The provided file is a slide presentation overview for the Naval Station Great Lakes (NSGL) Water Treatment Plant Clearwell Repair/Replacement Project by NAVFAC Mid-Atlantic. The project involves comprehensive upgrades to an existing water treatment facility serving approximately 21,250 people across 1,750 acres, including critical infrastructure like the Recruit Training Command and Lovell Federal Health Care Center. Key scope elements include constructing two new 410,000-gallon clearwell tanks, building a 3,500-square-foot transfer pump station, implementing internal building piping modifications, conducting demolition and hazardous material abatement, relocating utility lines, and integrating SCADA systems for automatic pump and system control.

The project requires careful phasing due to the facility's 24/7 operational status and critical base mission, with specific considerations for maintaining continuous water production, managing environmental compliance, and navigating complex site conditions involving built-up landfill and known substructure obstructions. The current water treatment plant, originally constructed in the early 1900s with major expansions in 1942 and 1944, produces 100% of potable water for the naval station using conventional treatment processes including chemical addition, sedimentation, rapid sand filtration, and chlorine disinfection. The solicitation (N4008525R2543) is a Design-Bid-Build contract issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Price Proposal Form REVISED 4-23.docx DOCX document
JandA ML-25-25 25R2543 Clearwell JA Hach Network Switches_Redacted.pdf PDF
JandA ML-25-22 25R2543 Clearwell JA Hach Chlorine Analyzer Brand Name_Redacted.pdf PDF
JandA ML-25-24 25R2543 Clearwell JA Industrial Automation Equipment_Redacted.pdf PDF
N4008525R2543 0006.pdf PDF
JandA ML-25-23 25R2543 Clearwell JA Historian Software Redacted.pdf PDF
PPI 131 - Installation Apperance Plan_Signage Section 6.pdf PDF
PPI 136 - Soil Characterization data.pdf PDF
N4008525R2543 0005.pdf PDF
Price Proposal Form REVISED.docx DOCX document
N4008525R2543 0004.pdf PDF
N4008525R2543 0003.pdf PDF
N4008525R2543 0002.pdf PDF
N4008525R2543 CLEARWELL SITE VISIT SIGN-IN SHEET.pdf PDF
N4008525R2543 0001.pdf PDF
N4008525R2543 Solicitation.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment H - Historical Small Business Utilization.docx DOCX document
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment J - 12_1704005_Clearwell_IFC DRAWINGS.pdf PDF
Attachment C- Construction Experience Project Data.docx DOCX document
Attachment I - NSGL FINAL SPECS.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Price Proposal Form.docx DOCX document
Attachment G- Individual Small Business Subcontracting Plan.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC Mid-Atlantic, PWD Great Lakes

Naval Station Great Lakes (NSGL) Water Treatment Plant Clearwell Repair/Replacement

Project Overview

For references purposes only

Site Map

You are Here

N

Site Orientation – Facing West

Bldg 11 Bldg 12A

Bldg 12

N

Pump Room

Bldg 45N

Bldg to be Demolished by Navy

NSGL Water System

Naval Facilities Engineering Systems Command (NAVFAC) operates and maintains the Navy owned surface water treatment plant, and the distribution and storage system serving Naval Station Great Lakes (NSGL) in North Chicago, IL.

• The Navy Public Water System (PWS):

–encompasses an area of approximately 1750 acres –serves approximately 21,250 people with 1,139 service connections –is permitted by the Illinois Environmental Protection Agency with Facility Number: IL097-5227 and Facility Name: GREAT LAKES NAVAL TRAINING STATION –produces 100% of the potable water for the entire Naval Station, including the Lovell Federal

Health Care Center (Veteran’s Affairs Hospital), Navy Housing and critical customers such as Recruit Training Command

–Operates 24/7 and continuously produces water

• The conventional treatment plant includes the following processes: chemical addition, sedimentation, rapid sand filtration, and disinfection with chlorine.

• The distribution system contains 3 ground storage tanks and 2 elevated tanks.

• The average daily demand is approximately 2 MGD and maximum day is approximately 4 MGD.

Existing Water One Line

NSGL Surface Water Treatment Plant

• The original NSGL Water Treatment Plant (Building 12) was built in the early 1900s.

Over its history, there were several additions to the initial Water Treatment Plant expanding the overall size of the Plant and changing its location slightly.

–Clearwells 1-3 are part of this original 1900s construction.

–The pump room is also original to the 1900s although the pumps and piping have been replaced.

–The current filter plant (Building 12A) was built in 1942 and contains flocculation basins, settling basins, filters 1-4 and Clearwell 4.

–Filters 5-8, Clearwell 5 and the Accelator® reactor clarifiers were constructed with a plant expansion in 1944.

• This 1944 expansion brought the plant design capacity up to 9 MGD, and resulted in the overall plant configuration as is found presently (2023). No significant additions or expansions are known to have occurred since 1944.

Existing Clearwells

Clearwell 1 Clearwell 2

Clearwell 3

Clearwell 4 (Below Filters)

Clearwell 5 (Below Filters) Bldg 12

Bldg 12A

Existing Site Plan

Clearwell 1 Clearwell 2

Clearwell 3

Clearwell 4 (Below Filters) Clearwell 5 (Below Filters)

Pump Room

Bldg 11

Bldg 12

Bldg 12A

Bldg 45N

Scope Highlights (1 of 2)

These slides do not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.

•Two Clearwell Tanks –410,000 gallons each –Finished water storage –Wire- or Strand-wound Pre-stressed Concrete

•Transfer Pump Station Building –3,500 square feet –500 square foot vestibule (Connecting to Building 12A) –4 transfer pump units –2 backwash pump units –Weir chamber and potable water wet well

• Internal Building Piping –Filter Effluent (Clearwells 4 and 5) –Backwash (Bld 12A) –Clearwell Effluent (Clearwell 1 & Bld 12)

Scope Highlights (2 of 2)

These slides do not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.

•Demolition and Hazardous Material Abatement

•Process Yard Piping and Valves

•Relocation/replacement of existing buried utility lines –Electrical, Sanitary, Storm & Water

•SCADA Integration –Automatic pump/system control –Remote monitoring and manual control

•Site work (grading, paving, fencing, and site restoration)

• (Bid Option) Concrete Repairs –Clearwells 4 and 5

New Construction – Final Site Plan

Yard Piping

Transfer Station

Clearwells

This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.

Bldg 11

Bldg 12

Bldg 12A

Final Rendering

Critical Scope Elements

• Project Phasing

– New Construction

– Temporary Construction

– Utility Cut-Over/Transition

– Demolition

• Active Industrial Work Area

– 24/7 Operations

– Plant Criticality to Base Mission –Sustain Delivery Access

– Maintain Access to Shared- Enclosed workspace

– Shutdowns limited

• Environmental

– Fed/State/Local EV Req’ts

– SWPP

– Permitting

– HAZMAT

• Site Information

– Soil is built-up landfill

– Known substructure obstructions

– Buried Key Utilities

This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.

Critical Phasing Elements

• New Construction

– Parking Improvements –Transfer Station

– New Clearwells Tanks

– Yard Piping

• Reconfiguration / Temporary Construction

– Existing Clearwell 4 & 5 Demo

– Permanent and Temporary Piping

•Utility Cut-Over/Transition

– Testing

– Commissioning

• Demolition

– Removal of existing infrastructure

– Facility Remediation

This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.

Drawing List

Phasing Plans

Yard Piping

Transfer Station

Clearwells

This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.

Existing Water Treatment P&ID

Clearwell 1 Clearwell 2

Clearwell 3

Clearwell 4 (Below Filters)

Clearwell 5 (Below Filters)

New Water Treatment Plant P&ID

Yard Piping

Transfer Station

Clearwells

This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.

B12A Filter Room

B12A Pipe Galley

B12 Pump Room High Lift Pumps