NOAA OMAO Amendment 0007_Drawings.pdf
PDF 1 MB Posted
- Attached to
- NOAA OMAO Ship and Support Facility Relocation, Naval Station Newport, Newport, Rhode Island
- Solicitation number
- N4008523R2527
About this file
This package of construction drawings and schedules specifies requirements for a NOAA ship and support facility relocation project at the Naval Station Newport in Newport, Rhode Island. The drawings include slab plans, framing sections, and foundation details for an administration/warehouse building and boat repair building. Product and installation requirements include concrete slabs, masonry walls, structural steel framing, roofing, plumbing fixtures, and mechanical systems. Plumbing fixtures and equipment are scheduled along with sizes, capacities, and other technical specifications. The project appears to involve new construction as well as renovation and relocation of existing facilities.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. REFER TO S-501 THRU S-508 FOR TYPICAL DETAILS.
3. TOP OF SLAB IS 100'-0" UNLESS OTHERWISE NOTED BY [-XX] ON PLAN.
4. TOP OF PILE CAP IS 98'-6" UNLESS OTHERWISE NOTED.
5. TOP OF GRADE BEAM IS 98'-6" UNLESS OTHERWISE NOTED.
A
2 3 4
5 6 7
B
C
D
E
A.1
B.1
3.1
CJ
CJ
C J
C J
C J
C J
CJ
C J
C J
C J
CJ
CJ
CJ
CJ
C
J
C J
C J
C J
C J
C J
C J
CJ
CJ
CJ
CJ
CJ
C J
C J
20 TYP
22 22
TYP
24 TYP
-4"
TOC
4' - 4 1/4" 4' - 4 1/4"
5' - 8 1/4"
5'
2" 5'
2"
4'
3/
8"
CL SLAB DEPRESSION
C L
S
LA
B D
E P
R E
S S
IO
N
16TYP12 TYP
7' - 7"
/4
1"
6' - 6"
5'
5/
8"
5' - 5 3/4" 3' - 11"
6' - 10" 4' - 3"
TYP
24 TYP
C L
H O
U S
E K
E E
P
IN
G P
A D
5'
5"
33 TYP
262626
8' - 7 1/8" 3' - 5 3/8"
3' - 3 5/8"
7'
3/
4"
3'
5"
2'
3/
4"
8' - 4 1/2"
9'
/4
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N N
O R
F O
L K
N
O R
F O
L K
V
A
AS NOTED
N E
W P
O R
T , R
H O
D E
IS
LA
N D
M
ID
L A
N T
D C
B L
N A
V A
L S
T A
T
IO
N N
E W
P O
R T
N O
A A
O M
A O
S H
IP
S U
P P
O R
T F
A C
IL
IT
Y R
E L O
C A
T
IO
N
1562331
RS/RC
EJA
DSN
04OCT2022
Timothy Calohan, PE, NOAA Senior Project Manager
N4008523R2527
S-143
A D
M
IN
W
A R
E H
O U
S E
S
LA
B
P
LA
N
O V
E R
A
LL
F
IR
S
T F
LO
O
R
JEW
12874054
ALC MWR
NEK
SHEET NOTES
SHEET KEYNOTES
1 6" CONCRETE SLAB-ON-GRADE REINFORCED WITH 6x6-W4XW4 WELDED WIRE
REINFORCEMENT OVER 20 MIL VAPOR BARRIER AND 12" DEPTH OF POROUS
FILL. REFER TO PLUMBING DRAWINGS FOR VAPOR MITIGATION INFO.
2 8" CONCRETE SLAB-ON-GRADE REINFORCED WITH #4 BARS AT 10" OC EACH
WAY, OVER 20 MIL VAPOR BARRIER OVER 12" POROUS FILL. REFER TO
PLUMBING DRAWINGS FOR VAPOR MITIGATION INFO.
12 NON-LOAD BEARING CMU WALL OVER THICKENED SLAB. REFER TO ARCH
DWG A-140 FOR WALL LOCATIONS. REFER TO TYPICAL DETAILS FOR
THICKENED SLAB.
16 FLOOR DRAIN, SEE ARCHITECTURAL DRAWINGS
20 CONTROL JOINT, SEE DETAIL C5/S-501
22 TYPICAL COLUMN ISOLATION JOINT, SEE DETAIL C4/S-501
23 REENTRANT BAR AT 90° CORNERS, SEE DETAIL A3/S-501
24 REENTRANT BAR AT DOORWAYS CORNERS, SEE DETAIL B4/S-501
26 INTERIOR HOUSEKEEPING PAD, SEE DETAIL A2/S-502. LOCATIONS SHOWN
ARE APPROXIMATE. COORDINATE EXACT PAD LOCATIONS WITH PURCHASED
EQUIPMENT AND FINAL ROOM LAYOUT.
33 RECESSED CONCRETE SLAB. REFER TO ARCH DETAIL B4/A-521 FOR MORE
INFO AND COORD WITH OVERHEAD DOOR MFR DETAILS.
PLAN
NORTH
KEY PLAN
A
BB
A
3/32" = 1'-0" A1
ADMIN / WAREHOUSE SLAB PLAN - OVERALL
PLAN
NORTH
0' 8' 16' 32'4'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
V
A P
O R
M
IT
IG
A
T
IO
N R
E F
E R
E N
C E
/0
9/
V
A P
O R
B A
R R
IE
R
T H
IC
K
N E
S S
/0
8/
A
B
C
30' - 0"
MBS B.L/FACE OF
GIRT/EDGE OF SLAB
1' - 10" 8"
8" 1' - 10"
MBS B.L/FACE OF
GIRT/EDGE OF SLAB
8'
MBS B.L/FACE OF
GIRT/EDGE OF SLAB
MBS COLUMN,
TYP
TOC 100' - 0"
(TYP, UNO)
MBS B.L/FACE OF
GIRT/EDGE OF SLAB
8"
BF BF
BFBF
C1 S-370
A1 S-370
S-370 C2
S-370 C4
A2 S-370
CF8.0
CF8.0
CF8.0
CF8.0
CF8.0
CF8.0
TYP
T Y
P
TYP
TYP
TYP
8'
CL TRENCH
15' - 0"
EDGE OF
TRENCH
EDGE OF
TRENCH
A4 S-370
1/8" / 1'-0" 1/8" / 1'-0"
/4
/4
TOC 100' - 0"
(TYP, UNO)
8" 1'
1'
8"
TOC EL 97' - 0"
TOC EL 97' - 0"
TOC EL 97' - 0"
TOC EL 97' - 0"
TOC EL 97' - 0"
TOC EL 97' - 0" 33
A
B
C
15' - 0" 15' - 0"
CJ CJ
SLOPE SLOPE
A4 S-370
TOC EL 99' - 10 1/2"
TOC EL 99' - 10 1/2"
S
LO
P E
S
LO
P E
TOC EL 100' - 0"
TOC EL 100' - 0"
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N N
O R
F O
L K
N
O R
F O
L K
V
A
AS NOTED
N E
W P
O R
T , R
H O
D E
IS
LA
N D
M
ID
L A
N T
D C
B L
N A
V A
L S
T A
T
IO
N N
E W
P O
R T
N O
A A
O M
A O
S H
IP
S U
P P
O R
T F
A C
IL
IT
Y R
E L O
C A
T
IO
N
1562331
RS/RC
EJA
DSN
04OCT2022
Timothy Calohan, PE, NOAA Senior Project Manager
N4008523R2527
S-171
B O
A T
R E
P A
IR
F O
U N
D A
TI
O
N A
N D
S
LA
B P
LA
N
JEW
12874059
ALC MWR
NEK
3/16" = 1'-0" A1
FOUNDATION AND SLAB PLAN
SHEET NOTES
SHEET KEYNOTES
1. REFER TO SHEETS S-001 AND S-002 FOR GENERAL NOTES, ABBREVIATIONS,
PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. FOUNDATIONS HAVE BEEN DESIGNED FOR PRELIMINARY REACTIONS. FINAL
COLUMN REACTIONS MUST BE PROVIDED BY THE MBS MANUFACTURER AND
REVIEWED BY STRUCTURAL ENGINEER OF RECORD PRIOR TO TO POURING
OF THE FOUNDATIONS TO ENSURE THAT THE FOUNDATIONS SHOWN ARE
ADEQUATE.
3. ALL FOOTINGS ARE CENTERED UNDER THE PEDESTAL UNLESS OTHERWISE
NOTED.
4. REFER TO S-501 THRU S-502 FOR TYPICAL FOUNDATION AND SLAB DETAILS
AND SECTIONS.
5. FOUNDATIONS HAVE BEEN DESIGNED FOR THE ASSUMED REACTIONS BELOW
USING LRFD LOAD COMBINATIONS. BRACED BAYS ASSUMED BETWEEN
GRIDLINES B AND C ON EITHER SIDE OF BUILDING. MOMENT FRAMES
ASSUMED BETWEEN GRIDLINES 1 AND 2.
A. GRAVITY LOAD = 30K
B. MAX UPLIFT = 5K
C. SHEAR = 15K
8 12" CONCRETE SLAB-ON-GRADE REINFORCED WITH #4 BARS AT 12" OC EACH
WAY OVER 20 MIL VAPOR BARRIER AND 12" DEPTH OF POROUS FILL.
9 MBS BRACE FRAME LOCATION. IF ALTERNATE LOCATIONS OR ADDITIONAL
BRACED FRAMES ARE REQUIRED, CONTACT THE ARCHITECT AND
STRUCTURAL ENGINEER OF RECORD FOR APPROVAL.
10 ADD (2) #4 X 4'-0" LONG BARS CENTERED IN SLAB AT ALL RE-ENTRANT
CORNERS.
11 DOWELED SAW JOINTS. REFER TO TYPICAL CONCRETE DETAILS
14 TRENCH DRAIN
33 RECESSED CONCRETE SLAB. REFER TO ARCH DETAIL B4/A-521 FOR MORE
INFO AND COORD WITH OVERHEAD DOOR MFR DETAILS.
PLAN
NORTH
0' 4' 8' 12'
COLUMN FOOTING SCHEDULE
MARK
DIMENSIONS
REINFORCINGWIDTH LENGTH DEPTH
CF8.0 8' - 6" 8' - 6" 2' - 0" (10) #6 EACH WAY, TOP &
BOTTOM
COLUMN FOOTING SCHEDULE NOTES:
1. FOR FOOTING SIZE AND REINFORCEMENT, SEE "COLUMN FOOTING
SCHEDULE" THIS SHEET.
2. FOOTINGS HAVE BEEN DESIGNED FOR ESTIMATED MBS COLUMN
REACTIONS. ANCHOR BOLTS SHALL NOT BE FABRICATED AND FOOTINGS
SHALL NOT BE CONSTRUCTED UNTIL THE MBS COLUMN REACTIONS HAVE
BEEN REVIEWED BY THE STRUCTURAL ENGINEER OF RECORD.
3. MBS SUPPLIER SHALL SUBMIT FINAL ANCHOR BOLT DIMENSONS, LAYOUTS,
AND ORIENTATIONS TO THE STRUCTURAL ENGINEER OF RECORD.
4. ALL ANCHOR BOLT DIMENSIONS, LAYOUTS, AND ORIENTATIONS MUST BE
VERIFIED AND COORDINATED WITH THE FINAL MBS DRAWINGS PRIOR TO
FABRICATION AND INSTALLATION.
COLUMN PEDESTAL SCHEDULE
MARK
DIMENSIONS REINFORCEMENT
LENGTH WIDTH VERTICAL TIES
PED 3' - 0" 3' - 0" (8) #8 BARS #4 @ 12" OC
3/16" = 1'-0" A3
SLAB JOINT PLAN
PLAN
NORTH
0' 4' 8' 12'
ALL WORK THIS SHEET IS
BID OPTION - BOAT REPAIR
BUILDING
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
V
A P
O R
B A
R R
IE
R
T H
IC
K
N E
S S
/0
8/
SEE TYP BEARING
DETAIL
JOIST, REFER TO PLAN
CMU WALL,
REFER TO PLAN
TYPICAL 'R1' JOIST
EXTENDED END. 550 PLF
ALLOWABLE CAPACITY
6" BRG
REFER TO PLAN
JBE
ROOF DECK,
REFER TO PLANGRID
SEE PLAN
1/
2"
BENT PL 6-1/2"X5"X1/4"
CONT.
3/16
GUTTER AND
ATTACHMENT BY MFR
ROOF MEMBRANE,
REFER TO ARCH
BEAM, REFER TO PLAN
CONC SLAB. REFER TO PLAN
L4X4X3/8 CONT WITH 5/8"⌀ x 6"
EMBEDMENT EPOXY ANCHORS AT 12" OC
CMU WALL,
REFER TO PLAN
SEE TYP BEAM BEARING
ON MASONRY DETAIL ON
SHEET S-505
GRID
116' - 0"
TOC
L4X4X3/8 CONT WITH 5/8"⌀ x 6"
EPOXY ANCHORS AT 12" OC
WITH 6" MIN EMBED
2 COURSE BOND BEAM
BELOW SECOND FLOOR
ELEVATION
CMU WALL, REFER
TO PLAN
CONCRETE FLOOR,
REFER TO PLAN
BEAM, REFER TO PLAN
116' - 0"
TOC
GRID
CONCRETE FLOOR,
REFER TO PLAN
116' - 0"
TOC
BEAM, REFER TO PLAN
SEE TYP BEARING DETAIL
CMU WALL,
REFER TO PLAN
SEE TYP BEAM BEARING
ON MASONRY DETAIL.
L4X4X3/8 CONT WITH 5/8"⌀x6"
EMBEDMENT EPOXY
ANCHORS AT 12" OC
ROOF DECK,
REFER TO PLAN
HSS3X3X3/8,
REFER TO PLAN
CMU WALL,
REFER TO PLAN
BEAM,
REFER TO PLAN
VARIES
TOP OF WALL
VARIES
TOS
ROOF DECK,
REFER TO PLAN
CONC BOND BEAM AT TOP OF SLOPED
WALL, REFER TO A1/S-504. COORDINATE
HEADED STUD LOCATIONS WITH
ADJACENT HSS EMBED PLATES
CONT. L4X4X1/4
SEE PLAN
3/16 2
EACH DECK
FLANGE
WELD AS
SPECIFIED
EMBED PL 6"X6"X3/8"
THICK WITH 1/2" DIA.
HEADED STUD WITH 6"
EMBED. AT EACH HSS
LOCATION.
3"3"
3" 3"
3/16
SEE SECTION C1/S-505 FOR
EMBED AND METAL ROOF DECK
SUPPORT INFO.
BENT PL4X4X1/4 CONT.
3/16 3
EACH
BEAM
ROOF MEMBRANE,
REFER TO ARCH (TYP.)
L6X4X5/16 (LLH) x
0'-6" LONG
3/16
3/16
3/16
ROOF JOIST OR
BEAM. REFER
TO PLAN
B.1
132'-6 1/2"
JST BRG EL
122'-1 1/4"
WP
ROOF DECK,
REFER TO PLAN
ROOF DECK,
REFER TO PLAN
JOIST,
REFER TO PLAN
BEAM,
REFER TO PLAN
HSS COLUMN,
REFER TO PLAN
FACE OF WALL,
REFER TO ARCH
ROOF MEMBRANE,
REFER TO ARCH
WP
BENT PL. REFER TO
B1/A-353
3' - 6"
1' - 0"
SLOPED BEAM,
REF PLAN
REFER TO PLAN
BEARING ELEV
COPE BEAM FOR
OUTRIGGER
EXTENSION
CL WALL
& BM
BRG PL
NOTE:
REFER TO TYPICAL BEAM
BEARING DETAILS.
GRID
A.1
PROVIDE HALF-BLOCK
AT BEAM BEARING
LOCATIONS
SEE PLAN
BENT PL 6-1/2"X5"X1/4"
CONT.
GUTTER AND
ATTACHMENT BY MFR
3/16 ROOF MEMBRANE,
REFER TO ARCH
CMU FACING
114'-0"
TOP OF WALL
GRID
A.1
3/ 8"
B /D
E C
K E
LE
V
A T
IO
N
C O
O R
D . W
IT
H
WELD AS
SPECIFIED
1/4" BENT PLATE CONT
BETWEEN BEAM
BEARING LOCATIONS
3/16 2-12
2" 2"
CL
WALL
CMU WALL REFER TO
PLAN
ROOF MEMBRANE,
REFER TO ARCH
SEE ADJACENT
SECTIONS FOR
MORE INFO.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N N
O R
F O
L K
N
O R
F O
L K
V
A
AS NOTED
N E
W P
O R
T , R
H O
D E
IS
LA
N D
M
ID
L A
N T
D C
B L
N A
V A
L S
T A
T
IO
N N
E W
P O
R T
N O
A A
O M
A O
S H
IP
S U
P P
O R
T F
A C
IL
IT
Y R
E L O
C A
T
IO
N
1562331
RS/RC
EJA
DSN
04OCT2022
Timothy Calohan, PE, NOAA Senior Project Manager
N4008523R2527
S-351
A D
M
IN
W
A R
E H
O U
S E
F
R A
M
IN
G S
E C
TI
O
N S
JEW
12874064
ALC MWR
NEK
3/4" = 1'-0" B3
SECTION
3/4" = 1'-0"
B4
SECTION
3/4" = 1'-0" A4
SECTION
0' 1' 2' 3'
0' 1' 2' 3'3/4" = 1'-0" A3
SECTION
0' 1' 2' 3'
0' 1' 2' 3'
3/4" = 1'-0" B1
SECTION - WAREHOUSE HIGH ROOF
0' 1' 2' 3'
3/4" = 1'-0" C2
SECTION
1" = 1'-0" A1
SECTION
1' 2'0' 6"
0' 1' 2' 3'
1" = 1'-0" C4
SECTION
1' 2'0' 6"
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
W
A
LL
B R
A C
E T
O R
O O
F J
O
IS
T O
R B
E A
M C
O N
N E
C T
IO
N
/0
8/
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N N
O R
F O
L K
N
O R
F O
L K
V
A
AS NOTED
N E
W P
O R
T , R
H O
D E
IS
LA
N D
M
ID
L A
N T
D C
B L
N A
V A
L S
T A
T
IO
N N
E W
P O
R T
N O
A A
O M
A O
S H
IP
S U
P P
O R
T F
A C
IL
IT
Y R
E L O
C A
T
IO
N
1562331
RS/RC
EJA
DSN
04OCT2022
Timothy Calohan, PE, NOAA Senior Project Manager
N4008523R2527
P-641
A D
M
IN
W
A R
E H
O U
S E
S
C H
E D
U
LE
S
CWS
12874193
CMO CMO
ALG
NOTES:
1. ALL FIXTURES INDICATED AS ARCHITECTURAL BARRIERS ACT (ABA) SHALL COMPLY AND BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE USFAS AND CABO/ANSI A117.1.
2. PROVIDE WITH ASSE 1070 MIXING VALVE.
3. SHOWER MIXER SHALL BE ASSE 1016 CERTIFIED.
4. EQUIPPED WITH UL 430 WASTE DISPOSAL.
5. PROVIDE WITH THERMOSTATIC MIXING VALVE ASSE 1071, DUST COVER, EMERGENCY ALARM SYSTEM AND SCALD PROTECTION.
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION
CONNECTIONS
COLD WATER HOT WATER VENT WASTE
GPM GPF REMARKS
MOUNTING HEIGHT
(LOWEST FLOOD RIM)
DWH-1 NATURAL GAS 39 120 240 120240
DWH-2 NATURAL GAS 120 0.5 240 120
MARK TYPE E.W.T. (°F) L.W.T. (°F) INPUT (MBH)
TURN ON
(GPM)
NATURAL GAS
(MBH)
VOLTS PHASE REMARKS
DOMESTIC WATER HEATER SCHEDULE (DWH) - ADMIN BLDG
RPZ-1 2 1/2" EPOXY COATED *** 10
MARK SIZE MATERIAL FLOW (GPM) PRESSURE DROP
(GPM)
REMARKS
BACKFLOW PREVENTER SCHEDULE
BFP-1 BRONZE BODY 10
MARK DESCRIPTION
BLV-1 CALIBRATED BALANCING VALVE 2.0 2.7 OFFICE / 102
REMARKS
BALANCING VALVE SCHEDULE (BLV)
FLOW RATE
(GPM)
PRESSURE DROP
(MAX PSI)
LOCATION
(ROOM / #)
LINE SIZE
3/4"
BLV-2 CALIBRATED BALANCING VALVE 2.0 2.7 DIVE / 132
LOCATION
(ROOM / #)
PIER
MECH / 138
24039
MECH / 138
LOCATION
(ROOM / #)
3/4"
MARK DRAIN TYPE
