This is a Small Business Participation Commitment Document (SBPCD) template that all offerors must complete for evaluation of small business utilization on the Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier project at Naval Station Newport, Newport, Rhode Island (Solicitation N40085-26-R-0001). The document requires offerors to identify their business size classification and applicable socioeconomic categories (SDB, WOSB, EDWOSB, HUBZone, VOSB, or SDVOSB) and serves as the sole form evaluated for Factor 5 scoring regarding small business participation commitments.

Offerors must complete a subcontracting breakdown detailing total contract value, self-performed work value, and subcontracted work value, with a mandatory minimum of 20% small business participation required as a percentage of total contract value. The document requires identification of specific small business subcontractors with firm written commitments (including teaming agreements, joint venture agreements, or signed letters of commitment), listed by company name, small business category, products/services to be provided, and nature of commitment. Large business offerors that do not meet the 20% small business participation minimum must provide detailed explanations, and any large business offeror not intending to subcontract must explain why subcontracting would not result in efficient contract performance. Small businesses intending 100% self-performance are exempted from this explanation requirement. All dollar amounts should be rounded to the nearest whole dollar and percentages to the nearest tenth of a percent.

View the file

Other files

File Type Posted
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Amendment 0008 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment S - Pier 1 - Amendment 003 Drawings.pdf PDF
CJA ML-23-80 - Redacted.pdf PDF
JA ML-26-40 USCG Kaeser Compressed Air System - Redacted.pdf PDF
JA ML-26-43 USCG Sanitary Pumps - Redacted.pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0001 USCG OPC.pdf PDF
Attachment L - Site Visit Log.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment I - SECNAV FORM 5512.pdf PDF
1826479dwg04of05_MECH.pdf PDF
1826479dwg05of05_ELEC.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT F

SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SBPCD)

OFFEROR’S NAME ADDRESS

N40085-26-R-0001 Design-Bid-Build, USCG Offshore Patrol Cutters(OPC) Homeport Pier, Naval Station Newport, Newport RI

Date Prepared

1. Instructions. The SBPCD includes the minimum level of commitment to subcontract with the SBs identified herein. This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for evaluation of Factor 5, Small Business Utilization and Participation. This is the only form that will be evaluated to determine the offeror’s small business participation commitment. Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to this form will not be evaluated. Round dollars to nearest whole dollar and percentages to the nearest tenth of a percent.

2. Offeror Information. Prime contractor size based on the NAICS Code identified in the solicitation (check one):

· Large Business (LB)

· Small Business (SB)

For offerors that identify as a SB, check all applicable socioeconomic categories that apply or check “None” if the offeror does not qualify under any of the socioeconomic categories:

· Small Disadvantaged Business (SDB)

· Woman-Owned Small Business (WOSB)

· Economically Disadvantaged Woman-Owned Small Business (EDWOSB)

· Historically Underutilized Business Zone Small Business (HUBZone SB)

· Veteran-Owned Small Business (VOSB)

· Service-Disabled Veteran-Owned Small Business (SDVOSB)

· None

3. Subcontracting Breakdown.

a. Total contract value (TCV)(including options)$
b. Total value of the work to be self-performed by the prime offeror$
c. Total value of work to be subcontracted$

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI N40085-26-R-0001

Attachment F – SBPCD, Page 2 of 3

4. Small Business Participation.

a. Complete the participation table below with dollars and % of total contract value to be subcontracted.

Small Business Participation (Including Small Business prime offeror’s participation)

Business Category
Dollar Value
% of TCV

Total Small Business (SB) (including all SB socio-economic categories and work self-performed as a SB) The minimum total small business subcontracting requirement for this contract is 20%. If this minimum small business participation requirement is not met, a detailed explanation is required below.

$
%
Small Disadvantaged Business (SDB)
$
%
Woman-Owned Small Business (WOSB)
$
%
Historically Underutilized Business Zone Small Business (HUBZone)
$
%
Veteran-Owned Small Business (VOSB)
$
%
Service-Disabled Veteran-Owned Small Business (SDVOSB)
$
%

If the offeror has not proposed a minimum of 20% for small business participation, provide a detailed explanation:

b. To the greatest extent possible, the table below should identify SBs where firm commitments are in place, to support the minimum small business participation requirement identified in paragraph 4.a (above). If subcontracting firm commitments are NOT in place, do not add the subcontractor to the table below. A SB commitment is a written agreement between a prime and small business to work together on this contract. This commitment in writing is considered the nature of commitment, which can include written teaming agreement, joint venture agreement, mentor-protégé agreement, written/signed letter of commitment from the small business, etc. This table can be expanded as needed.

Company Name
Small Business Category(ies)*
Products/Services, including type & variety of work
Nature of Commitment

*SB, SBD, WOSB, HUBZone SB, VOSB, SDVOSB

5. Explanation/Rationale. If no subcontractors are identified in paragraph 4.b. above, provide detailed explanation for why subcontractors are not identified with firm commitments AND how your firm will be able to achieve the proposed small business participation.

6. If a LB offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance. SBs intending to 100% self- perform are not required to provide an explanation.