1562331_spc_1of1.pdf
PDF 14 MB Posted
- Attached to
- NOAA OMAO Ship and Support Facility Relocation, Naval Station Newport, Newport, Rhode Island
- Solicitation number
- N4008523R2527
About this file
This solicitation is for ship and support facility relocation services for the National Oceanic and Atmospheric Administration (NOAA) at the Naval Station Newport in Newport, Rhode Island. The Naval Facilities Engineering Command is seeking proposals to relocate NOAA ships and support facilities as detailed in solicitation N4008523R2527 and accompanying specifications and drawings. Proposals are due via the Procurement Integrated Enterprise Environment solicitation module link provided by the specified response date. The selected contractor will be responsible for relocating NOAA vessels and supporting infrastructure to a new location within the naval station in accordance with accompanying technical requirements and specifications documents.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORK ORDER NO. 1562331
Contract NO. N40085-20-F6271
SPECIFICATIONS
FINAL SUBMISSION
NOAA OMAO Ship & Support Facility Relocation NAVFAC MIDLANT Design and Construction Business Line, Norfolk, VA
PREPARED BY:
MN / BMcD Joint Venture 1317 Executive Blvd.
Suite 300 Chesapeake, VA 23320
Architectural: Jamie Dubbe, RA, LEED Mechanical: Ryan Browning, PE Structural: Augusto Collot, PE Plumbing: Ryan Browning, PE Electrical: Boris Goli, PE Cathodic Protection: Kristin Ade, PE Civil: Ryan Stackpole, PE Communications: Luther Woodruff, PE Civil: Kenneth Scully, PE Structural: Roderick Whitsel, PE, SE Civil Kent Gannon, PE Fire Protection: Justin Worden, PE Landscape: Jeffrey Olszewski, RLA, ASLA
Submitted By: Anat Mor, AIA, LEED AP Date: 18 Nov 2022 AE Project Manager
Project Manager: Roger Schalge Date:
Approved By: James Donahue Date:
Design Production Director
Name: Ryan J. Stackpole, PE Discipline: Civil
Name: Kent. P. Gannon, PE Discipline: Civil
Name: Kenneth W. Scully, PE Discipline: Civil
Name: Jeffrey A. Olszewski, RLA, ASLA Discipline: Landscape
Name: Roderick D. Whitsel, PE Discipline: Structural
Name: Augusto L. Collot, PE Discipline: Structural
Name: Jamie M. Dubbe, RA Discipline: Architectural
Name: Justin Worden, PE Discipline: Fire Protection
Name: Ryan Michael Browning, PE Discipline: Plumbing, Mechanical
Name: Boris Konan Goli, PE Discipline: Electrical
Name: Kristin M. Ade, PE Discipline: Cathodic Protection
Name: Luther Augustus Woodruff III, PE Discipline: Telecommunications
NOAA OMAO Ship & Support Facility Relocation Work Order No. 1562331 NSN-Newport, Rhode Island
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11, CHG 11: 11/20 WORK RESTRICTIONS
01 20 00 11/20, CHG 1: 02/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20 ADMINISTRATIVE REQUIREMENTS
01 30 01.00 22 DESIGN, PROCUREMENT AND INSTALLATION
OF FURNITURE, FIXTURES AND EQUIPMENT
01 31 23.13 20 05/17, CHG 6: 02/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 13 11/20 SPECIAL PROJECT PROCEDURES
01 35 26 11/20 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 11/15 HEALTH, SAFETY, AND EMERGENCY RESPONSE
PROCEDURES FOR CONTAMINATED SITES
01 35 40.00 20 11/22 MARINE MAMMAL PROTECTION
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 45 35 11/20 SPECIAL INSPECTIONS
01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 4: 08/20 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 57 24 TURBIDITY CONTROL AND MONITORING
01 58 00 08/19, CHG 2: 11/20 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 1: 08/20 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 1: 11/20 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 2: 11/20 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 20 02/21 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 05/10 DEMOLITION
02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
DI VI SI ON 03 - CONCRETE
03 30 00 02/19, CHG 1: 02/21 CAST-IN-PLACE CONCRETE
03 31 30 02/19 MARINE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
03 45 33 05/16 PRECAST PRESTRESSED STRUCTURAL CONCRETE
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 20.00 27 02/21 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 1: 11/18 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 FACILITIES MISCELLANEOUS METAL
FABRICATIONS
05 50 14 08/18 STRUCTURAL METAL FABRICATIONS
05 50 16 05/17, CHG 1: 08/18 WATERFRONT MISCELLANEOUS METAL
FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 08/16 ROUGH CARPENTRY
06 13 33 11/16, CHG 1: 08/17 PIER TIMBERWORK
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 05/11, CHG 4: 02/21 METAL ROOF PANELS
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 52 00 05/12 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 32 13 08/20 SLIDING GLASS DOORS
08 33 23 08/20 OVERHEAD COILING DOORS
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 51 13 05/19 ALUMINUM WINDOWS
PROJECT TABLE OF CONTENTS Page 2
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 67 23.15 02/21 FUEL RESISTIVE RESINOUS FLOORING,
3-COAT SYSTEM
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
09 97 13.26 04/06 COATING OF STEEL WATERFRONT STRUCTURES
DI VI SI ON 10 - SPECI ALTI ES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 08/20 TOILET COMPARTMENTS
10 26 00 08/20 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 BENCHES
10 56 13 04/06 STEEL SHELVING
DI VI SI ON 11 - EQUI PMENT
11 11 37 11/18 ELECTRIC VEHICLE SUPPLY EQUIPMENT
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 08/20 ROLLER WINDOW SHADES
12 48 13 08/17 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 08/17, CHG 1: 08/18 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 21 26 02/16, CHG 1: 08/18 COLD-STORAGE ROOMS (PREFABRICATED
PANEL TYPE)
13 22 00 11/16 HAZMAT CONTAINERS
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR MECHANICAL
EQUIPMENT
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 05/11 PIER STANDPIPE SYSTEMS
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
PROJECT TABLE OF CONTENTS Page 3
21 22 00.00 40 05/16 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/15, CHG 3: 08/18 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 2: 02/20 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 1: 11/20 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 20 05/20 FACILITY GAS PIPING
23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20 HVAC AIR DISTRIBUTION
23 52 43.00 20 05/15, CHG 2: 08/18 LOW PRESSURE WATER HEATING BOILERS
(UNDER 800,000 BTU/HR OUTPUT)
23 81 00 05/18, CHG 1: 02/21 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 29 02/20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS
23 82 00.00 20 02/16, CHG 1: 08/18 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.01 CYBERSECURITY FOR BUILDING AUTOMATION
SYSTEM
25 05 11.02 CYBERSECURITY FOR DDC
25 05 11.03 CYBERSECURITY FOR ESS
DI VI SI ON 26 - ELECTRI CAL
26 05 33 01/07, CHG 1: 11/19 DOCKSIDE POWER CONNECTION STATIONS
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 08 00 08/08, CHG 1: 02/15 APPARATUS INSPECTION AND TESTING
26 11 16 02/10, CHG 2: 11/19 SECONDARY UNIT SUBSTATIONS
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 13 00 11/14 SF6/HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
26 13 01 08/13, CHG 1: 02/20 PAD-MOUNTED DEAD-FRONT AIR INSULATED
SWITCHGEAR
26 20 00 08/19, CHG 1: 11/19 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15, CHG 1: 08/17 SWITCHBOARDS
26 27 14.00 20 02/21 ELECTRICITY METERING
26 29 23 02/20 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
PROJECT TABLE OF CONTENTS Page 4
15-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 23 05/20 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC
PROTECTION (GACP) SYSTEM
26 51 00 05/20 INTERIOR LIGHTING
26 56 00 05/20 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 32 50.00 22 7/21 ELEVATOR LANDING TWO-WAY COMMUNICATION
SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 21 13 11/18 VAPOR MITIGATION
31 23 00.00 20 02/11 EXCAVATION AND FILL
31 41 16 11/20 METAL SHEET PILING
31 62 16.13 11/20 STEEL PIPE PILES
31 62 16.16 11/20 STEEL H-PILES
31 63 29 11/19 DRILLED CONCRETE SHAFTS
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 17 23 08/16 PAVEMENT MARKINGS
32 31 13.53 02/20 HIGH-SECURITY FENCES (CHAIN LINK) AND
GATES
32 92 19 08/17 SEEDING
32 93 00 08/17 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 31 23.00 10 08/18 SANITARY SEWER FORCE MAIN PIPING
33 32 16 11/19 PACKAGED UTILITY WASTEWATER PUMPING
STATIONS
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 51 39 08/17 MONITORING WELLS
33 71 02 02/15, CHG 1: 11/19 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
PROJECT TABLE OF CONTENTS Page 5
DI VI SI ON 34 - TRANSPORTATI ON
34 71 13.16 02/15 VEHICLE CRASH BARRIERS
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 51 13 05/21 CONCRETE FLOATING DOCK SYSTEM FOR
SMALL CRAFT
35 59 13.19 04/06 RUBBER MARINE FENDERS
35 59 20 06/19 HDPE PIPE PILE SLEEVES
35 59 35 06/19 MOORING FITTINGS
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
40 05 13 10/07, CHG 2: 02/20 PIPELINES, PROCESS PIPING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 6
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/ 11, CHG 1: 08/ 14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
INDEX OF DRAWINGS- VOLUME 1
SHEET_NO NAVFAC_NOSHEET NO. SHEET NAME
GENERAL
1 12873877 G-001 COVER SHEET - VOLUME 1
2 12873878 G-002 INDEX OF DRAWINGS - VOLUME 1
3 12873879 GI120 LIFE SAFETY SITE PLAN - ADMIN/WAREHOUSE BUILDING
4 12873880 GI121 LIFE SAFETY SITE PLAN - BOAT REPAIR BUILDING, HAZMAT
CONTAINER, AND CONNEX BOXES
5 12873881 GI140 ADMIN / WAREHOUSE - LIFE SAFETY NARRATIVE AND
BUILDING CODE ANALYSIS
6 12873882 GI141 ADMIN / WAREHOUSE - LIFE SAFETY PLANS
7 12873883 GI170 BOAT REPAIR - LIFE SAFETY NARRATIVE AND BUILDING
CODE ANALYSIS
8 12873884 GI180 PIER - LIFE SAFETY NARRATIVE, BUILDING CODE
ANALYSIS, AND SITE PLAN
9 12873885 GI190 HAZMAT CONTAINER AND CONEX BOXES - LIFE SAFETY
NARRATIVE AND BUILDING CODE ANALYSIS
SURVEY
10 12873886 V-100 PIER - OVERALL TOPOGRAPHIC PLAN
11 12873887 V-101 PIER LANDING – SOUTH EXISTING CONDITIONS
12 12873888 V-102 PIER LANDING – NORTH EXISTING CONDITIONS
13 12873889 V-103 ACCESS ROAD - EXISTING CONDITIONS
14 12873890 V-104 ACCESS PARKING - EXISTING CONDITIONS
15 12873891 V-105 BOAT REPAIR - EXISTING CONDITIONS
16 12873892 V-106 PIER - EXISTING CONDITIONS
17 12873893 V-107 BUILDING 6 - EXISTING CONDITIONS
18 12873894 V-108 ANDERSON AVE
19 12873895 V-109 BUILDING 76 - EXISTING CONDITIONS
20 12873896 V-110 BUILDING 11 PARKING AREA – EXISTING CONDITIONS
21 12873897 V-111 SURVEY CONTROL PLAN
GEOTECHNICAL
DOCUMENT 00 01 15 Page 1
22 12873898 B-101 GEOTECHNICAL INVESTIGATIONS PLAN - PIER LANDING
23 12873899 B-102 GEOTECHNICAL INVESTIGATIONS PLAN - BLDG 11 PARKING
AREA24 12873900 B-601 BORING LOGS - 1
25 12873901 B-602 BORING LOGS - 2
26 12873902 B-603 BORING LOGS - 3
27 12873903 B-604 BORING LOGS - 4
28 12873904 B-605 BORING LOGS - 5
29 12873905 B-606 BORING LOGS - 6
30 12873906 B-607 BORING LOGS - 7
31 12873907 B-608 BORING LOGS - 8
32 12873908 B-609 BORING LOGS - 9
33 12873909 B-610 BORING LOGS - 10
34 12873910 B-611 BORING LOGS - 11
35 12873911 B-612 BORING LOGS - 12
36 12873912 B-613 BORING LOGS - 13
37 12873913 B-614 BORING LOGS - 14
38 12873914 B-615 BORING LOGS - 15
39 12873915 B-616 BORING LOGS - 16
40 12873916 B-617 BORING LOGS - 17
41 12873917 B-618 BORING LOGS - 18
42 12873918 B-619 BORING LOGS - 19
43 12873919 B-620 BORING LOGS - 20
44 12873920 B-621 BORING LOGS - 21
45 12873921 B-622 BORING LOGS - 22
46 12873922 B-623 BORING LOGS - 23
47 12873923 B-624 BORING LOGS - 24
48 12873924 B-625 BORING LOGS - 25
CIVIL
49 12873925 C-001 LEGEND, AND ABBREVIATIONS
50 12873926 C-002 GENERAL NOTES
51 12873927 C-003 SITE ACCESS & LAYDOWN AREA
52 12873928 CD101 PIER LANDING - DEMOLITION PLAN
53 12873929 CD102 BUILDING 11 PARKING AREA - DEMOLITION PLAN
54 12873930 C-101 PIER LANDING - OVERALL SITE PLAN
55 12873931 C-102 PIER LANDING SOUTH - SITE PLAN
56 12873932 C-103 PIER LANDING NORTH - SITE PLAN
57 12873933 C-104 BUILDING 11 PARKING AREA - SITE PLAN
58 12873934 C-501 SITE DETAILS - PART 1
59 12873935 C-502 SITE DETAILS - PART 2
60 12873936 C-503 SITE DETAILS - PART 3
61 12873937 C-504 SITE DETAILS - PART 4
62 12873938 C-505 SITE DETAILS - PART 5
63 12873939 C-506 SITE DETAILS - PART 6
64 12873940 C-507 SITE DETAILS - PART 7
65 12873941 C-508 SITE DETAILS - PART 8
66 12873942 C-509 SITE DETAILS - PART 9
DOCUMENT 00 01 15 Page 2
67 12873943 CU101 PIER LANDING - COMPOSITE UTILITY PLAN
68 12873944 CU102 PIER LANDING - DRAINAGE & GRADING PLAN - PART 1
69 12873945 CU103 PIER LANDING - DRAINAGE & GRADING PLAN - PART 2
70 12873946 CU104 BUILDING 11 PARKING AREA - DRAINAGE & GRADING PLAN
71 12873947 CU105 PIER LANDING - WATER PLAN
72 12873948 CU106 PIER LANDING - SANITARY SEWER PLAN
73 12873949 CU107 PIER LANDING - NATURAL GAS PLAN
74 12873950 CU201 DRAINAGE PROFILES - PART 1
75 12873951 CU202 DRAINAGE PROFILES - PART 2
76 12873952 CU203 WATER PROFILES - PART 1
77 12873953 CU204 WATER PROFILES - PART 2
78 12873954 CU205 SANITARY SEWER PROFILES - PART 1
79 12873955 CU206 SANITARY SEWER PROFILES - PART 2
80 12873956 CU401 PIER LANDING - SANITARY SEWER LIFT STATIONS - PART
PLANS
81 12873957 CU501 DRAINAGE DETAILS - PART 1
82 12873958 CU502 DRAINAGE DETAILS - PART 2
83 12873959 CU503 DRAINAGE DETAILS - PART 3
84 12873960 CU504 WATER DETAILS
85 12873961 CU505 SANITARY SEWER DETAILS
86 12873962 CU506 PIER LANDING - SANITARY SEWER LIFT STATION DETAILS -
PART 1
87 12873963 CU507 PIER LANDING - SANITARY SEWER LIFT STATION DETAILS -
PART 2
88 12873964 CU508 PIER LANDING - SANITARY SEWER LIFT STATION DETAILS -
PART 3
89 12873965 CU509 PIER LANDING - SANITARY SEWER LIFT STATION DETAILS -
PART 4
90 12873966 CE101 PIER LANDING - SOIL EROSION PLAN CONTROL PLAN
91 12873967 CE102 BUILDING 11 PARKING AREA - SOIL EROSION PLAN CONTROL
PLAN
92 12873968 CE501 SOIL EROSION CONTROL DETAILS
93 12873969 CI001 LIFT STATION INSTRUMENTATION NOTES, LEGEND, &
ABBREVIATIONS
94 12873970 CI501 INSTRUMENT INSTALLATION DETAILS - PART 1
95 12873971 CI502 INSTRUMENT INSTALLATION DETAILS - PART 2
96 12873972 CI601 INSTRUMENTATION PLAN - SANITARY SEWER LIFT STATION #1
97 12873973 CI602 INSTRUMENTATION PLAN - SANITARY SEWER LIFT STATION #2
LANDSCAPE
DOCUMENT 00 01 15 Page 3
98 12873974 L-101 PIER LANDING - LANDSCAPE PLAN - PART 1
99 12873975 L-102 PIER LANDING - LANDSCAPE PLAN - PART 2
100 12873976 L-103 BUILDING 11 PARKING AREA - LANDSCAPE PLAN
101 12873977 L-501 PLANTING DETAILS
STRUCTURAL - WATERFRONT
102 12873978 SB001 WATERFRONT NOTES - 1 OF 4
103 12873979 SB002 WATERFRONT NOTES - 2 OF 4
104 12873980 SB003 WATERFRONT NOTES - 3 OF 4
105 12873981 SB004 WATERFRONT NOTES - 4 OF 4
106 12873982 SB005 TYPICAL DETAILS - 1 OF 2
107 12873983 SB006 TYPICAL DETAILS - 2 OF 2
108 12873984 SB011 EXISTING BULKHEAD DEMOLITION
109 12873985 SB012 EXISTING BULKHEAD DEMOLITION DETAILS
110 12873986 SB013 EXISTING BULKHEAD DEMOLITION SECTIONS
111 12873987 SB061 SITE PHOTOGRAPHS
112 12873988 SB101 PIER - GENERAL ARRANGEMENT PLAN
113 12873989 SB110 PIER - BULKHEAD PILE PLAN
114 12873990 SB111 PIER - SUBSTRUCTURE PLAN - AREA A
115 12873991 SB112 PIER - SUBSTRUCTURE PLAN - AREA B & C
116 12873992 SB113 PIER - SUBSTRUCTURE PLAN - AREA D
117 12873993 SB114 PIER - SUBSTRUCTURE PLAN - AREA E
118 12873994 SB115 PIER - SUBSTRUCTURE PLAN - AREA F
119 12873995 SB116 PIER - SUBSTRUCTURE PLAN - AREA G
120 12873996 SB117 PIER - SUBSTRUCTURE PLAN - AREA H
121 12873997 SB121 PIER - FRAMING PLAN - AREA A
122 12873998 SB122 PIER - FRAMING PLAN - AREA B & C
123 12873999 SB123 PIER - FRAMING PLAN - AREA D
124 12874000 SB124 PIER - FRAMING PLAN - AREA E
125 12874001 SB125 PIER - FRAMING PLAN - AREA F
126 12874002 SB126 PIER - FRAMING PLAN - AREA G
127 12874003 SB131 PIER - DECK PLAN - AREA A
128 12874004 SB132 PIER - DECK PLAN - AREA B & C
129 12874005 SB133 PIER - DECK PLAN - AREA D
130 12874006 SB134 PIER - DECK PLAN - AREA E
131 12874007 SB135 PIER - DECK PLAN - AREA F
132 12874008 SB136 PIER - DECK PLAN - AREA G
133 12874009 SB137 PIER - DECK PLAN - AREA H
134 12874010 SB140 PIER - STRIPING PLAN
135 12874011 SB201 PIER - SOUTH PILE CAP ELEVATIONS
136 12874012 SB202 PIER - SOUTH DECK ELEVATIONS
137 12874013 SB203 FLOATING DOCK ELEVATION
138 12874014 SB301 PIER - BULKHEAD SECTIONS
139 12874015 SB302 PIER - TYPICAL TRESTLE SECTIONS
140 12874016 SB303 PIER - TYPICAL SECTIONS
141 12874017 SB304 PIER - TYPICAL SECTIONS
142 12874018 SB403 PIER - LARGE SUBSTATION PLATFORM PLAN
DOCUMENT 00 01 15 Page 4
143 12874019 SB404 PIER - SMALL SUBSTATION PLATFORM PLAN
144 12874020 SB501 PILE DETAILS - 1 OF 2
145 12874021 SB502 PILE DETAILS - 2 OF 2
146 12874022 SB503 BULKHEAD DETAILS - 1 OF 2
147 12874023 SB504 BULKHEAD DETAILS - 2 OF 2
148 12874024 SB505 PILE CAP DETAILS - 1 OF 2
149 12874025 SB506 PILE CAP DETAILS - 2 OF 2
150 12874026 SB507 EXPANSION JOINT DETAILS
151 12874027 SB508 PRECAST CONCRETE PANEL DETAILS - 1 OF 3
152 12874028 SB509 PRECAST CONCRETE PANEL DETAILS - 2 OF 3
153 12874029 SB510 PRECAST CONCRETE PANEL DETAILS - 3 OF 3
154 12874030 SB511 VAULT DETAILS
155 12874031 SB512 UTILITY TRENCH DETAILS
156 12874032 SB513 MOORING HARDWARE DETAILS
157 12874033 SB514 FENDER SYSTEM DETAILS - 1 OF 2
158 12874034 SB515 FENDER SYSTEM DETAILS - 2 OF 2
159 12874035 SB516 PIER LADDER DETAILS
160 12874036 SB517 APRON AND SUPPORT PLATFORM DETAILS
161 12874037 SB519 GANGWAY DETAILS
162 12874038 SB520 SUBSTATION DETAILS
163 12874039 SB521 MISCELLANEOUS DETAILS - 1 OF 2
164 12874040 SB522 MISCELLANEOUS DETAILS - 2 OF 2
165 12874041 SB523 BASE BID & BID OPTION – BULKHEAD ENLARGED PLAN
166 12874042 SB524 BASE BID – BULKHEAD INFILL SLAB AND CAP DETAILS
167 12874043 SB525 BID OPTION – BULKHEAD INFILL SLAB AND CAP DEMOLITION
168 12874044 SB601 PILE SCHEDULE - 1 OF 3
169 12874045 SB602 PILE SCHEDULE - 2 OF 3
170 12874046 SB603 PILE SCHEDULE - 3 OF 3
STRUCTURAL - BUILDINGS
171 12874047 S-001 GENERAL NOTES - 1 OF 2
172 12874048 S-002 GENERAL NOTES - 2 OF 2
173 12874049 S-003 ADMIN / WAREHOUSE - WIND ISO DIAGRAMS
174 12874050 S-004 CANOPY AND SUNSHADE SNOW LOADING
175 12874051 S-140 ADMIN / WAREHOUSE - FOUNDATION PLAN - OVERALL
176 12874052 S-141 ADMIN / WAREHOUSE - FOUNDATION PLAN - AREA A
177 12874053 S-142 ADMIN / WAREHOUSE - FOUNDATION PLAN - AREA B
178 12874054 S-143 ADMIN / WAREHOUSE - SLAB PLAN - OVERALL - FIRST FLOOR
179 12874055 S-150 ADMIN / WAREHOUSE - FRAMING PLAN - SECOND FLOOR
180 12874056 S-160 ADMIN / WAREHOUSE - ROOF FRAMING PLAN - OVERALL
181 12874057 S-161 ADMIN / WAREHOUSE - ROOF FRAMING PLAN - AREA A
182 12874058 S-162 ADMIN / WAREHOUSE - ROOF FRAMING PLAN - AREA B
183 12874059 S-171 BOAT REPAIR - FOUNDATION AND SLAB PLAN
184 12874060 S-200 ADMIN / WAREHOUSE - WALL ELEVATIONS
185 12874061 S-201 ADMIN / WAREHOUSE - WALL ELEVATIONS
186 12874062 S-341 ADMIN / WAREHOUSE - FOUNDATION SECTIONS 1 OF 2
187 12874063 S-342 ADMIN / WAREHOUSE - FOUNDATION SECTIONS 2 OF 2
188 12874064 S-351 ADMIN / WAREHOUSE - FRAMING SECTIONS
DOCUMENT 00 01 15 Page 5
189 12874065 S-352 ADMIN/WAREHOUSE - FRAMING SECTIONS
190 12874066 S-353 ADMIN / WAREHOUSE - FRAMING SECTIONS
191 12874067 S-370 BOAT REPAIR - FOUNDATION SECTIONS
192 12874068 S-400 ENLARGED PLANS AND DETAILS
193 12874069 S-501 TYPICAL FOUNDATION DETAILS 1 OF 3
194 12874070 S-502 TYPICAL FOUNDATION DETAILS 2 OF 3
195 12874071 S-503 TYPICAL FOUNDATION DETAILS 3 OF 3
196 12874072 S-504 TYPICAL MASONRY DETAILS
197 12874073 S-505 TYPICAL FRAMING DETAILS 1 OF 3
198 12874074 S-506 TYPICAL FRAMING DETAILS 2 OF 3
199 12874075 S-507 TYPICAL FRAMING DETAILS 3 OF 3
200 12874076 S-508 TYPICAL ROOF DECK & JOIST DETAILS
201 12874077 S-509 TYPICAL FRAMING CONNECTIONS
INDEX OF DRAWINGS- VOLUME 2
SHEET_NO NAVFAC_NO SHEET NO. SHEET NAME
GENERAL
202 12874078 G-003 COVER SHEET - VOLUME 2
203 12874079 G-004 INDEX OF DRAWINGS - VOLUME 2
ARCHITECTURAL
204 12874080 A-001 LEGENDS, ABBREVIATIONS AND NOTES
205 12874081 A-010 ADMIN / WAREHOUSE - AIR BARRIER ENCLOSURE
206 12874082 A-140 ADMIN / WAREHOUSE - FIRST FLOOR PLAN - OVERALL
207 12874083 A-141 ADMIN / WAREHOUSE - FIRST FLOOR PLAN - AREA A
208 12874084 A-142 ADMIN / WAREHOUSE - FIRST FLOOR PLAN - AREA B
209 12874085 A-143 ADMIN / WAREHOUSE - SECOND FLOOR PLAN
210 12874086 A-144 ADMIN / WAREHOUSE - ROOF PLAN
211 12874087 A-150 ADMIN / WAREHOUSE - REFLECTED CEILING PLAN -
FIRST FLOOR - OVERALL
212 12874088 A-151 ADMIN / WAREHOUSE - REFLECTED CEILING PLAN -
FIRST FLOOR - AREA A
213 12874089 A-152 ADMIN / WAREHOUSE - REFLECTED CEILING PLAN -
FIRST FLOOR - AREA B
214 12874090 A-153 ADMIN / WAREHOUSE - REFLECTED CEILING PLAN -
SECOND FLOOR
215 12874091 A-170 BOAT REPAIR - FLOOR / ROOF / REFLECTED CEILING
PLAN
216 12874092 A-241 ADMIN / WAREHOUSE - SOUTH AND NORTH ELEVATIONS
DOCUMENT 00 01 15 Page 6
217 12874093 A-242 ADMIN / WAREHOUSE - EAST AND WEST ELEVATIONS
218 12874094 A-270 BOAT REPAIR - ELEVATIONS/SECTIONS/DTLS
219 12874095 A-341 ADMIN / WAREHOUSE - BUILDING SECTIONS
220 12874096 A-351 ADMIN / WAREHOUSE - BLDG AND WALL SECTIONS
221 12874097 A-352 ADMIN / WAREHOUSE - WALL SECTIONS
222 12874098 A-353 ADMIN / WAREHOUSE - WALL SECTIONS
223 12874099 A-370 BOAT REPAIR - WALL SECTIONS & DTLS
224 12874100 A-441 ADMIN / WAREHOUSE - ENLARGED PLAN & SECTION -
ELEVATOR
225 12874101 A-442 ADMIN / WAREHOUSE - ENLARGED PLAN & SECTION -
STAIRS
226 12874102 A-443 ADMIN / WAREHOUSE - ENLARGED EXT STAIR/RAMP PLAN,
SECTION, DETAILS
227 12874103 A-444 ADMIN / WAREHOUSE - ENLARGED PLAN - RESTROOMS
228 12874104 A-451 ADMIN / WAREHOUSE - MILLWORK PLANS & ELEVATIONS
229 12874105 A-452 ADMIN / WAREHOUSE - INTERIOR ELEVATIONS AND
DETAILS
230 12874106 A-461 DUMPSTER ENCLOSURE - PLAN, SECTION, ELEVATIONS
AND DETAILS
231 12874107 A-501 PARTITION TYPES
232 12874108 A-502 INTERIOR PARTITION DETAILS
233 12874109 A-503 PENETRATION DETAILS
234 12874110 A-511 WALL SECTION DETAILS
235 12874111 A-512 MISCELLANEOUS DETAILS
236 12874112 A-521 DOOR DETAILS
237 12874113 A-522 DOOR DETAILS
238 12874114 A-525 RESTROOM MOUNTING GUIDELINES
239 12874115 A-527 INTERIOR DETAILS
240 12874116 A-531 MILLWORK DETAILS
241 12874117 A-532 MILLWORK DETAILS
242 12874118 A-540 WALL PANEL DETAILS
243 12874119 A-601 ROOM FINISH LEGEND AND INTERIOR FINISH SCHEDULE
244 12874120 A-602 DOOR SCHEDULE
245 12874121 A-603 WINDOW AND LOUVER SCHEDULE AND DETAILS
246 12874122 A-604 SIGNAGE SCHEDULE
DOCUMENT 00 01 15 Page 7
247 12874123 A-741 ADMIN / WAREHOUSE - FLOOR FINISH PLAN - FIRST
FLOOR - AREA A
248 12874124 A-742 ADMIN / WAREHOUSE - FLOOR FINISH PLAN - FIRST
FLOOR - AREA B
249 12874125 A-743 ADMIN / WAREHOUSE - FLOOR FINISH PLAN - SECOND
FLOOR
250 12874126 A-751 ADMIN / WAREHOUSE - WALL FINISH AND SIGNAGE PLAN
- FIRST FLOOR - AREA A
251 12874127 A-752 ADMIN / WAREHOUSE - WALL FINISH AND SIGNAGE PLAN
- FIRST FLOOR - AREA B
252 12874128 A-753 ADMIN / WAREHOUSE - WALL FINISH AND SIGNAGE PLAN
- SECOND FLOOR
253 12874129 A-754 SIGNAGE DETAILS
254 12874130 A-755 SIGNAGE DETAILS
255 12874131 A-756 SIGNAGE DETAILS
INTERIOR
256 12874132 I-140 ADMIN / WAREHOUSE - FURNITURE PLAN - FIRST FLOOR
- OVERALL
257 12874133 I-141 ADMIN / WAREHOUSE - FURNITURE PLAN - FIRST FLOOR
- AREA A
258 12874134 I-142 ADMIN / WAREHOUSE - FURNITURE PLAN - FIRST FLOOR
- AREA B
259 12874135 I-143 ADMIN / WAREHOUSE - FURNITURE PLAN - SECOND FLOOR
260 12874136 I-201 SYSTEMS FURINTURE ELEVATIONS AND DETAILS
FIRE PROTECTION
261 12874137 FA001 FIRE ALARM AND CLEAN AGENT NOTES, LEGEND, AND
ABBREVIATIONS
262 12874138 FA141 ADMIN / WAREHOUSE - FIRE ALARM AND MASS
NOTIFICATION PLAN - FIRST FLOOR - AREA A
263 12874139 FA142 ADMIN / WAREHOUSE - FIRE ALARM AND MASS
NOTIFICATION PLAN - FIRST FLOOR - AREA B
264 12874140 FA143 ADMIN / WAREHOUSE - FIRE ALARM AND MASS
NOTIFICATION PLAN - SECOND FLOOR
265 12874141 FA441 ADMIN / WAREHOUSE - CLEAN AGENT ENLARGED PLAN
266 12874142 FA501 FIRE ALARM DETAILS
267 12874143 FA502 CLEAN AGENT DETAILS
268 12874144 FA601 FIRE ALARM AND CLEAN AGENT ONE-LINE DIAGRAM
269 12874145 FA602 FIRE ALARM MATRIX
270 12874146 FA603 CLEAN AGENT RELEASING SYSTEM MATRIX
DOCUMENT 00 01 15 Page 8
271 12874147 FX001 FIRE SUPPRESSION NOTES, LEGEND AND ABBREVIATIONS
272 12874148 FX101 PIER - FIRE SUPPRESSION PLAN - OVERALL
273 12874149 FX111 PIER - FIRE SUPPRESSION PLAN - AREA A
274 12874150 FX112 PIER - FIRE SUPPRESSION PLAN - AREA B AND C
275 12874151 FX113 PIER - FIRE SUPPRESSION PLAN - AREA D AND E
276 12874152 FX114 PIER - FIRE SUPPRESSION PLAN - AREA F AND G
277 12874153 FX141 ADMIN / WAREHOUSE - FIRE SUPPRESSION PLAN - FIRST
FLOOR - AREA A
278 12874154 FX142 ADMIN / WAREHOUSE - FIRE SUPPRESSION PLAN - FIRST
FLOOR - AREA B
279 12874155 FX143 ADMIN / WAREHOUSE - FIRE SUPPRESSION PLAN -
SECOND FLOOR
280 12874156 FX440 ADMIN / WAREHOUSE - FIRE PUMP ROOM ENLARGED PLAN
281 12874157 FX441 ADMIN / WAREHOUSE - CLEAN AGENT ENLARGED PLAN
282 12874158 FX501 PIER - FIRE SUPPRESSION DETAILS
283 12874159 FX601 FIRE SUPPRESSION RISER DIAGRAMS AND DETAILS
PLUMBING
284 12874160 P-001 LEGEND, ABBREVIATIONS AND NOTES
285 12874161 P-100 ADMIN / WAREHOUSE - VAPOR MITIGATION BELOW SLAB -
FIRST FLOOR - OVERALL
286 12874162 P-101 ADMIN / WAREHOUSE - VAPOR MITIGATION BELOW SLAB -
FIRST FLOOR - AREA A
287 12874163 P-102 ADMIN / WAREHOUSE - VAPOR MITIGATION BELOW SLAB -
FIRST FLOOR - AREA B
288 12874164 P-103 ADMIN / WAREHOUSE - VAPOR MITIGATION - FIRST
FLOOR - AREA A
289 12874165 P-104 ADMIN / WAREHOUSE - VAPOR MITIGATION - FIRST
FLOOR - AREA B
290 12874166 P-105 ADMIN / WAREHOUSE - VAPOR MITIGATION - SECOND
FLOOR
291 12874167 P-110 PIER PLUMBING OVERALL PLAN
292 12874168 P-111 PIER PLUMBING UTILITIES - AREA A
293 12874169 P-112 PIER PLUMBING UTILITIES - AREA B AND C
294 12874170 P-113 PIER PLUMBING UTILITIES - AREA D AND E
295 12874171 P-114 PIER PLUMBING UTILITIES - AREA F AND G
296 12874172 P-115 PIER PLUMBING UTLITIES - AREA H
297 12874173 P-140 ADMIN / WAREHOUSE - SANITARY PLAN - FIRST FLOOR -
OVERALL
DOCUMENT 00 01 15 Page 9
298 12874174 P-141 ADMIN / WAREHOUSE - SANITARY PLAN - FIRST FLOOR -
AREA A
299 12874175 P-142 ADMIN / WAREHOUSE - SANITARY PLAN - FIRST FLOOR -
AREA B
300 12874176 P-143 ADMIN / WAREHOUSE - SANITARY PLAN - SECOND FLOOR
- AREA A
301 12874177 P-150 ADMIN / WAREHOUSE - SUPPLY PLAN - FIRST FLOOR -
OVERALL
302 12874178 P-151 ADMIN / WAREHOUSE - SUPPLY PLAN - FIRST FLOOR -
AREA A
303 12874179 P-152 ADMIN / WAREHOUSE - SUPPLY PLAN - FIRST FLOOR -
AREA B
304 12874180 P-153 ADMIN / WAREHOUSE - SUPPLY PLAN - SECOND FLOOR -
AREA A
305 12874181 P-160 ADMIN / WAREHOUSE - ROOF PLAN - OVERALL
306 12874182 P-310 PIER - SECTIONS
307 12874183 P-311 PIER - SECTIONS
308 12874184 P-441 ADMIN / WAREHOUSE - ENLARGED WASTE & VENT PLANS
309 12874185 P-442 ADMIN / WAREHOUSE - ENLARGED SUPPLY PLANS
310 12874186 P-510 PIER - DETAILS
311 12874187 P-511 PIER - DETAILS
312 12874188 P-512 PIER - DETAILS
313 12874189 P-541 ADMIN / WAREHOUSE - DETAILS
314 12874190 P-542 ADMIN / WAREHOUSE - DETAILS
315 12874191 P-543 ADMIN / WAREHOUSE - DETAILS
316 12874192 P-610 PIER - SUPPORT SCHEDULES
317 12874193 P-641 ADMIN / WAREHOUSE - SCHEDULES
318 12874194 P-901 ADMIN / WAREHOUSE - SANITARY RISER
319 12874195 P-902 ADMIN / WAREHOUSE - SUPPLY AND GAS RISERS
MECHANICAL
320 12874196 M-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES
321 12874197 MH140 ADMIN / WAREHOUSE - DUCTWORK PLAN - FIRST FLOOR -
OVERALL
322 12874198 MH141 ADMIN / WAREHOUSE - DUCTWORK PLAN - FIRST FLOOR -
AREA A
323 12874199 MH142 ADMIN / WAREHOUSE - DUCTWORK PLAN - FIRST FLOOR -
AREA B
324 12874200 MH143 ADMIN / WAREHOUSE - DUCTWORK PLAN - SECOND FLOOR
DOCUMENT 00 01 15 Page 10
325 12874201 MH170 BOAT REPAIR - PLUMBING AND DUCTWORK PLANS
326 12874202 MI141 ADMIN / WAREHOUSE - INSTRUMENTATION PLAN - FIRST
FLOOR - AREA A
327 12874203 MI142 ADMIN / WAREHOUSE - INSTRUMENTATION PLAN - FIRST
FLOOR - AREA B
328 12874204 MI143 ADMIN / WAREHOUSE - INSTRUMENTATION PLAN - SECOND
FLOOR
329 12874205 MP140 ADMIN / WAREHOUSE - PIPING PLAN - FIRST FLOOR -
OVERALL
330 12874206 MP141 ADMIN / WAREHOUSE - PIPING PLAN - FIRST FLOOR -
AREA A
331 12874207 MP142 ADMIN / WAREHOUSE - PIPING PLAN - FIRST FLOOR -
AREA B
332 12874208 MP143 ADMIN / WAREHOUSE - PIPING PLAN - SECOND FLOOR
333 12874209 M-301 MECHANICAL SECTIONS
334 12874210 M-401 MECHANICAL ENLARGED PLANS
335 12874211 M-402 MECHANICAL ENLARGED PLANS
336 12874212 M-403 MECHANICAL ENLARGED PLANS
337 12874213 M-404 ENLARGED PLAN - DUCTWORK SECOND FLOOR
338 12874214 M-501 MECHANICAL DETAILS
339 12874215 M-502 MECHANICAL DETAILS
340 12874216 M-503 MECHANICAL DETAILS
341 12874217 M-504 MECHANICAL DETAILS
342 12874218 M-505 MECHANICAL DETAILS
343 12874219 M-506 MECHANICAL DETAILS
344 12874220 M-507 MECHANICAL DETAILS
345 12874221 M-601 MECHANICAL SCHEDULES
346 12874222 M-602 MECHANICAL SCHEDULES
347 12874223 M-670 BOAT REPAIR EQUIPMENT SCHEDULES
348 12874224 MI700 MECHANICAL CONTROLS LEGEND, ABBREVIATIONS, AND
NOTES
349 12874225 MI701 DDC SYSTEM SCHEMATIC NETWORK ARCHITECTURE DIAGRAM
350 12874226 MI702 HEATING HOT WATER SCHEMATIC AND POINTS LIST
351 12874227 MI703 HEATING HOT WATER SEQUENCE OF OPERATION
352 12874228 MI704 RTU SCHEMATIC AND POINTS LIST
353 12874229 MI705 RTU SEQUENCE OF OPERATIONS
DOCUMENT 00 01 15 Page 11
354 12874230 MI706 HVAC SEQUENCES AND SCHEMATICS
355 12874231 MI707 HVAC SEQUENCES AND SCHEMATICS
356 12874232 MI708 HVAC SEQUENCES AND SCHEMATICS
357 12874233 MI709 HVAC SEQUENCES AND SCHEMATICS
358 12874234 MI771 HVAC SEQUENCES AND CONTROLS
359 12874235 M-801 HEATING HOT WATER PLANT PIPING SCHEMATIC
INDEX OF DRAWINGS- VOLUME 3
SHEET_NO NAVFAC_NO SHEET NO. SHEET NAME
GENERAL
360 12874236 G-005 COVER SHEET - VOLUME 3
361 12874237 G-006 INDEX OF DRAWINGS - VOLUME 3
ELECTRICAL
362 12874238 E-001 LEGEND, ABBREVIATIONS AND GENERAL NOTES
363 12874239 ES101 ELECTRICAL & TELECOM SITE PLAN - AREA 1
364 12874240 ES102 ELECTRICAL & TELECOM SITE PLAN - AREA 2
365 12874241 ES103 ELECTRICAL & TELECOM SITE PLAN - AREA 3
366 12874242 ES104 ELECTRICAL & TELECOM SITE PLAN - AREA 4
367 12874243 ES105 ELECTRICAL & TELECOM SITE PLAN - AREA 5
368 12874244 ES106 ELECTRICAL & TELECOM SITE PLAN - AREA 6
369 12874245 ES107 ELECTRICAL & TELECOM SITE PLAN - AREA 7
370 12874246 ES108 ELECTRICAL & TELECOM SITE PLAN - AREA 8
371 12874247 ES109 ELECTRICAL & TELECOM SITE PLAN - AREA 9
372 12874248 ES110 ELECTRICAL & TELECOM SITE PLAN - AREA 10
373 12874249 ES111 ELECTRICAL & TELECOM SITE PLAN - PARKING LOT
374 12874250 ES112 ELECTRICAL & TELECOM SITE PLAN - BUILDING 11
PICTURES
375 12874251 ES401 ENLARGED ELECTRICAL SITE PLAN
376 12874252 E-170 BOAT REPAIR - LIGHTING, POWER AND LPS PLANS
377 12874253 EL141 ADMIN / WAREHOUSE - LIGHTING PLAN - FIRST FLOOR
- AREA A
378 12874254 EL142 ADMIN / WAREHOUSE - LIGHTING PLAN - FIRST FLOOR
- AREA B
DOCUMENT 00 01 15 Page 12
379 12874255 EL143 ADMIN / WAREHOUSE - LIGHTING PLAN - SECOND FLOOR
380 12874256 EL144 ADMIN / WAREHOUSE - LIGHTING CONTROLS
381 12874257 EL201 ADMIN / WAREHOUSE - LIGHTING ELEVATIONS
382 12874258 EL501 LIGHTING DETAILS
383 12874259 EL502 LIGHTING DETAILS
384 12874260 EL503 LIGHTING DETAILS
385 12874261 EL504 LIGHTING DETAILS
386 12874262 EL505 LIGHTING DETAILS
387 12874263 EL506 LIGHTING DETAILS
388 12874264 EP111 PIER - POWER PLAN - AREA A
389 12874265 EP112 PIER - POWER PLAN - AREA B
390 12874266 EP113 PIER - POWER PLAN - AREA C
391 12874267 EP114 PIER - POWER PLAN - AREA D
392 12874268 EP115 PIER - POWER PLAN - AREA E
393 12874269 EP116 PIER - POWER PLAN - AREA F
394 12874270 EP117 PIER - POWER PLAN - AREA G
395 12874271 EP118 PIER - POWER PLAN - AREA H
396 12874272 EP141 ADMIN / WAREHOUSE - POWER PLAN - FIRST FLOOR -
AREA A
397 12874273 EP142 ADMIN / WAREHOUSE - POWER PLAN - FIRST FLOOR -
AREA B
398 12874274 EP143 ADMIN / WAREHOUSE - POWER PLAN - SECOND FLOOR
399 12874275 EP201 PIER - POWER ELEVATIONS
400 12874276 EP441 ADMIN / WAREHOUSE - LARGE SCALE PLANS
401 12874277 EP442 ADMIN / WAREHOUSE - LARGE SCALE PLANS
402 12874278 EP501 POWER DETAILS
403 12874279 EP502 POWER DETAILS
404 12874280 EP503 POWER DETAILS
405 12874281 EP504 POWER DETAILS
406 12874282 EP505 POWER DETAILS
407 12874283 EP506 POWER DETAILS
408 12874284 EP507 POWER DETAILS
DOCUMENT 00 01 15 Page 13
409 12874285 EP508 POWER DETAILS
410 12874286 EP509 POWER DETAILS
411 12874287 EG111 PIER - GROUNDING PLAN - AREA A
412 12874288 EG112 PIER - GROUNDING PLAN - AREA B
413 12874289 EG113 PIER - GROUNDING PLAN - AREA C
414 12874290 EG114 PIER - GROUNDING PLAN - AREA D
415 12874291 EG115 PIER - GROUNDING PLAN - AREA E
416 12874292 EG116 PIER - GROUNDING PLAN - AREA F
417 12874293 EG117 PIER - GROUNDING PLAN - AREA G
418 12874294 EG118 PIER - GROUNDING PLAN - AREA H
419 12874295 EG140 ADMIN / WAREHOUSE - GROUNDING & LIGHTNING
PROTECTION
420 12874296 EG501 ADMIN / WAREHOUSE - GROUNDING DETAILS
421 12874297 EG502 PIER - GROUNDING RISER DIAGRAM
422 12874298 E-601 PIER - SINGLE LINE DIAGRAM
423 12874299 E-641 ADMIN / WAREHOUSE - SINGLE LINE DIAGRAM
424 12874300 E-642 ADMIN / WAREHOUSE - SINGLE LINE FEEDERS SCHEDULE
425 12874301 E-710 PIER - PANELBOARD SCHEDULES
426 12874302 E-711 PIER - PANELBOARD SCHEDULES
427 12874303 E-741 ADMIN / WAREHOUSE - PANELBOARD SCHEDULES
428 12874304 E-742 ADMIN / WAREHOUSE - PANELBOARD SCHEDULES
429 12874305 E-743 ADMIN / WAREHOUSE - PANELBOARD SCHEDULES
430 12874306 E-744 ADMIN / WAREHOUSE - PANELBOARD SCHEDULES
431 12874307 E-745 ADMIN / WAREHOUSE - PANELBOARD SCHEDULES
432 12874308 E-746 ADMIN / WAREHOUSE - PANELBOARD SCHEDULES
433 12874309 E-770 BOAT REPAIR - PANELBOARD SCHEDULES
434 12874310 EC301 CATHODIC PROTECTION SECTIONS
435 12874311 EC302 CATHODIC PROTECTION DETAILS
436 12874312 EC501 CATHODIC PROTECTION DETAILS
437 12874313 EC601 CATHODIC PROTECTION TABLES
TELECOMMUNICATIONS
438 12874314 TN001 NETWORKING LEGEND, ABBREVIATIONS AND GENERAL
NOTES
DOCUMENT 00 01 15 Page 14
439 12874315 TS501 SITE DETAILS
440 12874316 TS502 SITE DETAILS
441 12874317 TS503 SITE DETAILS
442 12874318 TG501 GROUNDING DETAILS
443 12874319 TG502 GROUNDING DETAILS
444 12874320 TG701 GROUNDING RISER
445 12874321 TN111 PIER - NETWORKING PLAN - AREA A AND B
446 12874322 TN112 PIER - NETWORKING PLAN - AREA C
447 12874323 TN113 PIER - NETWORKING PLAN - AREA D
448 12874324 TN114 PIER - NETWORKING PLAN - AREA E
449 12874325 TN115 PIER - NETWORKING PLAN - AREA F
450 12874326 TN116 PIER - NETWORKING PLAN - AREA G
451 12874327 TN141 ADMIN / WAREHOUSE - NETWORKING PLAN VIEW - FIRST
FLOOR - AREA A
452 12874328 TN142 ADMIN / WAREHOUSE - NETWORKING PLAN VIEW - FIRST
FLOOR - AREA B
453 12874329 TN143 ADMIN/WAREHOUSE - NETWORKING PLAN VIEW - SECOND
FLOOR
454 12874330 TN170 BOAT REPAIR - NETWORKING PLAN
455 12874331 TN181 BUILDING 76 - BASEMENT FLOOR PLAN & ELEVATION
456 12874332 TN182 BUILDING 76 - FIRST FLOOR PLAN & ELEVATION
457 12874333 TN191 BUILDING 1318 - FIRST FLOOR PLAN & ELEVATION
458 12874334 TN211 PIER - SECTIONS
459 12874335 TN241 ADMIN / WAREHOUSE - NETWORKING ELEVATIONS
460 12874336 TN242 ADMIN / WAREHOUSE - NETWORKING ELEVATIONS
461 12874337 TN243 ADMIN / WAREHOUSE - NETWORKING ELEVATION
462 12874338 TN244 ADMIN / WAREHOUSE - NETWORKING ELEVATION
463 12874339 TN441 ADMIN / WAREHOUSE - NETWORKING ENLARGED PLANS
464 12874340 TN501 NETWORKING DETAILS
465 12874341 TN502 NETWORKING DETAILS
466 12874342 TN503 NETWORKING DETAILS
467 12874343 TN504 NETWORKING DETAILS
468 12874344 TN505 NETWORKING DETAILS
DOCUMENT 00 01 15 Page 15
469 12874345 TN506 NETWORKING DETAILS
470 12874346 TN507 NETWORKING DETAILS
471 12874347 TN508 NETWORKING DETAILS
472 12874348 TN641 ADMIN / WAREHOUSE - NETWORKING SCHEDULES
473 12874349 TN741 ADMIN / WAREHOUSE - NETWORKING ONE-LINES AND
RISERS
474 12874350 TN742 ADMIN / WAREHOUSE - NETWORKING ONE-LINES AND
RISERS
475 12874351 TY001 SPECIAL SYSTEMS LEGEND AND NOTES
476 12874352 TY111 PIER - SECURITY PLAN VIEWS
477 12874353 TY141 ADMIN/WAREHOUSE - SPECIAL SYSTEMS PLAN VIEW -
AREA A
478 12874354 TY142 ADMIN/WAREHOUSE - SPECIAL SYSTEMS PLAN VIEW -
AREA B
479 12874355 TY143 ADMIN/WAREHOUSE - SPECIAL SYSTEMS PLAN VIEW -
SECOND FLOOR
480 12874356 TY241 ADMIN/WAREHOUSE - SPECIAL SYSTEMS ELEVATIONS
481 12874357 TY501 SPECIAL SYSTEMS DETAILS
482 12874358 TY502 SPECIAL SYSTEMS DETAILS
483 12874359 TY503 SPECIAL SYSTEMS DETAILS
484 12874360 TY741 ADMIN / WAREHOUSE - CCTV ONE-LINES AND SCHEDULES
485 12874361 TY742 ADMIN / WAREHOUSE - ONE-LINE AND RISER DIAGRAMS
AUDIO / VISUAL
486 12874362 TA001 LEGEND, ABBREVIATIONS, AND GENERAL NOTES
487 12874363 TA141 ADMIN / WAREHOUSE - AUDIOVISUAL PLAN - FIRST
FLOOR - AREA A
488 12874364 TA142 ADMIN / WAREHOUSE - AUDIOVISUAL PLAN - FIRST
FLOOR - AREA B
489 12874365 TA143 ADMIN / WAREHOUSE - AUDIOVISUAL PLAN - SECOND
FLOOR
490 12874366 TA151 ADMIN / WAREHOUSE - AUDIOVISUAL CEILING PLAN -
FIRST FLOOR - AREA A
491 12874367 TA152 ADMIN / WAREHOUSE - AUDIOVISUAL CEILING PLAN -
SECOND FLOOR
492 12874368 TA441 ADMIN / WAREHOUSE - AUDIOVISUAL DISPLAY
ELEVATIONS
DOCUMENT 00 01 15 Page 16
493 12874369 TA442 ADMIN / WAREHOUSE - AUDIOVISUAL DISPLAY
ELEVATIONS
494 12874370 TA443 ADMIN / WAREHOUSE - AUDIOVISUAL DISPLAY
ELEVATIONS
495 12874371 TA501 AUDIOVISUAL PLATE AND PANEL DETAILS
496 12874372 TA502 AUDIOVISUAL DISPLAY BACK BOX DETAILS
497 12874373 TA503 AUDIOVISUAL CAMERA BACK BOX DETAILS
498 12874374 TA504 AUDIOVISUAL SPEAKER DETAILS
499 12874375 TA741 ADMIN / WAREHOUSE - AV LARGE CONFERENCE ROOM 113
LINE DRAWING
500 12874376 TA742 ADMIN / WAREHOUSE - AV SMALL CONFERENCE ROOM 202
LINE DRAWING
501 12874377 TA743 ADMIN / WAREHOUSE - AV TECH LIBRARY/ HUDDLE 112
LINE DRAWING
502 12874378 TA744 ADMIN / WAREHOUSE - AV EXEC SUITE HUDDLE ROOM
120 LINE DRAWING
503 12874379 TA745 ADMIN / WAREHOUSE - AV EXEC SUITE SOUND MASKING
LINE DRAWING
504 12874380 TA746 ADMIN / WAREHOUSE - AV EXEC SUITE SOUND MASKING
CONTROL BOX ELEVATION
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Reference Drawings
The following reference drawings are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.
DWG NO. PROJECT TITLE SHEET TITLE
P.W. 3634-45 NAVAL SUPPLY DEPOT AT
CODDINGTON COVE
PIER AND PIER HEAD
Y&D 529896 COLD STORAGE PLANT GRADING AND UNDERGROUND SERVICE
PLAN
Y&D 529898 COLD STORAGE PLANT SITE DETAILS - SHEET NO. 1
Y&D 529899 COLD STORAGE PLANT SITE DETAILS - SHEET NO. 2
Y&D 529900 COLD STORAGE PLANT BREAKWATER & DREDGING PLAN &
DETAILS
DOCUMENT 00 01 15 Page 17
Y&D 529901 COLD STORAGE PLANT WHARF PLAN & DETAILS
Y&D 529902 COLD STORAGE PLANT RAILROAD SIDING PLAN, PROFILE &
DETAILS
Y&D 529903 COLD STORAGE PLANT PILE PLAN - SECTION I
Y&D 529904 COLD STORAGE PLANT PILE PLAN - SECTION II
Y&D 529905 COLD STORAGE PLANT FOUNDATION & FLOOR FRAMING PLAN
SECTION I
Y&D 529906 COLD STORAGE PLANT FOUNDATION & FLOOR FRAMING PLAN
SECTION II
Y&D 529913 COLD STORAGE PLANT FOUNDATION DETAILS - SHEET NO.
1 COLD STORAGE AREA
Y&D 529914 COLD STORAGE PLANT FOUNDATION DETAILS - SHEET NO.
2 COLD STORAGE AREA
Y&D 529915 COLD STORAGE PLANT FOUNDATION DETAILS - SHEET NO.
3 OFFICE & MACHINE ROOM AREA
Y&D 835,031 REPAIRS TO CATHODIC
PROTECTION SYSTEM FOR STEEL
WATERFRONT B'LK'H'D AT B'LD'G
NO. 42
NUWC 19-002A (SHEET 3) BUILDING 11 HVAC RETROFIT M-2 PARTIAL FLOOR PLAN - HVAC
NEW WORK
NUWC 19-002A (SHEET 8) BUILDING 11 HVAC RETROFIT E-1 PARTIAL FLOOR PLAN -
ELECTRICAL
NUWC 19-002A (SHEET 9) BUILDING 11 HVAC RETROFIT E-2 LEGEND, NOTES AND DETAILS -
ELECTRICAL
NUWC 18-08A (SHEET 6) COLLABORATIVE WORKSPACE
BUILDING 11
A-5 NEW REFLECTED CEILING PLAN
NUWC 18-08A (SHEET 15) COLLABORATIVE WORKSPACE
BUILDING 11
E-2 NEW ELECTRICAL POWER PLAN
NUWC 18-08A (SHEET 20) COLLABORATIVE WORKSPACE
BUILDING 11
E-7 PANEL SCHEDULES
NUWC 21-049A (SHEET 7) PARKING LOT REPAVING BUILDING
CS101 SITE PLAN
1.3.2 Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.
Subsurface data, not specified or indicated, have been obtained by the Government at this station. The data are available for examination by prospective bidders in the office of the Contracting Officer .
1.3.3 Subsurface Data
DOCUMENT 00 01 15 Page 18
Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders at the station. The soils report is included as part of the solicitation.
-- End of Document --
DOCUMENT 00 01 15 Page 19
THIS PAGE INTENTIONALLY LEFT BLANK
DOCUMENT 00 01 15 Page 20
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
This project supports the relocation of four NOAA vessels and support personnel, and includes waterfront work, shore-side buildings, and shore-side support areas. The waterfront work includes pier construction and a four-berth pier, trestle, floating dock and bulkhead replacement.
The supporting land-based includes facilities, with associated parking, exterior storage, and adjacent laydown area and incidental related work.
The project includes the Pier Landing site (adjacent to the current “T” pier and building number 6 along the shoreline) as the primary site location, and a secondary site for 50-space parking lot developed near Building 11.
The project is provided with Base Bid and Bid Options to support the available construction budget.
Base Bid includes construction of:
•Admin/warehouse building •Pier Landing Site and Utilities landing to the site •Bulkhead
Bid Options includes construction of:
•Bid Option - Pier and trestle •Bid Option - Small boat facility •Bid Option - Hazmat container •Bid Option - Floating dock •Bid Option - Bldg 11 site parking and utilities
1.2.2 Location
The work is located within an Installation Restoration (IR) site (in-water and landside), at the Naval Station Newport, Rhode Island, approximately as indicated. The exact location will be shown by the Contracting Officer.
Refer to USACE EM 385 Section 33, for safety requirements, Land Use Control (LUC), and Record of Decision (RD) for Site 19 Operable Unit 12, on-shore, and Operable Unit 5, off-shore, for lists of contaminants, SECTION 01 11 00 Page 1 engineering controls, handling of soil, groundwater and sediment, and other requirements.
1.3 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.4 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.4.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
1.5 GOVERNMENT-INSTALLED WORK
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 11 00 Page 2
SECTION 01 14 00
WORK RESTRICTIONS
11/ 11, CHG 11: 11/ 20
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.
b. The work under this contract requires special attention to the scheduling of the work in connection with Navy and USCG waterfront operations. Identify on the construction schedule each factor which constitutes a potential interruption to Pier Access Road operations.
c. The International Seapower Symposium (ISS) is held every 2 years at Pier 2 and is scheduled September 2023 and 2025. The Contractor will not be able to perform any work on the contract from September 9th to September 20th, 2023 and September 7th to September 22th, 2025. The work site shall be clean up to the best extent possible.
d. Any boats or barges to be brought into the restricted water of Naval Station Newport to perform the work on this contract shall provide 96-hour notification to the Contract Officer.
e. For all dive operations the contractor must notify the Contracting Officer 96-hours in advance.
f. Notify the Contracting Officer at least 48-hours prior to starting any phase of work including, excavation, in-water work, turbidity curtain installation, rip-rap removal, sheet piles installation, pile driving, etc.
g. Coordination with National Grid is required for the gas line installation. The contractor is responsible for the excavation, sand bedding, backfill, and final restoration including concrete meter pad in accordance with the National Grid trenching requirements. National Grid is responsible for the installation of the piping.
h. No in-water work shall begin until all related permits are received.
SECTION 01 14 00 Page 1
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Installation Access
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at…