1596300_dwg_30of35_V3_Plumbing.pdf
PDF 8 MB Posted
- Attached to
- Design Bid-Build P228 ATC Tower and Air Operations, Marine Corps Air Station, Cherry Point, North Carolina
- Solicitation number
- N4008522R2504
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING ABBREVIATIONS
DEGREES FAHRENHEIT
AIR GAP
ABOVE FINISHED FLOOR
AMBIENT
ACCESS PANEL
ARCHITECTURAL
BACK FLOW PREVENTOR
BOTTOM OF PIPE
BRITISH THERMAL UNITS
BTU PER HOUR
CONDENSATE DRAIN
CLEAN OUT
COMPRESSOR
CONTINENTAL UNITED STATES
CHLORINATED POLYVINYL CHLORIDE
DOWN
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DRAIN TROUGH
EAST
ELBOW
ENERGY EFFICIENCY RATIO
EXISTING
ELECTRIC WATER COOLER
FLOOR CLEAN OUT
FLOOR DRAIN
FUNNEL FLOOR DRAIN
FLOW INDICATOR
FLOW METER
FLOOR SINK
FEET OF WATER COLUMN
GRADE CLEAN OUT
HOSE BIBB
HUB DRAIN, HEAVY DUTY
HR
HOT WATER CIRCULATING PUMP
HEAT EXCHANGER
HYDRANT
IN ACCORDANCE WITH
INVERT ELEVATION
INCHES
ICE MAKER BOX
KILOWATT
POUNDS
LOCK CLOSED
LOCK OPEN
MAXIMUM
1000 BTUH
MANUFACTURER
NATURAL GAS SUPPLIER
NORTH
NOT TO SCALE
NORMAL WATER LEVEL
OPERATING
PLUMBING AND DRAIN INSTITUTE
PLACES
POINT OF CONNECTION
POINT OF DISCONNECTION
POUNDS PER SQUARE INCH GAUGE
POLYVINYL CHLORIDE
REFRIGERANT
REDUCED PRESSURE ZONE BFP
RISING STEM
SCHEDULE
SOUTH
SANITARY SEWER
STEAM
TRENCH DRAIN
TRAP PRIMER MANIFOLD
TOP OF PIPE
THERMAL MIXING VALVE
VENT, SANITARY
VAPOR MITIGATION
VENT THROUGH ROOF
WEST
WALL CLEANOUT
WATER HAMMER ARRESTOR
WEIGHT
WALL HYDRANT
WASHER UTILITY BOX
YARD CLEAN OUT
°F
AG
AFF
AMB
AP
ARCH
BFP
BOP
BTU
BTUH
CD
CO
COM
CONUS
CPVC
DN
DCW
DHW
DT
E
ELL
EER
EX
EWC
FCO
FD
FFD
FI
FM
FS
FT WC
GCO
HB
HD
HR
HWCP
HX
HY
IAW
IE
IN
IMB
KW
LBS
LC
LO
MAX
MBH
MFR
NGS
N
NTS
NWL
OPER
PDI
PL
POC
POD
PSIG
PVC
REFR
RPZ
RS
SCH
S
SS
ST
TD
TPM
TOP
TMV
V
VM
VTR
W
WCO
WHA
WT
WH
WUB
YCO
GENERAL NOTES:
NOTE:
QUESTION MARKS (?) ARE REPLACED BY PIPE SIZE ON DRAWINGS
DOMESTIC HOT WATER, 110°F
DOMESTIC COLD WATER
VENT
?" SS
SANITARY SEWER (ABOVE GRADE)
PIPE LINE DESIGNATIONS
DOMESTIC HOT WATER RECIRCULATION
?" SS
SANITARY SEWER (BELOW GRADE)
?" V
?" DCW
?" DHW
?" DHWR
NATURAL GAS?" G
?" VM
VAPOR MITIGATION (BELOW GRADE)
FD
EWC-1
L-1
PLUMBING SYMBOLS LEGEND
FLOOR DRAIN - SPEC. TYPE
ELECTRIC WATER COOLER
LAVATORY, UNDERCOUNTER MOUNT
PRESSURE/TEMPERATURE RELIEF VALVE
WH WALL HYDRANT
BALL VALVE
BALANCING VALVE
BV
BLV
THERMAL MIXING VALVETMV
CLEANOUT IN FLOORFCO
CLEANOUT IN WALLWCO
BACKFLOW PREVENTION ASSEMBLY
WC-3 WATER CLOSET (FLUSH TANK) ADA
WC-1 WATER CLOSET (WALL MOUNTED)
VENT THROUGH ROOFVTR
SH-2 SHOWER, ADA
PRV
WC-2 WATER CLOSET - ACCESSIBLE -
(WALL MOUNTED) ADA
L-2 LAVATORY, WALL MOUNTED
MR-1 MOP RECEPTOR
S-1 SINK, DOUBLE BOWL
S-2 SINK, SINGLE BOWL
SH-1 SHOWER
UR-1 URINAL
UR-2 URINAL, ADA
DWH-1 WATER HEATER
ST-1 HOT WATER STORAGE TANK
S
SOLENOID VALVESV
S-3 SINK, SINGLE BOWL
WCO
CLEANOUT (CO) IN RISER
PRESSURE GAUGE
FLOOR DRAIN/EQUIPMENT DRAIN
FLOOR OR WALL PENETRATION
VENT THRU ROOF (VTR)
RISER DIAGRAM LEGEND
FCO CLEANOUT (FCO) IN FLOOR
WATER HAMMER ARRESTOR - SPEC. TYPEWHA-A
CLEANOUT (WCO) IN WALL
N
E
DN
UP
W
S
ISOMETRIC DIRECTION ARROW
CO
CALLOUT IDENTIFICATION
SECTION, DETAIL, AND ELEVATION SYMBOL
IDENTIFIERS:
DRAWING SEQUENCE NUMBER INDICATES
WHERE TITLE IS LOCATED (MAY NOT BE
PRESENT IF CALLOUT AND TITLE ARE ON
THE SAME DRAWING)
LETTER AND NUMBER
DESIGNATOR FOR GRID COORDINATE
ONE OR TWO CHARACTER DISCIPLINE
DESIGNATOR (MAY NOT BE PRESENT IF
CALLOUT AND TITLE ARE ON DRAWINGS
WITHIN THE SAME DISCIPLINE)
SECTION CALLOUT EXAMPLE:
DETAIL CALLOUT EXAMPLE:
NORTH ARROW EXAMPLE:
PLAN
NORTH
SECTION, DETAIL, AND ELEVATION TITLE EXAMPLE:
PLAN TITLE EXAMPLE:
GRAPHIC SCALE EXAMPLE:
A#
G-000
N
BUILDING CIVIL/SITE
4' 8' 16'0' 1/8" =1'-0"
DETAIL NUMBER
SCALE
SHEET
REFERENCED
FROM
PLAN
NORTH
SCALE
TRUE NORTH
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:1
A
M
P-001
P
LU
M B
IN
G
L E
G E
N D
, A B
B R
E V
IA
T
IO
N
S A
N D
G E
N E
R A
L N
O
TE
S
MFS
12801651
MAS MAS
1596300
1 THESE GENERAL PLUMBING NOTES APPLY TO ALL PLUMBING DRAWINGS IN THIS SET.
2 INSTALL ALL EQUIPMENT PER MANUFACTURER'S INSTRUCTIONS.
3 PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE PLUMBING SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
4 PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT WITH ACCESSIBLE STOPS.
5 FIELD VERIFY ALL DIMENSIONS.
6 ALL CLEANOUTS SHALL BE FULL SIZE OF PIPE.
7 ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AROUND
OBSTRUCTIONS AT NO ADDITIONAL COST TO THE GOVERNMENT.
8 ALL PLUMBING VENTS WITHIN A 10'-0" RADIUS OF EXHAUST VENTS SHALL BE EXTENDED TO A HEIGHT OF 2'-0"
ABOVE EXHAUST VENT CROWN.
9 ALL HOSE BIBBS SHALL BE MOUNTED 18" ABOVE FINISHED FLOOR.
10 ALL WALL HYDRANTS SHALL BE MOUNTED 24" ABOVE FINISHED GRADE.
11 SLOPES AND INVERT ELEVATIONS OF ALL INTERIOR PIPING SHALL BE ESTABLISHED BEFORE ANY PIPING IS INSTALLED, IN ORDER THAT PROPER SLOPES WILL BE MAINTAINED. ALL PIPING SHALL BE ROUTED TO AVOID
CONFLICT WITH OTHER TRADES.
12 COORDINATE WITH ARCHITECTURAL WORKING DRAWINGS PRIOR TO ROUGHING-IN PLUMBING FIXTURES.
13 MAKE PROPER HOT AND COLD WATER, HOT WATER RECIRCULATING, WASTE, VENT, AND GAS, ETC PIPING CONNECTIONS TO ALL FIXTURES AND EQUIPMENT EVEN THOUGH ALL BRANCHES, FITTINGS AND CONNECTIONS
ARE NOT SHOWN.
14 PROVIDE DEEP SEAL TRAPS FOR ALL FLOOR DRAINS.
15 IT IS THE INTENTION OF THE DRAWINGS TO COVER ALL WORK AND MATERIAL FOR A COMPLETE INSTALLATION.
ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE CONTRACTING OFFICER) SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.
16 ENTIRE INSTALLATION, INCLUDING MATERIALS, EQUIPMENT, AND WORKMANSHIP, SHALL CONFORM WITH ALL APPLICABLE LAWS, CODES, AND REGULATIONS OF MUNICIPAL, STATE AND FEDERAL AUTHORITIES, ALSO THE LATEST EDITION OF THE STATE BUILDING CODES, APPLICABLE ASPE STANDARDS AND OTHER REGULATORY BODIES HAVING JURISDICTION OVER THE CLASS OF WORK. WHERE APPLICABLE, MATERIALS AND EQUIPMENT SHALL HAVE STAMPS OR SEALS OF ARI, ASME, ASSE, UL OR ASTM. THE CONTRACTOR SHALL MAKE TESTS FOR ACCEPTANCE AND APPROVAL BY CODE AND THE REQUIREMENTS OF APPLICABLE REGULATORY AGENCIES.
REQUIRED TESTS SHALL BE PERFORMED IN THE PRESENCE OF THE GOVERNMENT UNLESS OTHERWISE
STATED IN SPECIFICATION 22 00 00.
17 THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES IN ORDER TO RESOLVE ANY CONFLICTS THAT MIGHT ARISE DUE TO THE LOCATION OF EQUIPMENT OR THE USE OF THE SPACE.
18 RUN ALL PIPING CONCEALED ABOVE CEILING OR IN WALLS OR CHASES UNLESS OTHERWISE NOTED.
19 LAYOUT OF PIPING IS DIAGRAMMATIC. RUN ALL EXPOSED PIPING AS HIGH AS POSSIBLE UNLESS OTHERWISE
NOTED. ALLOW FOR RISES, DROPS, AND OFFSETS AS REQUIRED.
20 AFTER THE PIPING IS INSULATED, PROVIDE FACTORY FABRICATED PIPE LABELS, WITH DIRECTION OF FLOW ARROWS, ON THE FOLLOWING PIPING, AT 10 FOOT ON CENTER ON THE PIPING MAINS AND 5 FOOT ON CENTER
ON THE BRANCH RUNOUTS FROM MAINS, AS STATED IN SPECIFICATION 22 00 00.
21 REFER TO PLUMBING FIXTURE SCHEDULE ON SHEET P-601 FOR PIPE SIZE RUNOUTS TO FIXTURES NOT SHOWN
ON PLANS.
22 REFER TO CIVIL PLANS FOR BUILDING FINISHED FLOOR ELEVATIONS.
23 PIPING SHOWN ON DRAWINGS IS SCHEMATIC IN NATURE AND DOES NOT SHALL ALL FITTINGS, ELBOWS, AND COMPONENTS FOR DETAILED CONNECTION. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ANY ADDITIONAL
FITTINGS, ELBOWS, AND COMPONENTS TO PROVIDE A COMPLETE OPERABLE SYSTEM.
24 SPACE EQUIPMENT AND PIPING SUPPORTS TO PREVENT POINT LOADS ON STRUCTURE FROM EXCEEDING 250
LBS.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P R E
R
114 113
123 124 125
S-3
L-3
WC-2
SH-2
CO
FD-2
FD-1
SP-1
2"ø FM
2"ø FM
S E
E P
-1
F O
R A
R E
A C
A R
E A
A
SEE P-102 FOR AREA B
AREA A
SANITARY SEWER FORCE
MAIN. DISCHARGE 24"
MINIMUM ABOVE GRADE
AND PROVIDE SPLASH BLOCK
P-401
C1
ST-1
DWH-1
P-401
C3
W19
W19 W20
2"ø SS
4"ø SS
FCO 4"ø SS
4"ø SS
W06
W01 3"ø SS
W C
O
W22
W22
2"ø V
W33
W123"ø SS
ET-1INV ELE = 24.50'
INV ELE = 24.42'
INV ELE = 23.50'
141 3 7 138 1142
S
F
P
B
J
G
N
Q
R
M
C
H
I
K
L
95 6
E
D
CENTERLINE
OF 2"FM = 10'-0"
W22
W36
SP-3
SANITARY SEWER FORCE
MAIN. DISCHARGE 24"
MINIMUM ABOVE GRADE
AND PROVIDE SPLASH BLACK
CENTERLINE
OF 2"FM = 3'-0"
W12
2"ø V
W42
W42
CO 4"ø SS
3"ø SS 3"ø SS3"ø SS
3"ø SS
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:2
A
M
P-101
A
IR
O P
S
F
IR
S T
F
LO
O R
W A
S T
E A
N D
V E
N T
P
LA
N
A R
E A
A
MFS
12801652
MAS MAS
15963001/8" = 1'-0" A1
AIR OPS - PLUMBING FIRST FLOOR WASTE & VENT PLAN - AREA A
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
GENERAL NOTES
W01 2" SANITARY DOWN TO 3" BELOW SLAB AND 1 1/2" VENT UP.
W06 2" VENT FROM BELOW.
W12 2" VENT UP.
W19 2" SANITARY FROM ABOVE.
W20 4" SANITARY FROM ABOVE.
W22 SANITARY ROUTED ABOVE CEILING.
W33 3" SANITARY FROM ABOVE.
W36 3" SANITARY FROM HUB DRAIN ABOVE.
W42 3" SANITARY FROM FLOOR DRAIN ABOVE.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
153154
FD-2
SEE P-101 FOR AREA A
AREA B
FCO
FD-2
FD-2
FD-2
FCO
4"ø SS
4"ø SS
4"ø SS
4"ø SS
W06
4"ø SS
2"ø V 2"ø V
4"ø SS M01
M01
M01
M01M01
M01
4" SANITARY SEWER.
INV ELE = 23.08'.
SEE CIVIL CU102 FOR
CONTINUATION
INV ELE = 24.67'
INV ELE = 23.33'
INV ELE = 23.33'
A
1 3 7 138 1142 95 6 12
FD-2 W40
INV ELE = 24.67'
INV ELE =
23.58'
W18
VMF-1
V06
V11
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:2
A
M
P-102
A
IR
O P
S
F
IR
S T
F
LO
O R
W A
S T
E A
N D
V E
N T
P
LA
N
A R
E A
B
MFS
12801653
MAS MAS
1596300
1/8" = 1'-0" A1
AIR OPS - PLUMBING FIRST FLOOR WASTE & VENT PLAN - AREA B
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
M01 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE.
V06 6" VAPOR MITIGATION VENT FROM BELOW AND UP.
V11 1/2" VAPOR MITIGATION THREADED BLACK STEEL PIPE FROM
BELOW UP TO SAMPLING PORT.
W06 2" VENT FROM BELOW.
W18 3" VENT UP TO 3" VTR.
W40 4" SANITARY DOWN TO BELOW FOOTING.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
REF.
E
F
D W
139 149 148
145143142150
S-1
FD-2
FCO
S E
E P
-1
F O
R A
R E
A A
A R
E A
C
FD-2
FD-2
P-401
A3
P-401
C3
4" SANITARY SEWER.
INV ELE = 23.00'
SEE CIVIL FOR CONTINUATION
4"ø SS
4"ø SS
4"ø SS W06
4"ø SS
3"ø SS
2"ø V
WUB
FCO
2"ø V
2"ø V
W06
W14
2"ø V
4"ø SS
M01
M01
W28
4"ø SS
4"ø SS 1 1/2"ø V
INV ELE = 24.08'
INV ELE = 23.67'
INV ELE = 23.25'
INV ELE = 24.67'
INV ELE = 24.17'
INV ELE = 23.75'
S
F
P
J
G
N
Q
R
M
H
I
K
L
E
D
3"ø SS
4"ø SS
3"ø SS
FFD-1
V11
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:3
A
M
P-103
A
IR
O P
S
F
IR
S T
F
LO
O R
W A
S T
E A
N D
V E
N T
P
LA
N
A R
E A
C
MFS
12801654
MAS MAS
1596300
1/8" = 1'-0" A1
AIR OPS - PLUMBING FIRST FLOOR WASTE & VENT PLAN - AREA C
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
GENERAL NOTES
M01 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE.
V11 1/2" VAPOR MITIGATION THREADED BLACK STEEL PIPE FROM
BELOW UP TO SAMPLING PORT.
W06 2" VENT FROM BELOW.
W14 2" VENT UP TO 3" VTR.
W28 2" SANITARY DOWN TO 3" BELOW SLAB AND 2" VENT UP.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
S-2
MR-1
W30
204 205
209 208 207
210A
2"ø V
W14
W29
P-401
A1
141 3 7 138 1142
S
F
P
B
J
G
N
Q
R
M
C
H
I
K
L
95 6
E
D
W30
W29
W37
W32
2"ø V
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:3
A
M
P-104
A
IR
O P
S
S E
C O
N D
F
LO
O R
W A
S T
E A
N D
V E
N T
P
LA
N
A R
E A
A
MFS
12801655
MAS MAS
1596300
1/8" = 1'-0" A1
AIR OPS - PLUMBING SECOND FLOOR WASTE & VENT PLAN - AREA A
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
GENERAL NOTES
W14 2" VENT UP TO 3" VTR.
W29 3" SANITARY DOWN AND 2" VENT UP.
W30 3" VTR.
W32 2" SANITARY DOWN AND 1 1/2" VENT UP.
W37 3" HUB DRAIN FOR COUNTERTOP ICE MAKER E10. ICE MAKER E10
TO BE PROVIDED AS PART OF FF&EFOR COUNTEROP ICE MAKER.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
119 120
114 113
115 112
133 134
123 124 125
L-3
WC-2
SH-2
WH
WH
3/4"ø DCW
2"ø DCW 1 1/2"ø DHW
3/4"ø DHWR
3/4"ø DCW
2"ø DCW 1 1/2"ø DHW
S E
E P
-1
F O
R A
R E
A C
A R
E A
A
SEE P-106 FOR AREA B
AREA A
P-402
A3
P-402
C3
1/2"ø DHW 1/2"ø DHWR
3/4"ø DCW
2"ø DCW 1/2"ø DHWR
1/2"ø DHW
L14 L16
L18
2"ø DCW
1 1/2"ø DHW
3/4"ø DHWR
3/4"ø DHWR
S-3
1/2"ø DCW
L11
P-503
A1
3/4"ø DHW 1 1/2"ø DCW
BLV-1
BLV-4
141 3 7 138 1142
S
F
P
B
J
G
N
Q
R
M
C
H
I
K
L
95 6
E
D
1/2"ø DHW
1/2"ø DCW
WHA-A
BLV-5
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:3
A
M
P-105
A
IR
O P
S
F
IR
S T
F
LO
O R
S U
P P
LY
P
LA
N
A
R E
A A
MFS
12801656
MAS MAS
1596300
1/8" = 1'-0" A1
AIR OPS - PLUMBING FIRST FLOOR SUPPLY PLAN - AREA A
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
GENERAL NOTES
L11 1/2" DCW DOWN TO HUMIDIFIER.
L14 1/2" DCW AND DHW UP.
L16 3/4" DCW AND DHW UP.
L18 2" DCW AND 1/2" DHW UP.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
153154
WH
3" INCOMING DOMESTIC
WATER SERVICE. SEE CIVIL
CU102 FOR CONTINUATION.
3/4"ø DCW
RPZ-1
SEE P-105 FOR AREA A
AREA B
2"ø DCW 1 1/2"ø DHW
1"ø DHWR
M01
M01M01M01
M01
M01
TPM-1
L08L08L08 B
L V
-6
A
1 3 7 138 1142 95 6 12
L08L08L08
TPM-2
1/2"ø DHW 1/2"ø DCW
L30
3/4"ø DCW
1/2"ø DCW
B F
P
L26
2"ø DCW
1/2"ø G
1/2"ø G
1 1/4"ø G
1 1/4"ø G
1 1/4"ø G
1"ø G
L32L32
1 1/4" INCOMING NATURAL
GAS SERVICE. SEE CIVIL
CU102 FOR CONTINUATION
BFP-1
L10
L10
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:4
A
M
P-106
A
IR
O P
S
F
IR
S T
F
LO
O R
S U
P P
LY
P
LA
N
A
R E
A B
MFS
12801657
MAS MAS
1596300
1/8" = 1'-0" A1
AIR OPS - PLUMBING FIRST FLOOR SUPPLY PLAN - AREA B
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
GENERAL NOTES
L08 1/2" DCW FROM TRAP PRIMER.
L10 1/2" DCW DOWN TO ELECTRONIC TRAP PRIMER MANIFOLD.
L26 2" MAKE-UP WATER. SEE MECHANICAL FOR CONTINUATION.
L30 3/4" DCW DOWN TO HOSE BIBB. MOUNT 24" ABOVE FINISHED FLOOR.
L32 1" NG DOWN TO BOILER.
M01 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
E
F
139 149 148
145143142150
S-1
WH
WH
3/4"ø DCW
1"ø DHW
1 1/2"ø DCW
S E
E P
-1
F O
R A
R E
A A
A R
E A
C
P-402
C1 P-402
C3
WH
TPM-3
M01
M01 L20L20
EWC-1
3/4"ø DCW
3/4"ø DCW
1 1/2"ø DCW
1"ø DHW 3/4"ø DHW 1 1/4"ø DCW
WUB
BLV-2
1/2"ø DHWR
IMB
BLV-3
S
F
P
J
G
N
Q
R
M
C
H
I
K
L
E
D
3/4"ø DHWR
3/4"ø DHWR L30
L20
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:4
A
M
P-107
A
IR
O P
S
F
IR
S T
F
LO
O R
S U
P P
LY
P
LA
N
A
R E
A C
MFS
12801658
MAS MAS
1596300
1/8" = 1'-0" A1
AIR OPS - PLUMBING FIRST FLOOR SUPPLY PLAN - AREA C
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
GENERAL NOTES
L20 1/2" DCW FROM TRAP PRIMER.
L30 3/4" DCW DOWN TO HOSE BIBB. MOUNT 24" ABOVE FINISHED FLOOR.
M01 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
S-2
L15
MR-1
210A
209 208 207
205204
201A
L17
L21
IMB
P-402
A1
141 3 7 138 1142
S
F
P
B
J
G
N
Q
R
M
C
H
I
K
L
95 6
E
D
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:5
A
M
P-108
A
IR
O P
S
S E
C O
N D
F
LO
O R
S U
P P
LY
P
LA
N
A
R E
A A
MFS
12801659
MAS MAS
1596300
1/8" = 1'-0" A1
AIR OPS - PLUMBING SECOND FLOOR SUPPLY PLAN - AREA A
PLAN
NORTH
4' 8' 16'0'
PLAN
NORTH
KEY PLAN
A
B
C
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
GENERAL NOTES
L15 1/2" DCW AND DHW FROM BELOW.
L17 3/4" DCW AND DHW FROM BELOW.
L21 1/2" DCW TO ICE MAKER BOX IMB FOR COUNTERTOP ICE MAKER
E10. ICE MAKER E10 TO BE PROVIDED AS PART OF FF&E.
ROOM SCHEDULE
056 BASE NODE VAULT
100 STAIR
101 VESTIBULE
102 ENTRY
103 ELEVATOR
104 MEN'S
105 WOMEN'S
106 MOTHERS RM
107 CORRIDOR
108 COMM
109 BASH
110 WEAPON STOR
111 WX CLASSROOM
112 TOILET / SHOWER
113 BUNK ROOM
114 BUNK ROOM
115 STAIR
116 WX OIC
117 WX SNCOIC
118 WX SUPERVISOR
119 WX SIPR
120 ASOS
121 WX FLOOR
122 F/C
123 F/C SNCOIC
124 F/C CIV
125 ODO
126 ELEV EQUIP
127 BUNK / LOCKER
129 BUNK ROOM
130 TOILET / SHOWER
131 CORRIDOR
132 ADMIN STOR
133 FLIGHT PLANNING ROOM
134 QUIET
135 JANITOR
136 KITCHEN / BREAK
137 LOUNGE
138 TOILET / SHOWER
139 STORAGE BAY
140 PRE-SCREEN
141 VESTIBULE
142 MEN
143 WOMEN
144 POST-SCREEN
145 WOMEN
146 MEN
147 BREAK
148 DISPATCH
149 VAL SUPERVISOR
150 LOCKER
151 MECH
152 MECHANICAL
153 ELEC
154 UPS
155 AIRFIELD LIGHTS
156 BASE NODE
200 STAIR
201 CORRIDOR
201A EQUIP. CLOSET
202 RECEPTION
204 STORAGE
205 ATCO
207 NAVAIR EASU
208 FOD CELL
209 AOPS
210 CONFERENCE ROOM
210A KITCHEN
211 JAN
212 COMM
213 WOMEN'S
214 MEN'S
215 STAIR
216 CHIEF
217 MGYSGT
218 OSPO
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
E
F
R E
F
R E
F
R E
F
REF.REF.
FCO
S-2
S-2
FCO
4" SANITARY SEWER. INV ELE = 24.00'.
SEE CIVIL CU101 FOR CONTINUATION
P-411
A3
FD-1
MR-1
W28 4"ø SS
2"ø V
FCO W01
3"ø SS 2"ø V
W01
P-411
C3
F C
O
FCO
4"ø SS
FCO
4"ø SS
FCO
4"ø SS
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
FD-2
FD-2
FD-2
FD-2W14
W14
FD-2 W06
DWH-2
ST-2
ET-2
W05
W28
W05
W28
3"ø SS
S-3
4"ø SS
4"ø SS 2"ø V
W01
S-1
FD-1
MR-1
152 153 171
124 125 126 129 105 131 132 133
115 114
110113
4"ø SS
4"ø SS
3"ø SS
4"ø SS
2"ø V
1 1/2"ø V
W34 3"ø SS
M01
M01M01M01
M01M01
M01
INV. ELE = 27.08'
INV ELE = 26.50'
INV ELE = 26.50'
INV ELE = 26.42'
INV ELE = 24.83'
INV ELE = 24.75'
INV ELE = 26.50'
INV ELE = 25.92'
INV ELE = 26.42'
3"ø SS
INV ELE = 27.00'
INV ELE = 26.83'
INV ELE = 26.58'
FFD-1
3"ø SS
W38
W39
FD-2
INV ELE =
27.00'
INV ELE = 25.08'
VMF-2
V06
2"ø V
V11
V11
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND,
ABBREVIATIONS AND NOTES.
GENERAL NOTES
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-R A
N G
E -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:1
A
M
P-111
M
TR
A C
O N
P
LU
M
B
IN
G W
A S
TE
A
N D
V E
N T
P
LA
N
MFS
12801660
MAS MAS
1596300
1/8" = 1'-0" A1
MTRACON - PLUMBING - WASTE & VENT PLAN
PLAN
NORTH
4' 8' 16'0'
M01 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE.
V06 6" VAPOR MITIGATION VENT FROM BELOW AND UP.
V11 1/2" VAPOR MITIGATION THREADED BLACK STEEL PIPE
FROM BELOW UP TO SAMPLING PORT.
W01 2" SANITARY DOWN TO 3" BELOW SLAB AND 1 1/2" VENT UP.
W05 SANITARY ROUTED IN WALL.
W06 2" VENT FROM BELOW.
W14 2" VENT UP TO 3" VTR.
W28 2" SANITARY DOWN TO 3" BELOW SLAB AND 2" VENT UP.
W34 1 1/2" VENT FROM BELOW.
W38 1 1/2" SANITARY DOWN TO 3" BELOW SLAB. 1 1/2" VENT UP
FROM WATER FILTER STATION X10. WATER FILTER STATION
X10 TO BE PROVIDED AS PART OF FF&E.
W39 3" FUNNEL FLOOR DRAIN FOR ICE MAKER E9. ICE MAKER E9
TO BE PROVIDED AS PART OF FF&E.
ROOM SCHEDULE
101 CORRIDOR
102 ATCFO
103 ATC SNCOIC
104 ATC TRAINING OFFICE
105 COMM
106 ATC UNION OFFICE
107 ATC ADMIN STORAGE
108 ATCM STORAGE
109 TEST EQUIP.
110 STORAGE
111 JANITOR
112 ATC CONFERENCE ROOM
113 MOTHERS ROOM
114 MENS
115 WOMEN
116 ATC BREAK ROOM
117 FWO
118 ATC IFR ROOM
119 STARS SIMULATOR
120 LOCKERS
120 LOCKERS
121 ATCM SERVER
122 ATCM EQUIPMENT
122 ATCM EQUIPMENT
123 ATCM SUPPLY BAY
124 ATCM HAZMAT STORAGE
125 SUPPLY DESK
126 SET
127 ATCM BREAK ROOM
128 KITCHEN
129 VESTIBULE
130 ATCM CLASSROOM
131 ATCM UNION OFFICE
132 ATCM-SNOIC
133 ATCM-OIC
135 Room
141 ENTRANCE
142 OFFICE/OPS
143 RADIO STORAGE
143 RADIO STORAGE
144 OFFICE
144 OFFICE
144 OFFICE
145 CORRIDOR
146 CLASSROOM
147 STORAGE
148 WOMEN
149 MEN
149 RANGE CONTROL FACILITY
150 EQUIPMENT ROOM
151 RANGE CONTROL FACILITY
152 OFFICE
153 WOMEN
153 OFFICE
154 BREAK ROOM
155 JANITOR
155 OPEN OFFICE
156 JANITOR
157 STORAGE
158 OFFICE
159 OFFICE
160 OFFICE
161 OFFICE
171 MECHANICAL
172 UPS
173 ELECTRICAL
174 STORAGE
175 STORAGE
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
E
F
R E
F
R E
F
R E
F
REF.REF.
1 1/2"ø DCW
1"ø DHW
1/2"ø DHWR
S-2
MR-1
S-1
WH
WH
WH
3/4"ø DCW
3/4"ø DCW
3/4"ø DCW
3/4"ø DCW
WH
S-2
P-412
C3
1"ø DCW
P-412
C1
1 2 3 4 5 6 7 8
A
B
C
D
E
F
G
3/4"ø DHWR
2"ø DHW
2 1/2"ø DCW
2 1/2"ø DCW
2"ø DHW
3/4"ø DHWR
1"ø DCW
BLV-9
BLV-8
3/4"ø DHW
2 1/2"ø DCW 1 1/2"ø DCW 1 1/2"ø DHW 1/2"ø DHWR
1/2"ø DHW
1/2"ø DHW
B L
V -7
2"ø DCW
1 1/2"ø DHW
3/4"ø DHWR
P-412
A3
3/4"ø DCW
S-3
3/4"ø DCW
L11
L11
1/2"ø DCW
MR-1
L11
L11
L11
L11
124 125 126 129 105 131 132 133 102
106109
115 114
127 130
141 142 144
154 152 153 171
L25
2"ø DCW
2"ø DCW
2"ø DCW
2"ø DCW
IMB
L27
WH
1 1/2"ø DCW
2"ø DCW
L29
3/4"ø DHWR
1 1/2"ø DHW
2"ø DCW
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND,
ABBREVIATIONS AND NOTES.
GENERAL NOTES
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-R A
N G
E -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:1
A
M
P-112
M
TR
A C
O N
P
LU
M
B
IN
G S
U P
P
LY
P
LA
N
MFS
12801661
MAS MAS
1596300
1/8" = 1'-0" A1
MTRACON - PLUMBING - SUPPLY PLAN
PLAN
NORTH
4' 8' 16'0'
L11 1/2" DCW DOWN TO HUMIDIFIER.
L25 2" MAKE-UP WATER, PROVIDE EXPANSION FITTING
AT BUILDING INTERFACE. SEE SHEET P-121 FOR
CONTINUATION.
L27 1/2" DCW TO WATER FILTER STATION X10. WATER
FILTER STATION X10 TO BE PROVIDED AS PART OF
FF&E.
L29 1/2" DCW TO ICE MAKER BOX IMB FOR ICE MAKER
E9. ICE MAKER E9 TO BE PROVIDED AS PART OF
FF&E.
ROOM SCHEDULE
101 CORRIDOR
102 ATCFO
103 ATC SNCOIC
104 ATC TRAINING OFFICE
105 COMM
106 ATC UNION OFFICE
107 ATC ADMIN STORAGE
108 ATCM STORAGE
109 TEST EQUIP.
110 STORAGE
111 JANITOR
112 ATC CONFERENCE ROOM
113 MOTHERS ROOM
114 MENS
115 WOMEN
116 ATC BREAK ROOM
117 FWO
118 ATC IFR ROOM
119 STARS SIMULATOR
120 LOCKERS
120 LOCKERS
121 ATCM SERVER
122 ATCM EQUIPMENT
122 ATCM EQUIPMENT
123 ATCM SUPPLY BAY
124 ATCM HAZMAT STORAGE
125 SUPPLY DESK
126 SET
127 ATCM BREAK ROOM
128 KITCHEN
129 VESTIBULE
130 ATCM CLASSROOM
131 ATCM UNION OFFICE
132 ATCM-SNOIC
133 ATCM-OIC
135 Room
141 ENTRANCE
142 OFFICE/OPS
143 RADIO STORAGE
143 RADIO STORAGE
144 OFFICE
144 OFFICE
144 OFFICE
145 CORRIDOR
146 CLASSROOM
147 STORAGE
148 WOMEN
149 MEN
149 RANGE CONTROL FACILITY
150 EQUIPMENT ROOM
151 RANGE CONTROL FACILITY
152 OFFICE
153 WOMEN
153 OFFICE
154 BREAK ROOM
155 JANITOR
155 OPEN OFFICE
156 JANITOR
157 STORAGE
158 OFFICE
159 OFFICE
160 OFFICE
161 OFFICE
171 MECHANICAL
172 UPS
173 ELECTRICAL
174 STORAGE
175 STORAGE
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
3"ø SS
1 1/2"ø DCW
MR-1
4" SANITARY SEWER.
INV ELE = 24.83'. SEE
CIVIL CU101 FOR CONTINUATION
2" INCOMING DOMESTIC WATER
SERVICE. SEE CIVIL CU101 FOR
CONTINUATION
SP-2
DWH-3
FS-1
FS-1
DBP-1
RPZ-3
L07
W13
1"ø DCW
FCO
4"ø SS
3"ø SD
W17
W15
2"ø DCW
2"ø DCW
3/4" INCOMING
NATURAL GAS.
SEE CIVIL CU101
FOR CONTINUATION
3/4"ø G
L12
L12
M01
M01
M01
M01
L11
L24
INV ELE = 26.08'
INV ELE = 24.92'
INV ELE =
26.25'
INV ELE = 26.25'
W22
INV ELE = 26.25'
INV ELE = 26.17'
W07
FS-1
TPM-6
L08
3"ø SS
L10
L08L08
TPM-7
2"ø SSFM
SANITARY SEWER FORCE
MAIN. DISCHARGE 24"
MINIMUM ABOVE GRADE AND
PROVIDE SPLASH BLOCK
L30
HB
W41
1/2"ø DCW
V06
VMF-3
V11
NC
PRV SET TO 80 PSI
2"ø DCW
2"ø DCW
W10
L06
W16
2201 2204
3" VTR
6" VTR
W10
L06
W16
W10
W16
2702 FS-1
1/2"ø DCW
L11
PRV SET TO
60 PSI
L08
L10
TPM-8
WORK NOTES
3"ø SS
W09
W23
W24 L06
W22
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-A T
C -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:0
A
M
P-121
A
TC
T
P
LU
M B
IN
G
P
LA
N S
MFS
12801662
MAS MAS
1596300
1/4" = 1'-0" C1
PLUMBING PLAN - FLOOR 1
1/8" = 1'-0" C3
PLUMBING PLAN - FLOOR 2
1/8" = 1'-0" B1
PLUMBING PLAN - FLOOR 3
2' 4' 8'0' 1/4" =1'-0"
4' 8' 16'0' 1/8" =1'-0"
4' 8' 16'0' 1/8" =1'-0"
GENERAL NOTES
1. SEE SHEET P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
1/8" = 1'-0" A4
PLUMBING PLAN - LANDING 7
L06 1 1/2" DCW FROM BELOW AND UP.
L07 1 1/2" DCW UP.
L08 1/2" DCW FROM TRAP PRIMER.
L10 1/2" DCW DOWN TO ELECTRONIC TRAP PRIMER MANIFOLD.
L11 1/2" DCW DOWN TO HUMIDIFIER.
L12 1/2" NG DOWN TO BOILER.
L24 2" MAKE-UP WATER. SEE SHEET P-112 FOR CONTINUATION.
L30 3/4" DCW DOWN TO HOSE BIBB. MOUNT 24" ABOVE FINISHED FLOOR.
M01 MECHANICAL EQUIPMENT SHOWN FOR REFERENCE.
V06 6" VAPOR MITIGATION VENT FROM BELOW AND UP.
V11 1/2" VAPOR MITIGATION THREADED BLACK STEEL PIPE FROM
BELOW UP TO SAMPLING PORT.
W07 3" SANITARY DOWN AND 3" VENT UP.
W09 3" SANITARY FROM FLOOR SINK ABOVE.
W10 3" SANITARY FROM ABOVE AND DOWN.
W13 3" SANITARY FROM ABOVE.
W15 3" SD FROM ABOVE.
W16 3" SD FROM ABOVE AND DOWN.
W17 3" SD DISCHARGE TO LAMBS TONGUE 24" ABOVE GRADE.
W22 SANITARY ROUTED ABOVE CEILING.
W23 3" SANITARY FROM ABOVE AND DOWN. WITH 45 DEGREE OFFSET.
W24 3" STORM DRAIN FROM ABOVE AND DOWN WITH 45 DEGREE
OFFSET.
W41 PIPING TO BE SLEEVED THROUGH CONCRETE FOOTER.
ROOM SCHEDULE P-121
Number Name
2101 FP
2102 MECHANICAL
2103 CORRIDOR
2104 JANITOR
2105 ELECTRICAL
2106 STORAGE
2107 STAIRS
2108 ELEVATOR
2109 COMM
2110 VESTIBULE
2201 ELEVATOR
2203 STAIRS
2204 ADMIN
2301 ELEVATOR
2303 STAIRS
2304 SIMULATOR
2701 ELEVATOR
2702 CORRIDOR
2703 STAIRS
2704 COMM
1/8" = 1'-0" A3
PLUMBING PLAN - LANDING 6
NOTE: FLOORS 3, 4 AND 5 SIMILAR
4' 8' 16'0' 1/8" =1'-0"
PLAN
NORTH
4' 8' 16'0' 1/8" =1'-0"
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
S-1
DWH-6
W09
L05
W10
P-122
A1
W16
21001
21003
21004
21002
21005 21006
CO
1"ø DCW
L22 L27
3"ø SS
W22
PRV SET TO
60 PSI
3/4"ø DCW
W07 L31
FS-1
21104
W16
21107
21103
21102
2"ø SS
3/4"ø DCW
W25
CO
W25
CO
3"ø SD
3"ø SD
3"ø SD 1/2"ø DCW
3"ø V
1/2"ø DCW
L01
3" VENT THRU SIDE WALL.
PROVIDE BIRD SCREEN.
FS-1
3"ø V L11
L11
W27
1/2"ø DCW
PRV SET TO 60 PSI
L08
L08
TPM-9
L10
S-2
DWH-7
REFER TO QP-100
FOR UTILITY
CONNECTIONS
21205
CO
CO
W25W25
W25
W25
W26
W26
W26
W26
ROUTE DOWN
THRU MULLION
W35
W27ROUTE DOWN
THRU MULLION
L28
W03
1 1/2"ø V
WH
2"ø SD2"ø SD
2"ø SD
2"ø SD
W10
W16
L11
1/2"ø DCW
L06
PRV SET TO
60 PSI
CO
3"ø SS
CO
W08
W10
W12
W13W13
W16
W19
L06
WC-3 WC-3
L-2 L-2
DWH-5
DWH-4
W06
W12EWC-1
2"ø V 1"ø DCW
1"ø DCW
W093"ø SS
W22
W12
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
NOTES.
GENERAL NOTES
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-A T
C -C e n tr a l_ c w s o u th a ll.
rv t
/2
/2
:0
:1
A
M
P-122
A
TC
T
P
LU
M B
IN
G
P
LA
N S
MFS
12801663
MAS MAS
1596300
1/8" = 1'-0" C3
PLUMBING PLAN - FLOOR 10
1/8" = 1'-0" B1
PLUMBING PLAN - FLOOR 11
1/8" = 1'-0"
B2
PLUMBING PLAN - FLOOR 12
1/8" = 1'-0" C1
PLUMBING PLAN - FLOOR 8
1/8" = 1'-0"
C2
PLUMBING PLAN - FLOOR 9
1/4" = 1'-0" A1
PLUMBING ENLARGED PLAN
2' 4' 8'0'
1/4" =1'-0"
PLAN
NORTH
L01 1/2" DCW UP.
L05 1 1/2" DCW FROM BELOW AND 1" DCW UP.
L06 1 1/2" DCW FROM BELOW AND UP.
L08 1/2" DCW FROM TRAP PRIMER.
L10 1/2" DCW DOWN TO ELECTRONIC TRAP PRIMER MANIFOLD.
L11 1/2" DCW DOWN TO HUMIDIFIER.
L22 1/2" DCW FROM ABOVE.
L27 1/2" DCW TO WATER FILTER STATION X10. WATER FILTER STATION
X10 TO BE PROVIDED AS PART OF FF&E.
L28 3/4" DCW FROM BELOW.
L31 1" DCW FROM BELOW.
W03 2" SANITARY DOWN.
W06 2" VENT FROM BELOW.
W07 3" SANITARY DOWN AND 3" VENT UP.
W08 2" COMBINATION WASTE AND VENT FROM ABOVE.
W09 3" SANITARY FROM FLOOR SINK ABOVE.
W10 3" SANITARY FROM ABOVE AND DOWN.
W12 2" VENT UP.
W13 3" SANITARY FROM ABOVE.
W16 3" SD FROM ABOVE AND DOWN.
W19 2" SANITARY FROM ABOVE.
W22 SANITARY ROUTED ABOVE CEILING.
W25 2" STORM DRAIN FROM ABOVE.
W26 2" STORM DRAIN DOWN.
W27 3" VENT FROM BELOW.
W35 1 1/2" VENT UP.
ROOM SCHEDULE P-122
2801 ELEVATOR
2802 CORRIDOR
2803 STAIRS
2804 SIMULATOR
2901 ELEVATOR
2902 CORRIDOR
2903 STAIRS
2904 CAB ADMIN
21001 ELEVATOR
21002 CORRIDOR
21003 STAIRS
21004 BREAKROOM
21005 TOILET
21006 TOILET
21102 CORRIDOR
21103 STAIRS
21104 MECHANICAL ROOM
21107 ELEV EQUIP
21205 CAB
4' 8' 16'0' 1/8" =1'-0"
PLAN
NORTH
4' 8' 16'0' 1/8" =1'-0"
PLAN
NORTH
4' 8' 16'0' 1/8" =1'-0"
PLAN
NORTH
4' 8' 16'0' 1/8" =1'-0"
PLAN
NORTH
4' 8' 16'0' 1/8" =1'-0"
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEALSEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
L-1
L-1
L-1
L-1
L-1
L-1
UR-2
WC-1
WC-2
WC-1
WC-1
WC-2
FD-1 FD-1
EWC-1
1 1/2"ø V
2"ø V
2"ø V
2"ø SS
2"ø SS
4"ø SS
4"ø SS
W06
W06
W02
W14
WCO
105104
3"ø SS
3"ø SS
1 1/2"ø V
2"ø SS
3"ø V
SH-2
MR-1
SH-2
S-2
WC-2L-3
FD-1
FD-1
FD-1
FCO
L-1
WC-2
WCO
WCO
MR-1
4"ø SS 4"ø SS
4"ø SS
4"ø SS
4"ø SS
3"ø SS
2"ø V
W05
W18
W02
W01
2"ø V
INV ELE = 24.00'
INV ELE = 23.83'
INV ELE = 23.67'
4"ø SS
3"ø SS
W37
2"ø VV11
2"ø V
4"ø SS
W02
143142
WC-2 WC-2
L-2 L-2 WC-2
WC-2
L-2
L-2
WCO
WCO
S-2
EWC-1
4"ø SS 2"ø V
2"ø V
4"ø SS
4"ø SS
4"ø SS
1 1/2"ø V
4"ø SS
W02
W06
W02
W06W06
W06
W06W062"ø V
W14
2"ø V
FFD-1
W02
4"ø SS
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND, ABBREVIATIONS
AND NOTES.
GENERAL NOTES
WORK NOTES
L-1 W C
-1
W C
-2
WC-2
U R
-2
EWC-1
L-1
W C
O
W02
W32
4"ø SS
1 1/2"ø V
3"ø V
W06
2"ø V
W06
W18
FD-1
FD-1
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:5
A
M
P-401
P
LU
M B
IN
G
E N
LA
R
G E
D W
A S
T E
A N
D V
E N
T P
LA
N
S
MFS
12801664
MAS MAS
1596300
1/4" = 1'-0" C1
PLUMBING ENLARGED WASTE & VENT PLAN ROOMS 104 & 105
1/4" = 1'-0"
C3
PLUMBING ENLARGED WASTE & VENT PLAN ROOMS 130 & 138
1/4" = 1'-0" A3
PLUMBING ENLARGED WASTE & VENT PLAN ROOMS 142, 143, 145 & 146
V11 1/2" VAPOR MITIGATION THREADED BLACK STEEL PIPE FROM
BELOW UP TO SAMPLING PORT.
W01 2" SANITARY DOWN TO 3" BELOW SLAB AND 1 1/2" VENT UP.
W02 4" SANITARY DOWN AND 2" VENT UP.
W05 SANITARY ROUTED IN WALL.
W06 2" VENT FROM BELOW.
W14 2" VENT UP TO 3" VTR.
W18 3" VENT UP TO 3" VTR.
W32 2" SANITARY DOWN AND 1 1/2" VENT UP.
W37 3" HUB DRAIN FOR COUNTERTOP ICE MAKER E10. ICE MAKER E10
TO BE PROVIDED AS PART OF FF&EFOR COUNTEROP ICE MAKER.
PLAN
NORTH
2' 4' 8'0'
PLAN
NORTH
2' 4' 8'0'
PLAN
NORTH
2' 4' 8'0'1/4" = 1'-0" A1
PLUMBING ENLARGED WASTE & VENT PLAN ROOMS 213 & 214
PLAN
NORTH
2' 4' 8'0'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
WC-2 WC-2
L-2 L-2 WC-2
WC-2
L-2
L-2
S-2 146
WHA-A
WHA-A
1"ø DCW
WHA-B
WHA-A
1/2"ø DHWR
1"ø DHW 1 1/2"ø DCW
1/2"ø DHW
1 1/2"ø DCW
IMB
L-1
L-1
L-1
L-1
L-1
L-1
UR-2
WC-1
WC-2
WC-1
WC-1
WC-2
EWC-1
3/4"ø DHW 3/4"ø DCW
1 1/2"ø DCW
2"ø DCW
1"ø DHW
2"ø DCW
3/4"ø DHWR
1"ø DHW
1/2"ø DHW 1/2"ø DCW
3/4"ø DHWR
L20L20
WHA-C
WHA-A
L09
137130
SH-2
MR-1
SH-2
S-2
WC-2
L-3
L-3
WC-2
MR-1
3/4"ø DHW
3/4"ø DCW
3/4"ø DHW
1 1/2"ø DCW
1 1/2"ø DCW 1 1/2"ø DHW
1 1/2"ø DCW
1 1/2"ø DHW
1"ø DHW
WHA-A
WHA-A
IMB
1 1/2"ø DHW
2"ø DCW
L09
L09
L08
L08
L08
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND, ABBREVIATIONS
AND NOTES.
GENERAL NOTES
WORK NOTES
EWC-1
L-1
WC-1
WC-2
WC-2UR-2
L-1
1 1/2"ø DCW 2"ø DCW
WHA-A
WHA-C
L19L19
L09
L08
L08
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-O P
S -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:5
A
M
P-402
P
LU
M B
IN
G
E N
LA
R
G E
D S
U P
P
LY
P
LA
N S
MFS
12801665
MAS MAS
1596300
1/4" = 1'-0" C1
PLUMBING ENLARGED SUPPLY PLAN ROOMS 142, 143, 145 & 146
1/4" = 1'-0" A3
PLUMBING ENLARGED SUPPLY PLAN ROOMS 104 & 105
1/4" = 1'-0" C3
PLUMBING ENLARGED SUPPLY PLAN ROOMS 130 & 138
PLAN
NORTH
2' 4' 8'0'
PLAN
NORTH
2' 4' 8'0'
PLAN
NORTH
2' 4' 8'0'1/4" = 1'-0" A1
PLUMBING ENLARGED SUPPLY PLAN ROOMS 213 & 214
PLAN
NORTH
2' 4' 8'0'
L08 1/2" DCW FROM TRAP PRIMER.
L09 1/2" DCW DOWN TO PRESSURE ACTUATED TRAP PRIMER.
L19 2" DCW AND 1/2" DHW FROM BELOW.
L20 1/2" DCW FROM TRAP PRIMER.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
WC-2
WC-2
SH-2
SH-1
SH-2
SH-1
WC-1
WC-1
WC-1
UR-1
UR-2
WC-1
L-1
L-1
L-1
L-1
L-1
L-1
L-1
EWC-1
WCO
FD-1
FD-1
FD-1
4"ø SS 4"ø SS
4"ø SS
4"ø SS
4"ø SS
3"ø SS
3"ø SS
3"ø SS
3"ø SS
2"ø SS
2"ø V
2"ø SS
2"ø V
2"ø V
3"ø V
2"ø V
2"ø V
2"ø V
2"ø V
W06
W06
W06
W18
3"ø V
FCO
FCO
W06
W06
W28
114115
WC-2
WC-2
WC-1
UR-2L-1L-1
L-1L-1
EWC-1
W C
O
FD-1
FD-1
4"ø SS
4"ø SS
W02
WC-1
WC-1
F C
O2"ø V
2"ø V
4"ø SS
4"ø SS
4"ø SS
FCO
W14W06
W06
1 1/2"ø V
2"ø V
FCO
INV ELE = 27.08'
INV ELE = 27.00'
INV ELE = 27.25'
INV ELE = 27.00'
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND,
ABBREVIATIONS AND NOTES.
GENERAL NOTES
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-R A
N G
E -C e n tr a l_ m a s te v e n s b u rn s m c d .c o m
.r v t
/1
/2
:5
:1
A
M
P-411
P
LU
M B
IN
G
E N
LA
R
G E
D W
A S
T E
V
E N
T P
LA
N
S
MFS
12801666
MAS MAS
1596300
1/4" = 1'-0" A3
PLUMBING - ENLARGED WASTE & VENT PLAN ROOMS 114 & 115
1/4" = 1'-0" C3
PLUMBING - ENLARGED WASTE & VENT PLAN ROOMS 153 & 154
PLAN
NORTH
2' 4' 8'0'
PLAN
NORTH
2' 4' 8'0'
W02 4" SANITARY DOWN AND 2" VENT UP.
W06 2" VENT FROM BELOW.
W14 2" VENT UP TO 3" VTR.
W18 3" VENT UP TO 3" VTR.
W28 2" SANITARY DOWN TO 3" BELOW SLAB
AND 2" VENT UP.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/1 8/
SEAL
CHARLES WESLEY SOUTHALL
M C O M
ON
WE
ALT
H OF VIRG
IN
IA
O
N
E
NS
FES
AION L E
GI
Lic. No.053647P
ST-2
DWH-2
RPZ-2
3" INCOMING DOMESTIC
WATER SERVICE. SEE CIVIL
CU101 FOR CONTINUATION
2 1/2"ø DCW
2 1/2"ø DCW
TMS-2
ET-2
3"ø DCW
2 1/2"ø DCW
1 1/2"ø DHW
1/2"ø DHWR
3/4"ø DHWR 2"ø DHW
2 1/2"ø DCW
L08L08
L08
TPM-4
TPM-5
L08L08
3/4" INCOMING NATURAL
GAS SERVICE. SEE CIVIL
CU101 FOR CONTINUATION
1/2"ø DHWR
3/4"ø DHWR
2"ø DHW
3/4"ø G
3/4"ø G
1/2"ø G
3/4"ø G
2"ø DCW
L26
M01 M01
M01
M01M01
M01
M01
L12
L12
BLV-10BLV-11
L08
L10
2"ø DHW
L10
L30
3/4"ø DCW
HB
BFP-2
BFP
A1
P-503
WC-2
WC-2
SH-1
SH-2
WC-1
WC-1
WC-1
UR-1
UR-2
WC-1
L-1
L-1
L-1EWC-1
L-1
L-1
SH-2
1 1/2"ø DHW
1 1/2"ø DCW 1/2"ø DHWR
3/4"ø DHW
1 1/2"ø DHW
3/4"ø DHW 3/4"ø DCW
1 1/2"ø DCW
WHA-A
WHA-C
2 1/2"ø DCW
2"ø DCW 2 1/2"ø DCW
2 1/2"ø DCW
1 1/2"ø DCW
3/4"ø DCW
1/2"ø DHW
1/2"ø DHW
L09
L08
L08 L08
WHA-A
WC-2
WC-2WC-1
UR-2
L-1 L-1
L09
L-1 L-1
WC-1
WC-1
WHA-C
1 1/2"ø DCW 2"ø DCW
2"ø DCW
3/4"ø DHW
1/2"ø DHW
2"ø DCW
WHA-A
EWC-1
L08
L08
1. REFER TO DRAWING P-001 FOR PLUMBING LEGEND,
ABBREVIATIONS AND NOTES.
GENERAL NOTES
WORK NOTES
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
M
A R
IN
E
C O
R P
S I P
T N
A V
A L
S T
A T
IO
N
N
O R
F O
L K
V
A
EJA
M C
A S
C H
E R
R Y
P O
IN
T
C H
E R
R Y
P O
IN
T
N
C
AS NOTED
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
F Y
P
-2 A
T C
T O
W E
R A
N D
A
IR
O P
E R
A T
IO
N
S
DRAWFORM REVISION: 12 APRIL 2018
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
F
IL
E N
A M
E
P
LO
T T
E D
CJC/KDB
ALG
DSN
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
C
R e v it P ro je c ts
\B L D
G -P
-1
-P
-R A
N G
E -C e n tr a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .