This document is a Price Proposal Form for a design-bid-build water treatment plant (WTP) clearwell repair and replacement project at Naval Station Great Lakes in Illinois. The pricing schedule includes detailed line items for various construction components, such as new clearwell substructure and superstructure, transfer pump station work, sitework, mechanical utilities, environmental mitigation, instrumentation and controls, and electrical work. The document provides unit pricing opportunities for specific repair tasks like structural crack repair, delamination repair, and soil replacement. An additional option item is included for valve replacement. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command under solicitation number N4008525R2543, with bidders required to provide unit prices for each specified line item across multiple project elements.

View the file

Other files

File Type Posted
Price Proposal Form REVISED 4-23.docx DOCX document
JandA ML-25-25 25R2543 Clearwell JA Hach Network Switches_Redacted.pdf PDF
JandA ML-25-22 25R2543 Clearwell JA Hach Chlorine Analyzer Brand Name_Redacted.pdf PDF
JandA ML-25-24 25R2543 Clearwell JA Industrial Automation Equipment_Redacted.pdf PDF
N4008525R2543 0006.pdf PDF
JandA ML-25-23 25R2543 Clearwell JA Historian Software Redacted.pdf PDF
PPI 131 - Installation Apperance Plan_Signage Section 6.pdf PDF
PPI 136 - Soil Characterization data.pdf PDF
N4008525R2543 0005.pdf PDF
N4008525R2543 0004.pdf PDF
N4008525R2543 0003.pdf PDF
N4008525R2543 0002.pdf PDF
N4008525R2543 CLEARWELL SITE VISIT SIGN-IN SHEET.pdf PDF
N4008525R2543 0001.pdf PDF
N4008525R2543 Solicitation.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment H - Historical Small Business Utilization.docx DOCX document
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment J - 12_1704005_Clearwell_IFC DRAWINGS.pdf PDF
Attachment K - NSGL Clearwell Slide Presentation Final.pdf PDF
Attachment C- Construction Experience Project Data.docx DOCX document
Attachment I - NSGL FINAL SPECS.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Price Proposal Form.docx DOCX document
Attachment G- Individual Small Business Subcontracting Plan.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
1
BASE PRICE: Total Price for the entire work for NAVSTA Great Lakes WTP Clearwell Repair/Replacement in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1
EA
1A
Subtotal of Base Price for the entire work for the New Clearwell Substructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
2
EA
1B
Subtotal of Base Price for the entire work for the New Clearwell Superstructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
2
EA
1H
Subtotal of Base Price for the entire work for the Existing Clearwell Modifications, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
1C
Subtotal of Base Price for the entire work for the Transfer Pump Station Substructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
1D
Subtotal of Base Price for the entire work for the Transfer Pump Station Superstructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
1E
Subtotal of Base Price for the entire work for the Transfer Pump Station Interior Work, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
1F
Subtotal of Base Price for the entire work for the Transfer Pump Station Backwash Pump, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
2
EA
1G
Subtotal of Base Price for the entire work for the Transfer Pump Station Transfer Pump, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
4
EA
1I
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Paving, Site Prep, and Landscaping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
1J
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Mechanical Utilities and Yard Pipe, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
1K
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Environmental Mitigation, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
1L
Subtotal of Base Price for the entire project, for Instrumentation and Controls, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
1M
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Electrical Work, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
1N
Unit Price for providing Clearwell structural crack repair as identified per Detail C4 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1000
LF
$_____
$_____
1O
Unit Price for providing Clearwell delamination repair as identified per Details B4 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item.
100
SF
$_____
$_____
1P
Unit Price for providing Clearwell delamination repair as identified per Details A1 and A2 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item.
100
SF
$_____
$_____
1Q
Unit Price for replacing in-place soil that is undercut in accordance with Note 1D on sheet CG100 complete in accordance with the drawings and specifications, but excluding work provided in another line item.
10
CY
$_____
$_____
2
Option Item No. 1: Price for providing all work in connection with the replacement of Valve 596, complete and in accordance with the drawings and specifications, but excluding valve and work provided in another Priced line item.
1
EA

File details come from the government source that posted it. Updated .