in-place of the existing air-handling equipment serving the Office Areas on the Second Floor of Bay 5 East and West, including removal or abandonment-in-place of existing ductwork and piping;
Installation of variable air volume (VAV) boxes and rooftop units (RTUs) to serve these areas, including associated ductwork, piping, and controls;
Removal of existing fire sprinkler system, including escutcheons, main and branch lines, drop pipe, and fittings in the Office Areas on the Second Floor of Bay 5 East and West;
SECTION 01 11 00.00 22 Page 3
Removal and disposal of existing ceiling tiles and grid system in the Office Areas on the Second Floor of Bay 5 East and West and installation of a new 2x4 acoustical ceiling grid and tiles;
Removal of all existing power and controls to support the removed or abandoned HVAC equipment, including but not limited to the conduit, wiring, and junction boxes back to the source;
and installation of all new electrical distribution and controls to support the new HVAC equipment.
Option 5: Telecommunications Equipment Option 5 work includes:
Installation of fiber optic equipment in the existing telecommunications room in Bay 5 of Building 300, including but not limited to unit rack mounted fiber optic connector housing panels and 12 strand single mode fiber optic cable terminal plates.
1.2.2 Project Sequencing Requirements
The following restrictions apply to the sequencing of the work:
a. Most of the work for this project will occur outside of regular working hours as defined in Section 01 14 00.00 22 WORK RESTRICTIONS (PWD ME). Refer to Section 01 14 00.00 22 for additional requirements related to working hours.
b. Existing furniture and equipment to remain in construction areas (e.g.
office furniture, etc.) must be protected from dust, debris, demolition, and construction activities to ensure the items are not damaged and are useable at project completion. Temporary partitions must be full height. Provide daily cleanup as specified in Section 02 41 00 DEMOLITION AND DECONSTRUCTION and as directed by the Contracting Officer.
c. The building will be occupied by Government personnel adjacent to and within work areas during the project. Building 300 is a 24/7 production facility. Equipment and personnel must be protected at all times.
d. Construction sequencing/phasing plans have been developed in coordination with the Government and are provided within the drawing set. The construction sequencing/phasing plans provide proposed construction sequence strategies. Development of an independent construction phasing plan and construction schedule is the responsibility of the Contractor and shall be prepared in coordination with the Contracting Officer. The independent construction phasing plan and construction schedule shall be prepared to avoid impacting production operations within Building 300.
e. During the phased work of this project, occupied portions of Building 300 must remain fully operational including, but not limited to, the following utilities: plumbing, heat, ventilation, air conditioning, fire suppression, fire alarm, electrical power, communications systems, and security systems.
f. Building 300 is an historic facility and requires special coordination to have limited impact on the historic fabric and character defining features of the structure. Work must comply with the SECRETARY OF THE
SECTION 01 11 00.00 22 Page 4
INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES. Cross disciplinary coordination drawings are required for review and approval by the Contracting Officer and the PWD-ME Cultural Resources Manager prior to commencement of work.
g. Building 300 has six bays. Bays 1 through 5 are sequenced in a north/south direction and each bay is split into two halves, labeled east and west. Bay 6 is on the east side of the building, adjacent to Bays 3 East and 4 East. Bay 6 is split into two halves, labeled north and south. Work across all disciplines shall be phased in half-bay increments. Work can occur in multiple bays at once.
h. The Government requires and will provide escorts for the Contractor while working inside and on the roof of Building 300. Coordinate with the Contracting Officer to schedule escorts. All work within Building 300 and on the roof require the presence of an escort. The project schedule developed in accordance with Section 01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS) will be used to coordinate required escorts. Notify Contracting Officer weekly of escorts required for the subsequent three weeks of work.
i. Complete installation of all equipment, piping, and ductwork including required testing prior to installation of the new ceiling grid in Bay 5 Second Floor, as part of Bid Option Item No. 4. Any damage to the ceiling grid after installation shall be the responsibility of the Contractor to repair/replace as required.
j. All work on the HX system shall be completed during a single non-heating season, between April 15 and October 15.
k. Structural reinforcement of existing trusses and purlins to support new mechanical HVAC rooftop equipment shall be completed prior to installation of the mechanical HVAC rooftop equipment, including but not limited to ERVs, RTUs, and heating and ventilating units.
l. Removal of the existing ballasted membrane roof and replacement with a fully adhered 0.080 thermoplastic polyolefin (TPO) roof membrane assembly shall be completed prior to installation of the mechanical HVAC rooftop equipment, including but not limited to ERVs, RTUs, and heating and ventilating units.
m. Temporary construction loading on trusses shall only occur between April 15 and October 15. If temporary construction loading on trusses is to occur outside of this period, Contractor will be responsible for shoveling roof clear of snow.
n. Refer to Attachment A of this section for additional overview information regarding the project construction sequencing, constructability, and outage requirements, provided FOR INFORMATION
ONLY.
1.2.3 Location
The work is located at Building 300 at the Portsmouth Naval Shipyard. Note the "Project Site" is the specific area of construction within the limits of work as defined by the contract documents.
SECTION 01 11 00.00 22 Page 5
1.3 PROJECT SEQUENCING REQUIREMENTS
Provide Work Sequencing and Preparation Plan indicating how the work is to be accomplished and incorporating Government directives. The intent of this Plan is to show the Government that a complete understanding of the project requirements are understood including Subcontractors. The Plan must be carefully prepared and must include every aspect of the project including outages that will be required to support the construction and how it is to be accomplished with an absolute minimum of disruption to Government operations. No work may begin on the project until this plan is reviewed and approved by the Contracting Officer.
1.4 OCCUPANCY OF PREMISES
The building will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. While the building is occupied, life safety measures and access to egress components must be maintained. Provide temporary egress lighting, emergency lighting, fire alarm, and fire protection systems along paths of egress.
Parking is a critical component of work on the Portsmouth Naval Shipyard and parking & road outages must be submitted to the Contracting Officer for approval as outlined in the contract documents.
1.5 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.6 LOCATION OF UNDERGROUND UTILITIES
Verify location of underground utilities in accordance with Section
01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME).
1.6.1 Notification Prior to Excavation
Notify the Contracting Officer at least fourteen (14) working days prior to starting excavation work. See Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) and attachments for Dig Safe requirements.
1.7 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS
1.7.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90% complete, rough-in 100% complete, Inside Plant
SECTION 01 11 00.00 22 Page 6
(ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final stages of each phase of construction. After the Contracting Officer has facilitated coordination meetings between the Contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the Contract duration.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located on the Portsmouth Naval Shipyard.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
1.9 Beneficial Occupancy Requirements
All work elements identified as "Required for Facility Delivery (BOD)" included in Section 01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME) Attachment A NRZ Checklist must be completed and accepted by the Contractor's QC Manager prior to submitting the form to the NAVFAC PWD ME Construction Manager for NAVFAC PWD ME signatures.
The Contractor must submit completed NRZ Checklist with the required documentation no later…