1596300_dwg_11of35_V1_Civil.pdf

PDF 16 MB Posted

Attached to
Design Bid-Build P228 ATC Tower and Air Operations, Marine Corps Air Station, Cherry Point, North Carolina
Solicitation number
N4008522R2504
Issued by

View the file

Other files

File Type Posted
AMEND 0010 UPDATED WAGE DETERMINATION FOR P228.pdf PDF
AMENDMENT 0011 FOR P228 ATC TOWER.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008.pdf PDF
AMENDMENT 0007 FOR P228.pdf PDF
UPDATED REVISED BID SCHEDULE FOR P228.pdf PDF
AMENDMENT 0006 FOR P228.pdf PDF
PPI LOG 04 FOR P228.pdf PDF
AMENDMENT 0005 FOR P228.pdf PDF
UPDATED BID SCHEDULE FOR P228.pdf PDF
P228 PPI LOG 03.pdf PDF
P228 AMENDMENT 0004.pdf PDF
PPI LOG 02 FOR P228.pdf PDF
P228 AMENDMENT 0003.pdf PDF
P228 AMENDMENT 0003 DOCUMENT FOR PPI 4-7.pdf PDF
P228 AMENDMENT 0002.pdf PDF
AMENDMENT 0002-DRAWING REFERENCES.pdf PDF
P228 PPI LOG 01.pdf PDF
AMENDMENT 0001 FOR P228.pdf PDF
Site Visit Log P228.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1596300_dwg_24of35_V2_Architectural.pdf PDF
1596300_dwg_16of35_V1_Civil.pdf PDF
1596300_dwg_28of35_V3_Equipment.pdf PDF
1596300_dwg_05of35_V1_Civil.pdf PDF
1596300_dwg_14of35_V1_Civil.pdf PDF
1596300_dwg_33of35_V4_Electrical.pdf PDF
1596300_dwg_12of35_V1_Civil.pdf PDF
1596300_dwg_06of35_V1_Civil.pdf PDF
1596300_dwg_21of35_V1_Landscape.pdf PDF
RFP FOR P228 ATC TOWER.pdf PDF
1596300_dwg_23of35_V2_Structural.pdf PDF
1596300_dwg_01of35_V1_General.pdf PDF
1596300_dwg_22of35_V2_General.pdf PDF
Attachment A - Pre-Propsal Injuiries Log.doc DOC document
1596300_dwg_17of35_V1_Civil.pdf PDF
1596300_dwg_09of35_V1_Civil.pdf PDF
1596300_dwg_15of35_V1_Civil.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
1596300_dwg_04of35_V1_Survey-Geotechnical.pdf PDF
1596300_dwg_34of35_V4_Telecommunications.pdf PDF
1596300_dwg_26of35_V2_Interiors.pdf PDF
USCG MULTI-USE COMPLEX - 00 01 15 LIST OF DRAWINGS 100422.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
ATTACHMENT B BID SCHEDULE FOR P228 ATC TOWER.pdf PDF
JA ML-23-07 CHPT P228 Fire Protection_Redacted.pdf PDF
Attachment H- PIEE Vendor Access Instructions.pdf PDF
1596300_dwg_35of35_V4_Telecommunications.pdf PDF
1596300_dwg_27of35_V3_General.pdf PDF
1596300_spc01of01.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXIT DIAGRAM

NOTES:

1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.

2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE.

3. AGGREGATE SIZE MUST BE IN ACCORDANCE WITH NCDEQ EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (NCDOT CLASS A STONE

2"-6").

4. GRAVEL PAD MUST HAVE A MINIMUM THICKNESS OF 6".

5. PAD WIDTH MUST BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.

6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%..

7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.

8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP

OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE).

9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY

CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT.

10. MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.

6" M

IN

6" M

IN

50' MIN.

20' MIN.

FLOW

FLOW

ENTRANCE ELEVATION

(IF NEEDED)

1'

MI

N.

2'

MA

X.

NOTE:

1. INSTALL HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2 INCH OPENINGS OVER ALL

BLOCK OPENINGS TO HOLD GRAVEL IN PLACE.

2. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST OF THE STORM

DRAIN. THE FIRST ROW OF BLOCKS WILL BE PLACED HERE FOR LATERAL SUPPORT.

3. ONE BLOCK (AS SHOWN) IS TO BE PLACED ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE

BOTTOM ROW TO ALLOW FOR POOL DRAINAGE.

FOUNDATION SET 2" BELOW

CREST OF STORM DRAIN

SEDIMENT DROP INLET

W/ GRATE

TEMPORARY

SEDIMENT POOL

GRAVEL CLEAN NCDOT #57

DEWATERING

RUNOFF WATER

WITH SEDIMENT

WIRE SCREEN

BLOCK AND GRAVEL SECTION

WIRE SCREEN

DROP INLET GRATE

GRAVEL FILTER SHOULD

HAVE SLOPE OF 2:1

CONCRETE BLOCK

DEWATERING

BLOCK AND GRAVEL PERSPECTIVE

10 MIL. PLASTIC LINING

LATH & FLAGGING

ON ALL SIDES

SANDBAG

(TYP.)

A A

10' MIN.

VA

RI

ES

3'

10 MIL. PLASTIC

LINING

SANDBAG

BERM

1. THE CONTRACTOR MUST PROVIDE A DESIGNATED AREA FOR CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER CHUTES, HOPPERS, AND THE REAR OF THE VEHICLES. THIS AREA MUST HAVE A CONCRETE WASHOUT FACILITY AND BE CONSTRUCTED ACCORDING TO THE

DETAIL SHOWN.

2. THE CONCRETE WASHOUT FACILITY BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAINS, OPEN DITCHES, OR WATER BODIES.

3. DO NOT DISPOSE OF EXCESS CONCRETE ON SITE. WASHOUT DISCHARGE FROM THE CLEANING OF CONCRETE TRUCKS, TOOLS, AND OTHER

EQUIPMENT NOT BE DISCHARGED INTO STORM DRAINS, OPEN DITCHES, STREETS, OR STREAMS.

4. TRANSPORT ALL EXCESS CONCRETE OFF-SITE AND DISPOSED OF PROPERLY.

5. IT IS PROHIBITED TO WASHOUT THE MIXING DRUM OF CONCRETE TRUCKS ON-SITE.

PLAN SECTION A-A

NOTES:

C1 CONCRETE WASHOUT AREA

NTS C3 BLOCK AND GRAVEL INLET PROTECTION

NTS

A1 CRUSHED STONE CONSTRUCTION EXIT

NTS A3 SILT FENCE

NTS

4. GRAVEL MUST BE NCDOT WASHED #57 STONE.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FY

P -2

A

TC

T

O W

E R

A N

D A

IR

O

P E

R A

TI

O

N S

1317 EXECUTIVE BLVD.

SUITE 300

CHESAPEAKE, VA 23320

IS

SU

ED

F

OR

B

ID

/18

/22

CE501

SAT-TO FORM SIGNED BY

DON ELLIOT 12/19/19

PR

OFESS I ONAL

ENG I N E E R

NO

RTH CAROL I NA

CASS NDRA L Z WART

SEAL

049323

A 08/18/22

NOTES:

1. INSTALL FILTER AFTER ANY

ASPHALT PAVEMENT INSTALLATION.

2. WRAP 8" CONCRETE BLOCKS IN

FILTER FABRIC AND SPAN ACROSS

CATCH BASIN INLET.

3. FACE OPENINGS IN BLOCKS

OUTWARD.

4. LEAVE A GAP OF APPROXIMATELY

4 INCHES BETWEEN THE CURB

AND THE FILTERS TO ALLOW FOR

OVERFLOW TO PREVENT

HAZARDOUS PONDING.

5. INSTALL OUTLET PROTECTION

BELOW STORM DRAIN OUTLETS.

PAVEMENT

8" CONCRETE

BLOCK WRAPPED

IN FILTER FABRIC

CATCH BASIN

GUTTER

SECTION B-B

FLOW

GUTTER

8" CONCRETE BLOCK

WRAPPED IN FILTER FABRIC

CURBING

CATCH BASIN

B

FLOW

PAVEMENT

4"

PLAN

B

SECTION PLAN

NOTES:

1. ALL MATERIAL TO MEET SPECIFICATIONS. COMPOST FILTER SOCK TO BE

SILTSOXXTM BY FILTREXX OR APPROVED EQUAL.

2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS.

COMPOST FILTER SOCK (12")

AREA TO BE PROTECTEDWORK AREA

WORK AREA

AREA TO BE PROTECTED

COMPOST FILTER SOCK

WATER FLOW

PAVEMENT SURFACE

CONCRETE BLOCK (10' O.C.)

CONCRETE BLOCK (10' O.C.)

C1 COMPOST SOCK

NTS

C3 INLET PROTECTION (CURB INLET)

NTS

MIN. 8' - 1

0'

SECTION A-A

A

PLAN

A

NC DOT #5 OR #57

WASHED STONE CLASS B RIPRAP

A3 FILTER RING

NTS

A1 TEMPORARY DIVERSION

NTS

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FY

P -2

A

TC

T

O W

E R

A N

D A

IR

O

P E

R A

TI

O

N S

1317 EXECUTIVE BLVD.

SUITE 300

CHESAPEAKE, VA 23320

IS

SU

ED

F

OR

B

ID

CE502

DON ELLIOT 12/19/19

PR

OFESS I ONAL

ENG I N E E R

NO

RTH CAROL I NA

CASS NDRA L Z WART

SEAL

049323

N

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FY

P -2

A

TC

T

O W

E R

A N

D A

IR

O

P E

R A

TI

O

N S

1317 EXECUTIVE BLVD.

SUITE 300

CHESAPEAKE, VA 23320

IS

SU

ED

F

OR

B

ID

CE503

EROSION AND SEDIMENT

CONTROL NOTES

1. MANAGE CONSTRUCTION MATERIALS THAT POSE A POTENTIAL

CONTAMINATION THREAT TO STORM WATER TO MINIMIZE EXPOSURE TO

STORM WATER. KEEP MATERIALS IN SECURE CONTAINERS AND PROPERLY

LABELED. PROPERLY DISPOSE OF SOLID AND LIQUID WASTE AND OTHER

WASTES IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL

DISPOSAL REQUIREMENTS. DISPOSAL MUST BE CONSISTENT WITH

APPLICABLE STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY SEWER OR

SEPTIC SYSTEM REGULATIONS AND PROVIDE FOR THE PROPER DISPOSAL

OF CONTAMINATED SOILS TO THE EXTENT THESE ARE LOCATED WITHIN

THE PERMITTED AREA.

2. HANDLING CONSTRUCTION CHEMICALS. PERFORM MIXING, PUMPING,

TRANSFERRING OR OTHER HANDLING OF CONSTRUCTION CHEMICALS

SUCH AS FERTILIZER, LIME, ASPHALT, CONCRETE DRYING COMPOUNDS,

AND ALL OTHER POTENTIALLY HAZARDOUS MATERIALS IN AN AREA AWAY

FROM ANY WATERCOURSE, DITCH OR STORM DRAIN.

3. THE FOLLOWING GOOD HOUSEKEEPING PRACTICES WILL BE FOLLOWED ON

SITE DURING THE CONSTRUCTION PROJECT:

A. AN EFFORT WILL BE MADE TO STORE ONLY ENOUGH PRODUCT REQUIRED

TO DO THE JOB.

B. ALL MATERIALS STORED ON SITE WILL BE STORED IN A NEAT, ORDERLY

MANNER IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER

A ROOF OR OTHER ENCLOSURE.

C. PRODUCTS WILL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE

MANUFACTURER'S LABEL. SUBSTANCES WILL NOT BE MIXED WITH ONE

ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER.

D. WHENEVER POSSIBLE, ALL OF A PRODUCT WILL BE USED UP BEFORE

DISPOSING OF THE CONTAINER.

E. THE MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND

DISPOSAL WILL BE FOLLOWED.

4. AT NO TIME WILL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS

OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN

MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF

BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.

5. PROPERLY MAINTAIN ALL EROSION AND SEDIMENT BMPS UNTIL THE SITE IS

PERMANENTLY STABILIZED. MAINTENANCE MUST INCLUDE INSPECTIONS

OF ALL EROSION & SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A

WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK,

INCLUDING CLEANOUT, REPAIR, RE-PLACEMENT, RE-GRADING,

RE-SEEDING, RE-MULCHING, AND RE-NETTING MUST BE PERFORMED

IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED,

REPLACEMENT BMPS, OR MODIFICATION OF THOSE INSTALLED WILL BE

REQUIRED.

6. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING

THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT

POLLUTION, IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO

ELIMINATE THE POTENTIAL FOR ACCELERATED EROSION AND/OR

SEDIMENT POLLUTION.

7. KEEP A SUPPLY OF EROSION CONTROL MATERIAL (SILT FENCE, JUTE MESH,

RIP RAP, ETC.) ON-SITE FOR MAINTENANCE AND EMERGENCY REPAIRS.

8. OBTAIN ALL REGULATORY AGENCY PERMITS REQUIRED FOR THE SITE

PRIOR TO SITE WORK COMMENCES.

9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UNDERGROUND

UTILITIES. USE A THIRD PARTY FOR PRIVATE UTILITY LOCATING AS

NECESSARY. SILT FENCE TO BE PLACED OFFSET FROM UTILITY

LOCATIONS.

10. PERMANENTLY STABILIZE BY SEEDING PER PLANS. SPOILS TO BE PLACED

AROUND EXISTING STRUCTURES AND EQUIPMENT.

11. ANY OFF-SITE BORROW AND WASTE REQUIRED FOR THIS PROJECT MUST

COME FROM A SITE WITH AN APPROVED EROSION CONTROL PLAN, A SITE

REGULATED UNDER THE MINING ACT OF 1971, OR A LANDFILL REGULATED

BY THE DIVISION OF SOLID WASTE MANAGEMENT. TRASH/DEBRIS FROM

DEMOLITION ACTIVITIES OR GENERATED BY ANY ACTIVITIES ON SITE MUST

BE DISPOSED OF AT A FACILITY REGULATED BY THE DIVISION OF SOLID

WASTE MANAGEMENT OR PER DIVISION OF SOLID WASTE MANAGEMENT

OR DIVISION OF WATER RESOURCES RULES AND REGULATIONS.

12. ADDITIONAL MEASURES MAY BE REQUIRED. THE CONTRACTOR IS

RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON-SITE. IF THE

APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE

INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS

NECESSARY TO STOP SEDIMENT FROM LEAVING THIS SITE.

13. PROVIDE EROSION AND SEDIMENT CONTROL FOR UTILITY CONSTRUCTION

IN ACCORDANCE WITH APPROVED PLANS. UTILITY CONSTRUCTION MUST

ONLY BE FOR AREAS WITHIN THE DELINEATED LIMITS OF WORK. CALL

“NC811” AT 1-800-632-4949 48 HOURS PRIOR TO THE START OF WORK. WHEN

SAME DAY STABILIZATION IS APPROVED:

A. PLACE EXCAVATED TRENCH MATERIAL ON THE HIGH SIDE OF THE

TRENCH.

B. BACKFILL, COMPACT, AND STABILIZE TRENCHES FOR UTILITY

INSTALLATION AT THE END OF EACH WORKING DAY. OPEN NO MORE

TRENCH THAN CAN BE COMPLETED THE SAME DAY.

14. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, COMPLETE

PERMANENT OR TEMPORARY STABILIZATION WITHIN:

A. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER

CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL

SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND

B. SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR GRADED

AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING.

1. TEMPORARY GROUND COVER TO BE INSTALLED WITHIN SEVEN DAYS OF

STOPPING GRADING ACTIVITY AT ANY PHASE OF CONSTRUCTION.

1.1. BASH (BIRD AIRCRAFT STRIKE HAZARD) AREAS: MULCH CRIMPLED

IN-PLACE.

1.2. NON-BASH AREAS: BELOW SEEDING

1.2.1. MAY - JULY: GERMAN MILLET

1.2.2. AUGUST - APRIL: RYE GRAIN (NOT ANNUAL RYE GRASS)

2. PERMANENT GROUND COVER TO BE INSTALLED WITHIN SEVEN DAYS OF

COMPLETION OF FINAL GRADING.

2.1. BASH AREAS: PREFERRED APPLICATION IS CENTIPEDE SOD.

HOWEVER, THE FOLLOWING SEEDING SPECIFICATION MAY BE USED:

2.1.1. JANUARY - MARCH: MIXTURE (40% FESCUE, 40% UNHULLED

BERMUDA, 20% CENTIPEDE)

2.1.2. APRIL - AUGUST: MIXTURE (50% HULLED BERMUDA, 30%

CENTIPEDE, 20% BAHIA)

2.1.3. SEPTEMBER - DECEMBER: MIXTURE (60% FESCUE, 40%

UNHULLED BERMUDA)

2.2. NON-BASH AREAS: BELOW SEEDING, BASH SEEDING MAY ALSO BE

USED:

2.2.1. SEPTEMBER - MAY: CENTIPEDE GRASS

2.2.2. JUNE: BERMUDA GRASS

2.2.3. JULY - AUGUST: NO APPLICATION

3. FERTILIZE TEMPORARY SEEDING AS REQUIRED BY AN INDEPENDENT

SOIL ANALYSIS. INSPECT SEED WEEKLY AND PROVIDE WATER AS

NEEDED FOR GERMINATION. AFTER GERMINATION, WATER AT 1-INCH PER

WEEK UNTIL FIRST MOWING.

4. EXAMINE AREAS TO RECEIVE SEED FOR COMPLIANCE WITH

REQUIREMENTS AND FOR CONDITIONS AFFECTING PERFORMANCE OF

WORK AND ESTABLISHMENT. DO NOT PROCEED WITH INSTALLATION

UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.

5. DISPOSE OF ANY GROWTH, ROCKS, OR OTHER OBSTRUCTIONS WHICH

MIGHT INTERFERE WITH SEEDING OR LATER MAINTENANCE OPERATIONS.

REMOVE STONES OVER 38MM (1 1/2 INCHES) IN ANY DIMENSION AND

STICKS, ROOTS, RUBBISH, AND OTHER EXTRANEOUS MATTER.

6. GRADE SEED AREAS TO A SMOOTH, EVEN SURFACE WITH LOOSE,

UNIFORMLY FINE TEXTURE. ROLL AND RAKE, REMOVE RIDGES AND FILL

DEPRESSIONS TO MEET FINISH GRADES. DO NOT USE WET SEED OR

SEED WHICH IS MOLDY OR OTHERWISE DAMAGED IN TRANSIT OR

STORAGE.

7. SOW SEED WITH A BRILLION TYPE SEEDING MACHINE OR WHERE

APPLICABLE AND RESTRICTED BY STEEP SLOPES OR OTHER AREAS NOT

ACCESSIBLE TO THE SEEDING MACHINE, BROADCAST OR DROP SEED

METHODS MAY BE USED. DO NOT BROADCAST OR DROP SEED WHEN

WIND VELOCITY EXCEEDS 5 MPH. EVENLY DISTRIBUTE SEED BY SOWING

EQUAL QUANTITIES IN 2 DIRECTIONS AT RIGHT ANGLES TO EACH OTHER,

AND 3 DIRECTIONS IN HIGH MAINTENANCE AREAS.

8. RAKE, HARROW OR OTHERWISE WORK THE SEED INTO THE SOIL 1/4" TO

1/2" DEEP. KEEP THE AREA WELL- WATERED UNTIL THE SEEDS

GERMINATE AND THE SEEDLINGS HAVE GROWN SUFFICIENTLY TO

ESTABLISH A LAWN, THEN WATER AS NEEDED.

9. MOW GRASS TO A HEIGHT OF 50MM (2 INCHES) AS SOON AS THERE IS

ENOUGH TOP GROWTH TO CUT WITH MOWER. REMOVE NO MORE THAN

40% OF GRASS LEAF GROWTH IN INITIAL OR SUBSEQUENT MOWINGS. DO

NOT DELAY MOWING UNTIL GRASS BLADES BEND OVER AND BECOME

MATTED.

TEMPORARY STABILIZATION

AREAS REQUIRING TEMPORARY STABILIZATION TIME FRAME TO APPLY EROSION CONTROLS:

FOR ALL CONSTRUCTION ACTIVITIES, ANY

DISTURBED AREA, INCLUDING SOIL STOCKPILES WITHIN SEVEN (7) DAYS OF THE MOST RECENT

THAT WILL BE DORMANT FOR MORE THAN DISTURBANCE WITHIN THE AREA.

FOURTEEN (14) DAYS BUT LESS THAN NINETY (90)

DAYS, AND NOT WITHIN FIFTY (50) FEET OF A STREAM.

DISTURBED AREA THAT WILL BE PRIOR TO THE ONSET OF WINTER

IDLE OVER WINTER WEATHER/NOVEMBER 1ST.

NOTES:

WHERE VEGETATIVE STABILIZATION TECHNIQUES MAY CAUSE STRUCTURAL INSTABILITY OR ARE OTHERWISE UNOBTAINABLE, ALTERNATIVE STABILIZATION TECHNIQUES MUST BE EMPLOYED. THESE TECHNIQUES MAY INCLUDE MULCHING OR EROSION MATTING.OR NO MORE THAN 90 CALENDAR DAYS

(WHICHEVER IS SHORTER).

1. INSTALL EROSION AND SEDIMENT CONTROL (E&SC) DEVICES IN

ACCORDANCE WITH THE PLAN DRAWINGS.

2. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION CONTROL

DEVICES AND STORM WATER OUTFALLS BE INSPECTED WEEKLY (EVERY

7 CALENDAR DAYS) AND WITHIN 24 HRS. OF ONE-INCH RAIN EVENT. IT

WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE

INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS STABILIZED

EVIDENT BY 95% VEGETATIVE GROWTH FOR AREAS PROVIDED SEEDING.

TO FACILITATE RAINFALL MONITORING, A RAIN GAUGE IS REQUIRED TO

BE ON SITE. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR

CONDUCTING "SELF-INSPECTIONS INDICATING THE DATE BMPS ARE

INSTALLED AND STABILIZATION MEASURES (SEEDING/MULCHING/ OR

SOD) ARE INITIATED. BOTH INSPECTIONS ARE RECORDED ON THE SAME

REPORT FORM AND MUST BE MAINTAINED BY THE CONTRACTOR AT THE

ONSITE OFFICE. ONCE STABILIZATION HAS BEEN ACCOMPLISHED

INSPECTION RECORDS ARE TO BE FORWARDED TO EAD AND ALL

TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES REMOVED.

THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE

WITH ALL PERMITS AND PLANS, ANY CHANGES WILL BE APPROVED BY

THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND

SEDIMENTATION (ES) CONTROL PLAN, ES LETTER OF APPROVAL, NPDES

CONSTRUCTION PERMIT, AND NPDES CERTIFICATE OF COVERAGE WILL

BE MAINTAINED BY THE CONTRACTOR AT THE ONSITE OFFICE. IF SOIL IS

REMOVED FROM OR BROUGHT ONSITE, THE APPLICABLE EROSION

SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE

DISCLOSED.

3. REPAIR OR REPLACE INEFFECTIVE E&SC MEASURES IMMEDIATELY

AFTER IDENTIFICATION OR AS SOON AS WEATHER CONDITIONS ALLOW.

4. IDENTIFY AND INSTALL ADDITIONAL TEMPORARY E&SC DEVICES IN

AREAS DEEMED IN NEED OF PROTECTION.

5. REMOVE SEDIMENT FROM INLET PROTECTION DEVICES ONCE SEDIMENT

HAS REACHED 1/3 THE HEIGHT OF THE STRUCTURE.

6. REMOVE SEDIMENT FROM BEHIND SILT FENCE AS NECESSARY TO

PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO

REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING

THE FENCE DURING CLEANOUT.

7. REMOVE SEDIMENT AND RESTORE SEDIMENT TRAPS TO ORIGINAL

DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF

THE DESIGN DEPTH OF THE TRAP. PLACE SEDIMENT IN DESIGNATED

DISPOSAL AREA, AND REPLACE GRAVEL FACING THAT IS IMPAIRED BY

SEDIMENT. CHECK THE STRUCTURE FOR DAMAGE FROM EROSION OR

PIPING. ENSURE SPILLWAY REMAINS A MINIMUM OF 1.5 FEET BELOW THE

EMBANKMENT LOW POINT. REPLACE DISPLACED RIPRAP IMMEDIATELY.

REMOVE STRUCTURE AND ALL UNSTABLE SEDIMENT AFTER PERMANENT

STABILIZATION, AND SMOOTH AREA TO BLEND WITH ADJOINING AREAS.

8. PERFORM DAILY INSPECTIONS AND REMOVAL OF TRACKED MATERIAL

FROM THE PROJECT SITE ONTO ADJACENT ROADS.

9. MAINTAIN WRITTEN INSPECTION AND REPAIR OR REPLACEMENT FORMS

ON SITE AT ALL TIMES FOR E&SC MEASURES.

10. A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN, LETTER OF

APPROVAL, AND NPDES CONSTRUCTION PERMIT WILL BE MAINTAINED ON

SITE AT ALL TIMES.

11. MAINTAIN THE GRAVEL CONSTRUCTION ENTRANCE IN A CONDITION TO

PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE.

THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER

EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT

AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL

OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO

PUBLIC ROADWAYS.

12. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR CONDUCTING

"SELF INSPECTIONS" INDICATING THE DATE BMPs ARE INSTALLED AND

STABILIZATION MEASURES (SEEDING/MULCHING OR SOD) ARE INITIATED.

THE "SELF INSPECTION" REPORTS WILL BE MAINTAINED ALONG WITH THE

"NPDES" INSPECTION REPORTS. BOTH INSPECTIONS ARE RECORDED ON

THE SAME REPORT FORM AND MUST BE MAINTAINED BY THE

CONTRACTOR AT THE ONSITE OFFICE. ONCE STABILIZATION HAS BEEN

ACCOMPLISHED INSPECTION RECORDS ARE TO BE FORWARDED TO EAD

AND ALL TEMPORARY EROSION/SEDIMENTATION CONTROL DEVICES

REMOVED.

13. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE

WITH ALL PERMITS AND PLANS, ANY CHANGES WILL BE APPROVED BY

THE STATE PRIOR TO EXECUTION. A COPY OF THE EROSION AND

SEDIMENTATION CONTROL PLAN, LETTER OF APPROVAL, AND NPDES

CONSTRUCTION PERMIT WILL BE MAINTAINED BY THE CONTRACTOR AT

THE ONSITE OFFICE. IF SOIL IS REMOVED FROM OR BROUGHT ONSITE,

THE APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER, EROSION

SEDIMENTATION PERMIT NUMBER OR MINE PERMIT NUMBER WILL BE

DISCLOSED.

PERMANENT/TEMPORARY SEEDING,

FERTILIZING AND MULCHING NOTES

1. OBTAIN APPROVAL OF PLAN AND ANY NECESSARY PERMITS AND HOLD A

PRE-CONSTRUCTION CONFERENCE PRIOR TO COMMENCING ANY WORK.

WORK AT THE EXISTING ATCT SITE MAY NOT BEGIN UNTIL THE AIR OPS AND

ATCT/MTRACON FACILITIES ARE OPERATIONAL AND IN-USE AND WITH

CONTRACTING OFFICER APPROVAL.

2. FLAG THE WORK LIMITS.

3. INSTALL GRAVEL CONSTRUCTION ENTRANCES, PERIMETER SECURITY AND

EROSION CONTROL MEASURES AND INLET PROTECTION DEVICES FOR

EXISTING STORM DRAINAGE SYSTEMS.

4. DEMOLISH EXISTING FACILITIES AT AIR OPS AND ATCT/MTRACON SITES.

5. CLEAR AND GRUB VEGETATED AREAS AT ATCT/MTRACON SITE.

6. CONSTRUCT DRAINAGE SWALES, PRIOR TO ROUGH GRADING THE SITES.

STOCKPILE TOPSOIL AS NECESSARY.

7. INSTALL STORM SEWER CONVEYANCE PIPE AND STRUCTURES AND INLET

PROTECTION DEVICES.

8. FINAL GRADE, INSTALL ALL OTHER UTILITIES, INCLUDING BUT NOT LIMITED TO

WATER, SEWER, GAS, COMMUNICATIONS, ELECTRICAL POWER AND SITE

LIGHTING. VEGETATIVELY STABILIZE AREAS WHERE BUILDING CONSTRUCTION

IS NOT IMMINENT.

9. FLUSH STORM DRAIN NETWORKS OF SEDIMENT.

10. UPON COMPLETION OF CONSTRUCTION THE ENTRANCE DRIVES, PARKING

AND CIRCULATION AREAS ARE TO BE PAVED, AND ALL AREAS PERMANENTLY

VEGETATIVELY STABILIZED WITH CENTIPEDE SOD.

11. AFTER SITE STABILIZATION, TEMPORARY EROSION AND SEDIMENT CONTROL

MEASURES ARE TO BE REMOVED.

MAINTENANCE AND INSPECTION NOTES SEQUENCE OF CONSTRUCTION

SAT-TO FORM SIGNED BY

DON ELLIOT 12/19/19

PR

OFESS I ONAL

ENG I N E E R

NO

RTH CAROL I NA

CASS NDRA L Z WART

SEAL

049323

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FY

P -2

A

TC

T

O W

E R

A N

D A

IR

O

P E

R A

TI

O

N S

1317 EXECUTIVE BLVD.

SUITE 300

CHESAPEAKE, VA 23320

IS

SU

ED

F

OR

B

ID

CE504

DON ELLIOT 12/19/19

PR

OFESS I ONAL

ENG I N E E R

NO

RTH CAROL I NA

CASS NDRA L Z WART

SEAL

049323

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

FY

P -2

A

TC

T

O W

E R

A N

D A

IR

O

P E

R A

TI

O

N S

1317 EXECUTIVE BLVD.

SUITE 300

CHESAPEAKE, VA 23320

IS

SU

ED

F

OR

B

ID

CE505

DON ELLIOT 12/19/19

PR

OFESS I ONAL

ENG I N E E R

NO

RTH CAROL I NA

CASS NDRA L Z WART

SEAL

049323

CE501 - EROSION CONTROL DETAILS - 1
CE502 - EROSION CONTROL DETAILS - 2
CE503 - EROSION CONTROL NOTES
CE504 - EROSION CONTROL DETAILS - 3
CE505 - EROSION CONTROL DETAILS - 4

2022-08-15T07:00:38-0400

2022-08-15T07:00:51-0400

2022-08-15T07:00:54-0400

2022-08-15T07:00:54-0400

2022-08-15T07:00:55-0400

2022-09-22T08:57:35-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:57:51-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:57:52-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:57:53-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:57:54-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:58:07-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:58:27-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:58:28-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:58:29-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-09-22T08:58:29-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .