About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a Design-Build demolition project at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia. The amendment (Number 0005) provides responses to pre-proposal inquiries, clarifies technical details about the demolition of Building 195, and includes two attachments: NNSY Steam information and a Parking Map for Lot 43 and Building 19. Key clarifications include demolition depths, steam line and utility configurations, groundwater testing requirements, and specific details about structural elements to be removed. The amendment addresses contractor questions about soil removal, hazardous materials, electrical and mechanical demolition, and site preparation, providing guidance on the extent of work, testing protocols, and project-specific technical considerations.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N4008525R2674

Section SF 30 – Block 14 continuation page (SF 30)

The following have been added by full text:

AMENDMENT 0005

This amendment is issued to incorporate the following:

1. Provide Responses to Pre-Proposal Inquiries

2. Provide Attachment L – NNSY Steam

3. Provide Attachment M – NNSY Parking Map – Lot 43 and BLDG 19

1. Provide Responses to Pre-Proposal Inquiries

PPI Reference Question Response Page Section Paragraph

10 1 Part 3 Chapter3 6 D30

The existing 2” steam and steam condensate branch piping serving Bldg. 195 (branched off the 16” steam and 6” condensate mains), shall be cut and capped. Coordinate required downtime of the main steam and condensate with the government. Are there isolation valves for Building 195 branches from the main steam and condensate? Are they operational?

Have they been successfully exercised by Facilities ensuring that the work can be conducted during normal work hours?

1. The steam isolation valve on branch line has failed. Steam is still active up to the PRV station.

The isolation valve is on top of the 16” line. A shutdown of the overhead line will be required to properly cut/cap this service branch line and condensate line. A lift will be required to complete this job. This section of overhead piping will have to be secured at B174 and B172.

2. Steam service is still active to this point with an active leak inside the building. It will need to be secured inside the stevens street tunnel. In order to properly cut/cap this service line a steam outage of the tunnel steam system (and other hazardous energy systems) will be required.

These branch lines need to be cut/capped upstream of the valve and not just secured at the valve. This will ensure no valve leaks/failures occur in the future. Two separate outages will be needed to minimize service disruption.

Please see the Attachment L – NNSY Steam provided with Amendment 0005.

1.8.1.4 1.8.1.4 Provide the location of lot 43 the Parking at Burtons Point Road and it proximity to the site. Is this lot on base within walking distance to the site, less than 1/2 mile? Can a map be provided? Do we need to shuttle workers to the site?

The lot is further than a 1/2 mile. Please see Attachment M NNSY Parking Map – Lot 43 and BLDG 195 provided with Amendment 0005.

Attachment 1, Vol 1, page 251 of 522, Part 3, chapter 1 page 2 - AND -page 274 of 522, Part 3, chapter

6/ESR F20,

Scope in Part 3 Ch1 page 2 last paragraph indicates full demo of foundation but Part 3 Ch 2 page 2 last paragraph says to demo just to bottom of pile caps. Then Part 3 Ch 6 ESR F20 page 4 in F201001.2 first paragraph indicates removal of structures to a depth of 30’ below grade. Please clarify extents of demo below grade.

Part 3 Chapter 1 page 2 indicates the demolition of above and below ground elements as described in the DB RFP; therefore, further description within the other sections and drawings describe the extent of demolition for each structural and foundational element. S- 101 and S-301 describes the specific requirements for demolition. It is not the intent for the building structure to be removed completely down to 30' below grade. The deepest known structural element is the deep well plating tank. Please see historical drawing 4002735 in Attachment B for DWPT depth provided with the

RFP.

Attachment 1, Vol 1, page 251 of 522, Part 3, chapter 1 page 2 ---

AND ---

page 274 of 522, Part 3, chapter

Scope in Part 3 Ch1 page 2 last paragraph indicates full demo of foundation but Part 3 Ch 2 page 2 last paragraph says to demo just to bottom of pile caps. Then Part 3 Ch 6 ESR F20 page 4 in F201001.2 first paragraph indicates removal of structures to a depth of 30’ below grade. Please confirm that no timber or concrete piles are to be removed.

Refer to sheets S-101 and S-301 for demolition extent of piles, pile caps, grade beams, and pits. The intent is not to fully remove the piles, but to cut them off to the extent shown in the drawings.

Note that the extent of demolition is dependent on

6/ESR F20,

the proximity to the steam line and is identified in the

RFP.

Attachment A, Vol 1, page 290 of 522; Part 3, chapter

6/ESR G30,

G302001 1 Part 3 Ch ESR G30 G302001 states to provide 3” sewer pipe to connect Building 1512 to the existing sewer piping, however UFC 3-240-01 Wastewater Collection, in section 16-5 calls for minimum 6” gravity piping for mains. Please clarify size of main to be used.

Bid per RFP documents.

Intent is to connect proposed 3" wastewater pipe to existing 3" wastewater pipe. UFC 3- 240-01 is not applicable for this scenario.

Attachment A, Vol 1, page 291 of 522; Part 3, chapter

6/ESR G30,

G303007 5 Is there an existing stormwater permit for this site? If so, can it be provided?

There is not an existing stormwater permit for this site.

Attachment A, Vol 2, page 33 of 1234; sheet

AD101

In Volume 2 of the RFP in Part Six Attachment A page 33 of 1234 the demolition is shown as phased. We did not see phased demo described in the written narrative. Is the demo to be phased as shown on sheet AD101?

Per Part 3 Chapter6 /ESR F20 - Page 1. “The RFP drawings in Part 6 indicate potential demolition phases based on the different areas of the facility. The DB contractor is responsible for developing a comprehensive design schedule, demolition schedule, and phasing plan in accordance with the criteria and requirements stated throughout this RFP." The contractor is not required to demolish the building in the sequence as shown in the architectural drawings.

The DB contractor is responsible for developing the demolition phasing plan.

Attachment A, Vol 1, page 258 of 522; Part 3, chapter 3,

3.2.4 Figure 1 The sketch provided to show proposed

wastewater line to Building 1512 has a label and leader stating, "Demo existing wastewater treatment plant".

This leader appears to point to the 4 holding tanks to be demolished. Please confirm there is no demo of a WWTP in the scope.

Confirmed, there is no WWTP demo in this scope. Proceed per civil sheet CD100 which shows demo of holding tanks.

Can 21B be used to stabilize the site once demolition is completed prior to new construction activities?

VDOT 21A subbase material is required for the full depth of the subbase material specified in the proposed asphalt pavement buildup on civil page CS100. Contractor must install dense binder course per civil sheet CS100 prior to starting new construction activities and repair sense binder course as required.

2 Bid Form Please refer to the bid form CLIN 0002. Please provide the approximate depth of the undercut required for this CLIN will not exceed 20' in depth. If the contractor is to remove soils beyond 20' deep, an engineered system will need to be provided, which will not be included in the standard unit price.

Depth of excavation for structural elements is identified on drawings S- 101 and S-301 in Attachment A and throughout the RFP. Soil removal is required only to the extent required for removal of building & structural elements to the extent prescribed in the RFP. It is not the intent for the contractor to remove soils or other structural elements below the identified depths. The deep well plating tanks is the deepest known structure. S-101 and S- 301 identify the depth of the tank. The contractor must determine if an engineered system is required. Line Item 0002 should include for any unforeseen demolition, removal, and disposal of debris, structures, etc. if it impacts the removal of B195 as identified or will impact the final paved site.

2 Bid Form Please refer to the bid form CLIN 0003. Please provide the approximate depth of the undercut required for this CLIN will not exceed 20' in depth. If the contractor is to remove soils beyond 20' deep, an engineered system will need to be provided, which will

Depth of excavation for structural elements is identified on drawings S- 101 and S-301 in Attachment A and throughout the RFP. Soil removal is required only to the extent required for not be included in the standard unit price.

removal of building & structural elements to the extent prescribed in the RFP. It is not the intent for the contractor to remove soils or other structural elements below the identified depths. The deep well plating tanks is the deepest known structure. S-101 and S- 301 identify the depth of the tank. The contractor must determine if an engineered system is required. Line Item 0003 should include for any unforeseen stockpiling and disposal of unsatisfactory spoils.

2 Bid Form Please refer to bid form CLIN 0002.

Please verify that if the contractor encounters old creosote treated timber in the form of wood piles, the contractor may cut the pile in lieu of removing the entire pile. If the contractor is to remove the entire wood pile, please provide the approximate depths of the wood piles that are to be removed.

Piles are to be removed to the depth as identified on drawings S-101 and S-301 and to the elevations described in the RFP.

Unforeseen timber piles not identified for demolition are not required to be removed in their entirety, but should follow the guidance of like conditions and criteria as defined in the RFP.

1 Bid Form Please provide the levels and type of ground water contamination as the contractor will be required to provide different testing and hauling methods depending on the level and type of contamination.

Requirements for groundwater testing and containerization are identified in 01 57 19.00 22 and throughout the RFP. It is the responsibility of the contractor to develop the means and methods of dewatering, testing, containerization, and disposal of groundwater.

All excavated groundwater will be considered non-hazardous contaminated fluid.

1 Bid Form Please verify if the contractor will be required to test for PFAS when dewatering.

The contractor is required to test for PFAS for dewatering and suspected PFAS containing soils.

1 Bid Form Please provide the known levels of PFAS concentration levels, if applicable.

Please see Part 6 - Attachment C of the RFP for available information regarding PFAS. It is the responsibility of the contractor to perform PFAS testing of dewatering and soil testing per the criteria of the RFP.

1 Bid Form In lieu of requiring the removal of the ground water from site, please verify that the water may be treated on site and then placed back on site once treated.

Treatment and disposal on site is not acceptable.

9 011400.00

1.7 Please verify if the contractor will be

required to protect the adjacent railroad track.

The existing rail track is to remain, and therefore it must be protected by the contractor.

1 13329 Please verify that the High Performance and Sustainable Building specification may be waived for this project as the contractor is not replacing the building.

The High Performance and Sustainable Building specification should be included in the design, and tailored as applicable to the project scope.

12 013526.00

1.7.1.2 Please verify that the quality control

manager cannot be the SSHO on this project, as stated in section 013526.00 22.

SSHO is Level One, therefore, the SSHO cannot share any other role.

12 013526.00

1.7.1.2 Please verify that the superintendent

may also serve as the SSHO for this project.

No, SSHO is Level One, therefore, the SSHO cannot share any other role.

38 013526.00

3.9.1 Please verify that the contractor will

need to include the cost of 3rd party utility location services as indicated in section 013526.00 22 3.9.1.

Refer to specification section 01 35 26.00 22,

1.8.3.9 – Subsurface Utility Location Plan (SSUP) submittal requirements. Contractor is responsible for 3rd party locate for development of

SSUP.

3 014500.00

1.5.1 Please verify that the QC manager may

also serve as the Superintendent.

No, SSHO is Level One, therefore, the SSHO cannot share any other role.

5 015000.00

2.1.2 Please provide a detail and quantity of

the project identification sign(s) that are required per section 015000.00 22 2.1.2.

It is the contractor's responsibility to determine and provide signage design per the criteria identified in the RFP.

6 015000.00

2.3 Please verify that the intent is for the

contractor to install a perimeter fence around the project site.

Contractor is to preserve the CIA fence per civil sheet CS100. Contractor is to provide temporary fencing per section 2.3

FENCING.

13 015719.00

1.7.1.1.3.2 Please provide the quantity, sizes and

locations of all asbestos that will need to be abated for this project.

Available Hazardous material report is included in Part 6 - Attachment C of the RFP. Hazardous material drawings are included in Attachment A.

16 015719.00

1.8.4 Please verify that the environmental

manager, as required per section

015719.00 22 1.8.4, may also serve as the SSHO, QC manager or the superintendent.

No, SSHO is Level One, therefore, the SSHO cannot share any other role.

16 015719.00

1.8.5 Please verify that the environmental

coordinator may also serve as the environmental manager, SSHO, QC manager and the superintendent.

No, SSHO is Level One, therefore, the SSHO cannot share any other role.

34 015719.00

3.10.8.7 Please provide all locations and

quantities that contain lead paint, as indicated in section 015719.00 22 3.10.8.7, for bidding purposes.

Available Hazardous material report is included in Part 6 - Attachment C of the RFP. Hazardous material drawings are included in Attachment A.

34 015719.00

3.10.8.8 Please provide all locations and

quantities that contain PCBs, as indicated in section 015719.00 22 3.10.8.8, for bidding purposes.

Available Hazardous material report is included in Part 6 - Attachment C of the RFP. Hazardous material drawings are included in Attachment A.

34 015719.00

3.10.8.9 Please provide all locations and

quantities of lighting ballast and lamps that contain PCBs, as indicated in section 015719.00 22 3.10.8.9, for bidding purposes.

Available Hazardous material report is included in Part 6 - Attachment C of the RFP. Hazardous material drawings are included in Attachment A.

58 2 Part 3 2.6 Please provide the thickness of the paving desired after the building is demolished, for bidding purposes.

Refer to CS100 in Attachment A of the RFP.

59 2 Part 3 2.6 Please provide the approximate sizes of the sump pits, underground concrete tank and steam pit that will need to be removed.

Refer to sheet S-101 and S-301 for sizes in Attachment A and Attachment B of the RFP for historical drawings.

60 2 Part 3 2.6 Please provide the approximate depth (top of concrete tank) for the

Refer to sheet S-101 and S-301 for sizes in underground concrete tank that will need to be removed.

Attachment A and Attachment B of the RFP for historical drawings.

61 3 Part 3 3.2.4 Please provide the size of the existing two overhead wastewater pipes that are to be reconfigured into one underground wastewater pipe.

Refer to MP101 in Attachment A of the RFP.

62 2 Part 3 2.6 Please provide the size of the underground tank that is to be removed as this tank is not shown on the as-built drawings. Please include the length, width, depth of the tank along with the approximate depth of the top of tank, so the contractor may include the proper methods of removal.

Refer to sheets S-101 and S-301 in Attachment A of the RFP. Refer to historical drawings in Attachment B.

63 2 Part 3 2.6 Please provide the size of the 3 sump pits that are to be removed as this tank is not shown on the as-built drawings.

Please include the length, width, depth of the pits so the contractor may include the proper methods of removal.

Refer to sheets S-101 and S-301 in Attachment A of the RFP. Refer to historical drawings in Attachment B.

64 2 Part 3 2.6 Please provide the size of the steam pit that is to be removed as this tank is not shown on the as-built drawings. Please include the length, width, depth of the pit so the contractor may include the proper methods of removal.

Refer to sheets S-101 and S-301 in Attachment A of the RFP. Refer to historical drawings in Attachment B.

65 2 Part 3 3.2.4 Please provide as-builts for the wastewater piping support that is to be removed that feeds the wastewater treatment plant this is to be removed.

Wastewater treatment plant is not being demolished. Waste line from B1512 to the WWTP needs to be rerouted per the criteria in the RFP.

Refer to available drawings in Attachment B Historical drawings and on MP101 in Attachment A of the RFP.

66 2 Part 3 3.2.4 Please provide as-builts for the wastewater treatment plant that needs to be removed.

Wastewater treatment plant is not being demolished. Waste line from B1512 to the IWTP needs to be rerouted per the criteria in the RFP.

67 2 Part 3 3.2.4 Please provide a hazmat report on the wastewater treatment tanks/plant that will need to be removed.

Available Hazardous material report is included in Part 6 - Attachment C of the RFP.

68 2 Part 3 3.2.4 Please provide the existing thickness of the pavement that will need to be removed for the new wastewater line required per paragraph 3.2.4.

Assume the pavement thickness is 12-inches total with a 6" aggregate base layer and a varying thickness of upper asphalt layers. Refer to geotechnical report in

RFP.

71 2 Part 3 3.2.4 Please verify what building are to be removed that are adjacent to the wastewater treatment tanks. There are two buildings that look like they are a part of the treatment plant.

Only the tanks and buildings shown on the drawings in Attachment A of the RFP are to be removed.

72 2 Part 3 3.2.4 Please provide the depths of the two sanitary sewer lines that the contractor will be tying into, for bidding purposes.

Assume the wastewater lines are between 2-ft to 4-ft below grade.

73 2 Part 3 2.6 As the contract documents state to demolish Building 195 foundations to the bottom of pile cap elevation, please verify that the contractor will not need to remove the entire 10'x14'x18.5' pit in the deep well plating tanks.

The pit will be removed in its entirety per the S-101 and S-301. These drawings provide details that show extent of demolition for each identified structural element.

74 2 Part 3 2.6 Please provide an as built of the steam pipe support foundations as the contractor may be required to provide piling in order to prevent undermining the steam pipe support foundations.

As-builts of the steam line foundations are not able to be provided. Foundations are assumed to be similar to the foundations at the steam plant. All existing historic drawings are included in the RFP.

75 General Please verify if the existing railroad tracks will need to remain.

Railroad tracks will remain and must be protected by the contractor.

76 CS100 Part 6, Attachment A

NA There is a note on this sheet that describes reconfiguration of existing waste lines and electrical conduit, and refers the reader to Part 3, Ch. 3, Par.

3.2.4 for details. This paragraph under Part 3 (and the associated photo) excludes information about the conduit. Please provide additional information.

Assume electrical conduit is 1" GRS and to be rerouted underground.

77 1 Part 3 Chapter 6

D30 Please verify that the contractor will not need to include mechanical demolition for the wastewater treatment plant, other than the 3" pipes leaving building 1512. If additional mechanical demolition will need to occur, please provide a scope of work, for bidding purposes.

Confirmed. Provide demolition as indicated in the RFP.

78 1 Part 3 Chapter 6

D50 Please verify that the existing underground conduits/duct bank may

The existing primary feeder shall be remain in place. If not, please provide an existing utility plan showing the lines and duct banks that are to be removed. If existing drawings do not exist, please provide estimated quantities of each type of conduit/wire and each size of duct bank to be removed, for bidding purposes.

disconnected in Building 405 and the feeder to Building 195 shall be removed as shown on Drawing Sheet ES101 in Attachment A of the RFP.

The existing underground conduits/duct bank shall remain in place beyond the footprint of the Building 195 demolition.”

79 1 Part 3 Chapter 6

D50 Please verify that the contractor will not need to include electrical demolition for the wastewater treatment plant. If electrical demolition will need to occur, please provide a scope of work, for bidding purposes.

Confirmed. Water treatment plant is not demolished as a part of this project.

82 3 Part 3 Chapter 6

G403001 Please provide the location of manhole 265.

Refer to ES101 in Attachment A of the RFP.

83 1 D40 Please provide the scope of work required for the new fire protection system, if applicable.

The D40 section specifies fire protection scope/requirements for the demolition (during construction) activities. There are no “new” fire protection systems required.

84 9 part 4 G103001 1.2

Please provide the required finished elevation for the top of pavement for this project, for bidding purposes.

Elevation will vary with slope as proposed paving will tie to existing at limits of paving shown on sheet CS100, refer to survey sheets V-101 through V- 103 in attachment F of the RFP for elevation data at the existing building limits.

85 Hazardous Material

As the plating of material occurred, it is assumed that the dipping material may have fallen onto the concrete slab.

Please verify that abatement of the concrete slab will not be required. If it is required, please provide a quantity and classification of the waste required to be abated.

Abatement is not required.

Waste characterization sampling and analysis of building debris to be performed by the contractor in accordance with VA DEQ SWM Regulations.

86 Hazardous Material

Please provide the classification of waste that is to be removed for the ground water.

Groundwater is required to be sampled and characterized by the contractor prior to discharge to obtain permit.

89 Hazardous

Material Please provide the ppm for all hazardous material that are to be encountered onsite.

Refer to HazMat report and Geotech report provided in the RFP.

2. Provide Attachment L – NNSY Steam (attached separately)

3. Provide Attachment M – NNSY Parking Map – Lot 43 and BLDG 19 (attached separately)

Amendment 0001.pdf
23R2656 Amendment 0001
23R2656 Amendment 0004
Pages from 23R2541 Amendment 0003-2

Amendment 0001 continuation page

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0005
Code[0]: N40085
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: N40085-25-R-2674, DESIGN-BUILD (DB), DEMOLITION OF BUIILDING 195 NORFOLK NAVAL SHIPYARD (NNSY), PORTSMOUTH VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Jator de Leon, jator.v.deleon.civ@us.navy.mil

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511-3095

NameandAddress[0]:
AdministeredBy[0]: See Item 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: N4008525R2674
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 12
EffectiveDate[0]: 08/19/2025
Dated9B[0]: 07/17/2025
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]: