Attachment H - Historical Small Business Utilization.docx

DOCX document 42 KB Posted

Attached to
DESIGN-BID-BUILD, WTP CLEARWELL REPAIR/REPLACEMENT, NAVAL STATION GREAT LAKES, GREAT LAKES, ILLINOIS
Solicitation number
N4008525R2543
Issued by

About this file

Attachment H is a historical small business utilization form for the Design-Bid-Build Water Treatment Plant (WTP) Clearwell Repair/Replacement project at Naval Station Great Lakes (Solicitation N4008525R2543). The document provides detailed instructions for contractors to document their past small business subcontracting performance across up to five different projects, requiring comprehensive reporting on total project values, self-performed work, and subcontractor breakdowns.

The form mandates contractors to report subcontracting achievements across multiple socioeconomic categories, including overall small business, small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone, veteran-owned small business (VOSB), and service-disabled veteran-owned small business (SDVOSB). Contractors must provide actual subcontracting dollars and percentages, explain any unmet goals, and justify projects with zero small business subcontracting. This documentation will be used to evaluate Factor 5: Small Business Utilization and Participation for the Naval Facilities Engineering Command contract opportunity.

View the file

Other files

File Type Posted
Price Proposal Form REVISED 4-23.docx DOCX document
JandA ML-25-25 25R2543 Clearwell JA Hach Network Switches_Redacted.pdf PDF
JandA ML-25-22 25R2543 Clearwell JA Hach Chlorine Analyzer Brand Name_Redacted.pdf PDF
JandA ML-25-24 25R2543 Clearwell JA Industrial Automation Equipment_Redacted.pdf PDF
N4008525R2543 0006.pdf PDF
JandA ML-25-23 25R2543 Clearwell JA Historian Software Redacted.pdf PDF
PPI 131 - Installation Apperance Plan_Signage Section 6.pdf PDF
PPI 136 - Soil Characterization data.pdf PDF
N4008525R2543 0005.pdf PDF
Price Proposal Form REVISED.docx DOCX document
N4008525R2543 0004.pdf PDF
N4008525R2543 0003.pdf PDF
N4008525R2543 0002.pdf PDF
N4008525R2543 CLEARWELL SITE VISIT SIGN-IN SHEET.pdf PDF
N4008525R2543 0001.pdf PDF
N4008525R2543 Solicitation.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment J - 12_1704005_Clearwell_IFC DRAWINGS.pdf PDF
Attachment K - NSGL Clearwell Slide Presentation Final.pdf PDF
Attachment C- Construction Experience Project Data.docx DOCX document
Attachment I - NSGL FINAL SPECS.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Price Proposal Form.docx DOCX document
Attachment G- Individual Small Business Subcontracting Plan.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DBB WTP CLEARWELL REPAIR/REPLACEMENTN40085-25-R-2543
NAVAL STATION GREAT LAKES, GREAT LAKES, ILLINOISAttachment H

ATTACHMENT H

HISTORICAL SMALL BUSINESS UTILIZATION

N4008525R2543

This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for the evaluation of Factor 5, Small Business Utilization and Participation. Attachment H documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 1, Corporate Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment E will not be evaluated. Only complete Attachment H. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response.

INSTRUCTIONS FOR COMPLETING ATTACHMENT E:

· Complete the “PROJECT DETAILS” section for each Project submitted under Factor 1, Corporate Experience.

· Include contract or task order number; project title; the offeror’s business size; whether the contract was performed as a prime, subcontractor, or JV member; and whether a subcontracting plan was required.

· Complete the “ACTUAL” column (required for all projects regardless of whether goals were established)

· Enter dollar values actually subcontracted for each of the categories listed.

· Provide actual percentages calculated as a percentage of total subcontract value, unless goals were calculated as a percentage of total contract value.

· Complete the “GOAL” column - Enter goals, if applicable.

· If the project was a task order and no goals were established at the task order level, only complete the “ACTUAL” column. Goals for the overarching IDIQ contract should not be included in the “GOAL” column for task orders.

· Goals shall be included for standalone contracts when established.

· Goals can be entered as a percentage of total subcontract value or total contract value based on how the goals were established in the contract award.

· If goals were not established for the project submitted, or if goals were not established for a specific socioeconomic category, check N/A where applicable. The N/A block does not apply to the “ACTUAL” column, as actual subcontracted values are required for ALL projects, regardless of whether goals were established.

· If a goal was unmet for a Project, complete the section below titled “TO BE COMPLETED AS REQUIRED” under item #1.

· Explanation is required for each unmet goal.

· Item #1 is to be completed for each Project with unmet goal(s).

· If a Project has no small business subcontracting achievement (i.e.: $0 subcontracting in (d)), complete the “TO BE COMPLETED AS REQUIRED” under item #2.

· Item #2 is to be addressed for each Project with no small business subcontracting achievement.

· Enter zeroes (0) where applicable.

DEFINITION OF TERMS IN ATTACHMENT E:

· Total Project Dollar Value: the total contract or task order value; this is the actual value of the contract or task order, rather than a “Not To Exceed” dollar value on an IDIQ type contract.

· Total Self-Performed Value: the contract or task order dollar amount performed by the prime contractor, subcontractor or JV.

· Total Subcontract Value: the dollar amount of the contract or task order performed by subcontractors.

PROJECT DETAILS: Project #1

Contract/Project Number/Task Order Number:

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #2

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #3

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #4

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #5

Project Title:

Offeror Size: Large Business |_| Small Business |_|

Performed as: Prime Contractor |_| Subcontractor |_| JV Member |_|

Subcontracting Plan Required: |_| Yes |_| No

ACTUAL
GOAL

(if applicable)

1. Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)
N/A

1. Total Self-Performed Value: $

1. Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
|_|
(e) Large Business Concerns
$
%
$
%
|_|
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
|_|
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
|_|
(h) HUBZone Small Business Concerns
$
%
$
%
|_|
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%
|_|
(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)
$
%
$
%
|_|

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

1. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

File details come from the government source that posted it. Updated .