PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
| Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Sub-Total |
| Total Price |
| 0001 |
| BASE PRICE: Total Price for the entire work for NAVSTA Great Lakes WTP Clearwell Repair/Replacement in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item. |
| 1 |
| EA |
| 0001A |
| Subtotal of Base Price for the entire work for the New Clearwell Substructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 2 |
| EA |
| 0001B |
| Subtotal of Base Price for the entire work for the New Clearwell Superstructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 2 |
| EA |
| 0001C |
| Subtotal of Base Price for the entire work for the Existing Clearwell Modifications, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 1 |
| EA |
| 0001D |
| Subtotal of Base Price for the entire work for the Transfer Pump Station Substructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 1 |
| EA |
| 0001E |
| Subtotal of Base Price for the entire work for the Transfer Pump Station Superstructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 1 |
| EA |
| 0001F |
| Subtotal of Base Price for the entire work for the Transfer Pump Station Interior Work, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 1 |
| EA |
| 0001G |
| Subtotal of Base Price for the entire work for the Transfer Pump Station Backwash Pump, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 2 |
| EA |
| 0001H |
| Subtotal of Base Price for the entire work for the Transfer Pump Station Transfer Pump, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 4 |
| EA |
| 0001I |
| Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Paving, Site Prep, and Landscaping, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 0001J |
| Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Mechanical Utilities and Yard Pipe, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 0001K |
| Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Environmental Mitigation, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 0001L |
| Subtotal of Base Price for the entire project, for Instrumentation and Controls, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 0001M |
| Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Electrical Work, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 0001N |
| Unit Price for providing Clearwell structural crack repair as identified per Detail C4 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 1000 |
| LF |
| $_____ |
| $_____ |
| 0001O |
| Unit Price for providing Clearwell delamination repair as identified per Details B4 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 100 |
| SF |
| $_____ |
| $_____ |
| 0001P |
| Unit Price for providing Clearwell delamination repair as identified per Details A1 and A2 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 100 |
| SF |
| $_____ |
| $_____ |
| 0001Q |
| Unit Price for replacing in-place soil that is undercut in accordance with Note 1D on sheet CG100 complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 70 |
| CY |
| $_____ |
| $_____ |
| 0002 |
| Option Item No. 1: Price for providing all work in connection with the replacement of Valve 596, complete and in accordance with the drawings and specifications, but excluding valve and work provided in another Priced line item. |
| 1 |
| EA |
GENERAL BID NOTES
0. Award will be evaluated on the total proposed price for Line Items 0001-0002; Base Price and the sum of all Options.
0. The Government reserves the unilateral right to award Line Items 0002 to the Contractor at the proposed price within 30 calendar days after the contract award, and in accordance with all bid notes.
0. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206 (b) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s), Line Items 0002 to the total price for the Base Bid, Line Item 0001. Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5).
0. In accordance with FAR 52.217-7; Option for Increased Quantity-Separately Priced Line Item (Mar 1989), the Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
0. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
0. Failure to enter a price for any Line Item will result in a proposal being rejected.
0. If Line Item 0002 is exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.