Section -31 23 00.00 20.pdf
PDF 71 KB Posted
- Attached to
- NOAA OMAO Ship and Support Facility Relocation, Naval Station Newport, Newport, Rhode Island
- Solicitation number
- N4008523R2527
About this file
This specification covers excavation and fill requirements for the NOAA OMAO Ship and Support Facility Relocation project at the Naval Station Newport in Newport, Rhode Island. The specification defines soil materials acceptable for various uses, including satisfactory, unsatisfactory, cohesionless and cohesive materials. It also defines requirements for backfill and fill material, structural fill material, topsoil, porous fill for capillary water barriers, utility bedding materials, borrow, filter fabric, aggregate and gravel base courses, buried warning tapes, and detection wire for non-metallic piping. Execution requirements are outlined for protection, surface preparation, excavation, subgrade preparation, filling and backfilling, special earthwork for underdrains, finish operations, field quality control, and disposition of surplus material. Density, compaction, sampling and testing requirements are provided.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA OMAO Ship & Support Facility Relocation Work Order No. 1562331 NSN-Newport, Rhode Island
SECTION 31 23 00.00 20
EXCAVATION AND FILL
02/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C600 (2017) Installation of Ductile-Iron Mains and Their Appurtenances
ASTM INTERNATIONAL (ASTM)
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM D698 (2012; E 2014; E 2015) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft.
(600 kN-m/cu. m.))
ASTM D1140 (2017) Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method
ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
ASTM D3786/D3786M (2018) Standard Test Method for Bursting Strength of Textile Fabrics-Diaphragm Bursting Strength Tester Method
ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
SECTION 31 23 00.00 20 Page 1 May 8, 2023
ASTM D4355/D4355M (2014) Deterioration of Geotextiles from Exposure to Light, Moisture and Heat in a Xenon-Arc Type Apparatus
ASTM D4491/D4491M (2017) Standard Test Methods for Water Permeability of Geotextiles by Permittivity
ASTM D4533/D4533M (2015) Standard Test Method for Trapezoid Tearing Strength of Geotextiles
ASTM D4632/D4632M (2015a) Grab Breaking Load and Elongation of Geotextiles
ASTM D4751 (2020) Standard Test Method for Determining Apparent Opening Size of a Geotextile
ASTM D4759 (2011; R 2018) Standard Practice for Determining the Specification Conformance of Geosynthetics
ASTM D4833/D4833M (2007; R 2020) Standard Test Method forIndex Puncture Resistance of Geomembranes and Related Products
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
RHODE ISLAND DEPARTMENT OF TRANSPORTATION
RI DOT Standard Specifications for Road and Bridge Construction Amended March 2018
1.2 DEFINITIONS
1.2.1 Capillary Water Barrier
A layer of clean, poorly graded crushed rock, stone, or natural sand or gravel having a high porosity which is placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of pore water to the area immediately below a slab.
1.2.2 Degree of Compaction
Degree of compaction is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557, for general soil types, abbreviated as percent laboratory maximum density.
1.2.3 Hard Materials
Weathered rock, dense consolidated deposits, or conglomerate materials which are not included in the definition of "rock" but which usually
SECTION 31 23 00.00 20 Page 2 require the use of heavy excavation equipment, ripper teeth, or jack hammers for removal.
1.2.4 Rock
Solid homogeneous interlocking crystalline material with firmly cemented, laminated, or foliated masses or conglomerate deposits, neither of which can be removed without systematic drilling and blasting, drilling and the use of expansion jacks or feather wedges, or the use of backhoe-mounted pneumatic hole punchers or rock breakers; also large boulders, buried masonry, or concrete other than pavement exceeding 1 cubic yard in volume. Removal of hard material will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production.
1.2.5 Pile Supported Structure
As used herein, a structure where both the foundation and floor slab are pile supported.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Shoring and Sheeting Plan
Dewatering work plan
Submit 15 days prior to starting work.
SD-06 Test Reports
Borrow Site Testing; G
Fill and backfill test
Structural Fill material test
Porous fill test for capillary water barrier
Density tests
Copies of all laboratory and field test reports within 24 hours of the completion of the test.
1.4 DELIVERY, STORAGE, AND HANDLING
Perform in a manner to prevent contamination or segregation of materials.
1.5 CRITERIA FOR BIDDING
Base bids on the following criteria:
SECTION 31 23 00.00 20 Page 3
a. Surface elevations are as indicated.
b. Pipes or other artificial obstructions, except those indicated, will not be encountered.
c. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction.
d. Material character is indicated by the boring logs.
e. Borrow material, Suitable backfill and bedding material in the quantities required is not available at the project site.
f. Blasting will not be permitted. Remove material in an approved manner.
g. Assume 100% of excavated material will be contaminated, refer to Section 02 61 13.
1.6 REQUIREMENTS FOR OFF SITE SOIL
Soils brought in from off site for use as backfill shall be tested for all substances listed in Table 1, Table 2 and total petroleum hydrocarbons (TPH) as described in the Rhode Island Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases. Soils shall contain less than the residential direct exposure criteria for all substances in Table 1, less than the GA limit specified in Table 2, and less than 500 PPM TPH. Provide borrow site testing from a composite sample or material from the borrow site, with at least one test from each borrow site and at least one test per 500 tons of material to be imported.
Material shall not be brought onsite until tests have been approved by the Contracting Officer.
1.7 QUALITY ASSURANCE
1.7.1 Shoring and Sheeting Plan
Submit drawings and calculations, certified by a registered professional engineer, describing the methods for shoring and sheeting of excavations.
Drawings shall include material sizes and types, arrangement of members, and the sequence and method of installation and removal. Calculations shall include data and references used.
1.7.2 Dewatering Work Plan
Submit procedures for accomplishing dewatering work in accordance with Section 01 57 19 and Section 02 61 13.
1.7.3 Utilities
Movement of construction machinery and equipment over pipes and utilities during construction shall be at the Contractor's risk. Perform work adjacent to non-Government utilities as indicated in accordance with procedures outlined by utility company. Excavation made with power-driven equipment is not permitted within two feet of known Government-owned utility or subsurface construction. For work immediately adjacent to or for excavations exposing a utility or other buried obstruction, excavate
SECTION 31 23 00.00 20 Page 4 by hand. Start hand excavation on each side of the indicated obstruction and continue until the obstruction is uncovered or until clearance for the new grade is assured. Support uncovered lines or other existing work affected by the contract excavation until approval for backfill is granted by the Contracting Officer. Report damage to utility lines or subsurface construction immediately to the Contracting Officer.
PART 2 PRODUCTS
2.1 SOIL MATERIALS
2.1.1 Satisfactory Materials
Any materials classified by ASTM D2487 as GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, CH free of debris, roots, wood, scrap material, vegetation, refuse, soft unsound particles, and frozen, deleterious, or objectionable materials. Unless specified otherwise, the maximum particle diameter shall be one-half the lift thickness at the intended location.
2.1.2 Unsatisfactory Materials
Materials which do not comply with the requirements for satisfactory materials. Unsatisfactory materials also include man-made fills, trash, refuse, or backfills from previous construction. Unsatisfactory material also includes material classified as satisfactory which contains root and other organic matter, frozen material, and stones larger than 6 inches.
The Contracting Officer shall be notified of any contaminated materials.
2.1.3 Cohesionless and Cohesive Materials
Cohesionless materials include materials classified in ASTM D2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM, GP-GM, GW-GM, SW-SM, SP-SM, and SM shall be identified as cohesionless only when the fines are nonplastic (plasticity index equals zero). Materials classified as GM and SM will be identified as cohesive only when the fines have a plasticity index greater than zero.
2.1.4 Backfill and Fill Material
ASTM D2487, classification GW, GP, GM, SW, SP, SM with a maximum ASTM D4318 liquid limit of 35, maximum ASTM D4318 plasticity index of 12, and a maximum of 25 percent by weight passing ASTM D1140, No. 200 sieve.
2.1.5 Structural Fill Material
Provide materials classified as GW, or SW by ASTM D2487 where indicated.
The combined material shall conform to the following sieve analysis:
U.S. Standard Sieve Size Percent Finer by Weight
3 in. 100 No. 4 30-80
No. 40 10-50
SECTION 31 23 00.00 20 Page 5
U.S. Standard Sieve Size Percent Finer by Weight
No. 200 0-8
2.1.6 Topsoil
Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.
2.2 POROUS FILL FOR CAPILLARY WATER BARRIER
ASTM C33/C33M fine aggregate grading with a maximum of 3 percent by weight passing ASTM D1140, No. 200 sieve, 1-1/2 inches and no more than 2 percent by weight passing the No. 4 size sieve and conforming to the general soil material requirements specified in paragraph entitled "Satisfactory Materials."
2.3 UTILITY BEDDING MATERIAL
Except as specified otherwise in the individual piping section, provide bedding for buried piping in accordance with AWWA C600, Type 4, except as specified herein. Backfill to top of pipe shall be compacted to 95 percent of ASTM D698 maximum density. Plastic piping shall have bedding to spring line of pipe.
2.3.1 Sand
Clean, coarse-grained sand classified as Bedding Material in accordance with Section M.01.04 of the RI DOT Standard Specifications.
2.3.2 Gravel
Clean, coarsely graded natural gravel, crushed stone or a combination thereof identified as Bedding Material in accordance with Section M.01.04 of the RI DOT Standard Specifications.
2.4 BORROW
Obtain borrow materials required in excess of those furnished from excavations from sources outside of Government property. This material shall be in accordance with Section M.01.01 of the RI DOT Standard Specifications.
2.5 FILTER FABRIC
Provide a pervious sheet of polyester, nylon, glass or polypropylene, ultraviolet resistant filaments woven, spun bonded, fused, or otherwise manufactured into a nonraveling fabric with uniform thickness and strength. Fabric shall have the following manufacturer certified minimum average roll properties as determined by ASTM D4759:
SECTION 31 23 00.00 20 Page 6
Class A Class B
a. Grab tensile strength ( ASTM D4632/D4632M) machine and transversed direction min. 180 80 lbs.
b. Grab elongation ( ASTM D4632/D4632M) machine and transverse direction min. 15 15 percent
c. Puncture resistance ( ASTM D4833/D4833M) min. 80 25 lbs.
d. Mullen burst strength ( ASTM D3786/D3786M) min. 290 130 psi
e. Trapezoidal Tear ( ASTM D4533/D4533M) min. 50 25 lbs.
f. Apparent Opening Size ( ASTM D4751) See Criteria Below
(1) Soil with 50 percent or less particles by weight passing US No. 200 Sieve, AOS less than 0.6 mm (greater than #30 US Std. Sieve)
(2) Soil with more than 50 percent particles by weight passing US No. 200 Sieve, AOS less than 0.297 mm (greater than #50 US Std. Sieve)
g. Permeability ( ASTM D4491/D4491M) k fabric greater than k Soil
h. Ultraviolet Degradation ( ASTM D4355/D4355M) 70 percent Strength retained at 150 hours
2.6 AGGREGATE AND GRAVEL BASE AND SUBBASE COURSES
Graded aggregate and gravel borrow courses conforming to RI DOT Standard Specifications for construction indicated.
2.6.1 Gravel Borrow
Consisting of bank run sand and gravel, or plant processed, crushed or uncrushed gravel with fine aggregate added as filler. Material shall conform to RI DOT Standard Specification, M.01.02 and M.01.09, Table I, Column I.
2.6.2 Crushed Stone
Coarse aggregate consisting of crushed bedrock, shall not contain crushed or uncrushed gravel and shall be free of deleterious material or soft, friable particles. Material shall conform to RI DOT Standard Specifications, M.01.09, Table I, Column II.
2.6.3 Filter Stone
Filter Stone for underdrains shall conform to the gradation requirements of Colum V, Table I, Subsection M.01.09 of the RI DOT Standard Specifications. Soundness shall conform to the requirements of Subsection
SECTION 31 23 00.00 20 Page 7
M.01.11.
2.6.4 Crushed Stone for Underground Retention System
¾" to 2" clean, crushed, angular stone. Stone shall be double washed to remove all fines.
2.7 BURIED WARNING AND IDENTIFICATION TAPE
Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape on rolls, 3 inch minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black letters continuously over the entire tape length. Warning and identification to read, "CAUTION, BURIED (intended service) LINE BELOW" or similar wording.
Color and printing shall be permanent, unaffected by moisture or soil.
Warning Tape Color Codes
Red: Electric
Yellow: Gas, Oil; Dangerous Materials
Orange: Telephone and Other Communications
Blue: Potable Water Systems
Green: Sewer Systems
2.7.1 Warning Tape for Metallic Piping
Acid and alkali-resistant polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of tape shall be 0.003 inch. Tape shall have a minimum strength of 1500 psi lengthwise, and 1250 psi crosswise, with a maximum 350 percent elongation.
2.7.2 Detectable Warning Tape for Non-Metallic Piping
Polyethylene plastic tape conforming to the width, color, and printing requirements specified above. Minimum thickness of the tape shall be
0.004 inch. Tape shall have a minimum strength of 1500 psi lengthwise and 1250 psi crosswise. Tape shall be manufactured with integral wires, foil backing, or other means of enabling detection by a metal detector when tape is buried up to 3 feet deep. Encase metallic element of the tape in a protective jacket or provide with other means of corrosion protection.
2.8 DETECTION WIRE FOR NON-METALLIC PIPING
Detection wire shall be insulated single strand, solid copper with a minimum of 12 AWG.
SECTION 31 23 00.00 20 Page 8
PART 3 EXECUTION
3.1 PROTECTION
3.1.1 Shoring and Sheeting
Provide shoring bracing, trench boxes and sheeting where required. In addition to Section 25 A and B of EM 385-1-1 and other requirements set forth in this contract, include provisions in the shoring and sheeting plan that will accomplish the following:
a. Prevent undermining of pavements, foundations and slabs.
b. Prevent slippage or movement in banks or slopes adjacent to the excavation.
c. Allow for the abandonment of shoring and sheeting materials in place in critical areas as the work is completed. In these areas, backfill the excavation to the elevation indicated within 3 feet of the finished grade and remove the remaining exposed portion of the shoring before completing the backfill.
3.1.2 Drainage and Dewatering
Provide for the collection and disposal of surface and subsurface water encountered during construction.
3.1.2.1 Drainage
So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry. The Contractor shall establish/construct storm drainage features at the earliest stages of site development, and throughout construction grade the construction area to provide positive surface water runoff away from the construction activity and/or provide temporary ditches, swales, and other drainage features and equipment as required to maintain dry soils, prevent erosion and undermining of foundations. When unsuitable working platforms for equipment operation and unsuitable soil support for subsequent construction features develop, remove unsuitable material and provide new soil material as specified herein. It is the responsibility of the Contractor to assess the soil and ground water conditions presented by the plans and specifications and to employ necessary measures to permit construction to proceed. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site, the area immediately surrounding the site, and the area affecting operations at the site shall be continually and effectively drained.
3.1.2.2 Dewatering
Groundwater flowing toward or into excavations shall be controlled to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. French drains, sumps, ditches or trenches will not be permitted within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Control measures shall be taken by the time the excavation reaches the water level in order to maintain the integrity of the in situ material. While the excavation is
SECTION 31 23 00.00 20 Page 9 open, the water level shall be maintained continuously, at least 2 feet below the working level.
Operate dewatering system continuously until construction work below existing water levels is complete.
All dewatering shall be in accordance with Section 01 57 19 and Section 02 61 13.
3.1.3 Underground Utilities
Location of the existing utilities indicated is approximate. The Contractor shall physically verify the location and elevation of the existing utilities indicated prior to starting construction. The Contractor shall contact the Public Works Department for assistance in locating existing utilities.
3.1.4 Machinery and Equipment
Movement of construction machinery and equipment over pipes during construction shall be at the Contractor's risk. Repair, or remove and provide new pipe for existing or newly installed pipe that has been displaced or damaged.
3.2 SURFACE PREPARATION
3.2.1 Clearing and Grubbing
Unless indicated otherwise, remove trees, stumps, logs, shrubs, brush and vegetation and other items that would interfere with construction operations within the clearing limits. Remove stumps entirely. Grub out matted roots and roots over 2 inches in diameter to at least 18 inches below existing surface.
3.2.2 Stripping
Strip suitable soil from the site where excavation or grading is indicated and stockpile separately from other excavated material. Material unsuitable for use as topsoil shall be wasted. Locate topsoil so that the material can be used readily for the finished grading. Where sufficient existing topsoil conforming to the material requirements is not available on site, provide borrow materials suitable for use as topsoil. Protect topsoil and keep in segregated piles until needed.
3.2.3 Unsuitable Material
Remove vegetation, debris, decayed vegetable matter, sod, mulch, and rubbish underneath paved areas or concrete slabs.
3.3 EXCAVATION
Excavate to contours, elevation, and dimensions indicated. Reuse excavated materials that meet the specified requirements for the material type required at the intended location. Keep excavations free from water.
Excavate soil disturbed or weakened by Contractor's operations, soils softened or made unsuitable for subsequent construction due to exposure to weather. Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed. Refill with
SECTION 31 23 00.00 20 Page 10 satisfactory material and compact to 95 percent of ASTM D1557 maximum density. Unless specified otherwise, refill excavations cut below indicated depth with satisfactory material and compact to 95 percent of ASTM D1557 maximum density. Satisfactory material removed below the depths indicated, without specific direction of the Contracting Officer, shall be replaced with satisfactory materials to the indicated excavation grade; except as specified for spread footings. Determination of elevations and measurements of approved overdepth excavation of unsatisfactory material below grades indicated shall be done under the direction of the Contracting Officer.
3.3.1 Structures With Spread Footings
Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement. Fill over excavations with concrete during foundation placement.
3.3.2 Pile Cap Excavation and Backfilling
Excavate to bottom of pile cap prior to placing or driving piles, unless authorized otherwise by the Contracting Officer. Backfill and compact overexcavations and changes in grade due to pile driving operations to 95 percent of ASTM D698 maximum density.
3.3.3 Pipe Trenches
Excavate to the dimension indicated. Grade bottom of trenches to provide uniform support for each section of pipe after pipe bedding placement.
Tamp if necessary to provide a firm pipe bed. Recesses shall be excavated to accommodate bells and joints so that pipe will be uniformly supported for the entire length. Rock, where encountered, shall be excavated to a depth of at least 6 inches below the bottom of the pipe.
3.3.4 Hard Material and Rock Excavation
Remove hard material and rock to elevations indicated in a manner that will leave foundation material in an unshattered and solid condition.
Roughen level surfaces and cut sloped surfaces into benches for bond with concrete. Protect shale from conditions causing decomposition along joints or cleavage planes and other types of erosion. Removal of hard material and rock beyond lines and grades indicated will not be grounds for a claim for additional payment unless previously authorized by the Contracting Officer. Excavation of the material claimed as rock shall not be performed until the material has been cross sectioned by the Contractor and approved by the Contracting Officer. Common excavation shall consist of all excavation not classified as rock excavation.
3.3.5 Excavated Materials
Satisfactory excavated material required for fill or backfill shall be placed in the proper section of the permanent work required or shall be separately stockpiled if it cannot be readily placed. Satisfactory material in excess of that required for the permanent work and all unsatisfactory material shall be disposed of as specified in Paragraph
"DISPOSITION OF SURPLUS MATERIAL."
3.3.6 Final Grade of Surfaces to Support Concrete
Excavation to final grade shall not be made until just before concrete is
SECTION 31 23 00.00 20 Page 11 to be placed. For pile foundations, the excavation shall be stopped at an elevation 6 to 12 inches above the bottom of the footing before driving piles. After pile driving has been completed, the remainder of the excavation shall be completed to the elevations shown. Only excavation methods that will leave the foundation rock in a solid and unshattered condition shall be used. Approximately level surfaces shall be roughened, and sloped surfaces shall be cut as indicated into rough steps or benches to provide a satisfactory bond. Shales shall be protected from slaking and all surfaces shall be protected from erosion resulting from ponding or flow of water.
3.4 SUBGRADE PREPARATION
Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials as directed by the Contracting Officer. The surface shall be scarified to a depth of 6 inches before the fill is started. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to the specified density. When the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill.
Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used. Minimum subgrade density shall be as specified herein.
3.4.1 Proof Rolling
Proof rolling shall be done on an exposed subgrade free of surface water (wet conditions resulting from rainfall) which would promote degradation of an otherwise acceptable subgrade. After stripping, proof roll the existing subgrade of the building with six passes of a 15 ton, pneumatic-tired roller. Operate the roller in a systematic manner to ensure the number of passes over all areas, and at speeds between 2 1/2 to 3 1/2 miles per hour. When proof rolling under buildings, the building subgrade shall be considered to extend 5 feet beyond the building lines, and one-half of the passes made with the roller shall be in a direction perpendicular to the other passes. Notify the Contracting Officer a minimum of 3 days prior to proof rolling. Proof rolling shall be performed in the presence of the Contracting Officer. Rutting or pumping of material shall be undercut as directed by the Contracting Officer and replaced with structural fill material.
3.5 SUBGRADE FILTER FABRIC
Place synthetic fiber filter fabric as indicated directly on prepared subgrade free of vegetation, stumps, rocks larger than 2 inches diameter and other debris which may puncture or otherwise damage the fabric.
Repair damaged fabric by placing an additional layer of fabric to cover the damaged area a minimum of 3 feet overlap in all directions. Overlap fabric at joints a minimum of 3 feet. Obtain approval of filter fabric installation before placing fill or backfill. Place fill or backfill on fabric in the direction of overlaps and compact as specified herein.
SECTION 31 23 00.00 20 Page 12
Follow manufacturer's recommended installation procedures.
3.6 FILLING AND BACKFILLING
Fill and backfill to contours, elevations, and dimensions indicated.
Compact each lift before placing overlaying lift.
3.6.1 Gravel Borrow and Crushed Stone Placement
Provide for under paved areas or concrete as shown on the plans. Use materials meeting RI DOT specifications. Place in 6 inch lifts. Compact areas not accessible to rollers or compactors with mechanical hand tampers. Do not place over wet or frozen areas. Finish to a smooth surface by blading, rolling with a smooth roller, or both.
3.6.2 Backfill and Fill Material Placement
Provide for paved areas and under concrete slabs, except where structural fill material is provided. Place in 6 inch lifts. Do not place over wet or frozen areas. Place backfill material adjacent to structures as the structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against the structure.
3.6.3 Structural Fill Material Placement
Provide under structures not pile supported. Place in 6 inch lifts. Do not place over wet or frozen areas. Backfill adjacent to structures shall be placed as structural elements are completed and accepted. Backfill against concrete only when approved. Place and compact material to avoid loading upon or against structure.
3.6.4 Backfill and Fill Material Placement Over Pipes and at Walls
Backfilling shall not begin until construction below finish grade has been approved, underground utilities systems have been inspected, tested and approved, forms removed, and the excavation cleaned of trash and debris.
Backfill shall be brought to indicated finish grade. Where pipe is coated or wrapped for protection against corrosion, the backfill material up to an elevation 2 feet above sewer lines and 1 foot above other utility lines shall be free from stones larger than 1 inch in any dimension. Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power-driven hand tampers suitable for the material being compacted.
Backfill shall be placed carefully around pipes or tanks to avoid damage to coatings, wrappings, or tanks. Backfill shall not be placed against foundation walls prior to 7 days after completion of the walls. As far as practicable, backfill shall be brought up evenly on each side of the wall and sloped to drain away from the wall.
3.6.5 Porous Fill Placement
Provide under floor and area-way slabs on a compacted subgrade. Place in 4 inch lifts with a minimum of two passes of a hand-operated plate-type vibratory compactor.
SECTION 31 23 00.00 20 Page 13
3.6.6 Trench Backfilling
Backfill as rapidly as construction, testing, and acceptance of work permits. Place and compact backfill under structures and paved areas in 6 inch lifts to top of trench and in 6 inch lifts to one foot over pipe outside structures and paved areas.
3.7 BORROW
Where satisfactory materials are not available in sufficient quantity from required excavations, approved borrow materials shall be obtained as specified herein.
3.8 BURIED WARNING AND IDENTIFICATION TAPE
Provide buried utility lines with utility identification tape. Bury tape 12 inches below finished grade; under pavements and slabs, bury tape 6 inches below top of subgrade.
3.9 BURIED DETECTION WIRE
Bury detection wire directly above non-metallic piping at a distance not to exceed 12 inches above the top of pipe. The wire shall extend continuously and unbroken, from manhole to manhole. The ends of the wire shall terminate inside the manholes at each end of the pipe, with a minimum of 3 feet of wire, coiled, remaining accessible in each manhole.
The wire shall remain insulated over it's entire length. The wire shall enter manholes between the top of the corbel and the frame, and extend up through the chimney seal between the frame and the chimney seal. For force mains, the wire shall terminate in the valve pit at the pump station end of the pipe.
3.10 COMPACTION
Determine in-place density of existing subgrade; if required density exists, no compaction of existing subgrade will be required. Density requirements specified herein are for cohesionless materials. When cohesive materials are encountered or used, density requirements may be reduced by 5 percent.
3.10.1 General Site
Compact underneath areas designated for vegetation and areas outside the 5 foot line of the paved area or structure to 85 percent of ASTM D1557.
3.10.2 Structures, Spread Footings, and Concrete Slabs
Compact top 12 inches of subgrades to 95 percent of ASTM D1557. Compact fill and backfill material to 95 percent of ASTM D1557.
3.10.3 Adjacent Area
Compact areas within 5 feet of structures to 90 percent of ASTM D1557.
