AS4208.pdf

PDF 122 KB Posted

Attached to
BEQ Chiller Repairs, MCAS New River, Camp Johson, and Rifle Range
Solicitation number
N4008525R9023
Issued by

About this file

This document is an equipment schedule detailing mechanical system specifications for building P-632, including air handlers, chillers, boilers, pumps, and an energy recovery unit. The air handler schedule lists three Trane units located in mechanical rooms on the first, second, and third floors, with air flow rates ranging from 7,268 to 7,820 CFM and chilled water coil specifications. The chiller is a Trane CGAM060 air-cooled model with a 57.7-ton capacity, operating at 208-3 voltage. Two Hydrotherm KN-10 boilers are installed, each with a 1,000 MBH input and 880 MBH output, running on natural gas. The pump schedule includes four Bell & Gosset pumps: two chilled water pumps and two hot water pumps, with flow rates between 122-211 GPM. An additional SEMCO energy recovery unit is located in the attic mechanical room, with a 5,320 CFM supply air flow and 4,780 CFM exhaust air flow.

View the file

Other files

File Type Posted
AS4035.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
RR-143-1.pdf PDF
M447.docx DOCX document
AS4030.PDF PDF
M446.pdf PDF
Amend 0005.pdf PDF
M448.docx DOCX document
AS4015.pdf PDF
AS4006-4007.pdf PDF
RR143.pdf PDF
AS4207.pdf PDF
M435.pdf PDF
Amend 0004.pdf PDF
Amend 0003.pdf PDF
250443 SOW.pdf PDF
250437 Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
250443 Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
250437 25M061CN BEQ Chiller Repairs Phase II-MCAS New River PD.pdf PDF
25 0443 SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
250443Combined DIV 01 specs small projects.pdf PDF
250443 25M064CN BEQ RR143 Chiller Repairs PD.pdf PDF
250436 25M060CN BEQ Chiller Repairs-MCAS New River SR.pdf PDF
250436 25M060CN BEQ Chiller Repairs-MCAS New River PD.pdf PDF
250443 25M067CN BEQ Chiller Repairs Camp Johnson SR.pdf PDF
25-0437 SOW.pdf PDF
250436 SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
Amend 0002.pdf PDF
250437 25M061CN BEQ Chiller Repairs Phase II-MCAS New River SR.pdf PDF
250437 SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
250436 Contractor Environmental Guide Updated Format_20231009 with ESOP.pdf PDF
250436 Combined DIV 01 specs small projects.pdf PDF
250437 Combined DIV 01 specs small projects.pdf PDF
250436 SOW.pdf PDF
Amend 0001.pdf PDF
Combined_D01_specs_small_projects.pdf PDF
25-0440 SOW.doc.pdf PDF
Combined DIV 01 specs small projects.pdf PDF
SPEC 23 24 00 - HYDRONIC PIPE CLEANING AND FLUSHING PROCEDURES.pdf PDF
25M064CN BEQ RR143 Chiller Repairs SOW.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIR HANDLER SCHEDULE

SYM.

LOCATION

FLOOR

BLDG.

MFGR

MODEL

AIR FLOW CHILLED WATER COIL

ELECTRICAL SUPPLY FAN

OPER.

WT.

(LBS)

FILTERS

MERV 8

(30%)

REMARKS SUPPLY FAN OSA

CFM

MBH

ENT AIR LVG AIR WATER

ROWS FPI

CFM ESP DB WB DB WB FLOW ,l',p ENT LVG VOLTAGE HP

®2

MECH RM.

FIRST

P-632

TRANE

MCCB012

2.25"

1,750

148.3

74.6'F

61.4'F

55 O'F

53.2'F 29.6

GPM

2.54'

45'F

55'F

208-3 7.5

YES

®2

MECH RM.

SECOND

P-632

MCCB012

1,690

134.7

74.6T

60.9T

55 OT

53.3T 26.85

2.13'

55T

208-3 7.5

®2

THIRD

P-632

MCCB014

1,880

158.1

74.6T

60.TF

54.8'F

53.0'F 31.5

2.63'

SST

208-3 10

151 8

CHILLER SCHEDULE

MFGR. &

MODEL No.

SERVICE

TYPE

EVAPORATOR CONDENSER POWER EEFI ClEN ClES (IPLV) OPER.

WT.

(LBS)

REMARKS WATER

PD CAPACITY

WATER PD

(FT)

FOULING

FACTOR

AMBIENT

AIR TEMP.

V-PH MCA MOCP KW/TON EER

FLOW IN OUT GPM IN OUT

CH

1-2

CGAM060

P-632

EXTERIOR AIR

COOLED

137.9

'F

'F

17.8

FT

57.7 TONS

90'F

208-3

287.9

0.764

15.7

BOILER

MANUFACTURER

& MODEL NO.

FLOOR

LOCATION INPUT OUTPUT

THERMA

EFF

FUEL

ENT.

WATER TEMP.

LVG.

WATER TEMP. WATER L'i. P

OPER.

WT.

BURNER ELECTRICAL

REMARKS

V-PH AMPS

B HYDROTHERM

KN-10

P-632

FIRST

MECH RM

1000 MBH

880 MBH

NAT GAS

160'F

180'F

1360 LBS.

120-1

1-4

B HYDROTHERM

KN-10

P-632

MECH RM

1000 MBH

880 MBH

NAT GAS

160'F 180'F

1360 LBS.

120-1

2-4

PUMPS

MANUFACTURER

& MODEL NO.

FLOW

RATE WATER L'i. P RPM

ELECTRICAL OPER.

WT.

(LBS)

PUMP

EFF.

BLDG

FLOOR

LOCATION

REMARKS

VOLTAGE HP

CHWP

1-4

BELL & GOSSET

1510 2 1/2BB

211 GPM

80 FT

73.4

MECH ROOM

CHWP

1510 2 1/2BB

211 GPM

73.4

STAND-BY

HWP

1-4

1510 1 1 /2" AC

122 GPM

7.5 418 65.1

HWP

1510 1 1 /2"BC

122 GPM

7.5 418 65.1

STAND-BY

ENERGY RECOVERY UNIT-DEDICATED OSA AHU

FLOOR

MFGR

MODEL

AIR FLOW CHILLED WATER COIL PREHEAT COIL ELECTRICAL OPER.

WT.

(LBS)

FILTERS

MERV 7

(30%)

REMARKS SUPPLY FAN EXH FAN

MBH

ENT AIR LVG AIR WATER

ROWS FPI

MBH

ENT AIR LVG AIR WATER

ROWS FPI VOLTAGE

SUP FAN EXH FAN

CFM ESP CFM ESP DB WB DB WB FLOWI 6P ENT LVG DB WB DB WB FLOWI 6P ENT LVG HP HP

®2

MECH RM.

ATTIC

P-632

SEMCO

CM7500

FV7500H

3/4"

1.25"

60.9'F

55 OT

53.3'F 46.6

55'F

60.9°F

55 O'F

53.3°F 11.7 s5·F

208-3 5 5

File details come from the government source that posted it. Updated .