Attachment O - Revised Price Proposal Form.pdf

PDF 410 KB Posted

Attached to
DESIGN-BUILD (DB), DEMOLITION OF BUILDING 195 NORFOLK NAVAL SHIPYARD (NNSY), PORTSMOUTH, VIRGINIA
Solicitation number
N4008525R2674
Issued by

About this file

This is a Bid Price Schedule for the NNSY Building 195 Demolition project. The document outlines three primary line items: a base price for the entire demolition work (Line Item 0001), a subtotal for dewatering operations (Line Item 0001A), and two optional line items for additional work. Line Item 0002 covers demolition and removal of unforeseen buried debris, structures, pipes, and concrete, with an estimated quantity of 3,000 tons. Line Item 0003 involves removal and disposal of unsatisfactory excavation spoils, with an estimated quantity of 10,000 tons, to be replaced with imported structural fill or crushed stone.

The bid includes specific provisions for pricing and potential contract adjustments. The Government reserves the right to award Line Items 0002-0003 within 120 calendar days after contract award, with pricing based on unit rates. The evaluation of options will involve adding the prices of optional line items to the base bid for award purposes. Contractors must provide unit prices for all line items, and failure to do so will result in proposal rejection. The document emphasizes that any work under the optional line items requires prior written approval from the Contracting Officer, and measurements will be based on certified truck scale documentation.

View the file

Other files

File Type Posted
B195 Amendment 0012.pdf PDF
Attachment Q - Updated Specs.pdf PDF
B195 Amendment 0011.pdf PDF
B195 Amendment 0010.pdf PDF
B195 Amendment 0009.pdf PDF
B195 Amendment 0008.pdf PDF
B195 Amendment 0007.pdf PDF
B195 Amendment 0006.pdf PDF
Attachment N - Revised Specs.pdf PDF
B195 Amendment 0005.pdf PDF
B195 Amendment 0004.pdf PDF
B195 Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Attachment K - B195 Site Visit Log.pdf PDF
Amendment 0001.pdf PDF
Attachment J- Building 195 NNSY Location.pdf PDF
Attachment A - 1606626_B195-RFP Vol 1 of 2.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item Description Quantity Unit Unit Price Sub-Total Total Price

0001 BASE PRICE: Total Price for Line Item 0001 for the entire work for Project NNSY Building 195 Demolition in accordance with the RFP, complete, but excluding work provided in another Priced line Item.

EA

0001A Subtotal of Base Price - Unit Price for all dewatering operations, containerization, testing, transportation and disposal of all construction dewatering effluent at a licensed facility, complete in accordance with the RFP, but excluding work provided in another line item.

*3,000,000

GALLONS

For Line Item 0001A: Unit price for providing all dewatering operations, containerization, testing, transportation, and disposal of all construction dewatering effluent encountered within planned excavations. Unit price shall include removal and disposal at an off-site permitted RCRA C facility. Discharge quantities in gallons must be certified and approved by the Contracting Officer. Any work under this line item will not proceed without prior written approval and field verification from the Contracting Officer.

Total Price for Line Item 0001 and 0001A: $____________

0002 Option Item No. 1: Unit Price for demolition, removal and disposal of unforeseen buried debris, structures, pipes and concrete below grade 1/2 CY and larger in size encountered within the planned excavation limits complete in accordance with the RFP, but excluding work provided in another line item.

*3,000

TONS

GENERAL BID NOTES

a. Award will be made on the total proposed price for Line Item 0001- 0003.

b. Quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities and FAR 52.211-18, Variations in Estimated Quantity shall apply to these Line Items. In accordance with FAR 52.211-18; If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

For Bid Option Item No. 1: Unit price for providing all work in connection with demolition, removal and disposal of unforeseen buried structures, pipes, debris, creosote treated lumber and concrete, 1/2 CY or larger in size that is encountered within the planned excavation limits and not identified in the Contract Documents for demolition. Buried structures, pipes, debris, creosote treated lumber and concrete smaller than 1/2 CY in size found within the planned excavation limits will be considered incidental to the work.

Unit price shall include removal and disposal at an off-site licensed disposal facility that is permitted to receive creosote treated and inert, non-hazardous material. Unit price shall include handling and transportation. The volume of material removed will be determined based on certified truck scale measurement (tons) of material disposed at the receiving facility and approved by the Contracting Officer. Any work under this line item will not proceed without prior written approval and field verification from the Contracting Officer.

0003 Option Item No. 2: - Unit

Price for removal, temporary stockpiling and disposal of unsatisfactory excavation spoils encountered within planned excavations and replacement with imported structural fill material or with #57 crushed stone, complete in accordance with the RFP, but excluding work provided in another Line Item.

*10,000 TONS $________ $____________ $____________

For Bid Option Item No. 2: Unit price for all work in connection with the removal, disposal, and replacement of excavation spoils classified as Unsatisfactory Material encountered within planned excavations with imported structural backfill or imported #57 crushed stone as specified. Unsatisfactory Material determinations shall be made by the Government Geotechnical Engineer and approved by the Contracting Officer. Soils disturbed by the contractor’s construction activities, or that are excessively wet and soft due to lack of proper site maintenance and protection measures, and lack of specified drainage or excavation dewatering will not be considered unsatisfactory. All excavation spoils classified as Unsatisfactory Material must be anticipated to be non-hazardous PFAS impacted contaminated soil media and must be disposed of at an off-site permitted facility that accepts PFAS impacted contaminated soil media. Unit price shall include all handling and transportation. Unit price shall include removal and disposal at an off-site permitted facility. The volume of material removed and imported backfill required will be determined based on certified truck scale measurement (tons) of material disposed at the receiving facility and approved by the Contracting Officer. Any work under this line item will not proceed without prior written approval of the Contracting Officer and direction of the Government Geotechnical Engineer.

Grand Total Line Items 0001 - 0003 $____________

c. The Government reserves the unilateral right to award Line Items 0002- 0003 to the Contractor at the proposed price within 120 calendar days after the contract award, and in accordance with all bid notes. A firm fixed proposed price is required for Line Item 0001- 0003. No provision is made for economic price adjustment. If Line Item 0002 or 0003 is exercised, the contract completion date will not be extended beyond award of the contract.

d. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s), Line Items 0002 - 0003 to the total price for the Base Bid, Line Item 0001.

Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5).

e. In accordance with FAR 52.217-7; Option for Increased Quantity-Separately Priced Line Item (Mar 1989), the Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree. Note: this is only applicable to bid options with unit priced quantities and is not applicable for unit priced quantities within the Base Bid.

f. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

g. Failure to enter a price for any Line Item will result in a proposal being rejected.

h. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

i. If Line Items 0002- 0003 are exercised, additional bonding and consent of surety is required.

Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.