FD-1 FLOOR DRAIN - GENERAL DUTY
DRAIN SIZE
3"
TRAP PRIMER
CONNECTION
6" ROUND YES
FD-2 FLOOR DRAIN - HEAVY DUTY 4" 6" ROUND YES
REMARKSSTRAINER
ELECTRONIC TRAP PRIMER MANIFOLD
DRAIN AND CLEAN OUT SCHEDULE
FD-4 FLOOR DRAIN - HEAVY DUTY 3" 6" ROUND YES
MARK DESCRIPTION
TPM-1 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" 4 MECH / 138
REMARKS
TRAP PRIMER MANIFOLD SCHEDULE (TPM)
TPM-3 ELECTRONIC TRAP PRIMER MANIFOLD
COLD WATER
LINE SIZE
3/4"
NUMBER OF
DRAINS SERVING
LOCATION
(BLDG / ROOM)
TPM-2 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" -1 JAN / 223
2 DIVE / 132
PRESSURE ACTUATED TRAP PRIMER VALVE
FD-3 FLOOR DRAIN - HEAVY DUTY 3" 6" ROUND YES ELECTRONIC TRAP PRIMER MANIFOLD
WC-1 WATER CLOSET, ABA 1" - 2" 4" - 1.1 WALL MOUNTED17"
L-1 LAVATORY, WALL HUNG, ABA 1/2" 2" 0.35 -
S-1 SINK, SINGLE BOWL (25x18) 1/2" 2" 1.5 - STAINLESS STEEL, NOTE 4
S-2 SINK, SINGLE BOWL (18x18) 1/2" 2" 1.5 -
1/2"
1/2"
1/2"
1 1/2"
1 1/2"
1 1/2" STAINLESS STEEL
WALL MOUNTED, SENSOR FAUCET, NOTE 234"
UNDERMOUNT
UNDERMOUNT
S-3 SINK, DOUBLE BOWL UTILITY 1/2" 2" 1.5 -1/2" 1 1/2" 34"
0.5
MECH / 138
DWH-3 NATURAL GAS 120 0.5 240 120 124039 MECH / 138
TPM-4 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" 1 SHIP STOR / 123 -
TPM-5 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" 3 -
FLOOR MOUNTED
2 1/2"
TYP FOR FOUR CONNECTIONS
PROVIDED WITH INTERNAL HWRP; NOTE 1
TELECOM / 110
NOTES:
1. THE DOMESTIC WATER HEATER CONTROLS THE 2 SPEED INTERNAL HWRP, "LOW" OPERATION AT 0.5 GPM AND "HIGH" IS 4 GPM @ 24' HEAD.
PROVIDED WITH INTERNAL HWRP; NOTE 1
PROVIDED WITH INTERNAL HWRP; NOTE 1 TPM-6 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" 2 -SHIPPING / 135
FCO FLOOR CLEAN OUT FULL SIZE ROUND - -
WCO WALL CLEAN OUT ROUND - -
TD-1 TRENCH DRAIN - HEAVY DUTY 3" TRAFFIC RATED NO BOAT REPAIR BUILDING
ELECTRONIC TRAP PRIMER MANIFOLD
SH-1 SHOWER 1/2" 3" 1.5 - NOTE 3
SH-2 SHOWER, ABA 1/2" 3" 1.5 - NOTE 3
MR-1 MOP RECEPTOR 1/2" 1/2" 3" 2.5 -
EWC-1 ELECTRIC WATER COOLER 1/2" - 2" 2" 0.13 -
FREEZE PROOF IN LOCKABLE RECESSED WALL BOXWH WALL HYDRANT 3/4" - - - - -
LOCATED IN MECHANICAL ROOMS AND BOAT REPAIRHB HOSE BIBB 3/4" - - - - -
1/2"
1/2"
1 1/2"
1 1/2"
1 1/2"
BI-LEVEL, EQUIPPED W/ BOTTLE FILLER
FLOOR
ABA
FLOOR
FLOOR
ESEW-1 EMERGENCY SHOWER/EYEWASH 1 1/4" 1 1/4" 1 1/2" 2" 20 - WALL MOUNTED; NOTE 5-
HS HOSE STATION 1/2" 1/2" - - - - -
FLOOR MOUNTED, MOLDED STONE
LOCATED AT FLOATING PIERHB-D HOSE BIBB - DOCK 3/4" - - - - - -
S-4 SINK, SINGLE BOWL UTILITY - BOAT REPAIR 1/2" 2" 1.51/2" 1 1/2" 34" FLOOR MOUNTED, MOLDED STONE
BFP-2 BRONZE BODY 10 BOAT REPAIR31"
MARK PUMP DESCRIPTION
SP-1 ELEVATOR SUMP PUMP
TYPE
SUMP
TOTAL HEAD
(FT WC)
50 20
PUMP SCHEDULE
CAPACITY
(GPM)
MIN. MOTOR
(HP)
VOLTAGE /
PHASE
120/1
NOTES:
1. SUMP PUMP TO BE EQUIPPED WITH HIGH LEVEL ALARMS AND OIL SENSOR.
REMARKS
NOTE 1ELEV / 120
LOCATION
(ROOM / #)
MARK DESIGN STATIC
PRESSURE (IN. WC.)
VMF-1 -1.0 75
VAPOR MITIGATION FAN SCHEDULE
DESIGN AIR FLOW
(CFM)
PIPE CONNECTION
(IN.)
MOTORVOLTAGE/
PHASE
6" ECM - SPEED CONTROLABLE120/1 EEB STOR/125
FAN LOCATION
(ROOM / #)
NOTES:
1. FAN SECTIONS ARE TO BE VERIFIED AS ADEQUATE AFTER FINAL TESTING HAS OCCURED.
NOTES
VMF-2 -1.0 75 6" ECM - SPEED CONTROLABLE120/1 OPERATION/133
VMF-3 -1.0 75 6" ECM - SPEED CONTROLABLE120/1 CORR/210A
MARK DESCRIPTION
AC-1 AIR COMPRESSOR RECIPROCATING - TANK MOUNTED
AIR COMPRESSOR SCHEDULE
TYPE MAX. FLOW OUTPUT
(ACFM)
PRESSURE OUTPUT
(PSI)
MIN. MOTOR
(HP)
VOLTAGE/
PHASE
NOTES
135 90 5 480/3
AIR RECEIVER
(GAL)
60 MECH/138
LOCATION
(ROOM / #)
NOTES:
1. RECEPTACLE PROVIDED BY DIVISION 26.
TPM-7 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" 2 TELECOM/216 -
TPM-8 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" 1 BOAT REPAIR -
TPM-9 PRESSURE ACTIVATED TRAP PRIMER 3/4" 4 ADMIN 130/131 -
TPM-10 PRESSURE ACTIVATED TRAP PRIMER 3/4" 1 MEN / 117 -
TPM-11 PRESSURE ACTIVATED TRAP PRIMER 3/4" 1 WMN 116 -
TPM-12 PRESSURE ACTIVATED TRAP PRIMER 3/4" 1 MEN / 225 -
TPM-13 PRESSURE ACTIVATED TRAP PRIMER 3/4" 1 WMN 224 -
FULL SIZE
VOLTAGE
WOB WATER OUTLET BOX 1/2" - - - - - -
AC-2 AIR COMPRESSOR RECIPROCATING - TANK MOUNTED 5.3 90 1.6 120/1 30 BOAT REPAIR NOTE 1
NOTE 1
NOTE 1
NOTE 1
TPM-14 ELECTRONIC TRAP PRIMER MANIFOLD 3/4" 1 SHIP STOR / 123 24 -
BFP-3 BRONZE BODY 1031" MECH / 138 MECH MAKE-UP
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
U
P D
A T
E D
P
LU
M B
IN
G
S C
H E
D U
LE
/0 8/
| Sheets |
| S-143 - ADMIN / WAREHOUSE - SLAB PLAN - OVERALL - FIRST FLOOR |
| S-351 - ADMIN / WAREHOUSE - FRAMING SECTIONS |
| S-171 - BOAT REPAIR - FOUNDATION AND SLAB PLAN |
| S-351 - ADMIN - WAREHOUSE - FRAMING SECTIONS |
| NOAA_P-641_ADMIN - WAREHOUSE SCHEDULES |
| 2023-05-18T13:51:33-0400 | |
| Augusto Collot | |
| I am signing to certify the authenticity of this document. |
| 2023-05-18T13:51:36-0400 | |
| Augusto Collot | |
| I am signing to certify the authenticity of this document. |
| 2023-05-18T13:51:36-0400 | |
| Augusto Collot | |
| I am signing to certify the authenticity of this document. |
| 2023-05-18T13:52:16-0400 | |
| Ryan Browning | |
| I am signing to certify the authenticity of this document. |
| 2023-05-25T11:42:35-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2023-05-25T11:42:49-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2023-05-25T11:42:49-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2023-05-25T11:42:49-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2023-05-25T11:43:02-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2023-05-25T11:43:15-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2023-05-25T11:43:15-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2023-05-25T11:43:15-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |