This document is a mechanical engineering schedule drawing (M-601) for HVAC equipment specifications, specifically detailing comprehensive schedules for air handlers, energy recovery units, chillers, boilers, pumps, supply diffusers, and return/exhaust registers. The drawing provides technical specifications for multiple mechanical systems, including equipment locations, model numbers, air flow rates, electrical specifications, water flow parameters, and operational characteristics.

Key technical details include multiple air handling units with 3" and 5" configurations, each with specific supply/return fan specifications, air flow volumes between 6,650-7,480 CFM, and requirements for UV light and VFD (variable frequency drive) integration. The energy recovery unit is dedicated to an OSA (outside air) AHU, with detailed electrical and performance metrics. Additional equipment includes three boilers with 92.7% efficiency, multiple pumps with varying horsepower and voltage requirements, and a chiller with specific cooling capacity and efficiency ratings. The document appears to be an as-built mechanical system design drawing, providing comprehensive technical specifications for a complex HVAC infrastructure.

View the file

Other files

File Type Posted
AS4035.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
RR-143-1.pdf PDF
M447.docx DOCX document
AS4030.PDF PDF
AS4208.pdf PDF
Amend 0005.pdf PDF
M448.docx DOCX document
AS4015.pdf PDF
AS4006-4007.pdf PDF
RR143.pdf PDF
AS4207.pdf PDF
M435.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
250443 SOW.pdf PDF
250437 Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
250443 Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
250437 25M061CN BEQ Chiller Repairs Phase II-MCAS New River PD.pdf PDF
25 0443 SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
250443Combined DIV 01 specs small projects.pdf PDF
250443 25M064CN BEQ RR143 Chiller Repairs PD.pdf PDF
250436 25M060CN BEQ Chiller Repairs-MCAS New River SR.pdf PDF
250436 25M060CN BEQ Chiller Repairs-MCAS New River PD.pdf PDF
250443 25M067CN BEQ Chiller Repairs Camp Johnson SR.pdf PDF
25-0437 SOW.pdf PDF
250436 SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
Amend 0002.pdf PDF
250437 25M061CN BEQ Chiller Repairs Phase II-MCAS New River SR.pdf PDF
250437 SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
250436 Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
250436 Combined DIV 01 specs small projects.pdf PDF
250437 Combined DIV 01 specs small projects.pdf PDF
250436 SOW.pdf PDF
Amend 0001.pdf PDF
Combined_D01_specs_small_projects.pdf PDF
25-0440 SOW.doc.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
25M064CN BEQ RR143 Chiller Repairs SOW.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .