NOAA OMAO Drawings_07202023.pdf

PDF 3 MB Posted

Attached to
NOAA OMAO Ship and Support Facility Relocation, Naval Station Newport, Newport, Rhode Island
Solicitation number
N4008523R2527
Issued by

About this file

This solicitation package seeks proposals for the NOAA OMAO Ship and Support Facility Relocation project at the Naval Station Newport in Newport, Rhode Island. The Navy's Naval Facilities Engineering Command will relocate NOAA facilities including drawings, specifications, and links to the solicitation module. Proposals are due via the PIEE solicitation module. The solicitation package includes requirements for construction services to relocate NOAA ships and support facilities.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
NOAA OMAO Drawings_07242023.pdf PDF
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
NOAA OMAO Amendment 0009_Drawings_06152023.pdf PDF
NOAA OMAO Amendment 0009_Drawings_06062023.pdf PDF
NOAA OMAO Amendment 0009_Specs.pdf PDF
Amendment 0008.pdf PDF
Attachment H - Price Proposal Form R4.docx DOCX document
NOAA OMAO Amendment 0007_Drawings.pdf PDF
Amendment 0007.pdf PDF
Section -31 23 00.00 20.pdf PDF
Attachment H - Price Proposal Form R3.docx DOCX document
NOAA OMAO Amendment 0006_Specifications.pdf PDF
Amendment 0006.pdf PDF
NOAA OMAO Amendment 0006_Drawings.pdf PDF
NOAA OMAO Amendment 0003_Drawings_04172023.pdf PDF
NOAA Site Visit 2 Log.pdf PDF
NOAA OMAO Amendment 0003_Specifications_04172023.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
NOAA OMAO Amendment 0002_Specifications.pdf PDF
Attachment H - Price Proposal Form R2 .docx DOCX document
NOAA OMAO Amendment 0002_Drawings.pdf PDF
Amendment 0002.pdf PDF
NOAA OMAO Amendment 0001_Specifications.pdf PDF
Attachment H - Price Proposal Form R1.docx DOCX document
Amendment 0001.pdf PDF
NOAA OMAO Pre-Scope Presentation .pdf PDF
Site Visit log.pdf PDF
NOAA OMAO Amendment 0001_Drawings.pdf PDF
Attachment J-Site Map.pdf PDF
Interior Finishes_Redacted.pdf PDF
Attachment I - PIEE Vendor Access Instructions.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.doc DOC document
Attachment B1 - SECNAV FORM 5512-NSNPT.pdf PDF
1562331_spc_1of1.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment B2 -SECNAV FORM 5512-NSNPT SAMPLE.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Solicitation N4008523R2527.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
Attachment H - Price Proposal Form.docx DOCX document
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

M J

J

J

J

T2S

MATCH LINE REFER TO A1 / EP118

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

A3

EP201

123456

B'

A'

C' 1'

2'

WP1.6

BH45

BH50

BH55

BH60

B3

EP201

A1

EP201

20 22

7 20 22

EMH-L4

EMH-L3

CL

B

C

A

D

T2S T2S

HTP-01

HTP-02

IP-1 - 1

IP-2 - 1

M A

T C

H

LI

N E

R E

F E

R T

O A

/ E

S

HH

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

EP111

P

IE

R

P O

W E

R P

LA

N

A

R E

A A

JC

12874264

JR BG

JAS

SHEET KEYNOTES

1. SEE SHEET ES101 FOR THE ELECTRICAL AND TELECOM FEEDER

SCHEDULE.

1. TELECOM CIRCUITS. SEE SHEET TN101.

2. HANDHOLE FOR LIGHTING CIRCUITS. REFER TO SHEET SB522 FOR

ADDITIONAL INFORMATION.

3. REFER TO SHEET A1/ES104 FOR LIFT STATION CONTROL PANEL.

4. PROVIDE CONNECTION TO POLE MOUNTED EXTERIOR CAMERAS. REFER

TO EMLV1-5 ON SHEET E-741 FOR BRANCH CIRCUIT INFORMATION.

5. UNDER BASE BID, PROVIDE CONDUITS FOR THE FLOATING DOCK UP TO

MANHOLES EMH-L3 AND EMH-L4. MANHOLES ARE PART OF THE BASE BID.

6. PROVIDE CONNECTION HEATING ENCLOSURE. REFER TO MECHLVB-14 ON

SHEET E-744 FOR BRANCH CIRCUIT INFORMATION.

7. PROVIDE CONNECTION TO PIER ACU. REFER TO EMLV1-4 ON SHEET E-741

FOR BRANCH CIRCUIT INFORMATION. REFER TO SHEET ES104 FOR PIER

ACU LOCATION.

8. REFER TO DETAIL C2/EP505 FOR FLOATING DECK HANDHOLE.

9. ROUTE HEAT TRACE PANEL FEEDER CONDUIT THROUGH SLAB.

1/8" = 1'-0" A1

POWER PLAN - AREA A

PLAN

NORTH

ABD CEFG

H

KEY PLAN

PLAN

NORTH

4' 8' 16'0'

BID OPTION - FLOATING

DOCK SYSTEM

SHEET NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

B

A S

E B

ID

U

P D

A T

E

/2 7/

U

P D

A T

E D

H E

A T

IN

G

B O

X L

O A

D

/1 7/

U

P D

A T

E D

H T

P s

S E

R V

IC

E

P A

N E

LB

O

A R

D

/2 7/

T2S

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

789101112

C1

EP201

CL

B

C

A

D

HTP-03

HTP-04

IP-1 - 2

IP-2 - 2

(TYP.)

48 48

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

EP112

P

IE

R

P O

W E

R P

LA

N

A

R E

A B

JC

12874265

JR BG

JAS

SHEET KEYNOTES

1/8" = 1'-0" A1

POWER PLAN - AREA B

PLAN

NORTH

ABD CEFG

H

KEY PLAN

PLAN

NORTH

4' 8' 16'0'

1. TELECOM CIRCUITS. SEE SHEET TN102.

2. ROUTE HEAT TRACE PANEL (HTP) FEEDER CONDUIT THROUGH SLAB.

1. SEE SHEET ES101 FOR THE ELECTRICAL AND TELECOM FEEDER

SCHEDULE.

SHEET NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

B

A S

E B

ID

U

P D

A T

E

/2 7/

U

P D

A T

E D

H T

P s

S E

R V

IC

E

P A

N E

LB

O

A R

D

/2 7/

M

M

J

P

P

P

5 8

44 13

14 15 15 15 15

15 15 15 15 14

44 13

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

EJ 18192021222324252627

CL

B

C

A

D

HTP-05

HTP-06

P1

P2

Hot Box Enclosure-01

Hor Box Enclosure-02

P1 - 1,3

P2 - 1,3

IP-1 - 3

IP-2 - 3

44 12

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

EP114

P

IE

R

P O

W E

R P

LA

N

A

R E

A D

JC

12874267

JR BG

JAS

SHEET KEYNOTES

1. TELECOM CIRCUITS. SEE SHEET TN103.

2. UNIT SUBSTATION B-1. SEE ELEVATION ON DETAIL A2 / EP503.

3. UNIT SUBSTATION B-2. SEE ELEVATION ON DETAIL A2 / EP503.

4. UNIT SUBSTATION IP-1. SEE DETAIL B2 / EP503.

5. UNIT SUBSTATION IP-2. SEE DETAIL B2 / EP503.

6. PROVIDE CONTROL WIRING IN 3" SCHD40 PVC CONDUIT FOR SHIP SHORE

POWER.

7. PROVIDE CONNECTION TO POLE MOUNTED EXTERIOR CAMERAS. REFER

TO EMLV1-5 ON SHEET E-741 FOR BRANCH CIRCUIT INFORMATION.

8. ROUTE HEAT TRACE PANEL (HTP) AND HOT BOX HEATER FEEDER

CONDUIT THROUGH SLAB.

1/8" = 1'-0" A1

POWER PLAN - AREA D

PLAN

NORTH

ABD CEFG

H

KEY PLAN

PLAN

NORTH

4' 8' 16'0'

1. SEE SHEET ES101 FOR THE ELECTRICAL AND TELECOM FEEDER

SCHEDULE.

2. THE DIMENSIONS OF THE UNIT SUBSTATIONS ON THE PIER CANNOT BE

EXCEEDED AS TO NOT INTRUDE INTO THE PIER FIRE LANE. ALL NEC

CLEARANCES MUST BE OBSERVED. PRIMARY AND SECONDARY

SECTIONS MUST BE FRONT ACCESS ONLY.

3. PRIOR TO FINAL DESIGN FABRICATION AND INSTALLATION OF PLATFORM,

COORDINATE UNIT SUBSTATION MOUNTING POINTS WITH THE PLATFORM

STRUCTURE TO AVOID MISALIGNMENT WITH THE UNIT SUBSTATION

MOUNTING LOCATIONS.

SHEET NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

B

A S

E B

ID

U

P D

A T

E

/2 7/

U

P D

A T

E D

U N

IT

S

U B

S T

A T

IO

N

S

/2 7/

U

P D

A T

E D

H E

A T

IN

G

B O

X L

O A

D

/1 7/

U

P D

A T

E D

C O

N D

U

IT

S R

O U

T E

/1

5/

U

P D

A T

E D

H T

P s

S E

R V

IC

E

P A

N E

LB

O

A R

D

/2 7/

P P

P

11 1 1

8 9

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

8 9

272829303132333435

CL

B

C

A

D

1514 15 15 15 8 9

98 14 15 15 15 15

4" ø

HTP-08

HTP-07

IP-3 - 1

IP-4 - 1

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

EP115

P

IE

R

P O

W E

R P

LA

N

A

R E

A E

JC

12874268

JR BG

JAS

SHEET KEYNOTES

1/8" = 1'-0" A1

POWER PLAN - AREA E

PLAN

NORTH

ABD CEFG

H

KEY PLAN

PLAN

NORTH

4' 8' 16'0'

1. TELECOM CIRCUITS. SEE SHEET TN104.

2. PIER INDUSTRIAL POWER LVCB. SEE DETAIL A2 / EP505.

3. PIER SHORE POWER LVCB. SEE DETAIL A2 / EP508.

4. PROVIDE CONTROL WIRING IN 3" SCHD40 PVC CONDUIT FOR PIER SHORE

POWER.

5. ROUTE HEAT TRACE PANEL (HTP) AND FEEDER CONDUIT THROUGH SLAB.

1. SEE SHEET ES101 FOR THE ELECTRICAL AND TELECOM FEEDER

SCHEDULE.

SHEET NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

B

A S

E B

ID

U

P D

A T

E

/2 7/

U

P D

A T

E D

S H

E E

T K

E Y

N O

T E

S

/1 5/

U

P D

A T

E D

C O

N D

U

IT

S R

O U

T E

/1

5/

U

P D

A T

E D

H T

P s

S E

R V

IC

E

P A

N E

LB

O

A R

D

/2 7/

M

M

14 15 15 15 15

14 15 15 15 15

13 44

8 9

13 44

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

3536373839404142

CL

B

C

A

D

4" ø

Hot Box Enclosure-04

Hot Box Enclosure-03

HTP-10

IP-3 - 2

HTP-09

IP-4 - 2

P4 - 1,3

P3 - 1,3

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

EP116

P

IE

R

P O

W E

R P

LA

N

A

R E

A F

JC

12874269

JR BG

JAS

SHEET KEYNOTES

1. TELECOM CIRCUITS. SEE SHEET TN105.

2. UNIT SUBSTATION IP-3. SEE DETAIL B2 / EP503.

3. UNIT SUBSTATION IP-4. SEE DETAIL B2 / EP503.

4. UNIT SUBSTATION B-3. SEE DETAIL A2 / EP503.

5. UNIT SUBSTATION B-4. SEE DETAIL A2 / EP503.

6. PIER INDUSTRIAL POWER LVCB. SEE DETAIL A2 / EP505.

7. PIER SHORE POWER LVCB. SEE DETAIL A2 / EP508.

8. PROVIDE CONTROL WIRING IN 3" SCHD40 PVC CONDUIT FOR PIER SHORE

POWER.

9. ROUTE HEAT TRACE PANEL (HTP) AND HOT BOX HEATER FEEDER

CONDUIT THROUGH SLAB.

1/8" = 1'-0" A1

POWER PLAN - AREA F

PLAN

NORTH

ABD CEFG

H

KEY PLAN

PLAN

NORTH

4' 8' 16'0'

1. SEE SHEET ES101 FOR THE ELECTRICAL AND TELECOM FEEDER

SCHEDULE.

2. THE DIMENSIONS OF THE UNIT SUBSTATIONS ON THE PIER CANNOT BE

EXCEEDED AS TO NOT INTRUDE INTO THE PIER FIRE LANE. ALL NEC

CLEARANCES MUST BE OBSERVED. PRIMARY AND SECONDARY

SECTIONS MUST BE FRONT ACCESS ONLY.

3. PRIOR TO FINAL DESIGN FABRICATION AND INSTALLATION OF PLATFORM,

COORDINATE UNIT SUBSTATION MOUNTING POINTS WITH THE PLATFORM

STRUCTURE TO AVOID MISALIGNMENT WITH THE UNIT SUBSTATION

MOUNTING LOCATIONS.

SHEET NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

B

A S

E B

ID

U

P D

A T

E

/2 7/

U

P D

A T

E D

U N

IT

S

U B

S T

A T

IO

N

S

/2 7/

U

P D

A T

E D

H E

A T

IN

G

B O

X L

O A

D

/1 7/

U

P D

A T

E D

S H

E E

T K

E Y

N O

T E

S

/1 5/

U

P D

A T

E D

C O

N D

U

IT

S R

O U

T E

/1

5/

U

P D

A T

E D

H T

P s

S E

R V

IC

E

P A

N E

LB

O

A R

D

/2 7/

P

P

P

M A

T C

H L

IN

E

R E

F E

R T

O A

/ E

P

4243444546474849

CL

B

C

A

D

1(TYP.)

HTP-11

HTP-12

IP-3 - 3

IP-4 - 3

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

EP117

P

IE

R

P O

W E

R P

LA

N

A

R E

A G

JC

12874270

JR BG

JAS

1/8" = 1'-0" A1

POWER PLAN - AREA G

PLAN

NORTH

ABD CEFG

H

KEY PLAN

PLAN

NORTH

4' 8' 16'0'

1. SEE SHEET ES101 FOR THE ELECTRICAL AND TELECOM FEEDER

SCHEDULE.

SHEET KEYNOTES

1. TELECOM CIRCUITS. SEE SHEET TN106.

2. ROUTE HEAT TRACE PANEL (HTP) FEEDER CONDUIT THROUGH SLAB.

SHEET NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

B

A S

E B

ID

U

P D

A T

E

/2 7/

U

P D

A T

E D

H T

P s

S E

R V

IC

E

P A

N E

LB

O

A R

D

/2 7/

SECONDARY DISTRIBUTION SECTIONS

1500KVA

13.8KV TO 480 / 450V

UNGROUNDED

OIL-FILLED

TRANSFORMER

15KV

VACUUM

FAULT

INTERRUPTER

(CIRCUIT IN

AND CIRCUIT

OUT TO

INDUSTRIAL

STATION)

NEMA-4X DOORS

OVER EACH BREAKER

BATTERY CHARGER

BEHIND DOOR

50A FREEZE

SEAL

RECEPTACLE

PNL

BATTERIES BEHIND

COVER

MCB

3000AF

3000AT

SECONDARY DISTRIBUTION SECTIONS

NOTES:

1. TYPICAL FOR UNIT SUBSTATIONS B1, B2, B3, AND B4.

2. ORIENT UNIT SUBSTATIONS SUCH THAT THE 15KV PRIMARY

SWITCHES ARE ORIENTED TOWARDS THE SHORE SIDE OF THE PIER /

TRESTLE.

3. PROVIDE SEPARATE DIGITAL METERS FOR EACH INDIVIDUAL 800A

BREAKER SERVING THE LVCB(S).

4. PRIMARY AND SECONDARY SECTIONS MUST BE FRONT ACCESS ONLY.

SPARE 800A

DRAWOUT CB

FOR THE 30A SERVICE TO

THE 1A FUSIBLE LINK

TESTING LOCATION AND

THE SURGE PROTECTION

DEVICE (SPD), PROVIDE A

STANDARD MOLDED

CASE BREAKER INSIDE

THE UNIT SUBSTATION.

SECONDARY

SWITCHBOARD

300KVA

13.8KV TO 480Y/277V

OIL-FILLED

TRANSFORMER

15KV

VACUUM

FAULT

INTERRUPTER

MCB

400AF

400AT

SECONDARY DISTRIBUTION SECTIONS

480Y/277V

DISTRIBUTION

SECTION

45KVA

480V TO

208Y/120V

DRY-TYPE

208Y/120V

DIST.

SECTION

NOTES:

1. TYPICAL FOR UNIT SUBSTATIONS IP-1, IP-2, IP-3, AND IP-4.

2. ORIENT UNIT SUBSTATIONS SUCH THAT THE 15KV PRIMARY

SWITCHES ARE ORIENTED TOWARDS THE SHORE SIDE OF THE PIER /

TRESTLE.

3. PRIMARY AND SECONDARY SECTIONS MUST BE FRONT ACCESS ONLY.

TRANSITION CABLES AS

REQUIRED TO TERMINATE AT

POWER STATION (TYP)

TYPICAL LOW VOLTAGE

CONNECTION BOX

ELECTRICAL EQUIPMENT

FOUNDATION

NUMBER OF CONDUITS PER

PLANS EMBEDDED IN SLAB

24" BEND RADIUS

ROUTE CONDUITS

TO CABLE WELL

CABLE WELL

GROUNDING ELECTRODE

CONDUCTOR FROM LVCB

ENCLOSURE TO GROUND LOOP,

SEE SITE PLANS FOR

CONTINUATION.

LIGHT WITH PHOTOCELL. PROVIDE

PHOTOCELL ON THE SAME CIRCUIT AS

THE RECEPTACLES

CONE TOP HINGED

FOR RELAMPING

(2) 30A, L14-30R

TWISTLOCK RECEPTACLES

ON DEDICATED CIRCUITS

AT 45 DEGREES WITH

HINGED COVER

ACCESS PANEL

BREAKER PANEL WITH

COVER

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

EP503

P O

W E

R D

E

TA

IL

S

JC

12874280

JR BG

JAS

NOT TO SCALE

A2

TYPICAL BERTH UNIT SUBSTATION

NOT TO SCALE

B2

TYPICAL INDUSTRIAL UNIT SUBSTATION

NOT TO SCALE

A1

TYPICAL LVCB SECTION

NOT TO SCALE

B1

FLOATING DOCK ELECTRICAL PILLAR

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

U

P D

A T

E D

U N

IT

S

U B

S T

A T

IO

N

S D

E T

A

IL

S

/2 7/

U

P D

A T

E D

U N

IT

S

U B

S T

A T

IO

N

S E

LE

V

A T

IO

N

/2

7/

800AF

500AT

100AF

30AT

S P

A R

E

200AF

200AT

100AF

70AT

45KVA

480V TO 208Y/120V

DRY TYPE, 3ϕ, 4 WIRE

SF6-B

1500KVA

13.8KV TO 480/450V

3ϕ, 3 WIRE

300KVA

13.8KV TO 480Y/277V

3ϕ, 4 WIRE

300KVA

13.8KV TO 480Y/277V

3ϕ, 4 WIRE

300KVA

13.8KV TO 480Y/277V

3ϕ, 4 WIRE

300KVA

13.8KV TO 480Y/277V

3ϕ, 4 WIRE

400AF

400AT

UNIT

SUBSTATION

B-1

UNIT SUBSTATION

IP-1 UNIT SUBSTATION

IP-3

UNIT SUBSTATION

IP-2

UNIT SUBSTATION

IP-4

3000AF

3000AT

PANEL

P1

208Y/120V 3P/4W

150A MCB

FROM SF6-A. REFER

TO SHEET E-641.

V F

I

V F

I

V F

I

V F

I

800AF

500AT

800AF

500AT

800AF

500AT

M

M

17 16

EMH-L4

EMH-L3

2 2

998 998

8 8

998 2

S P

D

VFI

600AF

98 98 98

RELAY

BATT

VFI

600AF

1500KVA

13.8KV TO 480/450V

3ϕ, 3 WIRE

UNIT

SUBSTATION

B-3

M

VFI

600AF

RELAY

BATT

VFI

600AF

1500KVA

13.8KV TO 480/450V

3ϕ, 3 WIRE

UNIT

SUBSTATION

B-2

M

VFI

600AF

RELAY

BATT

VFI

600AF

1500KVA

13.8KV TO 480/450V

3ϕ, 3 WIRE

UNIT

SUBSTATION

B-4

M

VFI

600AF

RELAY

BATT

VFI

600AF

5 5 5 5

VFI

600AF

RELAY

BATT

M

RELAY

BATT

M

RELAY

BATT

M

RELAY

BATT

100AF

50AT

100AF

50AT

400AF

400AT

400AF

400AT

400AF

400AT

800AF

500AT

100AF

30AT

S P

A R

E800AF

500AT

800AF

500AT

800AF

500AT S

P

D 800AF

500AT

100AF

30AT

S P

A R

E800AF

500AT

800AF

500AT

800AF

500AT S

P

D 800AF

500AT

100AF

30AT

S P

A R

E800AF

500AT

800AF

500AT

800AF

500AT S

P D

SPD

100AF

50AT

200AF

200AT

100AF

70AT

PANEL

P1

208Y/120V 3P/4W

150A MCB

100AF

50AT

100AF

50AT

SPD

100AF

50AT

200AF

200AT

100AF

70AT

PANEL

P1

208Y/120V 3P/4W

150A MCB

100AF

50AT

100AF

50AT

SPD

100AF

50AT

200AF

200AT

100AF

70AT

PANEL

P1

208Y/120V 3P/4W

150A MCB

100AF

50AT

100AF

50AT

SPD

100AF

50AT

45KVA

480V TO 208Y/120V

DRY TYPE, 3ϕ, 4 WIRE

45KVA

480V TO 208Y/120V

DRY TYPE, 3ϕ, 4 WIRE

45KVA

480V TO 208Y/120V

DRY TYPE, 3ϕ, 4 WIRE

3000AF

3000AT

3000AF

3000AT

3000AF

3000AT

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

E-601

P

IE

R

S

IN

G

LE

L

IN

E D

IA

G

R A

M S

JC

12874298

JR BG

JAS

NOT TO SCALE

A1

PIER - SINGLE LINE DIAGRAMS

1. PROVIDE TRANSFORMER WITH 480V AND 450V SECONDARY TAPS TO

ALLOW FOR THE BERTHING OF 480V AND 450V VESSELS.

2. TYPICAL PIER MANHOLE.

3. PROVIDE TWO (2) 1" CONDUITS STUBBED OUT TO 5'-0" PAST THE

SWITCH'S PAD FOR FURTURE CONTROLLING OF SWITCHED WAYS.

4. NOT USED.

5. REFER TO ANSI NUMBER AND FUNCTIONS SCHEDULE FOR DIGITAL

MULTI-FUNCTION PROTECTIVE RELAY.

6. PROVIDE 120V CONNECTION TO RELAY BATTERY. REFER TO SHEET

E-711 FOR ADDITIONAL INFORMATION.

1. REFER TO SHEET ES101 FOR ELECTRICAL SITE FEEDER SCHEDULE.

2. REFER TO SHEETS EP111 TO EP118 FOR PIER POWER PLAN.

3. SEE E-509 FOR SHORE POWER (B1 THRU B4) RECEPTACLE INDICATION

LIGHTS, REMOTE TRIP / CLOSE, AND AUTOMATIC TRIP FUNCTIONS FROM

THE SHORE POWER MOUNDS. PROVIDE CONTROL CABLING AS

REQUIRED TO MEET THE PERFORMANCE BASED FUNCTIONS.

4. PROVIDE FRONT ACCESS ONLY 15KV PRIMARY SWITCHES AND 480V /

480V SWITCHBOARDS / SWITCHGEAR.

5. REFER TO 26 23 00 FOR ADDITIONAL DIGITAL METERING REQUIREMENTS

FOR THE MAIN AND BRANCH SHORE POWER CIRCUIT BREAKERS IN

ADDITION TO THE STANDARD AMI METER.

SHEET KEYNOTES

SHEET NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

U

P D

A T

E D

P

IE

R S

IN

G

LE

L

IN

E

D

IA

G R

A M

S

/0 9/

B

A S

E B

ID

U

P D

A T

E

/2 7/

U

P D

A T

E D

U N

IT

S

U B

S T

A T

IO

N

/1

7/

U

P D

A T

E D

IP

U

N

IT

S U

B S

T A

T I O

N

/2 7/

ANSI NUMBERS AND FUNCTIONS

50BF

50N 50 (P,G,Q) 51N 51 (P,G,Q)

UNDERVOLTAGE

BREAKER FAILURE OVERCURRENT

NEUTRAL-GROUND OVERCURRENT

OVERCURRENT (PHASE, GROUND, NEGATIVE SEQUENCE)

NEUTRAL-GROUND TIME-OVERCURRENT

TIME-OVERCURRENT (PHASE, GROUND, NEGATIVE SEQUENCE)

ALARM RELAY

A-C RECLOSING RELAY

LOCKOUT RELAY, MASTER TRIP RELAY

DIFFERENTIAL PROTECTIVE RELAY

3 3

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E L O

C A

T

IO

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008523R2527

E-710

P

IE

R

P A

N E

LB

O

A R

D S

C H

E D

U

LE

S

JC

12874301

JR BG

JAS

DEMAND WITH EXPANSION: 1949 A

TOTAL ESTIMATED DEMAND CURRENT: 1624 A

TOTAL CONNECTED CURRENT: 1624 A

TOTAL ESTIMATED DEMAND LOAD: 1350168 VA

TOTAL CONNECTED LOAD: 1350168 VA

SWITCHBOARD TOTALS

7 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

6 SERVICE TO 1A FUSIBLE LINK REFER TO ES101 FEEDER #14 3 30 A 100 A 19953 VA

5 SPARE 3 800 A 800 A 0 VA

4 PIER SHORE POWER REC #4 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

3 PIER SHORE POWER REC #3 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

2 PIER SHORE POWER REC #2 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

1 PIER SHORE POWER REC #1 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 3000 A

MOUNTING: FLOOR WIRES: 3 MAINS RATING: 3000 A

SUPPLY FROM: UNIT SUBSTATION B-1 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-1 VOLTAGE: 480/450V DELTA A.I.C. RATING: 65,000

SWITCHBOARD: B-1

DEMAND WITH EXPANSION: 1949 A

TOTAL ESTIMATED DEMAND CURRENT: 1624 A

TOTAL CONNECTED CURRENT: 1624 A

TOTAL ESTIMATED DEMAND LOAD: 1350168 VA

TOTAL CONNECTED LOAD: 1350168 VA

SWITCHBOARD TOTALS

7 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

6 SERVICE TO 1A FUSIBLE LINK REFER TO ES101 FEEDER #14 3 30 A 100 A 19953 VA

5 SPARE 3 800 A 800 A 0 VA

4 PIER SHORE POWER REC #4 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

3 PIER SHORE POWER REC #3 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

2 PIER SHORE POWER REC #2 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

1 PIER SHORE POWER REC #1 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 3000 A

MOUNTING: FLOOR WIRES: 3 MAINS RATING: 3000 A

SUPPLY FROM: UNIT SUBSTATION B-2 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-2 VOLTAGE: 480/450V DELTA A.I.C. RATING: 65,000

SWITCHBOARD: B-2

DEMAND WITH EXPANSION: 1949 A

TOTAL ESTIMATED DEMAND CURRENT: 1624 A

TOTAL CONNECTED CURRENT: 1624 A

TOTAL ESTIMATED DEMAND LOAD: 1350168 VA

TOTAL CONNECTED LOAD: 1350168 VA

SWITCHBOARD TOTALS

7 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

6 SERVICE TO 1A FUSIBLE LINK REFER TO ES101 FEEDER #14 3 30 A 100 A 19953 VA

5 SPARE 3 800 A 800 A 0 VA

4 PIER SHORE POWER REC #4 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

3 PIER SHORE POWER REC #3 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

2 PIER SHORE POWER REC #2 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

1 PIER SHORE POWER REC #1 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 3000 A

MOUNTING: FLOOR WIRES: 3 MAINS RATING: 3000 A

SUPPLY FROM: UNIT SUBSATION B-3 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-3 VOLTAGE: 480/450V DELTA A.I.C. RATING: 65,000

SWITCHBOARD: B-3

DEMAND WITH EXPANSION: 1949 A

TOTAL ESTIMATED DEMAND CURRENT: 1624 A

TOTAL CONNECTED CURRENT: 1624 A

TOTAL ESTIMATED DEMAND LOAD: 1350168 VA

TOTAL CONNECTED LOAD: 1350168 VA

SWITCHBOARD TOTALS

7 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

6 SERVICE TO 1A FUSIBLE LINK REFER TO ES101 FEEDER #14 3 30 A 100 A 19953 VA

5 SPARE 3 800 A 800 A 0 VA

4 PIER SHORE POWER REC #4 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

3 PIER SHORE POWER REC #3 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

2 PIER SHORE POWER REC #2 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

1 PIER SHORE POWER REC #1 REFER TO ES101 FEEDER #15 3 500 A 800 A 332554 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 3000 A

MOUNTING: FLOOR WIRES: 3 MAINS RATING: 3000 A

SUPPLY FROM: UNIT SUBSTATION B-4 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-4 VOLTAGE: 480/450V DELTA A.I.C. RATING: 65,000

SWITCHBOARD: B-4

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

A

D D

E D

A N

D U

P D

A T

E D

P A

N E

L S

C H

E D

U

LE

S

/2 7/

DEMAND WITH EXPANSION: 283 A

TOTAL ESTIMATED DEMAND CURRENT: 236 A

TOTAL CONNECTED CURRENT: 310 A

TOTAL ESTIMATED DEMAND LOAD: 195954 VA

TOTAL CONNECTED LOAD: 257465 VA

SWITCHBOARD TOTALS

6 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

5 45 kVA TRANSFORMER 3#4, #8G. IN 1"C 3 70 A 100 A 24677 VA

4 PIER INDUSTRIAL REC 200A REFER TO ES101 FEEDER #12 3 200 A 200 A 133022 VA

3 HTP-05 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

2 HTP-03 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

1 HTP-01 4#4, #4G. IN 1-1/4"C 3 50 A 100 A 33255 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

PROVIDE 100% RATED MAIN BREAKER.

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 400 A

MOUNTING: FLOOR WIRES: 4 MAINS RATING: 400 A

SUPPLY FROM: UNIT SUBSTATION IP-1 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-1 VOLTAGE: 480/277 Wye A.I.C. RATING: 35,000

SWITCHBOARD: IP-1

DEMAND WITH EXPANSION: 283 A

TOTAL ESTIMATED DEMAND CURRENT: 236 A

TOTAL CONNECTED CURRENT: 310 A

TOTAL ESTIMATED DEMAND LOAD: 195954 VA

TOTAL CONNECTED LOAD: 257465 VA

SWITCHBOARD TOTALS

6 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

5 45 kVA TRANSFORMER 3#4, #8G. IN 1"C 3 70 A 100 A 24677 VA

4 PIER INDUSTRIAL REC 200A REFER TO ES101 FEEDER #12 3 200 A 200 A 133022 VA

3 HTP-06 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

2 HTP-04 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

1 HTP-02 4#4, #4G. IN 1-1/4"C 3 50 A 100 A 33255 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

PROVIDE 100% RATED MAIN BREAKER.

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 400 A

MOUNTING: FLOOR WIRES: 4 MAINS RATING: 400 A

SUPPLY FROM: UNIT SUBSTATION IP-2 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-2 VOLTAGE: 480/277 Wye A.I.C. RATING: 35,000

SWITCHBOARD: IP-2

DEMAND WITH EXPANSION: 283 A

TOTAL ESTIMATED DEMAND CURRENT: 236 A

TOTAL CONNECTED CURRENT: 310 A

TOTAL ESTIMATED DEMAND LOAD: 195954 VA

TOTAL CONNECTED LOAD: 257465 VA

SWITCHBOARD TOTALS

6 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

5 45 kVA TRANSFORMER 3#4, #8G. IN 1"C 3 70 A 100 A 24677 VA

4 PIER INDUSTRIAL REC 200A REFER TO ES101 FEEDER #12 3 200 A 200 A 133022 VA

3 HTP-11 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

2 HTP-09 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

1 HTP-07 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

PROVIDE 100% RATED MAIN BREAKER.

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 400 A

MOUNTING: FLOOR WIRES: 4 MAINS RATING: 400 A

SUPPLY FROM: UNIT SUBSTATION IP-3 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-3 VOLTAGE: 480/277 Wye A.I.C. RATING: 35,000

SWITCHBOARD: IP-3

DEMAND WITH EXPANSION: 283 A

TOTAL ESTIMATED DEMAND CURRENT: 236 A

TOTAL CONNECTED CURRENT: 310 A

TOTAL ESTIMATED DEMAND LOAD: 195954 VA

TOTAL CONNECTED LOAD: 257465 VA

SWITCHBOARD TOTALS

6 SPD PER MANUFACTURER'S INSTRUCTIONS 3 60 A 100 A 0 VA

5 45 kVA TRANSFORMER 3#4, #8G. IN 1"C 3 70 A 100 A 24677 VA

4 PIER INDUSTRIAL REC 200A REFER TO ES101 FEEDER #12 3 200 A 200 A 133022 VA

3 HTP-12 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

2 HTP-10 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

1 HTP-08 4#6, #10G. IN 1"C 3 50 A 100 A 33255 VA

CKT LOAD NAME DESIGN WIRE AND CONDUIT POLES

TRIP

RATING

FRAME SIZE Load COMMENTS

PROVIDE 100% RATED MAIN BREAKER.

NOTES:

ENCLOSURE: NEMA 4XSS MCB RATING: 400 A

MOUNTING: FLOOR WIRES: 4 MAINS RATING: 400 A

SUPPLY FROM: UNIT SUBSTATION IP-4 PHASES: 3 MAINS TYPE: MCB

LOCATION: BERTH-4 VOLTAGE: 480/277 Wye A.I.C. RATING: 35,000

SWITCHBOARD: IP-4

EP111 - PIER -POWER PLAN -AREA A
EP112 - PIER -POWER PLAN -AREA B
EP114 - PIER -POWER PLAN -AREA D
EP115 - PIER -POWER PLAN -AREA E
EP116 - PIER -POWER PLAN -AREA F
EP117 - PIER -POWER PLAN -AREA G
EP503 - POWER DETAILS
E-601 - PIER -SINGLE LINE DIAGRAMS
E-710 - PIER -PANELBOARD SCHEDULES
2023-07-21T09:50:41-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:49-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:50-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:50-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:51-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:52-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:53-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:54-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T09:50:55-0400
Boris Goli
I am signing ro cerifty the authenticity od this document.
2023-07-21T14:00:22-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:00:56-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:00-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:05-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:09-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:14-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:20-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:26-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:30-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:01:48-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:02:26-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:02:31-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:02:37-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:02:42-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:02:48-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:02:52-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:02:57-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2023-07-21T14:03:03-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .