This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a design-build demolition project at Norfolk Naval Shipyard in Portsmouth, Virginia. Amendment 0007 incorporates three key changes: 1) updates to the Bid Price Schedule regarding excavation spoils disposal, including requirements for non-hazardous PFAS impacted contaminated soil media, 2) responses to multiple pre-proposal inquiries covering topics such as monthly exposure reports, medical examinations, railroad track safety, project scheduling, and field office requirements, and 3) a separately attached Revised Price Proposal Form. The amendment is issued by NAVFAC Mid-Atlantic Contracting Core, with an effective date of 08/28/2025, and provides clarifications and guidance for potential contractors bidding on the building demolition project.

The pre-proposal inquiry responses provide specific details about project requirements, including confirmation that: medical examinations are required only for abatement contractors, the adjacent track is active but will be under an outage, a temporary field trailer is required, QC and field offices do not need to be separate, and excavation spoils must be disposed of at an off-site permitted facility accepting PFAS impacted contaminated soil media. The contract point of contact is Jator de Leon, and the solicitation number is N4008525R2674.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N4008525R2674

Section SF 30 – Block 14 continuation page (SF 30)

The following have been added by full text:

AMENDMENT 0007

This amendment is issued to incorporate the following:

1. Provide Continuation Sheet for Bid Price Schedule

2. Provide Responses to Pre-Proposal Inquiries

3. Provide Attachment O – Revised Price Proposal Form

1. Provide Continuation Sheet for Bid Price Schedule

CONTINUATION SHEET

BID PRICE SCHEDUE:

Lim Item 0003, Option Item No. 2

ADD the following:

"All excavation spoils classified as Unsatisfactory Material must be anticipated to be non-hazardous PFAS impacted contaminated soil media and must be disposed of at an off-site permitted facility that accepts PFAS impacted contaminated soil media." after the third sentence from the top starting with “Soils disturbed by”

DELETE the following:

"RCRA D" from the third sentence from the bottom starting with “Unit price shall”

2. Provide Responses to Pre-Proposal Inquiries

PPI Reference Question Response

Page Section Paragraph

6 10 01 14 00.00 1.4

Specification states the following: 1.4

MONTHLY EXPOSURE REPORTS:

Provide a Monthly Exposure Report and attach to the monthly billing request. This report is a compilation of employee-hours worked each month for all site workers, both Prime and subcontractor. Failure to submit the report may result in retention of up to 10 percent of the voucher. 1. Please

"Monthly Exposure Report is found in 01 35 26.00 22

- 1.4. Daily reporting for exposure is required by the abatement contractor and 3rd party monitoring firm.

provide a list of exposures that will be required to be tested? 2. Does this apply to all persons working onsite, supervising work, delivery drivers, visitors, etc.?

15 11 02 83 00 1.5.2.4

1.5.2.4 Medical Examinations

Submit pre-work blood lead levels and post-work blood lead levels for all workers performing lead, cadmium, chromium activities during the execution of the work.

Initial medical surveillance as required by 29 CFR 1926.62, 29 CFR 1926. Does this requirement extend to site supervision, QC, and SSHO personnel?

This requirement is for the abatement contractor(s) / sub-contractors only. It is required for persons working to abate the lead-paint and asbestos prior to demolition. It does not apply to the GC's site supervision, QC, and SSHO personnel.

9 011400.00 22 1.7

Please verify if the track adjacent to the work is active. If so, please verify that the contractor will be required to provide flaggers while work is occurring adjacent to the track.

1. Yes, the track adjacent to the work is active.

2. Track will require an outage to be submitted by NAVFAC (no flaggers will be required).

9 011400.00 22 1.7

Please verify if the track adjacent to the work is active. If so, please provide the name of the entity who owns the track so the contractor may include the proper safety requirements that the entity requires.

1. Yes, the track adjacent to the work is active.

2. NAVFAC owns the track. Track outage is sent to Brian Whelan at brian.whelan2.civ@us.nav y.mil for operational purposes. The track will be out of service while work is being done.

9 011400.00 22 1.7

Please provide additional insurance requirements that the contractor will need to include while working next to the railroad track, if applicable.

No additional insurance requirements once I tag out the track with the submitted outage.

5 013217.00 20 1.9 Please verify that the designated project scheduler may also be the project manager, as long as they meet the qualifications listed in section 1.9.1. If not, please provide a list of qualifications that the project scheduler must meet.

If scheduler will NOT be 3rd party, submit validation that individual meets 1.9.1 specs for review and approval.

12 013526.00 22 1.7.1.3 Please verify that the contractor will need to follow the qualifications for the superintendent under section 013000.00 22

1.5.1 and therefore can omit the qualifications for superintendent under section 013526.00 22 1.7.1.3.

"UFGS - 013000 section 1.7.1

10 years’ experience. 5 years’ experience on similar projects.

10 015000.00 22 3.5.1 Please verify that the contractor will need to provide a temporary administrative field office, as required per section 015000.00 22 3.5.1.

Yes field trailer is required

11 015000.00 22 3.5.2 Please verify that the contractor will need to provide a quality control manager records and field office that is separate from the temporary administrative field office.

QC office and field office are not required to be separate.

2 Part 3 3.2.4 Please verify if the covered walkway that is above the waste water treatment plant will need to be removed. If so, please provide the as-builts along with the limits of the demolition as this appears to run into multiple different buildings that are to remain.

We are unaware of a covered walkway. Please provide additional information or specify.

Bid Price Schedule item 0003 Option Item No. 2 states “Unit price shall include removal and disposal at an off-site permitted RCRA D facility.” Bid Price Schedule Line Item 0001A states in the “For Line Item 0001A that all dewatering effluent “shall include removal and disposal at an off-site permitted RCRA C facility. A RCRA C facility is associated with hazardous waste. The materials that are described in Bid Price Schedule item 0003 Option Item No. 2 may have been exposed to the contaminated groundwater.

If the materials described in Bid Price Schedule item 0003 Option Item No. 2 have been exposed to groundwater wouldn’t they also need to be managed as hazardous waste and disposed of at a RCRA C facility?

Please see Attachment O – Revised Price Proposal Form: "All excavation spoils classified as Unsatisfactory Material must be anticipated to be non-hazardous PFAS impacted contaminated soil media and must be disposed of at an off-site permitted facility that accepts PFAS impacted contaminated soil media."

3. Provide Attachment O – Revised Price Proposal Form (attached separately)

Amendment 0001.pdf
23R2656 Amendment 0001
23R2656 Amendment 0004
Pages from 23R2541 Amendment 0003-2

Amendment 0001 continuation page

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0007
Code[0]: N40085
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: N40085-25-R-2674, DESIGN-BUILD (DB), DEMOLITION OF BUIILDING 195 NORFOLK NAVAL SHIPYARD (NNSY), PORTSMOUTH VIRGINIA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Jator de Leon, jator.v.deleon.civ@us.navy.mil

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511-3095

NameandAddress[0]:
AdministeredBy[0]: See Item 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: N4008525R2674
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 4
EffectiveDate[0]: 08/28/2025
Dated9B[0]: 07/17/2025
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .