Attachment E - Price Proposal Form.docx

DOCX document 27 KB Posted

Attached to
DESIGN-BID-BUILD, WTP CLEARWELL REPAIR/REPLACEMENT, NAVAL STATION GREAT LAKES, GREAT LAKES, ILLINOIS
Solicitation number
N4008525R2543
Issued by

About this file

This document is a Price Schedule (Attachment E - Price Proposal Form) for a design-bid-build water treatment plant (WTP) clearwell repair and replacement project at Naval Station Great Lakes in Illinois. The pricing form details multiple line items for comprehensive construction work, including base pricing for new clearwell substructure and superstructure, existing clearwell modifications, transfer pump station components (substructure, superstructure, interior work, pumps), and additional project sitework elements such as paving, mechanical utilities, environmental mitigation, instrumentation and controls, and electrical work.

The price proposal includes specific unit pricing for structural repairs like clearwell crack repairs (1000 linear feet) and delamination repairs (100 square feet), with quantities and unit prices to be filled in by the bidder. There is also an optional line item for replacing Valve 596. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command under solicitation number N4008525R2543, indicating a federal government construction project with detailed specification requirements for comprehensive water treatment facility infrastructure renovation.

View the file

Other files

File Type Posted
Price Proposal Form REVISED 4-23.docx DOCX document
JandA ML-25-25 25R2543 Clearwell JA Hach Network Switches_Redacted.pdf PDF
JandA ML-25-22 25R2543 Clearwell JA Hach Chlorine Analyzer Brand Name_Redacted.pdf PDF
JandA ML-25-24 25R2543 Clearwell JA Industrial Automation Equipment_Redacted.pdf PDF
N4008525R2543 0006.pdf PDF
JandA ML-25-23 25R2543 Clearwell JA Historian Software Redacted.pdf PDF
PPI 131 - Installation Apperance Plan_Signage Section 6.pdf PDF
PPI 136 - Soil Characterization data.pdf PDF
N4008525R2543 0005.pdf PDF
Price Proposal Form REVISED.docx DOCX document
N4008525R2543 0004.pdf PDF
N4008525R2543 0003.pdf PDF
N4008525R2543 0002.pdf PDF
N4008525R2543 CLEARWELL SITE VISIT SIGN-IN SHEET.pdf PDF
N4008525R2543 0001.pdf PDF
N4008525R2543 Solicitation.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Attachment H - Historical Small Business Utilization.docx DOCX document
Attachment D- Past Performance Questionnaire.docx DOCX document
Attachment F- Small Business Participation Commitment.docx DOCX document
Attachment J - 12_1704005_Clearwell_IFC DRAWINGS.pdf PDF
Attachment K - NSGL Clearwell Slide Presentation Final.pdf PDF
Attachment C- Construction Experience Project Data.docx DOCX document
Attachment I - NSGL FINAL SPECS.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment G- Individual Small Business Subcontracting Plan.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
0001
BASE PRICE: Total Price for the entire work for NAVSTA Great Lakes WTP Clearwell Repair/Replacement in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1
EA
0001A
Subtotal of Base Price for the entire work for the New Clearwell Substructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
2
EA
0001B
Subtotal of Base Price for the entire work for the New Clearwell Superstructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
2
EA
0001C
Subtotal of Base Price for the entire work for the Existing Clearwell Modifications, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001D
Subtotal of Base Price for the entire work for the Transfer Pump Station Substructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001E
Subtotal of Base Price for the entire work for the Transfer Pump Station Superstructure complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001F
Subtotal of Base Price for the entire work for the Transfer Pump Station Interior Work, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1
EA
0001G
Subtotal of Base Price for the entire work for the Transfer Pump Station Backwash Pump, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
2
EA
0001H
Subtotal of Base Price for the entire work for the Transfer Pump Station Transfer Pump, complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
4
EA
0001I
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Paving, Site Prep, and Landscaping, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001J
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Mechanical Utilities and Yard Pipe, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001K
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Environmental Mitigation, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001L
Subtotal of Base Price for the entire project, for Instrumentation and Controls, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001M
Subtotal of Base Price for the entire project sitework, outside the facilities 5-foot line, for Electrical Work, complete in accordance with the drawings and specifications, but excluding work described in another line Item.
1
EA
0001N
Unit Price for providing Clearwell structural crack repair as identified per Detail C4 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item.
1000
LF
$_____
$_____
0001O
Unit Price for providing Clearwell delamination repair as identified per Details B4 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item.
100
SF
$_____
$_____
0001P
Unit Price for providing Clearwell delamination repair as identified per Details A1 and A2 on S-507 complete in accordance with the drawings and specifications, but excluding work provided in another line item.
100
SF
$_____
$_____
0002
Option Item No. 1: Price for providing all work in connection with the replacement of Valve 596, complete and in accordance with the drawings and specifications, but excluding valve and work provided in another Priced line item.
1
EA

File details come from the government source that posted it. Updated .