This is a comprehensive specification document for Building 300 Roof and HVAC Repair at Portsmouth Naval Shipyard, a manufacturing and machining facility requiring extensive system replacement and renovation. The project scope includes removal and replacement of the existing ballasted membrane roof with a fully adhered 0.080 TPO roof membrane assembly; demolition and replacement of HVAC systems installed between 1979-1984 that contain RCRA 8 metal deposits; replacement of the steam-to-hot-water plant with new unit heaters and dedicated outdoor air systems with destratification fans; complete removal and replacement of fire alarm, mass notification, and sprinkler systems; replacement of the existing 2500 kVA main service transformer, 15 kV service switch, and 480V switchgear; and associated utility work including electrical distribution, sanitary sewerage installation, and site restoration. Hazardous material abatement including asbestos remediation and RCRA 8 dust containment is required throughout the project.

The specifications establish comprehensive administrative and technical requirements including: cost-loaded network analysis schedules with monthly updates, earned value reporting, detailed quality control procedures with defined definable features of work, a comprehensive accident prevention plan with site safety and health officer requirements, facility/utility/service outage coordination with 15-calendar-day advance notice, extensive environmental controls including indoor air quality management and 60-percent construction waste diversion from landfills, critical infrastructure risk analysis for work near shipyard facilities, work sequencing phased by half-bay increments with Government-provided escorts required, operation and maintenance manuals with training requirements, record drawings and as-built documentation, and warranty management extending through a one-year construction warranty period plus manufacturer-specific extended warranties. Work is restricted to specific hours (11 PM to 7 AM weekdays, 7 AM Saturday to 11 PM Sunday with bay-specific variations), must maintain all building utilities to the occupied facility, and requires compliance with Portsmouth Naval Shipyard regulations including DBIDS credentialing, radiological controls, fire prevention protocols, and security requirements.

View the file

Other files

File Type Posted
N4008525R0029 0012.pdf PDF
N4008526R0029 0011.pdf PDF
N4008526R0029 0010.pdf PDF
N4008526R0029 0009.pdf PDF
N4008526R00290008.pdf PDF
N4008526R00290007.pdf PDF
N4008526R0029 0006.pdf PDF
Attachment O - PNSY B300 HAZMAT Report_Rev 1.pdf PDF
Attachment N - PNSY B300 MOD 1 HAZMAT Report.pdf PDF
N4008526R0029 Site Visit Log.pdf PDF
N4008526R0029 0005.pdf PDF
N4008526R0029 0004.pdf PDF
N4008526R0029 0003.pdf PDF
N4008526R0029 0002.pdf PDF
Attachment L - DBIDS 5500b.docx DOCX document
N4008526R0029 0001.pdf PDF
Attachment M - Pass Office Virtual Line Guidance.pdf PDF
Attachment K - SECNAV 5512.pdf PDF
Attachment H - Small Business Participation Commitment.pdf PDF
Attachment B -Pre-Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment J - Contractor Exempt Purchase Certificate.pdf PDF
Attachment G - Historical Small Business Utilization.pdf PDF
Attachment F - Past Performance Questionnaire.pdf PDF
Attachment D - Price Proposal Form.pdf PDF
Attachment C - PIEE Vendor Access Instructions.pdf PDF
Attachment A1 - PNSY B300 Roof and HVAC Repairs - Final - Plans.pdf PDF
N4008526R0029.pdf PDF
Attachment I - Small Business Subcontracting Plan.pdf PDF
Attachment E - Construction Experience Project Data.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural: Mechanical:

Civil: Electrical:

Structural:

APPROVED BY:

For Commander, NAVFAC:

Date:

Submitted By: Date:

B300 Roof and HVAC Repair Delivery Order #: N40085-23-F-5097

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00.00 22 02/24 SUMMARY OF WORK (PWD ME)

01 14 00.00 22 11/22, CHG 3: 08/24 WORK RESTRICTIONS (PWD ME)

01 20 00.00 22 11/20, CHG 4: 08/24 PRICE AND PAYMENT PROCEDURES (PWD ME)

01 30 00.00 22 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS (PWD ME)

01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 17.00 20 11/23, CHG 1: 08/24 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 10 02/24 SUBSTITUTIONS

01 35 26.00 22 05/24 GOVERNMENTAL SAFETY REQUIREMENTS (PWD

ME)

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 44 00.00 22 10/23 ARCHAEOLOGICAL MONITORING (PWD ME)

01 45 00.00 22 08/23, CHG 1: 05/24 QUALITY CONTROL (PWD ME)

01 45 35 05/24 SPECIAL INSPECTIONS

01 50 00.00 22 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS (PWD ME)

01 57 19.00 22 08/22 TEMPORARY ENVIRONMENTAL CONTROLS -

PORTSMOUTH NAVAL SHIPYARD (PWD ME)

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00.00 22 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS (PWD ME)

01 78 23 05/23 OPERATION AND MAINTENANCE DATA

01 78 24.00 22 05/23, CHG 1: 11/23 ELECTRONIC OPERATION AND MAINTENANCE

SUPPORT INFORMATION (eOMSI) FACILITY

DATA WORKBOOK (FDW)

01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION AND DECONSTRUCTION

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 82 00.00 22 09/21 ASBESTOS REMEDIATION (PNS PROJECTS)

02 83 00.00 22 09/21 MANAGEMENT OF LEAD, CADMIUM, AND

CHROMIUM DURING RENOVATION,

DEMOLITION, REMOVAL, AND ABATEMENT

(PNS PROJECTS)

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

02 84 33 11/22 REMOVAL AND DISPOSAL OF

POLYCHLORINATED BIPHENYLS (PCBs)

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 2: 05/21 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

PROJECT TABLE OF CONTENTS Page 1

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 05 23.16 08/18 STRUCTURAL WELDING

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 08/23 MINERAL FIBER BLANKET INSULATION

07 54 23 09/24 THERMOPLASTIC-POLYOLEFIN (TPO) ROOFING

07 60 00 08/23 FLASHING AND SHEET METAL

07 72 00 12/24 ROOF ACCESSORIES

07 84 00.00 22 07/24 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 91 00 08/20 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 08/20 INTERIOR SIGNAGE

DIVISION 13 - SPECIAL CONSTRUCTION

13 12 10 06/24 MODULAR BREAKROOM

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND

SEISMIC CONTROL

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 01 30.41 05/22 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

PROJECT TABLE OF CONTENTS Page 2

23 05 15 05/22 COMMON PIPING FOR HVAC

23 05 48.19 05/18, CHG 2: 08/20 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00.00 20 05/23, CHG 1: 08/24 COMMISSIONING OF MECHANICAL SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 09 53.00 20 02/10, CHG 2: 08/17 SPACE TEMPERATURE CONTROL SYSTEMS

23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING

SYSTEM

23 21 23 08/17 HYDRONIC PUMPS

23 22 26.00 20 02/10, CHG 1: 05/15 STEAM SYSTEM AND TERMINAL UNITS

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 54 19 08/21 BUILDING HEATING SYSTEMS, WARM AIR

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 6: 11/22 CHILLED, CHILLED-HOT, AND CONDENSER

WATER PIPING SYSTEMS

23 72 00.00 10 01/08 ENERGY RECOVERY SYSTEMS

23 73 13.00 40 05/17 MODULAR OUTDOOR CENTRAL-STATION

AIR-HANDLING UNITS

23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS

23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 08/24 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

25 05 11.02 08/24 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR

FACILITY-RELATED CONTROL SYSTEMS

25 10 10 02/19, CHG 1: 05/21 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 11 16 11/21 SECONDARY UNIT SUBSTATIONS

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

26 23 00 02/24 LOW-VOLTAGE SWITCHGEAR

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

PROJECT TABLE OF CONTENTS Page 3

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 22 08/2024 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 13.62 11/23 BITUMINOUS SURFACE TREATMENT

32 11 23 05/22 AGGREGATE BASE COURSE AND GRADED

CRUSHED AGGREGATE BASE COURSE FOR

FLEXIBLE PAVING

32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

DIVISION 33 - UTILITIES

33 30 00 05/18 SANITARY SEWERAGE

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

DIVISION 40 - PROCESS INTERCONNECTIONS

40 17 26.00 20 04/06 WELDING PRESSURE PIPING

40 17 30.00 40 02/23 WELDING GENERAL PIPING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/11, CHG 1: 08/14

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

DRAWING NO. NAVFAC DWG NO. TITLE

G-001 12919653 COVER SHEET

G-002 12919654 DRAWING LIST 1 OF 2

G-003 12919655 DRAWING LIST 2 OF 2

G-004 12919656 OVERALL BID OPTIONS KEY PLAN FIRST FLOOR

G-005 12919657 OVERALL BID OPTIONS KEY PLAN SECOND FLOOR

G-006 12919658 GENERAL CONSTRUCTABILITY NOTES

G-101 12919659 CODE SUMMARY & GENERAL PROJECT NOTES

G-102 12919660 LIFE SAFETY PLANS 1

G-103 12919661 LIFE SAFETY PLANS 2

G-104 12919662 LIFE SAFETY PLANS 3

GC101 12919663 LAYDOWN AREA SITE PLAN

HA101 12919664 FIRST FLOOR ABATEMENT PLAN

HA103 12919665 MECHANICAL PLATFORM ABATEMENT PLAN

HA104 12919666 ROOF ABATEMENT PLAN

C-100 12919667 FIRE PUMP ROOM UTILITIES PLAN AND PROFILE

C-500 12919668 CIVIL DETAILS

S-001 12919669 GENERAL STRUCTURAL NOTES

S-002 12919670 TYPICAL DETAILS PART 1 OF 2

S-003 12919671 TYPICAL DETAILS PART 2 OF 2

S-100 12919672 FLOOR SLAB PLAN

DOCUMENT 00 01 15 Page 1

DRAWING NO. NAVFAC DWG NO. TITLE

S-104 12919673 OVERALL ROOF FRAMING PLAN

S-111 12919674 BAY 2 WEST ROOF FRAMING PLAN

S-112 12919675 BAY 2 EAST ROOF FRAMING PLAN

S-113 12919676 BAY 3 WEST ROOF FRAMING PLAN

S-114 12919677 BAY 4 WEST ROOF FRAMING PLAN

S-115 12919678 BAY 4 EAST ROOF FRAMING PLAN

S-116 12919679 BAY 5 WEST ROOF FRAMING PLAN

S-117 12919680 BAY 5 EAST ROOF FRAMING PLAN

S-120 12919681 TRUSS REINFORCING DETAILS PART 1 OF 2

S-121 12919682 TRUSS REINFORCING DETAILS PART 2 OF 2

S-122 12919683 ROOFTOP UNIT SUPPORT DETAILS

S-130 12919684 FIRE PUMP ROOM PLANS

S-131 12919685 FIRE PUMP ROOM SECTIONS & DETAILS PART 1 OF 3

S-132 12919686 FIRE PUMP ROOM SECTIONS & DETAILS PART 2 OF 3

S-133 12919687 FIRE PUMP ROOM SECTIONS & DETAILS PART 3 OF 3

S-201 12919688 WEST FRAME ELEVATION

S-301 12919689 STEEL SECTIONS & DETAILS

AD001 12919690 DEMOLITION NOTES

AD105 12919691 DEMOLITION OVERALL ROOF PLAN

AD110 12919692 DEMOLITION FIRST FLOOR PLAN BAY 1 WEST

AD112 12919693 DEMOLITION FIRST FLOOR PLAN BAY 2 WEST

AD119 12919694 DEMOLITION FIRST FLOOR PLAN BAY 5 EAST

AD128 12919695 DEMOLITION SECOND FLOOR PLAN BAY 5 WEST

AD129 12919696 DEMOLITION SECOND FLOOR PLAN BAY 5 EAST

AD140 12919697 DEMOLITION ROOF PLAN BAY 1 WEST

AD141 12919698 DEMOLITION ROOF PLAN BAY 1 EAST

AD142 12919699 DEMOLITION ROOF PLAN BAY 2 WEST

AD143 12919700 DEMOLITION ROOF PLAN BAY 2 EAST

AD144 12919701 DEMOLITION ROOF PLAN BAY 3 WEST

AD145 12919702 DEMOLITION ROOF PLAN BAY 3 EAST

DOCUMENT 00 01 15 Page 2

DRAWING NO. NAVFAC DWG NO. TITLE

AD146 12919703 DEMOLITION ROOF PLAN BAY 4 WEST

AD147 12919704 DEMOLITION ROOF PLAN BAY 4 EAST

AD148 12919705 DEMOLITION ROOF PLAN BAY 5 WEST

AD149 12919706 DEMOLITION ROOF PLAN BAY 5 EAST

AD166 12919707 DEMOLITION REFLECTED CEILING PLAN 2ND FLOOR

MEZZANINE BAY 4 WEST

AD168 12919708 DEMOLITION REFLECTED CEILING PLAN 2ND FLOOR BAY 5

WEST & EAST

AD201 12919709 DEMOLITION OVERALL ELEVATIONS

A-001 12919710 ABBREVIATIONS & SYMBOLS

A-002 12919711 GENERAL NOTES & LEGENDS

A-003 12919712 PARTITION, CEILING & ROOF TYPES

A-004 12919713 OVERALL KEY PLAN

A-005 12919714 ARCHITECTURAL FIRST FLOOR PHASING PLAN

A-006 12919715 ARCHITECTURAL SECOND FLOOR PHASING PLAN

A-007 12919716 ARCHITECTURAL FIRST FLOOR RIGGING PLAN

A-008 12919717 ARCHITECTURAL SECOND FLOOR RIGGING PLAN

A-107 12919718 OVERALL ROOF PLAN

A-110 12919719 FIRST FLOOR PLAN BAY 1 WEST

A-112 12919720 FIRST FLOOR PLAN BAY 2 WEST

A-114 12919721 FIRE FLOOR PLAN BAY 3 WEST

A-119 12919722 FIRST FLOOR PLAN BAY 5 EAST

A-128 12919723 SECOND FLOOR PLAN BAY 5 WEST

A-129 12919724 SECOND FLOOR PLAN BY 5 EAST

A-140 12919725 ROOF PLAN BAY 1 WEST

A-141 12919726 ROOF PLAN BAY 1 EAST

A-142 12919727 ROOF PLAN BAY 2 WEST

A-143 12919728 ROOF PLAN BAY 2 EAST

A-144 12919729 ROOF PLAN BAY 3 WEST

A-145 12919730 ROOF PLAN BAY 3 EAST

A-146 12919731 ROOF PLAN BAY 4 WEST

DOCUMENT 00 01 15 Page 3

DRAWING NO. NAVFAC DWG NO. TITLE

A-147 12919732 ROOF PLAN BAY 4 EAST

A-148 12919733 ROOF PLAN BAY 5 WEST

A-149 12919734 ROOF PLAN BAY 5 EAST

A-166 12919735 REFLECTED CEILING PLAN 2ND FLOOR MEZZANINE BAY 4 WEST

A-168 12919736 REFLECTED CEILING PLAN 2ND FLOOR BAY 5 WEST & EAST

A-201 12919737 OVERALL ELEVATIONS

A-231 12919738 3D VIEWS

A-401 12919739 PARTIAL PLANS AT FIRE PUMP ROOM - BAY 1 WEST

A-402 12919740 PARTIAL PLANS AT MODULAR OFFICE - BAY 1 WEST

A-403 12919741 PARTIAL PLANS AT MODULAR OFFICE - BAY 2 WEST

A-501 12919742 DETAILS

A-502 12919743 DETAILS

A-503 12919744 DETAILS

A-521 12919745 ROOF DETAILS

A-522 12919746 ROOF DETAILS

A-523 12919747 ROOF DETAILS

A-524 12919748 ROOF DETAILS

A-801 12919749 DOOR & FINISH SCHEDULE AND DETAILS

FA001 12919750 FIRE ALARM GENERAL NOTES AND LEGEND

FA002 12919751 FIRE ALARM AND MASS NOTIFICATION LIFT ACCESS ZONES

FA003 12919752 FIRE ALARM AND MASS NOTIFICATION LIFT ACCESS ZONES -

LEVEL 2

FD101 12919753 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 1 WEST - DEMOLITION

FD102 12919754 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 1 EAST - DEMOLITION

FD103 12919755 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 2 WEST - DEMOLITION

FD104 12919756 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 2 EAST - DEMOLITION

FD105 12919757 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 3 WEST - DEMOLITION

FD106 12919758 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 3 EAST - DEMOLITION

FD107 12919759 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 4 WEST - DEMOLITION

FD108 12919760 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 4 EAST - DEMOLITION

DOCUMENT 00 01 15 Page 4

DRAWING NO. NAVFAC DWG NO. TITLE

FD109 12919761 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 5 WEST - DEMOLITION

FD110 12919762 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 5 EAST - DEMOLITION

FD111 12919763 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE

BAY 3 EAST - DEMOLITION

FD112 12919764 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE

BAY 4 WEST - DEMOLITION

FD113 12919765 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 3 WEST - DEMOLITION

FD114 12919766 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 3 EAST - DEMOLITION

FD115 12919767 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 4 WEST - DEMOLITION

FD116 12919768 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 4 EAST - DEMOLITION

FD117 12919769 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 5 WEST - DEMOLITION

FD118 12919770 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 5 EAST - DEMOLITION

FD119 12919771 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

MEZZANINE - BAY 4 WEST - DEMOLITION

FD120 12919772 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

MEZZANINE - BAY 5 WEST - DEMOLITION

FD121 12919773 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 WEST -

DEMOLITION

FD122 12919774 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 EAST -

DEMOLITION

FD123 12919775 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 WEST -

DEMOLITION

FD124 12919776 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 EAST -

DEMOLITION

FD125 12919777 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 WEST -

DEMOLITION

FD126 12919778 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 EAST -

DEMOLITION

FD127 12919779 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 WEST -

DEMOLITION

FD128 12919780 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 EAST -

DEMOLITION

FD129 12919781 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 WEST -

DEMOLITION

FD130 12919782 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 EAST -

DEMOLITION

FD131 12919783 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 WEST -

DEMOLITION

FD132 12919784 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 EAST -

DEMOLITION

FA101 12919785 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 1 WEST

FA102 12919786 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 1 EAST

FA103 12919787 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 2 WEST

FA104 12919788 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 2 EAST

FA105 12919789 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 3 WEST

DOCUMENT 00 01 15 Page 5

DRAWING NO. NAVFAC DWG NO. TITLE

FA106 12919790 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 3 EAST

FA107 12919791 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 4 WEST

FA108 12919792 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 4 EAST

FA109 12919793 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 5 WEST

FA110 12919794 FIRE ALARM AND MASS NOTIFICATION PLAN - FIRST FLOOR

- BAY 5 EAST

FA111 12919795 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -

BAY 1 WEST

FA112 12919796 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -

BAY 2 WEST

FA113 12919797 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -

BAY 3 WEST

FA114 12919798 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -

BAY 3 EAST

FA115 12919799 FIRE ALARM AND MASS NOTIFICATION PLAN - MEZZANINE -

BAY 4 WEST

FA116 12919800 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 4 WEST

FA117 12919801 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 4 EAST

FA118 12919802 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 5 WEST

FA119 12919803 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

- BAY 5 EAST

FA120 12919804 FIRE ALARM AND MASS NOTIFICATION PLAN - SECOND FLOOR

MEZZANINE - BAY 4 WEST

FA121 12919805 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL

PENTHOUSE

FA122 12919806 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -

BAY 2 WEST

FA123 12919807 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -

BAY 2 EAST

FA124 12919808 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -

BAY 3 WEST

FA125 12919809 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -

BAY 4 EAST

FA126 12919810 FIRE ALARM AND MASS NOTIFICATION PLAN - ROOF LEVEL -

BAY 5 WEST

FA201 12919811 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

FIRST FLOOR - BAY 1 AND 2 EAST AND WEST

FA202 12919812 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

FIRST FLOOR - BAY 3 AND 4 EAST AND WEST

FA203 12919813 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

FIRST FLOOR - BAY 5 EAST AND WEST

FA204 12919814 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

MEZZANINE - BAY 1 AND 2 EAST AND WEST

FA205 12919815 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

MEZZANINE - BAY 3 AND 4 EAST AND WEST

FA206 12919816 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

SECOND FLOOR - BAY 3, 4 AND 6 EAST AND WEST

FA207 12919817 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

SECOND FLOOR - BAY 5 EAST AND WEST

FA208 12919818 ACOUSTUCALLY DISTINGUISHABLE SPACE (ADS) PLAN -

THIRD FLOOR - ROOF LEVEL PENTHOUSE

DOCUMENT 00 01 15 Page 6

DRAWING NO. NAVFAC DWG NO. TITLE

FA401 12919819 FIRE ALARM AND MASS NOTIFICATION PLAN - ENLARGED

FIRE PUMP ROOM

FA501 12919820 FIRE ALARM DETAILS

FA601 12919821 FIRE ALARM SCHEDULES AND DIAGRAMS

FA602 12919822 FIRE ALARM SCHEDULES AND DIAGRAMS

FX001 12919823 FIRE SUPPRESSION GENERAL NOTES

FX002 12919824 FIRE SUPPRESSION SMBOLS & ABBREVIATIONS

FX003 12919825 FIRE PROTECTION LIFT ACCESS ZONES

FX004 12919826 FIRE PROTECTION LIFT ACCESS ZONES - LEVEL 2

FX005 12919827 FIRE SUPPRESSION ZONE PLAN

FX006 12919828 FIRE SUPPRESSION PHASE PLAN - LEVEL 2

FX007 12919829 FIRE SUPPRESSION PHASE PLAN - LEVEL 1

FX101 12919830 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 WEST

FX102 12919831 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 1 EAST

FX103 12919832 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 WEST

FX104 12919833 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 2 EAST

FX105 12919834 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 WEST

FX106 12919835 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 3 EAST

FX107 12919836 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 WEST

FX108 12919837 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 4 EAST

FX109 12919838 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 WEST

FX110 12919839 FIRE SUPPRESSION PLAN - FIRST FLOOR - BAY 5 EAST

FX111 12919840 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 1 WEST

FX112 12919841 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 2 WEST

FX113 12919842 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 3 WEST

FX114 12919843 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 3 EAST

FX115 12919844 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 4 WEST

FX116 12919845 FIRE SUPPRESSION PLAN - MEZZANINE - BAY 5 EAST

FX117 12919846 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 1 WEST

FX118 12919847 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 1 EAST

DOCUMENT 00 01 15 Page 7

DRAWING NO. NAVFAC DWG NO. TITLE

FX119 12919848 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 2 WEST

FX120 12919849 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 2 EAST

FX121 12919850 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 3 WEST

FX122 12919851 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 3 EAST

FX123 12919852 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 4 WEST

FX124 12919853 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 4 EAST

FX125 12919854 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 WEST

FX126 12919855 FIRE SUPPRESSION PLAN - SECOND FLOOR - BAY 5 EAST

FX127 12919856 FIRE SUPPRESSION PLAN - SECOND FLOOR MEZZANINE - BAY

4 WEST

FX128 12919857 FIRE SUPPRESSION PLAN - ROOF LEVEL PENTHOUSE

FX401 12919858 FIRE PROTECTION - ENLARGED PLANS

FX402 12919859 FIRE PROTECTION - ENLARGED PLANS

FX403 12919860 FIRE SUPPRESSION STORAGE CALCULATION

FX501 12919861 FIRE PROTECTION DETAILS

M-001 12919862 LEGENDS, NOTES, AND ABBREVIATIONS

M-002 12919863 LEGENDS, NOTES, AND ABBREVIATIONS

M-003 12919864 OVERALL KEY PLAN

M-101 12919865 PHASING PLAN - PHASE A

M-102 12919866 PHASING PLAN - PHASE B

M-103 12919867 PHASING PLAN - PHASE C

M-104 12919868 PHASING PLAN - PHASE D

M-105 12919869 PHASING PLAN - PHASE E

M-106 12919870 PHASING PLAN - PHASE F

M-107 12919871 PHASING PLAN - PHASE G

M-108 12919872 PHASING PLAN - PHASE H AND I

M-109 12919873 PHASING PLAN - PHASE J

M-201 12919874 RIGGING PLAN - FIRST FLOOR

M-202 12919875 RIGGING PLAN - SECOND FLOOR

MD110 12919876 FIRST FLOOR DEMO PLAN BAY 1 WEST

DOCUMENT 00 01 15 Page 8

DRAWING NO. NAVFAC DWG NO. TITLE

MD111 12919877 FIRST FLOOR DEMO PLAN BAY 1 EAST

MD112 12919878 FIRST FLOOR DEMO PLAN BAY 2 WEST

MD113 12919879 FIRST FLOOR DEMO PLAN BAY 2 EAST

MD114 12919880 FIRST FLOOR DEMO PLAN BAY 3 WEST

MD115 12919881 FIRST FLOOR DEMO PLAN BAY 3 EAST

MD116 12919882 FIRST FLOOR DEMO PLAN BAY 4 WEST

MD117 12919883 FIRST FLOOR DEMO PLAN BAY 4 EAST

MD118 12919884 FIRST FLOOR DEMO PLAN BAY 5 WEST

MD119 12919885 FIRST FLOOR DEMO PLAN BAY 5 EAST

MD120 12919886 SECOND FLOOR DEMO PLAN BAY 1 WEST

MD121 12919887 SECOND FLOOR DEMO PLAN BAY 1 EAST

MD122 12919888 SECOND FLOOR DEMO PLAN BAY 2 WEST

MD123 12919889 SECOND FLOOR DEMO PLAN BAY 2 EAST

MD124 12919890 SECOND FLOOR DEMO PLAN BAY 3 WEST

MD125 12919891 SECOND FLOOR DEMO PLAN BAY 3 EAST

MD126 12919892 SECOND FLOOR DEMO PLAN BAY 4 WEST

MD127 12919893 SECOND FLOOR DEMO PLAN BAY 4 EAST

MD128 12919894 SECOND FLOOR DEMO PLAN BAY 5 WEST

MD129 12919895 SECOND FLOOR DEMO PLAN BAY 5 EAST

MD140 12919896 ROOF DEMO PLAN BAY 1 WEST

MD141 12919897 ROOF DEMO PLAN BAY 1 EAST

MD142 12919898 ROOF DEMO PLAN BAY 2 WEST

MD143 12919899 ROOF DEMO PLAN BAY 2 EAST

MD144 12919900 ROOF DEMO PLAN BAY 3 WEST

MD145 12919901 ROOF DEMO PLAN BAY 3 EAST

MD146 12919902 ROOF DEMO PLAN BAY 4 WEST

MD147 12919903 ROOF DEMO PLAN BAY 4 EAST

MD148 12919904 ROOF DEMO PLAN BAY 5 WEST

MD149 12919905 ROOF DEMO PLAN BAY 5 EAST

DOCUMENT 00 01 15 Page 9

DRAWING NO. NAVFAC DWG NO. TITLE

MH110 12919906 FIRST FLOOR PLAN BAY 1 WEST

MH111 12919907 FIRST FLOOR PLAN BAY 1 EAST

MH112 12919908 FIRST FLOOR PLAN BAY 2 WEST

MH113 12919909 FIRST FLOOR PLAN BAY 2 EAST

MH114 12919910 FIRST FLOOR PLAN BAY 3 WEST

MH115 12919911 FIRST FLOOR PLAN BAY 3 EAST

MH116 12919912 FIRST FLOOR PLAN BAY 4 WEST

MH117 12919913 FIRST FLOOR PLAN BAY 4 EAST

MH118 12919914 FIRST FLOOR PLAN BAY 5 WEST

MH119 12919915 FIRST FLOOR PLAN BAY 5 EAST

MH120 12919916 SECOND FLOOR PLAN BAY 1 WEST

MH121 12919917 SECOND FLOOR PLAN BAY 1 WEST

MH122 12919918 SECOND FLOOR PLAN BAY 1 EAST

MH123 12919919 SECOND FLOOR PLAN BAY 2 WEST

MH124 12919920 SECOND FLOOR PLAN BAY 2 EAST

MH125 12919921 SECOND FLOOR PLAN BAY 3 WEST

MH126 12919922 SECOND FLOOR PLAN BAY 3 EAST

MH127 12919923 SECOND FLOOR PLAN BAY 4 EAST

MH128 12919924 SECOND FLOOR PLAN BAY 5 WEST

MH129 12919925 SECOND FLOOR PLAN BAY 5 EAST

MH140 12919926 ROOF PLAN - BAY 1 WEST

MH141 12919927 ROOF PLAN - BAY 1 EAST

MH142 12919928 ROOF PLAN - BAY 2 WEST

MH143 12919929 ROOF PLAN - BAY 2 EAST

MH144 12919930 ROOF PLAN - BAY 3 WEST

MH145 12919931 ROOF PLAN - BAY 3 EAST

MH146 12919932 ROOF PLAN BAY 4 WEST

MH147 12919933 ROOF PLAN BAY 4 EAST

MH148 12919934 ROOF PLAN BAY 5 WEST

DOCUMENT 00 01 15 Page 10

DRAWING NO. NAVFAC DWG NO. TITLE

MH149 12919935 ROOF PLAN BAY 5 EAST

MH201 12919936 ARU ELEVATIONS

MH202 12919937 ARU ELEVATIONS

MP110 12919938 FIRST FLOOR PLAN BAY 1 WEST

MP111 12919939 FIRST FLOOR PLAN BAY 1 EAST

MP112 12919940 FIRST FLOOR PLAN BAY 2 WEST

MP113 12919941 FIRST FLOOR PLAN BAY 2 EAST

MP114 12919942 FIRST FLOOR PLAN BAY 3 WEST

MP115 12919943 FIRST FLOOR PLAN BAY 3 EAST

MP116 12919944 FIRST FLOOR PLAN BAY 4 WEST

MP117 12919945 FIRST FLOOR PLAN BAY 4 EAST

MP118 12919946 FIRST FLOOR PLAN BAY 5 WEST

MP119 12919947 FIRST FLOOR PLAN BAY 5 EAST

MP120 12919948 SECOND FLOOR PLAN BAY 1 WEST

MP121 12919949 SECOND FLOOR PLAN BAY 1 EAST

MP122 12919950 SECOND FLOOR PLAN BAY 2 WEST

MP123 12919951 SECOND FLOOR PLAN BAY 2 EAST

MP124 12919952 SECOND FLOOR PLAN BAY 3 WEST

MP125 12919953 SECOND FLOOR PLAN BAY 3 EAST

MP126 12919954 SECOND FLOOR PLAN BAY 4 WEST

MP127 12919955 SECOND FLOOR PLAN BAY 4 EAST

MP128 12919956 SECOND FLOOR PLAN BAY 5 WEST

MP129 12919957 SECOND FLOOR PLAN BAY 5 EAST

MP401 12919958 ENLARGED PLANS

MP402 12919959 ENLARGED PLANS

MP403 12919960 ENLARGED PLANS

M-501 12919961 DETAILS

M-502 12919962 DETAILS

M-503 12919963 DETAILS

DOCUMENT 00 01 15 Page 11

DRAWING NO. NAVFAC DWG NO. TITLE

M-504 12919964 DETAILS

M-505 12919965 DETAILS

M-506 12919966 DETAILS

M-507 12919967 DETAILS

M-508 12919968 DETAILS

M-509 12919969 DETAILS

M-600 12919970 SCHEDULES

M-601 12919971 SCHEDULES

M-602 12919972 SCHEDULES

M-603 12919973 SCHEDULES

M-604 12919974 SCHEDULES

M-605 12919975 PIPING DIAGRAMS STEAM HX

M-606 12919976 PIPING DIAGRAMS HW BAYS 1, 2, 3

M-607 12919977 PIPING DIAGRAMS HW BAYS 4 & 5

M-608 12919978 PIPING DIAGRAMS CHW BAYS 4 & 5

M-609 12919979 AIRFLOW DIAGRAMS BAYS 1, 2, 3

M-610 12919980 AIRFLOW DIAGRAMS BAYS 4 & 5

M-701 12919981 AUTOMATIC TEMPERATURE CONTROLS

M-702 12919982 AUTOMATIC TEMPERATURE CONTROLS

M-703 12919983 AUTOMATIC TEMPERATURE CONTROLS

M-704 12919984 AUTOMATIC TEMPERATURE CONTROLS

M-705 12919985 AUTOMATIC TEMPERATURE CONTROLS

M-706 12919986 AUTOMATIC TEMPERATURE CONTROLS

M-707 12919987 AUTOMATIC TEMPERATURE CONTROLS

M-708 12919988 AUTOMATIC TEMPERATURE CONTROLS

M-709 12919989 AUTOMATIC TEMPERATURE CONTROLS

M-710 12919990 AUTOMATIC TEMPERATURE CONTROLS

M-711 12919991 AUTOMATIC TEMPERATURE CONTROLS

M-712 12919992 AUTOMATIC TEMPERATURE CONTROLS

DOCUMENT 00 01 15 Page 12

DRAWING NO. NAVFAC DWG NO. TITLE

M-713 12919993 AUTOMATIC TEMPERATURE CONTROLS

E-001 12919994 LEGENDS, GENERAL NOTES, AND ABBREVIATIONS

ED101 12919995 OVERALL FIRST FLOOR DEMO PLAN

ED102 12919996 OVERALL SECOND FLOOR DEMO PLAN

ED103 12919997 OVERALL MECH PLATFORM DEMO PLAN

ED104 12919998 OVERALL ROOF DEMO PLAN

ED105 12919999 OUTSIDE CABLE DEMOLITION PLAN

ED110 12920000 LARGE SCALE DEMO PLAN FLOOR 1 BAY 1 WEST

ED111 12920001 LARGE SCALE DEMO PLAN FLOOR 1 BAY 1 EAST

ED112 12920002 LARGE SCALE DEMO PLAN FLOOR 1 BAY 2 WEST

ED113 12920003 LARGE SCALE DEMO PLAN FLOOR 1 BAY 2 EAST

ED114 12920004 LARGE SCALE DEMO PLAN FLOOR 1 BAY 3 WEST

ED115 12920005 LARGE SCALE DEMO PLAN FLOOR 1 BAY 3 EAST

ED117 12920006 LARGE SCALE DEMO PLAN FLOOR 1 BAY 4 EAST

ED118 12920007 LARGE SCALE DEMO PLAN FLOOR 1 BAY 5 WEST

ED119 12920008 LARGE SCALE DEMO PLAN FLOOR 1 BAY 5 EAST

ED126 12920009 LARGE SCALE DEMO PLAN FLOOR 2 BAY 4 WEST

ED127 12920010 LARGE SCALE DEMO PLAN FLOOR 2 BAY 4 EAST

ED128 12920011 LARGE SCALE DEMO PLAN FLOOR 2 BAY 5 WEST

ED129 12920012 LARGE SCALE DEMO PLAN FLOOR 2 BAY 5 EAST

ED132 12920013 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 2 WEST

ED134 12920014 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 3 WEST

ED136 12920015 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 4 WEST

ED137 12920016 LARGE SCALE DEMO PLAN MECH PLATFORM BAY 4 EAST

ED144 12920017 LARGE SCALE DEMO PLAN ROOF BAY 3 WEST

ED146 12920018 LARGE SCALE DEMO PLAN ROOF BAY 4 WEST

ED148 12920019 LARGE SCALE DEMO PLAN ROOF BAY 5 WEST

ED401 12920020 ENLARGED DEMO PLAN ROOF BAY 3 WEST

ED402 12920021 ENLARGED DEMO PLAN FLOOR 1 BAY 3 EAST - PUMP TEST

DOCUMENT 00 01 15 Page 13

DRAWING NO. NAVFAC DWG NO. TITLE

ED600 12920022 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 1 OF 6

ED601 12920023 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 2 OF 6

ED602 12920024 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 3 OF 6

ED603 12920025 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 4 OF 6

ED604 12920026 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 5 OF 6

ED605 12920027 ONE-LINE DIAGRAM - DEMO WORK - PANELBOARDS 6 OF 6

ED606 12920028 ONE LINE DIAGRAM - DEMO WORK - SWGR4 SLD

E-101 12920029 OVERALL FIRST FLOOR INSTALL PLAN

E-102 12920030 OVERALL SECOND FLOOR INSTALL PLAN

E-103 12920031 OVERALL MECH PLATFROM INSTALL PLAN

E-104 12920032 OVERALL ROOF INSTALL PLAN

E-105 12920033 OUTSIDE CABLE TEMPORARY AND SEQUENCING PLAN

E-106 12920034 OUTSIDE CABLE FINAL INSTALLATION PLAN

E-110 12920035 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 1 WEST

E-111 12920036 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 1 EAST

E-112 12920037 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 2 WEST

E-113 12920038 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 2 EAST

E-114 12920039 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 3 WEST

E-115 12920040 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 3 EAST

E-116 12920041 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 4 WEST

E-117 12920042 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 4 EAST

E-118 12920043 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 5 WEST

E-119 12920044 LARGE SCALE INSTALL PLAN FLOOR 1 BAY 5 EAST

E-120 12920045 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 1 WEST

E-121 12920046 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 1 EAST

E-122 12920047 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 2 WEST

E-123 12920048 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 2 EAST

E-124 12920049 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 3 WEST

DOCUMENT 00 01 15 Page 14

DRAWING NO. NAVFAC DWG NO. TITLE

E-126 12920050 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 4 WEST

E-127 12920051 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 4 EAST

E-128 12920052 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 5 WEST

E-129 12920053 LARGE SCALE INSTALL PLAN FLOOR 2 BAY 5 EAST

E-130 12920054 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 1 WEST

E-131 12920055 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 1 EAST

E-132 12920056 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 2 WEST

E-133 12920057 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 2 EAST

E-134 12920058 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 3 WEST

E-135 12920059 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 3 EAST

E-136 12920060 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 4 WEST

E-137 12920061 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 4 EAST

E-138 12920062 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 5 WEST

E-139 12920063 LARGE SCALE INSTALL PLAN MECH PLATFORM BAY 5 EAST

E-142 12920064 LARGE SCALE INSTALL PLAN ROOF BAY 2 WEST

E-143 12920065 LARGE SCALE INSTALL PLAN ROOF BAY 2 EAST

E-144 12920066 LARGE SCALE INSTALL PLAN ROOF BAY 3 WEST

E-145 12920067 LARGE SCALE INSTALL PLAN ROOF BAY 3 EAST

E-146 12920068 LARGE SCALE INSTALL PLAN ROOF BAY 4 WEST

E-147 12920069 LARGE SCALE INSTALL PLAN ROOF BAY 4 EAST

E-148 12920070 LARGE SCALE INSTALL PLAN ROOF BAY 5 WEST

E-149 12920071 LARGE SCALE INSTALL PLAN ROOF BAY 5 EAST

EL121 12920072 LIGHTING PLAN

E-301 12920073 SECTIONS

E-302 12920074 SECTIONS

E-303 12920075 SECTIONS

E-304 12920076 SECTIONS

E-305 12920077 SECTIONS

E-306 12920078 SECTIONS

DOCUMENT 00 01 15 Page 15

DRAWING NO. NAVFAC DWG NO. TITLE

E-307 12920079 SECTIONS

E-308 12920080 SECTIONS

E-401 12920081 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST -

TRANSFORMER

E-402 12920082 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST - 13.2 KV

E-403 12920083 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST - B80, 400A

& E6

E-404 12920084 ENLARGED INSTALL PLAN FLOOR 1 BAY 3 WEST - PUMP TEST

E-405 12920085 ENLARGED INSTALL PLAN GROUND ROUTING

E-406 12920086 ENLARGED INSTALL PLAN ROOF BAY 3 WEST

E-407 12920087 OVERALL 480V CONDUIT PLAN

E-501 12920088 DETAILS

E-502 12920089 DETAILS II

E-600 12920090 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 1 OF 6

E-601 12920091 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 2 OF 6

E-602 12920092 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 3 OF 6

E-603 12920093 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 4 OF 6

E-604 12920094 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 5 OF 6

E-605 12920095 ONE-LINE DIAGRAM - NEW WORK - PANELBOARDS 6 OF 6

E-606 12920096 ONE-LINE DIAGRAM - NEW WORK - SWGR4 SLD INTERIM 1

E-607 12920097 ONE-LINE DIAGRAM - NEW WORK - SWGR4 SLD INTERIM 2

E-608 12920098 ONE-LINE DIAGRAM - NEW WORK - SWGR4 SLD FINAL

E-609 12920099 GROUNDING DIAGRAMS

E-610 12920100 GROUNDING DIAGRAMS

E-650 12920101 SCHEDULES

E-651 12920102 SCHEDULES

E-652 12920103 SCHEDULES

E-653 12920104 SCHEDULES

E-654 12920105 SCHEDULES

DOCUMENT 00 01 15 Page 16

DRAWING NO. NAVFAC DWG NO. TITLE

E-655 12920106 SCHEDULES

E-656 12920107 SCHEDULES

E-657 12920108 SCHEDULES

E-658 12920109 SCHEDULES

E-659 12920110 SCHEDULES

E-660 12920111 SCHEDULES

ET101 12920112 TELECOMMUNICATIONS PLAN

ET501 12920113 TELECOMMUNICATIONS DETAILS

-- End of Document --

DOCUMENT 00 01 15 Page 17

SECTION 01 11 00.00 22

SUMMARY OF WORK (PWD ME)

02/24

PART 1 GENERAL

This Section applies to Design-Bid-Build projects at the Portsmouth Naval Shipyard and PWD ME AOR Facilities.

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Cross Disciplinary Coordination Drawings; G

Work Sequencing and Preparation Plan; G

Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes replacement or upgrade to specific building systems in Building 300, including:

Removal of the existing ballasted membrane roof down to the existing steel deck and replacement with a fully adhered 0.080 thermoplastic polyolefin (TPO) roof membrane assembly;

Removal or abandonment-in-place of the existing air-handling equipment serving the manufacturing/machining areas in Building 300 Bays 1 through 5, including but not limited to door heaters, heating and ventilating units, and exhaust fans, and removal or abandonment-in-place of existing ductwork, piping, and controls associated with the equipment;

Removal and replacement of existing unit heaters;

Installation of floor mounted air rotation units (ARUs) and roof mounted energy recovery units (ERVs) to serve the manufacturing/machining areas in Building 30 Bays 1 through 5, including associated ductwork, piping, and controls;

Replacement of the existing steam to hot water plant, including pumps, expansion tank, air separator, piping, and controls;

Removal of existing fire alarm and mass notification system, including conduit, backboxes, wire, and devices and installation of a fire alarm and mass notification system, including conduit, back boxes, raceway, and wiring;

Removal of existing fire sprinkler system, including sprinkler heads, SECTION 01 11 00.00 22 Page 1 escutcheons, main and branch lines, drop pipe, and fittings in all sections of Building 300 except for the Office Areas on the Second Floor of Bay 5 East and West, where work includes inspection of existing fire sprinkler piping, and replacement of sprinkler heads only;

Installation of a new wet-pipe sprinkler system including construction of a 2-hour fire rated interior room to support a diesel fire pump, fire pump test headers, and associated piping and equipment;

Utility work to install sanitary sewerage piping from the floor drain inside the 2-hour fire rated interior room to the sanitary sewerage main on the exterior of Building 300, including installation of an oil/water separator and all excavation, backfill, shoring, and paving;

Removal and replacement of portions of the 480V electrical distribution system to support the HVAC work, including but not limited to demolition of existing panelboards, conduit, wiring, and control components and installation of new panelboards, transformers, conduit, junction boxes, wiring, and control components;

Electrical and lighting work in support of the new fire sprinkler system, including a new 480V circuit to a transformer and 480V distribution panelboard and all associated conduits, wiring, and controls;

Temporary removals/relocations/installations required to install the equipment detailed by other disciplines;

Removal and replacement of the 2500 kVA main service transformer for Building 300, feeding Switchgear 4; replacement of the existing ungrounded delta system with a wye grounded system; replacement of the 15 kV service switch feeding this transformer, as well as the 480V main and feeder switchgear; new design will include a high resistance grounded system and electronic trip units on the draw out power circuit breakers to incorporate phase and ground fault protection; installation of the new transformer on the first floor with cable bus extended from the new transformer up into the penthouse where the new feeder switchgear will be installed; and abandonment in place of the existing Switchgear 4 in the penthouse, to be used as a splice box for connections between new switchgear and existing feeder cables;

Structural reinforcement of existing trusses and purlins to support new mechanical HVAC rooftop equipment;

New structural framing for support of new mechanical HVAC rooftop equipment curb;

Hazardous material (Asbestos, Lead, Cadmium, Chromium, PCBs) abatement, testing, handling, disposal, and/or removal efforts related to the aforementioned work items;

and all incidental related work.

Project Options Include:

Option 1: Modular Building in Bay 1 West Option 1 work includes installation of a two-story pre-manufactured modular facility in Bay 1 West within Building 300, consisting of a break room on the ground floor, office space on the second deck, and a single stair on the exterior of the modular building, including electrical, HVAC, SECTION 01 11 00.00 22 Page 2 fire protection, and telecommunication utilities to support the installation of a complete and usable modular space. Electrical shall include 100A breaker box and all wiring, circuits, handy boxes, conduit, etc.; HVAC shall include a new VRF system with indoor heat pumps for each room, a single remote outdoor unit (mounted on the roof), and an energy recovery unit for ventilation to each indoor heat pump; fire protection shall include all piping, sprinklers, and notification devices; all provided by the modular building company.

Option 2: Modular Building in Bay 2 West Option 2 work includes installation of a two-story pre-manufactured modular facility in Bay 2 West within Building 300, consisting of a break room on the ground floor, office space on the second deck, and a single stair on the exterior of the modular building, including electrical, HVAC, fire protection, and telecommunication utilities to support the installation of a complete and usable modular space. Electrical shall include 100A breaker box and all wiring, circuits, handy boxes, conduit, etc.; HVAC shall include a new VRF system with indoor heat pumps for each room, a single remote outdoor unit (mounted on the roof), and an energy recovery unit for ventilation to each indoor heat pump; fire protection shall include all piping, sprinklers, and notification devices; all provided by the modular building company. Work also includes demolition and removal of the existing modular facility in the same location in Bay 2 West, including associated hazardous material abatement, testing, handling, disposal, and/or removal efforts. Demolition of the existing modular facility also includes demolition of all support utilities (electrical, telecom, mechnical, plumbing, etc.) to the existing modular facility back to the utility source.

Option 3: HVAC in Precision Cooled Spaces Option 3 work includes:

Removal or abandonment-in-place of the existing air-handling equipment serving the precision cooled spaces in Building 300, including removal or abandonment-in-place of existing ductwork and piping;

Installation of a chiller outside of Building 300, within the CIA fencing clear zone, variable air volume (VAV) boxes and rooftop units (RTUs) to serve these areas, including associated ductwork, piping, and controls;

Removal of all existing power and controls to support the removed or abandoned HVAC equipment, including but not limited to the conduit, wiring, and junction boxes back to the source;

and installation of all new electrical distribution and controls to support the new HVAC equipment.

Option 4: HVAC in 2nd Floor Offices Option 4 work includes:

Removal or abandonment-in-place of the existing air-handling equipment serving the Office Areas on the Second Floor of Bay 5 East and West, including removal or abandonment-in-place of existing ductwork and piping;

Installation of variable air volume (VAV) boxes and rooftop units (RTUs) to serve these areas, including associated ductwork, piping, and controls;

Removal of existing fire sprinkler system, including escutcheons, main and branch lines, drop pipe, and fittings in the Office Areas on the Second Floor of Bay 5 East and West;

SECTION 01 11 00.00 22 Page 3

Removal and disposal of existing ceiling tiles and grid system in the Office Areas on the Second Floor of Bay 5 East and West and installation of a new 2x4 acoustical ceiling grid and tiles;

Removal of all existing power and controls to support the removed or abandoned HVAC equipment, including but not limited to the conduit, wiring, and junction boxes back to the source;

and installation of all new electrical distribution and controls to support the new HVAC equipment.

Option 5: Telecommunications Equipment Option 5 work includes:

Installation of fiber optic equipment in the existing telecommunications room in Bay 5 of Building 300, including but not limited to unit rack mounted fiber optic connector housing panels and 12 strand single mode fiber optic cable terminal plates.

1.2.2 Project Sequencing Requirements

The following restrictions apply to the sequencing of the work:

a. Most of the work for this project will occur outside of regular working hours as defined in Section 01 14 00.00 22 WORK RESTRICTIONS (PWD ME). Refer to Section 01 14 00.00 22 for additional requirements related to working hours.

b. Existing furniture and equipment to remain in construction areas (e.g.

office furniture, etc.) must be protected from dust, debris, demolition, and construction activities to ensure the items are not damaged and are useable at project completion. Temporary partitions must be full height. Provide daily cleanup as specified in Section 02 41 00 DEMOLITION AND DECONSTRUCTION and as directed by the Contracting Officer.

c. The building will be occupied by Government personnel adjacent to and within work areas during the project. Building 300 is a 24/7 production facility. Equipment and personnel must be protected at all times.

d. Construction sequencing/phasing plans have been developed in coordination with the Government and are provided within the drawing set. The construction sequencing/phasing plans provide proposed construction sequence strategies. Development of an independent construction phasing plan and construction schedule is the responsibility of the Contractor and shall be prepared in coordination with the Contracting Officer. The independent construction phasing plan and construction schedule shall be prepared to avoid impacting production operations within Building 300.

e. During the phased work of this project, occupied portions of Building 300 must remain fully operational including, but not limited to, the following utilities: plumbing, heat, ventilation, air conditioning, fire suppression, fire alarm, electrical power, communications systems, and security systems.

f. Building 300 is an historic facility and requires special coordination to have limited impact on the historic fabric and character defining features of the structure. Work must comply with the SECRETARY OF THE

SECTION 01 11 00.00 22 Page 4

INTERIOR'S STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES. Cross disciplinary coordination drawings are required for review and approval by the Contracting Officer and the PWD-ME Cultural Resources Manager prior to commencement of work.

g. Building 300 has six bays. Bays 1 through 5 are sequenced in a north/south direction and each bay is split into two halves, labeled east and west. Bay 6 is on the east side of the building, adjacent to Bays 3 East and 4 East. Bay 6 is split into two halves, labeled north and south. Work across all disciplines shall be phased in half-bay increments. Work can occur in multiple bays at once.

h. The Government requires and will provide escorts for the Contractor while working inside and on the roof of Building 300. Coordinate with the Contracting Officer to schedule escorts. All work within Building 300 and on the roof require the presence of an escort. The project schedule developed in accordance with Section 01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS) will be used to coordinate required escorts. Notify Contracting Officer weekly of escorts required for the subsequent three weeks of work.

i. Complete installation of all equipment, piping, and ductwork including required testing prior to installation of the new ceiling grid in Bay 5 Second Floor, as part of Bid Option Item No. 4. Any damage to the ceiling grid after installation shall be the responsibility of the Contractor to repair/replace as required.

j. All work on the HX system shall be completed during a single non-heating season, between April 15 and October 15.

k. Structural reinforcement of existing trusses and purlins to support new mechanical HVAC rooftop equipment shall be completed prior to installation of the mechanical HVAC rooftop equipment, including but not limited to ERVs, RTUs, and heating and ventilating units.

l. Removal of the existing ballasted membrane roof and replacement with a fully adhered 0.080 thermoplastic polyolefin (TPO) roof membrane assembly shall be completed prior to installation of the mechanical HVAC rooftop equipment, including but not limited to ERVs, RTUs, and heating and ventilating units.

m. Temporary construction loading on trusses shall only occur between April 15 and October 15. If temporary construction loading on trusses is to occur outside of this period, Contractor will be responsible for shoveling roof clear of snow.

n. Refer to Attachment A of this section for additional overview information regarding the project construction sequencing, constructability, and outage requirements, provided FOR INFORMATION

ONLY.

1.2.3 Location

The work is located at Building 300 at the Portsmouth Naval Shipyard. Note the "Project Site" is the specific area of construction within the limits of work as defined by the contract documents.

SECTION 01 11 00.00 22 Page 5

1.3 PROJECT SEQUENCING REQUIREMENTS

Provide Work Sequencing and Preparation Plan indicating how the work is to be accomplished and incorporating Government directives. The intent of this Plan is to show the Government that a complete understanding of the project requirements are understood including Subcontractors. The Plan must be carefully prepared and must include every aspect of the project including outages that will be required to support the construction and how it is to be accomplished with an absolute minimum of disruption to Government operations. No work may begin on the project until this plan is reviewed and approved by the Contracting Officer.

1.4 OCCUPANCY OF PREMISES

The building will be occupied during performance of work under this Contract.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. While the building is occupied, life safety measures and access to egress components must be maintained. Provide temporary egress lighting, emergency lighting, fire alarm, and fire protection systems along paths of egress.

Parking is a critical component of work on the Portsmouth Naval Shipyard and parking & road outages must be submitted to the Contracting Officer for approval as outlined in the contract documents.

1.5 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.6 LOCATION OF UNDERGROUND UTILITIES

Verify location of underground utilities in accordance with Section

01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME).

1.6.1 Notification Prior to Excavation

Notify the Contracting Officer at least fourteen (14) working days prior to starting excavation work. See Section 01 35 26.00 22 GOVERNMENTAL SAFETY REQUIREMENTS (PWD ME) and attachments for Dig Safe requirements.

1.7 NAVY AND MARINE CORPS INTRANET (NMCI) COORDINATION REQUIREMENTS

1.7.1 NMCI Contractor Access

Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90% complete, rough-in 100% complete, Inside Plant

SECTION 01 11 00.00 22 Page 6

(ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections. Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final stages of each phase of construction. After the Contracting Officer has facilitated coordination meetings between the Contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the Contract duration.

1.8 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located on the Portsmouth Naval Shipyard.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

1.9 Beneficial Occupancy Requirements

All work elements identified as "Required for Facility Delivery (BOD)" included in Section 01 30 00.00 22 ADMINISTRATIVE REQUIREMENTS (PWD ME) Attachment A NRZ Checklist must be completed and accepted by the Contractor's QC Manager prior to submitting the form to the NAVFAC PWD ME Construction Manager for NAVFAC PWD ME signatures.

The Contractor must submit completed NRZ Checklist with the required documentation no later…