3.10.4 Paved Areas
Compact top 12 inches of subgrades to 95 percent of ASTM D1557. Compact fill and backfill materials to 95 percent of ASTM D1557.
SECTION 31 23 00.00 20 Page 14
3.11 SPECIAL EARTHWORK REQUIREMENTS FOR UNDERDRAINS
Excavate stormwater bioretention filter basins and associated underdrain area to dimensions indicated. Backfill underdrains around and over the pipes after pipe installation has been approved. Place crushed stone material in 6 inch lifts and compact with mechanical, vibrating plate tampers or rammers until no further consolidation can be achieved.
Compact backfill overlying the crushed stone material as specified for adjacent or overlying work.
3.11.1 Crushed Stone Backfill Without Filter Fabric
3.11.1.1 Perforated or Slotted Wall Pipe
Place crushed stone material as pipe is laid and extend as dimensioned on the plans.
3.11.2 Crushed Stone Backfill Using Filter Fabric
3.11.2.1 Perforated Pipes at Stormwater Bioretention Filter Basin
Wrap one layer of filter fabric around crushed stone backfill in such a manner that fabric overlap is a minimum of 2 inches. Place Crushed stone material under the bioretention filter basins, with perforated underdrain set where and as detailed on the plans.
3.12 FINISH OPERATIONS
3.12.1 Grading
Finish grades as indicated within one-tenth of one foot. Grade areas to drain water away from structures. Maintain areas free of trash and debris. For existing grades that will remain but which were disturbed by Contractor's operations, grade as directed.
3.12.2 Topsoil and Seed
Scarify existing subgrade. Provide 4 inches of topsoil for newly graded finish earth surfaces and areas disturbed by the Contractor. Topsoil shall not be placed when the subgrade is frozen, excessively wet, extremely dry, or in a condition otherwise detrimental to seeding, planting, or proper grading. If there is insufficient on-site topsoil meeting specified requirements for topsoil, provide topsoil required in excess of that available. Seeding shall be per Section 32 92 19.
Provide mulch and water to establish an acceptable stand of grass.
3.12.3 Protection of Surfaces
Protect newly backfilled, graded, and topsoiled areas from traffic, erosion, and settlements that may occur. Repair or reestablish damaged grades, elevations, or slopes.
3.13 DISPOSITION OF SURPLUS MATERIAL
Remove from Government property surplus or other soil material not required or suitable for filling or backfilling, and brush, refuse, stumps, roots, and timber.
SECTION 31 23 00.00 20 Page 15
3.14 FIELD QUALITY CONTROL
3.14.1 Sampling
Take the number and size of samples required to perform the following tests.
3.14.2 Testing
Perform one of each of the following tests for each material used. Provide additional tests for each source change.
3.14.2.1 Fill and Backfill Material Testing
Test fill and backfill material in accordance with ASTM C136/C136M for conformance to ASTM D2487 gradation limits; ASTM D1140 for material finer than the No. 200 sieve; ASTM D4318 for liquid limit and for plastic limit;
ASTM D698 or ASTM D1557 for moisture density relations, as applicable.
3.14.2.2 Structural Fill Material Testing
Test structural fill material in accordance with ASTM C136/C136M for conformance to ASTM D2487 gradation limits; ASTM D1140 for material finer than the No. 200 sieve; ASTM D698 or ASTM D1557 for moisture density relations, as applicable.
3.14.2.3 Porous Fill Testing
Test porous fill in accordance with ASTM C136/C136M for conformance to gradation specified in ASTM C33/C33M.
3.14.2.4 Density Tests
Test density in accordance with ASTM D1556/D1556M , or ASTM D6938. When ASTM D6938 density tests are used, verify density test results by performing an ASTM D1556/D1556M density test at a location already ASTM D6938 tested as specified herein. Perform an ASTM D1556/D1556M density test at the start of the job, and for every 10 ASTM D6938 density tests thereafter. Test each lift at randomly selected locations every 2000 square feet of existing grade in fills for structures and concrete slabs, and every 2500 square feet for other fill areas and every 2000 square feet of subgrade in cut. Include density test results in daily report.
Bedding and backfill in trenches: One test per 50 linear feet in each lift.
-- End of Section --
SECTION 31 23 00.00 20 Page 16
| 31 23 00.00 20 - EXCAVATION AND FILL |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Capillary Water Barrier |
| 1.2.2 Degree of Compaction |
| 1.2.3 Hard Materials |
| 1.2.4 Rock |
| 1.2.5 Pile Supported Structure |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 CRITERIA FOR BIDDING |
| 1.6 REQUIREMENTS FOR OFF SITE SOIL |
| 1.7 QUALITY ASSURANCE |
| 1.7.1 Shoring and Sheeting Plan |
| 1.7.2 Dewatering Work Plan |
| 1.7.3 Utilities |
| PART 2 PRODUCTS |
| 2.1 SOIL MATERIALS |
| 2.1.1 Satisfactory Materials |
| 2.1.2 Unsatisfactory Materials |
| 2.1.3 Cohesionless and Cohesive Materials |
| 2.1.4 Backfill and Fill Material |
| 2.1.5 Structural Fill Material |
| 2.1.6 Topsoil |
| 2.2 POROUS FILL FOR CAPILLARY WATER BARRIER |
| 2.3 UTILITY BEDDING MATERIAL |
| 2.3.1 Sand |
| 2.3.2 Gravel |
| 2.4 BORROW |
| 2.5 FILTER FABRIC |
| 2.6 AGGREGATE AND GRAVEL BASE AND SUBBASE COURSES |
| 2.6.1 Gravel Borrow |
| 2.6.2 Crushed Stone |
| 2.6.3 Filter Stone |
| 2.6.4 Crushed Stone for Underground Retention System |
| 2.7 BURIED WARNING AND IDENTIFICATION TAPE |
| 2.7.1 Warning Tape for Metallic Piping |
| 2.7.2 Detectable Warning Tape for Non-Metallic Piping |
2.8 DETECTION WIRE FOR NON-METALLIC PIPING
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Shoring and Sheeting |
| 3.1.2 Drainage and Dewatering |
| 3.1.2.1 Drainage |
| 3.1.2.2 Dewatering |
| 3.1.3 Underground Utilities |
| 3.1.4 Machinery and Equipment |
| 3.2 SURFACE PREPARATION |
| 3.2.1 Clearing and Grubbing |
| 3.2.2 Stripping |
| 3.2.3 Unsuitable Material |
| 3.3 EXCAVATION |
| 3.3.1 Structures With Spread Footings |
| 3.3.2 Pile Cap Excavation and Backfilling |
| 3.3.3 Pipe Trenches |
| 3.3.4 Hard Material and Rock Excavation |
| 3.3.5 Excavated Materials |
| 3.3.6 Final Grade of Surfaces to Support Concrete |
| 3.4 SUBGRADE PREPARATION |
| 3.4.1 Proof Rolling |
| 3.5 SUBGRADE FILTER FABRIC |
| 3.6 FILLING AND BACKFILLING |
| 3.6.1 Gravel Borrow and Crushed Stone Placement |
| 3.6.2 Backfill and Fill Material Placement |
| 3.6.3 Structural Fill Material Placement |
| 3.6.4 Backfill and Fill Material Placement Over Pipes and at Walls |
| 3.6.5 Porous Fill Placement |
| 3.6.6 Trench Backfilling |
| 3.7 BORROW |
| 3.8 BURIED WARNING AND IDENTIFICATION TAPE |
| 3.9 BURIED DETECTION WIRE |
| 3.10 COMPACTION |
| 3.10.1 General Site |
| 3.10.2 Structures, Spread Footings, and Concrete Slabs |
| 3.10.3 Adjacent Area |
| 3.10.4 Paved Areas |
| 3.11 SPECIAL EARTHWORK REQUIREMENTS FOR UNDERDRAINS |
| 3.11.1 Crushed Stone Backfill Without Filter Fabric |
| 3.11.1.1 Perforated or Slotted Wall Pipe |
| 3.11.2 Crushed Stone Backfill Using Filter Fabric |
| 3.11.2.1 Perforated Pipes at Stormwater Bioretention Filter Basin |
| 3.12 FINISH OPERATIONS |
| 3.12.1 Grading |
| 3.12.2 Topsoil and Seed |
| 3.12.3 Protection of Surfaces |
| 3.13 DISPOSITION OF SURPLUS MATERIAL |
| 3.14 FIELD QUALITY CONTROL |
| 3.14.1 Sampling |
| 3.14.2 Testing |
| 3.14.2.1 Fill and Backfill Material Testing |
| 3.14.2.2 Structural Fill Material Testing |
| 3.14.2.3 Porous Fill Testing |
| 3.14.2.4 Density Tests |