The provided file is a slide presentation overview for the Naval Station Great Lakes (NSGL) Water Treatment Plant Clearwell Repair/Replacement Project by NAVFAC Mid-Atlantic. The project involves comprehensive upgrades to an existing water treatment facility serving approximately 21,250 people across 1,750 acres, including critical infrastructure like the Recruit Training Command and Lovell Federal Health Care Center. Key scope elements include constructing two new 410,000-gallon clearwell tanks, building a 3,500-square-foot transfer pump station, implementing internal building piping modifications, conducting demolition and hazardous material abatement, relocating utility lines, and integrating SCADA systems for automatic pump and system control.
The project requires careful phasing due to the facility's 24/7 operational status and critical base mission, with specific considerations for maintaining continuous water production, managing environmental compliance, and navigating complex site conditions involving built-up landfill and known substructure obstructions. The current water treatment plant, originally constructed in the early 1900s with major expansions in 1942 and 1944, produces 100% of potable water for the naval station using conventional treatment processes including chemical addition, sedimentation, rapid sand filtration, and chlorine disinfection. The solicitation (N4008525R2543) is a Design-Bid-Build contract issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC Mid-Atlantic, PWD Great Lakes
Naval Station Great Lakes (NSGL) Water Treatment Plant Clearwell Repair/Replacement
Project Overview
For references purposes only
Site Map
You are Here
N
Site Orientation – Facing West
Bldg 11 Bldg 12A
Bldg 12
N
Pump Room
Bldg 45N
Bldg to be Demolished by Navy
NSGL Water System
Naval Facilities Engineering Systems Command (NAVFAC) operates and maintains the Navy owned surface water treatment plant, and the distribution and storage system serving Naval Station Great Lakes (NSGL) in North Chicago, IL.
• The Navy Public Water System (PWS):
–encompasses an area of approximately 1750 acres –serves approximately 21,250 people with 1,139 service connections –is permitted by the Illinois Environmental Protection Agency with Facility Number: IL097-5227 and Facility Name: GREAT LAKES NAVAL TRAINING STATION –produces 100% of the potable water for the entire Naval Station, including the Lovell Federal
Health Care Center (Veteran’s Affairs Hospital), Navy Housing and critical customers such as Recruit Training Command
–Operates 24/7 and continuously produces water
• The conventional treatment plant includes the following processes: chemical addition, sedimentation, rapid sand filtration, and disinfection with chlorine.
• The distribution system contains 3 ground storage tanks and 2 elevated tanks.
• The average daily demand is approximately 2 MGD and maximum day is approximately 4 MGD.
Existing Water One Line
NSGL Surface Water Treatment Plant
• The original NSGL Water Treatment Plant (Building 12) was built in the early 1900s.
Over its history, there were several additions to the initial Water Treatment Plant expanding the overall size of the Plant and changing its location slightly.
–Clearwells 1-3 are part of this original 1900s construction.
–The pump room is also original to the 1900s although the pumps and piping have been replaced.
–The current filter plant (Building 12A) was built in 1942 and contains flocculation basins, settling basins, filters 1-4 and Clearwell 4.
–Filters 5-8, Clearwell 5 and the Accelator® reactor clarifiers were constructed with a plant expansion in 1944.
• This 1944 expansion brought the plant design capacity up to 9 MGD, and resulted in the overall plant configuration as is found presently (2023). No significant additions or expansions are known to have occurred since 1944.
Existing Clearwells
Clearwell 1 Clearwell 2
Clearwell 3
Clearwell 4 (Below Filters)
Clearwell 5 (Below Filters) Bldg 12
Bldg 12A
Existing Site Plan
Clearwell 1 Clearwell 2
Clearwell 3
Clearwell 4 (Below Filters) Clearwell 5 (Below Filters)
Pump Room
Bldg 11
Bldg 12
Bldg 12A
Bldg 45N
Scope Highlights (1 of 2)
These slides do not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.
•Two Clearwell Tanks –410,000 gallons each –Finished water storage –Wire- or Strand-wound Pre-stressed Concrete
•Transfer Pump Station Building –3,500 square feet –500 square foot vestibule (Connecting to Building 12A) –4 transfer pump units –2 backwash pump units –Weir chamber and potable water wet well
• Internal Building Piping –Filter Effluent (Clearwells 4 and 5) –Backwash (Bld 12A) –Clearwell Effluent (Clearwell 1 & Bld 12)
Scope Highlights (2 of 2)
These slides do not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.
•Demolition and Hazardous Material Abatement
•Process Yard Piping and Valves
•Relocation/replacement of existing buried utility lines –Electrical, Sanitary, Storm & Water
•SCADA Integration –Automatic pump/system control –Remote monitoring and manual control
•Site work (grading, paving, fencing, and site restoration)
• (Bid Option) Concrete Repairs –Clearwells 4 and 5
New Construction – Final Site Plan
Yard Piping
Transfer Station
Clearwells
This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.
Bldg 11
Bldg 12
Bldg 12A
Final Rendering
Critical Scope Elements
• Project Phasing
– New Construction
– Temporary Construction
– Utility Cut-Over/Transition
– Demolition
• Active Industrial Work Area
– 24/7 Operations
– Plant Criticality to Base Mission –Sustain Delivery Access
– Maintain Access to Shared- Enclosed workspace
– Shutdowns limited
• Environmental
– Fed/State/Local EV Req’ts
– SWPP
– Permitting
– HAZMAT
• Site Information
– Soil is built-up landfill
– Known substructure obstructions
– Buried Key Utilities
This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.
Critical Phasing Elements
• New Construction
– Parking Improvements –Transfer Station
– New Clearwells Tanks
– Yard Piping
• Reconfiguration / Temporary Construction
– Existing Clearwell 4 & 5 Demo
– Permanent and Temporary Piping
•Utility Cut-Over/Transition
– Testing
– Commissioning
• Demolition
– Removal of existing infrastructure
– Facility Remediation
This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.
Drawing List
Phasing Plans
Yard Piping
Transfer Station
Clearwells
This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.
Existing Water Treatment P&ID
Clearwell 1 Clearwell 2
Clearwell 3
Clearwell 4 (Below Filters)
Clearwell 5 (Below Filters)
New Water Treatment Plant P&ID
Yard Piping
Transfer Station
Clearwells
This slide does not identify the full scope required for construction, only major New Activities. It is up to the bidding contractors to ensure full understanding of the project scope.
B12A Filter Room
B12A Pipe Galley
B12 Pump Room High Lift Pumps