View the file

Other files

File Type Posted
AMEND 0010 UPDATED WAGE DETERMINATION FOR P228.pdf PDF
AMENDMENT 0011 FOR P228 ATC TOWER.pdf PDF
Amendment 0008.pdf PDF
AMENDMENT 0007 FOR P228.pdf PDF
UPDATED REVISED BID SCHEDULE FOR P228.pdf PDF
AMENDMENT 0006 FOR P228.pdf PDF
PPI LOG 04 FOR P228.pdf PDF
AMENDMENT 0005 FOR P228.pdf PDF
UPDATED BID SCHEDULE FOR P228.pdf PDF
P228 PPI LOG 03.pdf PDF
P228 AMENDMENT 0004.pdf PDF
PPI LOG 02 FOR P228.pdf PDF
P228 AMENDMENT 0003.pdf PDF
P228 AMENDMENT 0003 DOCUMENT FOR PPI 4-7.pdf PDF
P228 AMENDMENT 0002.pdf PDF
AMENDMENT 0002-DRAWING REFERENCES.pdf PDF
P228 PPI LOG 01.pdf PDF
AMENDMENT 0001 FOR P228.pdf PDF
Site Visit Log P228.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1596300_dwg_24of35_V2_Architectural.pdf PDF
1596300_dwg_16of35_V1_Civil.pdf PDF
1596300_dwg_28of35_V3_Equipment.pdf PDF
1596300_dwg_05of35_V1_Civil.pdf PDF
1596300_dwg_14of35_V1_Civil.pdf PDF
1596300_dwg_33of35_V4_Electrical.pdf PDF
1596300_dwg_12of35_V1_Civil.pdf PDF
1596300_dwg_06of35_V1_Civil.pdf PDF
1596300_dwg_21of35_V1_Landscape.pdf PDF
RFP FOR P228 ATC TOWER.pdf PDF
1596300_dwg_23of35_V2_Structural.pdf PDF
1596300_dwg_01of35_V1_General.pdf PDF
1596300_dwg_22of35_V2_General.pdf PDF
Attachment A - Pre-Propsal Injuiries Log.doc DOC document
1596300_dwg_17of35_V1_Civil.pdf PDF
1596300_dwg_09of35_V1_Civil.pdf PDF
1596300_dwg_15of35_V1_Civil.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
1596300_dwg_04of35_V1_Survey-Geotechnical.pdf PDF
1596300_dwg_34of35_V4_Telecommunications.pdf PDF
1596300_dwg_26of35_V2_Interiors.pdf PDF
USCG MULTI-USE COMPLEX - 00 01 15 LIST OF DRAWINGS 100422.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
ATTACHMENT B BID SCHEDULE FOR P228 ATC TOWER.pdf PDF
JA ML-23-07 CHPT P228 Fire Protection_Redacted.pdf PDF
Attachment H- PIEE Vendor Access Instructions.pdf PDF
1596300_dwg_35of35_V4_Telecommunications.pdf PDF
1596300_dwg_11of35_V1_Civil.pdf PDF
1596300_dwg_27of35_V3_General.pdf PDF
1596300_spc01of01.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to correct FAR 52.211-10, w hich w as incorrectly posted in Amendment 0008. The proposal due date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Dec-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008522R2504

X 9B. DATED (SEE ITEM 11)

14-Nov-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Dec-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522R2504

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use in phases:

Phase 1a: Demolition of B-1790 and construction of Air Traffic Control Tower. Demolition and construction of work will commence within 15 calendar days of notice to proceed. The Air Traffic Control Tower will be complete not later than 850 calendar days from notice to proceed.

Phase 1a: Demolition of B-131 and construction of Air Operations Facility. Demolition and construction of work will begin no earlier than 8 JUN 2023, once B131 has been vacated, and will be completed not later than 850 calendar days from the date that B-131 is vacated.

Phase 2: Existing tower demolition will begin 180 calendar days after the New Air Traffic Control Tower is complete and turned over to the government for outfitting. Demolition of the existing tower is to be completed within 240 calendar days of the notice to proceed for Phase 2.

The time stated for completion shall include final cleanup of the premises., If any or all options are exercised, with the exception of CLIN 0003 Option No. 02 for the demolition of the existing tower, the contract completion date remains the same as that of the base price work, as the work required by these options can be performed concurrent to the base work.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .