B195 Amendment 0012.pdf

PDF 822 KB Posted

Attached to
DESIGN-BUILD (DB), DEMOLITION OF BUILDING 195 NORFOLK NAVAL SHIPYARD (NNSY), PORTSMOUTH, VIRGINIA
Solicitation number
N4008525R2674
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Design-Build demolition project at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. Amendment 0012 revises the proposal due date to 23 January 2026 at 1400 local time, and makes several key specification changes, including:

Modifications include extending various timelines for project deliverables, such as increasing the data required submission from 15 to 45 calendar days, extending the facilitated partnering timeline from 35 to 120 calendar days, and adjusting submission deadlines for the Construction Quality Control Plan, Preconstruction Survey, and Environmental Protection Plan. The amendment also incorporates an updated wage determination (VA20260161) for building construction projects in Portsmouth, VA, which details prevailing wage rates for multiple trade classifications. Offerors are required to submit a signed revised price proposal form, acknowledgement of all amendments, and a new bid bond.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085-25-R-2674

Section SF 30 – Block 14 continuation page (SF 30)

The following have been added by full text:

AMENDMENT 0012

NOTE: All offerors wishing to continue with this procurement must submit a signed revised price proposal form, acknowledgement of all amendments, and new bid bond

This amendment is issued to incorporate the following:

1. Revise Proposal Due Date

2. Provide Continuation Sheet for Updated Specifications

3. Incorporate Updated Wage Determination

4. Provide Attachment Q – Updated Specs (The only changes to the specifications are the changes indicated in the

Continuation sheet in item 2 below.)

1. Revised Proposal Due Date

The due date for submission of revised proposals for those invited to participate is 23 January 2026, no later than 1400 local time via email to Kristy Gerrek at kristy.l.gerrek.civ@us.navy.mil.

2. Continuation Sheet for Updated Specifications

SPECIFICATIONS

Section 01 20 00, Price and Procedures

1.3.1 Data Required

Replace: ’15’ calendar days of notice of award with ’45’.

Section 01 30 00.00 22, Administrative Requirements

1.8.1 Facilitated (Formal) Partnering

1.8.1.a Replace: ‘35’ calendar days with ‘120’.

Section 01 32 17.00 20, Cost Loaded Network Analysis Schedules (NAS)

1.2.1 Preliminary Scheduling Meeting

Delete: ‘Before preparation of the Project Baseline Schedule, and prior to the start of work, meet with the Contracting Officer to discuss the proposed schedule and the requirements of this section.’

Replace With: ‘Before preparation of the Project Baseline Schedule, prior to the start of work, and within 35 days of award, meet with the Contracting Officer to discuss the proposed schedule and the requirements of this section.

Section 01 33 00.05 20, Construction Submittal Procedures

1.2 Submittal Descriptions (SD)

Under SD-03 Product Data add a fourth item to this list: ‘Submit list of proposed products within 20 calendar days of pre-construction meeting.’

1.3.1 Submittal Register

Add sentence to end of paragraph: ‘The Submittal Register will be submitted within 45 calendar days of award.’

Section 01 45 00.00 22, Quality Controls

1.6.1 Construction Quality Control (QC) Plan

Delete: ‘Submit a Construction QC Plan prior to start of construction.’

Replace with: ‘Submit a Construction QC Plan within 45 calendar days of award.’

Section 01 57 19.00 22, Temporary Environmental Controls For NNSY

1.8.1 Preconstruction Survey, Controls and Protection of Features

Delete: ‘Prior to start of any onsite construction activities, perform a Preconstruction Survey and Controls of the project site with the Contracting Officer, and take photographs via the Contracting Officer, showing existing environmental conditions in and adjacent to the site.’

Replace With: ‘Within 15 calendar days of mobilization, perform a Preconstruction Survey and Controls of the project site with the Contracting Officer, and take photographs via the Contracting Officer, showing existing environmental conditions in and adjacent to the site.’

1.9 Environmental Protection Plan

Delete: ‘Submit the EPP within 15 days after Contract award and not less than 10 days before the pre-construction meeting.’

Replace with: ‘Submit the EPP within 20 days after Contract award and not less than 10 days before the pre-construction meeting.’

Section 02 84 33.00 22, Removal and Disposal of Polychlorinated Biphenyls (PCBs)

1.6.1 Pre-Construction Requirements

Delete: ‘Prior to beginning work, the Contractor shall meet with the Contracting Officer and the Environmental department (Code 106.32) to discuss in detail, the PCB draining and removal plan, including work procedures and safety precautions.’

Replace with: ‘Within 65 calendar days of award, the Contractor shall meet with the Contracting Officer and the Environmental department (Code 106.32) to discuss in detail, the PCB draining and removal plan, including work procedures and safety precautions.’

3. Incorporate Updated Wage Determination

"General Decision Number: VA20260161 01/02/2026

Superseded General Decision Number: VA20250161

State: Virginia

Construction Type: Building

County: Portsmouth* County in Virginia.

* INDEPENDENT CITY OF PORTSMOUTH

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date 0 01/02/2026

ASBE0024-006 10/01/2024

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 40.77 20.17+a

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.

BOIL0045-003 01/01/2025

Rates Fringes

BOILERMAKER......................$ 38.97 27.39

BRVA0008-001 05/01/2022

Rates Fringes

BRICKLAYER.......................$ 22.44 10.23

ELEC0080-010 06/01/2025

Rates Fringes

ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 36.85 17.18%+7.80+a

a. Workmen shall take off 1 hour with pay, at the discretion of the employer, on State and National Election days;

Tuesday following the first Monday in November, provided they are qualified and vote.

ELEV0052-005 01/01/2025

Rates Fringes

ELEVATOR MECHANIC................$ 52.06 38.435+a+b

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.

ENGI0147-019 06/01/2025

Rates Fringes

POWER EQUIPMENT OPERATOR

Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100

ft. above ground............$ 40.99 18.05 Cranes under 90 tons........$ 39.99 18.05

IRON0028-006 05/01/2023

Rates Fringes

IRONWORKER, RIGGER...............$ 30.22 11%+14.24

IRON0028-007 05/01/2024

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL.......................$ 31.00 18.28

* PLUM0110-008 11/01/2025

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 33.67 17.50

PLUMBER..........................$ 33.67 17.50

SUVA2013-045 01/11/2016

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 17.00 0.00

CAULKER..........................$ 18.49 1.33

CEMENT MASON/CONCRETE FINISHER...$ 17.48 0.00

GLAZIER..........................$ 19.36 4.68

IRONWORKER, REINFORCING..........$ 27.18 4.13

LABORER: Mason Tender - Brick...$ 13.48 3.27

LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12

LABORER: Common or General, Including Demolition and Pipelaying.......................$ 12.06 2.49

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 20.69 1.35

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03

OPERATOR: Bulldozer.............$ 18.07 3.50

OPERATOR: Forklift..............$ 19.40 7.00

OPERATOR: Loader................$ 21.28 3.17

OPERATOR: Roller................$ 16.25 4.88

PAINTER (Brush and Roller).......$ 16.87 0.00

PAINTER: Spray..................$ 18.10 5.43

ROOFER...........................$ 18.40 2.31

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.24 2.80

SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67

TILE FINISHER....................$ 23.40 0.00

TILE SETTER......................$ 27.80 10.25

TRUCK DRIVER: Dump Truck........$ 15.50 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive

Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210.

END OF GENERAL DECISION

4. Provide Attachment Q – Updated Specs (attached separately)

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0012
Code[0]: N40085
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: N40085-25-R-2674, DESIGN-BUILD (DB), DEMOLITION OF BUIILDING 195 NORFOLK NAVAL SHIPYARD (NNSY), PORTSMOUTH VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Kristy Gerrek, kristy.l.gerrek.civ@us.navy.mil

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511-3095

NameandAddress[0]:
AdministeredBy[0]: See Item 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: N4008525R2674
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 12
EffectiveDate[0]: 01/16/2026
Dated9B[0]: 07/17/2025
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .