EXIT DIAGRAM
NOTES:
1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.
2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE.
3. AGGREGATE SIZE MUST BE IN ACCORDANCE WITH NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (NCDOT CLASS A STONE
2"-6").
4. GRAVEL PAD MUST HAVE A MINIMUM THICKNESS OF 6".
5. PAD WIDTH MUST BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.
6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%..
7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.
8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP
OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE).
9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY
CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT.
10. MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
6" M
IN
6" M
IN
50' MIN.
20' MIN.
FLOW
FLOW
ENTRANCE ELEVATION
(IF NEEDED)
1'
MI
N.
2'
MA
X.
NOTE:
1. INSTALL HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS OVER ALL
BLOCK OPENINGS TO HOLD GRAVEL IN PLACE.
2. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM
DRAIN. THE FIRST ROW OF BLOCKS WILL BE PLACED HERE FOR LATERAL SUPPORT.
3. ONE BLOCK (AS SHOWN) IS TO BE PLACED ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE
BOTTOM ROW TO ALLOW FOR POOL DRAINAGE.
FOUNDATION SET 2" BELOW
CREST OF STORM DRAIN
SEDIMENT DROP INLET
W/ GRATE
TEMPORARY
SEDIMENT POOL
GRAVEL CLEAN NCDOT #57
DEWATERING
RUNOFF WATER
WITH SEDIMENT
WIRE SCREEN
BLOCK AND GRAVEL SECTION
WIRE SCREEN
DROP INLET GRATE
GRAVEL FILTER SHOULD
HAVE SLOPE OF 2:1
CONCRETE BLOCK
DEWATERING
BLOCK AND GRAVEL PERSPECTIVE
10 MIL. PLASTIC LINING
LATH & FLAGGING
ON ALL SIDES
SANDBAG
(TYP.)
A A
10' MIN.
VA
RI
ES
3'
10 MIL. PLASTIC
LINING
SANDBAG
BERM
1. THE CONTRACTOR MUST PROVIDE A DESIGNATED AREA FOR CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS, AND THE REAR OF THE VEHICLES. THIS AREA MUST HAVE A CONCRETE WASHOUT FACILITY AND BE CONSTRUCTED ACCORDING TO THE
DETAIL SHOWN.
2. THE CONCRETE WASHOUT FACILITY BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR WATER BODIES.
3. DO NOT DISPOSE OF EXCESS CONCRETE ON SITE. WASHOUT DISCHARGE FROM THE CLEANING OF CONCRETE TRUCKS, TOOLS, AND OTHER
EQUIPMENT NOT BE DISCHARGED INTO STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS.
4. TRANSPORT ALL EXCESS CONCRETE OFF-SITE AND DISPOSED OF PROPERLY.
5. IT IS PROHIBITED TO WASHOUT THE MIXING DRUM OF CONCRETE TRUCKS ON-SITE.
PLAN SECTION A-A
NOTES:
C1 CONCRETE WASHOUT AREA
NTS C3 BLOCK AND GRAVEL INLET PROTECTION
NTS
A1 CRUSHED STONE CONSTRUCTION EXIT
NTS A3 SILT FENCE
NTS
4. GRAVEL MUST BE NCDOT WASHED #57 STONE.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
IS
SU
ED
F
OR
B
ID
/18
/22
CE501
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
A 08/18/22
NOTES:
1. INSTALL FILTER AFTER ANY
ASPHALT PAVEMENT INSTALLATION.
2. WRAP 8" CONCRETE BLOCKS IN
FILTER FABRIC AND SPAN ACROSS
CATCH BASIN INLET.
3. FACE OPENINGS IN BLOCKS
OUTWARD.
4. LEAVE A GAP OF APPROXIMATELY
4 INCHES BETWEEN THE CURB
AND THE FILTERS TO ALLOW FOR
OVERFLOW TO PREVENT
HAZARDOUS PONDING.
5. INSTALL OUTLET PROTECTION
BELOW STORM DRAIN OUTLETS.
PAVEMENT
8" CONCRETE
BLOCK WRAPPED
IN FILTER FABRIC
CATCH BASIN
GUTTER
SECTION B-B
FLOW
GUTTER
8" CONCRETE BLOCK
WRAPPED IN FILTER FABRIC
CURBING
CATCH BASIN
B
FLOW
PAVEMENT
4"
PLAN
B
SECTION PLAN
NOTES:
1. ALL MATERIAL TO MEET SPECIFICATIONS. COMPOST FILTER SOCK TO BE
SILTSOXXTM BY FILTREXX OR APPROVED EQUAL.
2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS.
COMPOST FILTER SOCK (12")
AREA TO BE PROTECTEDWORK AREA
WORK AREA
AREA TO BE PROTECTED
COMPOST FILTER SOCK
WATER FLOW
PAVEMENT SURFACE
CONCRETE BLOCK (10' O.C.)
CONCRETE BLOCK (10' O.C.)
C1 COMPOST SOCK
NTS
C3 INLET PROTECTION (CURB INLET)
NTS
MIN. 8' - 1
0'
SECTION A-A
A
PLAN
A
NC DOT #5 OR #57
WASHED STONE CLASS B RIPRAP
A3 FILTER RING
NTS
A1 TEMPORARY DIVERSION
NTS
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
IS
SU
ED
F
OR
B
ID
CE502
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
N
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
IS
SU
ED
F
OR
B
ID
CE503
EROSION AND SEDIMENT
CONTROL NOTES
1. MANAGE CONSTRUCTION MATERIALS THAT POSE A POTENTIAL
CONTAMINATION THREAT TO STORM WATER TO MINIMIZE EXPOSURE TO
STORM WATER. KEEP MATERIALS IN SECURE CONTAINERS AND PROPERLY
LABELED. PROPERLY DISPOSE OF SOLID AND LIQUID WASTE AND OTHER
WASTES IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL
DISPOSAL REQUIREMENTS. DISPOSAL MUST BE CONSISTENT WITH
APPLICABLE STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY SEWER OR
SEPTIC SYSTEM REGULATIONS AND PROVIDE FOR THE PROPER DISPOSAL
OF CONTAMINATED SOILS TO THE EXTENT THESE ARE LOCATED WITHIN
THE PERMITTED AREA.
2. HANDLING CONSTRUCTION CHEMICALS. PERFORM MIXING, PUMPING,
TRANSFERRING OR OTHER HANDLING OF CONSTRUCTION CHEMICALS
SUCH AS FERTILIZER, LIME, ASPHALT, CONCRETE DRYING COMPOUNDS,
AND ALL OTHER POTENTIALLY HAZARDOUS MATERIALS IN AN AREA AWAY
FROM ANY WATERCOURSE, DITCH OR STORM DRAIN.
3. THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED ON
SITE DURING THE CONSTRUCTION PROJECT:
A. AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED
TO DO THE JOB.
B. ALL MATERIALS STORED ON SITE WILL BE STORED IN A NEAT, ORDERLY
MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER
A ROOF OR OTHER ENCLOSURE.
C. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
MANUFACTURER'S LABEL. SUBSTANCES WILL NOT BE MIXED WITH ONE
ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER.
D. WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE
DISPOSING OF THE CONTAINER.
E. THE MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND
DISPOSAL WILL BE FOLLOWED.
4. AT NO TIME WILL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS
OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN
MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF
BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
5. PROPERLY MAINTAIN ALL EROSION AND SEDIMENT BMPS UNTIL THE SITE IS
PERMANENTLY STABILIZED. MAINTENANCE MUST INCLUDE INSPECTIONS
OF ALL EROSION & SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A
WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK,
INCLUDING CLEANOUT, REPAIR, RE-PLACEMENT, RE-GRADING,
RE-SEEDING, RE-MULCHING, AND RE-NETTING MUST BE PERFORMED
IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED,
REPLACEMENT BMPS, OR MODIFICATION OF THOSE INSTALLED WILL BE
REQUIRED.
6. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING
THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT
POLLUTION, IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO
ELIMINATE THE POTENTIAL FOR ACCELERATED EROSION AND/OR
SEDIMENT POLLUTION.
7. KEEP A SUPPLY OF EROSION CONTROL MATERIAL (SILT FENCE, JUTE MESH,
RIP RAP, ETC.) ON-SITE FOR MAINTENANCE AND EMERGENCY REPAIRS.
8. OBTAIN ALL REGULATORY AGENCY PERMITS REQUIRED FOR THE SITE
PRIOR TO SITE WORK COMMENCES.
9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UNDERGROUND
UTILITIES. USE A THIRD PARTY FOR PRIVATE UTILITY LOCATING AS
NECESSARY. SILT FENCE TO BE PLACED OFFSET FROM UTILITY
LOCATIONS.
10. PERMANENTLY STABILIZE BY SEEDING PER PLANS. SPOILS TO BE PLACED
AROUND EXISTING STRUCTURES AND EQUIPMENT.
11. ANY OFF-SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST
COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE
REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED
BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM
DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST
BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID
WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT
OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS.
12. ADDITIONAL MEASURES MAY BE REQUIRED. THE CONTRACTOR IS
RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE
APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE
INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS
NECESSARY TO STOP SEDIMENT FROM LEAVING THIS SITE.
13. PROVIDE EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION
IN ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION MUST
ONLY BE FOR AREAS WITHIN THE DELINEATED LIMITS OF WORK. CALL
“NC811” AT 1-800-632-4949 48 HOURS PRIOR TO THE START OF WORK. WHEN
SAME DAY STABILIZATION IS APPROVED:
A. PLACE EXCAVATED TRENCH MATERIAL ON THE HIGH SIDE OF THE
TRENCH.
B. BACKFILL, COMPACT, AND STABILIZE TRENCHES FOR UTILITY
INSTALLATION AT THE END OF EACH WORKING DAY. OPEN NO MORE
TRENCH THAN CAN BE COMPLETED THE SAME DAY.
14. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, COMPLETE
PERMANENT OR TEMPORARY STABILIZATION WITHIN:
A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER
CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL
SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND
B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED
AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.
1. TEMPORARY GROUND COVER TO BE INSTALLED WITHIN SEVEN DAYS OF
STOPPING GRADING ACTIVITY AT ANY PHASE OF CONSTRUCTION.
1.1. BASH (BIRD AIRCRAFT STRIKE HAZARD) AREAS: MULCH CRIMPLED
IN-PLACE.
1.2. NON-BASH AREAS: BELOW SEEDING
1.2.1. MAY - JULY: GERMAN MILLET
1.2.2. AUGUST - APRIL: RYE GRAIN (NOT ANNUAL RYE GRASS)
2. PERMANENT GROUND COVER TO BE INSTALLED WITHIN SEVEN DAYS OF
COMPLETION OF FINAL GRADING.
2.1. BASH AREAS: PREFERRED APPLICATION IS CENTIPEDE SOD.
HOWEVER, THE FOLLOWING SEEDING SPECIFICATION MAY BE USED:
2.1.1. JANUARY - MARCH: MIXTURE (40% FESCUE, 40% UNHULLED
BERMUDA, 20% CENTIPEDE)
2.1.2. APRIL - AUGUST: MIXTURE (50% HULLED BERMUDA, 30%
CENTIPEDE, 20% BAHIA)
2.1.3. SEPTEMBER - DECEMBER: MIXTURE (60% FESCUE, 40%
UNHULLED BERMUDA)
2.2. NON-BASH AREAS: BELOW SEEDING, BASH SEEDING MAY ALSO BE
USED:
2.2.1. SEPTEMBER - MAY: CENTIPEDE GRASS
2.2.2. JUNE: BERMUDA GRASS
2.2.3. JULY - AUGUST: NO APPLICATION
3. FERTILIZE TEMPORARY SEEDING AS REQUIRED BY AN INDEPENDENT
SOIL ANALYSIS. INSPECT SEED WEEKLY AND PROVIDE WATER AS
NEEDED FOR GERMINATION. AFTER GERMINATION, WATER AT 1-INCH PER
WEEK UNTIL FIRST MOWING.
4. EXAMINE AREAS TO RECEIVE SEED FOR COMPLIANCE WITH
REQUIREMENTS AND FOR CONDITIONS AFFECTING PERFORMANCE OF
WORK AND ESTABLISHMENT. DO NOT PROCEED WITH INSTALLATION
UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
5. DISPOSE OF ANY GROWTH, ROCKS, OR OTHER OBSTRUCTIONS WHICH
MIGHT INTERFERE WITH SEEDING OR LATER MAINTENANCE OPERATIONS.
REMOVE STONES OVER 38MM (1 1/2 INCHES) IN ANY DIMENSION AND
STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER.
6. GRADE SEED AREAS TO A SMOOTH, EVEN SURFACE WITH LOOSE,
UNIFORMLY FINE TEXTURE. ROLL AND RAKE, REMOVE RIDGES AND FILL
DEPRESSIONS TO MEET FINISH GRADES. DO NOT USE WET SEED OR
SEED WHICH IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR
STORAGE.
7. SOW SEED WITH A BRILLION TYPE SEEDING MACHINE OR WHERE
APPLICABLE AND RESTRICTED BY STEEP SLOPES OR OTHER AREAS NOT
ACCESSIBLE TO THE SEEDING MACHINE, BROADCAST OR DROP SEED
METHODS MAY BE USED. DO NOT BROADCAST OR DROP SEED WHEN
WIND VELOCITY EXCEEDS 5 MPH. EVENLY DISTRIBUTE SEED BY SOWING
EQUAL QUANTITIES IN 2 DIRECTIONS AT RIGHT ANGLES TO EACH OTHER,
AND 3 DIRECTIONS IN HIGH MAINTENANCE AREAS.
8. RAKE, HARROW OR OTHERWISE WORK THE SEED INTO THE SOIL 1/4" TO
1/2" DEEP. KEEP THE AREA WELL- WATERED UNTIL THE SEEDS
GERMINATE AND THE SEEDLINGS HAVE GROWN SUFFICIENTLY TO
ESTABLISH A LAWN, THEN WATER AS NEEDED.
9. MOW GRASS TO A HEIGHT OF 50MM (2 INCHES) AS SOON AS THERE IS
ENOUGH TOP GROWTH TO CUT WITH MOWER. REMOVE NO MORE THAN
40% OF GRASS LEAF GROWTH IN INITIAL OR SUBSEQUENT MOWINGS. DO
NOT DELAY MOWING UNTIL GRASS BLADES BEND OVER AND BECOME
MATTED.
TEMPORARY STABILIZATION
AREAS REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS:
FOR ALL CONSTRUCTION ACTIVITIES, ANY
DISTURBED AREA, INCLUDING SOIL STOCKPILES WITHIN SEVEN (7) DAYS OF THE MOST RECENT
THAT WILL BE DORMANT FOR MORE THAN DISTURBANCE WITHIN THE AREA.
FOURTEEN (14) DAYS BUT LESS THAN NINETY (90)
DAYS, AND NOT WITHIN FIFTY (50) FEET OF A STREAM.
DISTURBED AREA THAT WILL BE PRIOR TO THE ONSET OF WINTER
IDLE OVER WINTER WEATHER/NOVEMBER 1ST.
NOTES:
WHERE VEGETATIVE STABILIZATION TECHNIQUES MAY CAUSE STRUCTURAL INSTABILITY OR ARE OTHERWISE UNOBTAINABLE, ALTERNATIVE STABILIZATION TECHNIQUES MUST BE EMPLOYED. THESE TECHNIQUES MAY INCLUDE MULCHING OR EROSION MATTING.OR NO MORE THAN 90 CALENDAR DAYS
(WHICHEVER IS SHORTER).
1. INSTALL EROSION AND SEDIMENT CONTROL (E&SC) DEVICES IN
ACCORDANCE WITH THE PLAN DRAWINGS.
2. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL
DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY (EVERY
7 CALENDAR DAYS) AND WITHIN 24 HRS. OF ONE-INCH RAIN EVENT. IT
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE
INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED
EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING.
TO FACILITATE RAINFALL MONITORING, A RAIN GAUGE IS REQUIRED TO
BE ON SITE. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR
CONDUCTING "SELF-INSPECTIONS INDICATING THE DATE BMPS ARE
INSTALLED AND STABILIZATION MEASURES (SEEDING/MULCHING/ OR
SOD) ARE INITIATED. BOTH INSPECTIONS ARE RECORDED ON THE SAME
REPORT FORM AND MUST BE MAINTAINED BY THE CONTRACTOR AT THE
ONSITE OFFICE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED
INSPECTION RECORDS ARE TO BE FORWARDED TO EAD AND ALL
TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES REMOVED.
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE
WITH ALL PERMITS AND PLANS, ANY CHANGES WILL BE APPROVED BY
THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND
SEDIMENTATION (ES) CONTROL PLAN, ES LETTER OF APPROVAL, NPDES
CONSTRUCTION PERMIT, AND NPDES CERTIFICATE OF COVERAGE WILL
BE MAINTAINED BY THE CONTRACTOR AT THE ONSITE OFFICE. IF SOIL IS
REMOVED FROM OR BROUGHT ONSITE, THE APPLICABLE EROSION
SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE
DISCLOSED.
3. REPAIR OR REPLACE INEFFECTIVE E&SC MEASURES IMMEDIATELY
AFTER IDENTIFICATION OR AS SOON AS WEATHER CONDITIONS ALLOW.
4. IDENTIFY AND INSTALL ADDITIONAL TEMPORARY E&SC DEVICES IN
AREAS DEEMED IN NEED OF PROTECTION.
5. REMOVE SEDIMENT FROM INLET PROTECTION DEVICES ONCE SEDIMENT
HAS REACHED 1/3 THE HEIGHT OF THE STRUCTURE.
6. REMOVE SEDIMENT FROM BEHIND SILT FENCE AS NECESSARY TO
PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO
REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING
THE FENCE DURING CLEANOUT.
7. REMOVE SEDIMENT AND RESTORE SEDIMENT TRAPS TO ORIGINAL
DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF
THE DESIGN DEPTH OF THE TRAP. PLACE SEDIMENT IN DESIGNATED
DISPOSAL AREA, AND REPLACE GRAVEL FACING THAT IS IMPAIRED BY
SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR
PIPING. ENSURE SPILLWAY REMAINS A MINIMUM OF 1.5 FEET BELOW THE
EMBANKMENT LOW POINT. REPLACE DISPLACED RIPRAP IMMEDIATELY.
REMOVE STRUCTURE AND ALL UNSTABLE SEDIMENT AFTER PERMANENT
STABILIZATION, AND SMOOTH AREA TO BLEND WITH ADJOINING AREAS.
8. PERFORM DAILY INSPECTIONS AND REMOVAL OF TRACKED MATERIAL
FROM THE PROJECT SITE ONTO ADJACENT ROADS.
9. MAINTAIN WRITTEN INSPECTION AND REPAIR OR REPLACEMENT FORMS
ON SITE AT ALL TIMES FOR E&SC MEASURES.
10. A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN, LETTER OF
APPROVAL, AND NPDES CONSTRUCTION PERMIT WILL BE MAINTAINED ON
SITE AT ALL TIMES.
11. MAINTAIN THE GRAVEL CONSTRUCTION ENTRANCE IN A CONDITION TO
PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE.
THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER
EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT
AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL
OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO
PUBLIC ROADWAYS.
12. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING
"SELF INSPECTIONS" INDICATING THE DATE BMPs ARE INSTALLED AND
STABILIZATION MEASURES (SEEDING/MULCHING OR SOD) ARE INITIATED.
THE "SELF INSPECTION" REPORTS WILL BE MAINTAINED ALONG WITH THE
"NPDES" INSPECTION REPORTS. BOTH INSPECTIONS ARE RECORDED ON
THE SAME REPORT FORM AND MUST BE MAINTAINED BY THE
CONTRACTOR AT THE ONSITE OFFICE. ONCE STABILIZATION HAS BEEN
ACCOMPLISHED INSPECTION RECORDS ARE TO BE FORWARDED TO EAD
AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES
REMOVED.
13. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE
WITH ALL PERMITS AND PLANS, ANY CHANGES WILL BE APPROVED BY
THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND
SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL, AND NPDES
CONSTRUCTION PERMIT WILL BE MAINTAINED BY THE CONTRACTOR AT
THE ONSITE OFFICE. IF SOIL IS REMOVED FROM OR BROUGHT ONSITE,
THE APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER, EROSION
SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE
DISCLOSED.
PERMANENT/TEMPORARY SEEDING,
FERTILIZING AND MULCHING NOTES
1. OBTAIN APPROVAL OF PLAN AND ANY NECESSARY PERMITS AND HOLD A
PRE-CONSTRUCTION CONFERENCE PRIOR TO COMMENCING ANY WORK.
WORK AT THE EXISTING ATCT SITE MAY NOT BEGIN UNTIL THE AIR OPS AND
ATCT/MTRACON FACILITIES ARE OPERATIONAL AND IN-USE AND WITH
CONTRACTING OFFICER APPROVAL.
2. FLAG THE WORK LIMITS.
3. INSTALL GRAVEL CONSTRUCTION ENTRANCES, PERIMETER SECURITY AND
EROSION CONTROL MEASURES AND INLET PROTECTION DEVICES FOR
EXISTING STORM DRAINAGE SYSTEMS.
4. DEMOLISH EXISTING FACILITIES AT AIR OPS AND ATCT/MTRACON SITES.
5. CLEAR AND GRUB VEGETATED AREAS AT ATCT/MTRACON SITE.
6. CONSTRUCT DRAINAGE SWALES, PRIOR TO ROUGH GRADING THE SITES.
STOCKPILE TOPSOIL AS NECESSARY.
7. INSTALL STORM SEWER CONVEYANCE PIPE AND STRUCTURES AND INLET
PROTECTION DEVICES.
8. FINAL GRADE, INSTALL ALL OTHER UTILITIES, INCLUDING BUT NOT LIMITED TO
WATER, SEWER, GAS, COMMUNICATIONS, ELECTRICAL POWER AND SITE
LIGHTING. VEGETATIVELY STABILIZE AREAS WHERE BUILDING CONSTRUCTION
IS NOT IMMINENT.
9. FLUSH STORM DRAIN NETWORKS OF SEDIMENT.
10. UPON COMPLETION OF CONSTRUCTION THE ENTRANCE DRIVES, PARKING
AND CIRCULATION AREAS ARE TO BE PAVED, AND ALL AREAS PERMANENTLY
VEGETATIVELY STABILIZED WITH CENTIPEDE SOD.
11. AFTER SITE STABILIZATION, TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES ARE TO BE REMOVED.
MAINTENANCE AND INSPECTION NOTES SEQUENCE OF CONSTRUCTION
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
IS
SU
ED
F
OR
B
ID
CE504
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
IS
SU
ED
F
OR
B
ID
CE505
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
| CE501 - EROSION CONTROL DETAILS - 1 |
| CE502 - EROSION CONTROL DETAILS - 2 |
| CE503 - EROSION CONTROL NOTES |
| CE504 - EROSION CONTROL DETAILS - 3 |
| CE505 - EROSION CONTROL DETAILS - 4 |
2022-08-15T07:00:38-0400
2022-08-15T07:00:51-0400
2022-08-15T07:00:54-0400
2022-08-15T07:00:54-0400
2022-08-15T07:00:55-0400
| 2022-09-22T08:57:35-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:57:51-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:57:52-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:57:53-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:57:54-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:58:07-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:58:27-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:58:28-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:58:29-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:58:29-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .