Attachment G - Historical Small Business Utilization.pdf

PDF 207 KB Posted

Attached to
B300 Waterfront Machine Shop Roof and HVAC Repair Portsmouth Naval Shipyard
Solicitation number
N4008526R0029
Issued by

About this file

This is Attachment G to federal contract solicitation N40085-26-R-0029, a form for documenting historical small business utilization and subcontracting achievements. The attachment is a template designed for all offerors—both large and small businesses—to complete and submit as supporting documentation for evaluation of small business utilization (Factor 3). The form requires completion for each project submitted under Factor 1 (Corporate Experience) and must be completed in the specified format; submissions using alternative formats or forms created by offerors will not be evaluated.

The form requires offerors to provide detailed project information including contract/task order number, project title, offeror business size classification, performance role (prime contractor, subcontractor, or joint venture member), and whether a subcontracting plan was required. For each project, offerors must complete an "ACTUAL" column with dollar values and percentages for all subcontracting categories and a "GOAL" column where applicable. The subcontracting breakdown categories include overall Small Business Concerns (SB), Large Business Concerns, Small Disadvantaged Business Concerns (SDB), Women-Owned Small Business Concerns (WOSB), HUBZone Small Business Concerns, Veteran-Owned Small Business Concerns (VOSB), and Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). Offerors must provide detailed explanations for any unmet goals and for any projects with zero small business subcontracting achievement. All percentages must be rounded to the nearest tenth of a percent. The form accommodates up to five projects and permits offerors to expand sections as needed to provide sufficient responses.

View the file

Other files

File Type Posted
N4008525R0029 0012.pdf PDF
N4008526R0029 0011.pdf PDF
N4008526R0029 0010.pdf PDF
N4008526R0029 0009.pdf PDF
N4008526R00290008.pdf PDF
N4008526R00290007.pdf PDF
Attachment O - PNSY B300 HAZMAT Report_Rev 1.pdf PDF
Attachment N - PNSY B300 MOD 1 HAZMAT Report.pdf PDF
N4008526R0029 0006.pdf PDF
N4008526R0029 Site Visit Log.pdf PDF
N4008526R0029 0005.pdf PDF
N4008526R0029 0004.pdf PDF
N4008526R0029 0003.pdf PDF
N4008526R0029 0002.pdf PDF
N4008526R0029 0001.pdf PDF
Attachment M - Pass Office Virtual Line Guidance.pdf PDF
Attachment L - DBIDS 5500b.docx DOCX document
Attachment K - SECNAV 5512.pdf PDF
Attachment J - Contractor Exempt Purchase Certificate.pdf PDF
Attachment H - Small Business Participation Commitment.pdf PDF
Attachment B -Pre-Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment A2 - PNSY B300 Roof and HVAC Repairs - Specifications.pdf PDF
Attachment F - Past Performance Questionnaire.pdf PDF
Attachment D - Price Proposal Form.pdf PDF
Attachment C - PIEE Vendor Access Instructions.pdf PDF
Attachment A1 - PNSY B300 Roof and HVAC Repairs - Final - Plans.pdf PDF
N4008526R0029.pdf PDF
Attachment I - Small Business Subcontracting Plan.pdf PDF
Attachment E - Construction Experience Project Data.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment G – Historical Small Business Utilization, Page 1 of 6

(Rev 3/2023)

ATTACHMENT G

HISTORICAL SMALL BUSINESS UTILIZATION

N40085-26-R-0029

This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for the evaluation of Factor 3, Small Business Utilization and Participation. Attachment G documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 1, Corporate

Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment G will not be evaluated. Only complete Attachment G. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response.

INSTRUCTIONS FOR COMPLETING ATTACHMENT G:

• Complete the “PROJECT DETAILS” section for each Project submitted under Factor 1, Corporate Experience.

- Include contract or task order number; project title; the offeror’s business size; whether the contract was performed as a prime, subcontractor, or JV member; and whether a subcontracting plan was required.

• Complete the “ACTUAL” column (required for all projects regardless of whether goals were established)

- Enter dollar values actually subcontracted for each of the categories listed.

- Provide actual percentages calculated as a percentage of total subcontract value, unless goals were calculated as a percentage of total contract value.

• Complete the “GOAL” column - Enter goals, if applicable.

- If the project was a task order and no goals were established at the task order level, only complete the

“ACTUAL” column. Goals for the overarching IDIQ contract should not be included in the “GOAL” column for task orders.

- Goals shall be included for standalone contracts when established.

- Goals can be entered as a percentage of total subcontract value or total contract value based on how the goals were established in the contract award.

• If goals were not established for the project submitted, or if goals were not established for a specific socioeconomic category, check N/A where applicable. The N/A block does not apply to the “ACTUAL” column, as actual subcontracted values are required for ALL projects, regardless of whether goals were established.

• If a goal was unmet for a Project, complete the section below titled “TO BE COMPLETED AS REQUIRED” under item #1.

- Explanation is required for each unmet goal.

- Item #1 is to be completed for each Project with unmet goal(s).

• If a Project has no small business subcontracting achievement (i.e.: $0 subcontracting in (d)), compete the “TO

BE COMPLETED AS REQUIRED” under item #2.

- Item #2 is to be addressed for each Project with no small business subcontracting achievement.

• Enter zeroes (0) where applicable.

DEFINITION OF TERMS IN ATTACHMENT G:

• Total Project Dollar Value: the total contract or task order value; this is the actual value of the contract or task order, rather than a “Not To Exceed” dollar value on an IDIQ type contract.

• Total Self-Performed Value: the contract or task order dollar amount performed by the prime contractor, subcontractor or JV.

• Total Subcontract Value: the dollar amount of the contract or task order performed by subcontractors.

Attachment G – Historical Small Business Utilization, Page 2 of 6

PROJECT DETAILS: Project #1

Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business Small Business

Performed as: Prime Contractor

Subcontractor

JV Member

Subcontracting Plan Required: Yes No

ACTUAL

GOAL

(if applicable)

(a) Total Project Dollar Value: $ Whole

Dollars

Percent of line (a) or

(c)

Whole

Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business

Concerns (SDVOSB)

TO BE COMPLETED AS REQUIRED:

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in

(d)) (if applicable):

Attachment G – Historical Small Business Utilization, Page 3 of 6

PROJECT DETAILS: Project #2

(a) Total Project Dollar Value: $ Whole

Dollars

Percent of line (a) or

(c)

Whole

Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in

Attachment G – Historical Small Business Utilization, Page 4 of 6

PROJECT DETAILS: Project #3

(a) Total Project Dollar Value: $ Whole

Dollars

Percent of line (a) or

(c)

Whole

Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in

Attachment G – Historical Small Business Utilization, Page 5 of 6

PROJECT DETAILS: Project #4

(a) Total Project Dollar Value: $ Whole

Dollars

Percent of line (a) or

(c)

Whole

Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in

Attachment G – Historical Small Business Utilization, Page 6 of 6

PROJECT DETAILS: Project #5

(a) Total Project Dollar Value: $ Whole

Dollars

Percent of line (a) or

(c)

Whole

Dollars

Percent of line (a) or

(c) N/A (b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)

(e) Large Business Concerns $ % $ %

(f) Small Disadvantaged Business Concerns (SDB) $ % $ %

(g) Women-Owned Small Business Concerns (WOSB) $ % $ %

(h) HUBZone Small Business Concerns $ % $ %

(i) Veteran-Owned Small Business Concerns (VOSB) $ % $ %

(j) Service-Disabled Veteran-Owned Small Business

1. Provide a detailed explanation for each unmet goal. Simply acknowledging that a goal was missed is not

2. Provide a detailed explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in

File details come from the government source that posted it. Updated .