1596300_dwg_09of35_V1_Civil.pdf
PDF 8 MB Posted
- Attached to
- Design Bid-Build P228 ATC Tower and Air Operations, Marine Corps Air Station, Cherry Point, North Carolina
- Solicitation number
- N4008522R2504
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOC
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
25.5
.5
25.0
25.0
24.0
.025
.0
27.0
26.0
25.0
25.0 27.0
26.0
27.0
26.0 26.0
.0
.0
.0
24.0
24.024.025.025.0
25.0
25.0
27.026.0
25.0
27.0
27.0
.0
.5
.0
.5
.0 NO PARKINGNO
P
AR
KI
NG
X
X
X X
X X
X
X X X X X
X X
X X
XX
6TH AVENUE
LOC
LOC
LO
C
LOC
LO
C
LO
C
LO
C
LOC LO
C
LOC
LO
C
LO
C
LO
C
LOC
LOC
LOCLOC
LOC
LOC
LOC
LOC LOC
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOCLOC
LO
C
LO
C
LO
C
LOC LOC LOC LOC LOC
LO
C
LOC
X
X
X
NO PARKING
LA
NE
LANE
NO
P
AR
KI
NG
LANE
FIRE
NO PARKING
P
FI
RE P
FIRE
P
LANE
FIRE
P
X
SEE SHEETS CE101, CE111, AND CE121
SEE SHEET CE102,
CE112, CE122
SEE SHEETS CE103,
CE113, CE123
SEE SHEETS CE104,
CE114, CE124
BID OPTION
1" = 100'A2 OVERALL EROSION CONTROL PLAN
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
SCALE IN FEET
100' 200'
KEY PLAN
PLAN
NORTH
CE101
CE102
CE103CE104
GENERAL NOTES
IS
SU
ED
F
OR
B
ID
/18
/22
17. EROSION AND SEDIMENT CONTROL PRACTICES NOT ALREADY SPECIFIED ON THIS PLAN MAY
BE NECESSARY DUE TO UNFORESEEN ENVIRONMENTAL CONDITIONS AND/OR CHANGES IN
DRAINAGE PATTERNS CAUSED BY EARTH-MOVING ACTIVITY.
18. SOIL STOCKPILES, TOPSOIL OR OTHERWISE, MUST BE SITUATED AWAY FROM STREETS,
SWALES, OR OTHER WATERWAYS AND MUST BE SEEDED AND/OR MULCHED IN ACCORDANCE
WITH THE NORTH CAROLINA DEQ TIMEFRAME FOR STABILIZATION. PROVIDE SILT FENCE
PERIMETER CONTROL A MINIMUM OF FIVE FEET BEYOND THE TOE OF THE SLOPE.
19. ON-SITE PERSONNEL MUST TAKE ALL NECESSARY MEASURES TO COMPLY WITH APPLICABLE
REGULATIONS REGARDING FUGITIVE DUST EMISSIONS.
20. CONCRETE WASH WATER MUST NOT BE ALLOWED TO FLOW TO STREAMS, DITCHES, STORM
DRAINS, OR ANY OTHER WATER CONVEYANCE. CONSTRUCT A SUMP OR PIT WITH NO
POTENTIAL FOR DISCHARGE IF NEEDED TO CONTAIN CONCRETE WASH WATER. CUT AND PLUG
FIELD TILE OR OTHER SUBSURFACE DRAINAGE STRUCTURES WITHIN 10 FT. OF THE SUMP. FOR
SMALL PROJECTS, TRUCK CHUTES MAY BE RINSED AWAY FROM ANY WATER CONVEYANCES.
GENERAL EROSION CONTROL NOTES CONTINUED
1. SEE SHEET C-001 FOR SURVEY AND CIVIL NOTES AND LEGENDS.
CE100
X
ROTATION= -44.30598240
R O
TA
TI
O N
=45 .6
PLAN
NORTH
VEGETATIVE STABILIZATION NOTES
1. PERMANENTLY RESTORE ALL AREAS OF DISTURBANCE OUTSIDE
THE LIMITS OF NEW PAVEMENT WITH 4 INCHES OF TOPSOIL AND
CENTIPEDE SOD. USE EROSION CONTROL BLANKET WHEREVER
FINISHED GRADE SLOPE IS GREATER HAN 4H:1V.
2. ALL PERMANENT RESTORATION OF DISTURBED AREAS NOT
PLANTED MUST BE CENTIPEDE SOD.
3. PROVIDE EROSION AND SEDIMENT CONTROL FOR UTILITY
CONSTRUCTION IN ACCORDANCE WITH APPROVED PLANS.
UTILITY CONSTRUCTION MUST ONLY BE FOR AREAS WITHIN THE
DELINEATED LIMIT OF DISTURBANCE. WHEN SAME DAY
STABILIZATION IS APPROVED:
3.1. PLACE EXCAVATED TRENCH MATERIAL ON THE HIGH SIDE OF
THE TRENCH.
3.2. BACKFILL, COMPACT, AND STABILIZE TRENCHES FOR UTILITY
INSTALLATION AT THE END OF EACH WORKING DAY. OPEN
NO MORE TRENCH THAN CAN BE COMPLETED THE SAME
DAY.
4. FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE,
COMPLETE PERMANENT OR TEMPORARY STABILIZATION WITHIN:
4.1. THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL
PERIMETER CONTROLS, DIKES, SWALES, DITCHES,
PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3
HORIZONTAL TO 1 VERTICAL (3:1);
4.2. AND SEVEN (7) CALENDAR DAYS AS TO ALL OTHER
DISTURBED OR GRADED AREAS ON THE PROJECT SITE NOT
UNDER ACTIVE GRADING.
1. THIS DRAWING WAS PREPARED IN ACCORDANCE WITH THE
NORTH CAROLINA EROSION & SEDIMENT CONTROL PLANNING
AND DESIGN MANUAL. THE CONTRACTOR IS RESPONSIBLE FOR
INSTALLING EROSION AND SEDIMENTATION CONTROL MEASURES
IN ACCORDANCE WITH THE PLANS APPROVED BY NCDEQ.
2. BORROW SITE:
2.a. SOIL CAN NOT BE REMOVED FROM OR BROUGHT ONTO THE
PROJECT SITE UNLESS THE AREA HAS BEEN SPECIFIED IN
THE EROSION CONTROL PLAN.
2.b. IF SOIL IS REMOVED FROM THE SITE THE PLAN SHOULD
INDICATE THE PERMIT NUMBER ISSUED BY THE DIVISION OF
LAND QUALITY OF THE LOCATION RECEIVING THE SOIL AND
THE VOLUME OF SOIL BEING TRANSFERRED.
2.c. IF THE SOIL IS GOING TO A PERMITTED LANDFILL
REGULATED BY THE DIVISION OF SOLID WASTE
MANAGEMENT THE PERMIT NUMBER SHOULD BE IDENTIFIED.
2.d. ADDITIONALLY IF SOIL IS BEING BROUGHT TO THE SITE
FROM A BORROW AREA THE APPLICABLE PERMIT NUMBER
SHOULD BE INDICATED AND THE VOLUME OF SOIL BEING
TRANSFERRED IDENTIFIED.
3. INSPECTIONS DURING CONSTRUCTION:
3.a. THE NPDES CONSTRUCTION PERMIT REQUIRES EROSION
CONTROL DEVICES AND STORM WATER OUTFALLS BE
INSPECTED WEEKLY (EVERY 7 CALENDAR DAYS) AND WITHIN
24 HRS OF ONE-INCH RAIN EVENT. IT WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO CONDUCT THESE
INSPECTIONS AND MAINTAIN RECORDS UNTIL THE AREA HAS
BEEN STABILIZED, EVIDENT BY 95% VEGETATIVE GROWTH
FOR AREAS PROVIDED SEEDING.
3.b. TO FACILITATE RAINFALL MONITORING A RAIN GAUGE IS
REQUIRED TO BE ON SITE.
3.c. ADDITIONALLY THE CONTRACTOR IS RESPONSIBLE FOR
CONDUCTING A SELF INSPECTION INDICATING THE DATE
BMPS ARE INSTALLED AND STABILIZATION MEASURES
(SEEDING/MULCHING OR SOD) ARE INITIATED.
3.d. BOTH INSPECTIONS ARE RECORDED ON THE SAME REPORT
FORM AND MUST BE MAINTAINED BY THE CONTRACTOR AT
THE ONSITE OFFICE. ONCE STABILIZATION HAS BEEN
ACCOMPLISHED INSPECTION RECORDS ARE TO BE
FORWARDED TO EAD AND ALL TEMPORARY
EROSION/SEDIMENTATION CONTROL DEVICES REMOVED.
3.e. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING
COMPLIANCE WITH ALL PERMITS AND PLANS, ANY CHANGES
WILL BE APPROVED BY THE STATE PRIOR TO EXECUTION. A
COPY OF THE EROSION AND SEDIMENTATION (ES) CONTROL
PLAN, ES LETTER 0F APPROVAL, NPDES CONSTRUCTION
PERMIT, AND NPDES CERTIFICATE OF COVERAGE WILL BE
MAINTAINED BY THE CONTRACTOR AT THE ONSITE OFFICE.
3.f. IF SOIL IS REMOVED FROM OR BROUGHT ONSITE, THE
APPLICABLE SOLID WASTE MANAGEMENT PERMIT NUMBER,
EROSION SEDIMENTATION PERMIT OR MINE PERMIT
NUMBER WILL BE DISCLOSED.
4. NCDEQ DOES NOT APPROVE THE USE OF STRAW BALES FOR
RETARDING OR FILTERING SEDIMENT.
5. RYE GRASS IS NOT IN THE APPROVED SEEDING SPECIFICATIONS
OR ACCEPTABLE FOR NURSE COVER FOR PERMANENT GRASS
COVER.
6. BOTH THE AUTHORIZATION TO CONSTRUCT AND STATE LETTER
INDICATING APPROVAL OF SPECS AND PLANS MUST BE POSTED
AT THE CONSTRUCTION ENTRANCE. SHOULD THE PROJECT
INVOLVE TEST WELL DRILLING IN AN EFFORT TO DETERMINE
SOURCE WATER QUALITY, APPROVAL MAY BE GRANTED BEFORE
PLAN/SPEC SUBMITTAL.
7. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING
ENVIRONMENTAL DUE DILIGENCE AND DETERMINING THAT ALL
IMPORTED FILL MEETS THE EPA & STATE DEQ DEFINITION OF
CLEAN FILL. CLEAN FILL MEANS THAT THE FILL MATERIAL IS NOT
CONTAMINATED BY SOLID WASTES, INFECTIOUS WASTES,
HAZARDOUS WASTES OR CONSTRUCTION AND DEMOLITION
DEBRIS (C&DD).
8. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS INVESTIGATIVE
TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL
PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES,
REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS,
ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS,
ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR
AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF DUE
DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE
PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL
MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF
REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED
BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST
BE TESTED BY CHERRY POINT ENVIRONMENTAL TO DETERMINE IF
IT QUALIFIES AS CLEAN FILL.
9. SILT FENCE IS SHOWN IN THE APPROXIMATE LOCATION OF
PLACEMENT. PLACE ADDITIONAL SILT FENCE TO PROTECT ANY
ADDITIONAL AREAS DISTURBED DURING CONSTRUCTION.
10. INSTALL SILT FENCE IN ACCORDANCE WITH BEST MANAGEMENT
PRACTICES PRIOR TO LAND DISTURBANCE. MAINTAIN SILT FENCE
DURING CONSTRUCTION AND ONLY REMOVED WHEN A UNIFORM
80% VEGETATIVE COVER HAS BEEN ESTABLISHED AND
APPROVED BY OWNER.
11. PROPERLY RECYCLE OR DISPOSE OF ALL WASTE MATERIAL PER
LOCAL OR STATE REQUIREMENTS.
12. TOP SOIL STOCKPILE, CONCRETE WASHOUT AND WASTE
DISPOSAL AREAS MAY BE PLACED IN A CENTRAL LOCATION
WITHIN THE LIMITS OF DISTURBANCE TO ACCOMMODATE
CONSTRUCTION AND MATERIAL LAYDOWN REQUIREMENTS.
13. IMPLEMENT PERIMETER SEDIMENT CONTROL MEASURES (SILT
FENCE) AS THE FIRST STEP OF GRADING AND WITHIN SEVEN (7)
DAYS FROM THE START OF GRUBBING AND MUST CONTINUE TO
FUNCTION UNTIL UPSLOPE AREAS DRAINING TO THEM ARE
PERMANENTLY STABILIZED.
14. CLEAN STREETS DIRECTLY ADJACENT TO CONSTRUCTION
ENTRANCES AND RECEIVING TRAFFIC FROM THE DEVELOPMENT
AREA, DAILY TO REMOVE SEDIMENT TRACKED OFF-SITE. CLEAN
THE CATCH BASINS ON THESE STREETS NEAREST TO THE
CONSTRUCTION ENTRANCES WEEKLY.
15. ALL EROSION AND SEDIMENT CONTROL PRACTICES SPECIFIED ON
THIS PLAN MUST CONFORM WITH DETAILS AND SPECIFICATIONS
OUTLINED IN THE CURRENT VERSION OF THE NORTH CAROLINA
EROSION & SEDIMENT CONTROL PLANNING & DESIGN MANUAL OR
OTHER STANDARDS ACCEPTABLE TO NORTH CAROLINA DEQ.
GENERAL EROSION CONTROL NOTES
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
A 08/18/22
X
XX
X
X
X
X
X
6TH AVENUE
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LO
CLOC
LO
C
LO
C
LO
C
LOC
LO
C
LOC
LOCLOC
LOC LOC
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC
LO
C
LO
C
LO
C
LO
C
25.5
.5
25.0
25.0
24.0
.0
.0
27.0
26.0
25.0
25.0
27.0
26.0
27.0
26.0
26.0
.0
.0
.0
24.0
24.0
24.0
25.025.0
25.0
25.0
27.0
26.0
25.0
27.0
27.0
6TH AVENUE
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SF
SF
SF
SF
1BEGIN
2END
1BEGIN
2BEGIN
END
SFSFSFSF
SF
SF
SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
BEGIN
END
1 END
2 END
12BEGIN
A1 INITIAL EROSION CONTROL PLAN - AREA 1
GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PLAN
NORTH
KEY PLAN
1" = 30' 0
SCALE IN FEET
30' 60'
CE102
CE103CE104
PLAN
NORTH
IS
SU
ED
F
OR
B
ID
CE101
WORK NOTES
1. SILT FENCE
2. COMPOST SOCK
3. CONSTRUCTION ENTRANCE
4. BLOCK AND GRAVEL INLET PROTECTION
5. CURB INLET FILTER
6. FILTER RING
7. CONCRETE WASHOUT
1. SEE SHEET C-001 FOR SURVEY AND CIVIL NOTES AND LEGENDS.
2. SEE SHEET CE100 FOR EROSION CONTROL NOTES.
3. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235
DESIGN DOCUMENTS.
4. COORDINATE AND REVISE LOCATION OF SILT FENCE ADJACENT
TO BUILDING B1699 AS NEEDED TO ALLOW FOR CONSTRUCTION
ACTIVITIES AFTER BUILDING B1699 DEMOLITION, COORDINATE
WITH P-197 CONTRACTOR.
A3
CE501C1
CE502 A1
CE501C3
CE501 C3
CE502
X
ESC LEGEND
CONSTRUCTION ENTRANCE
COMPOST SOCK
INLET PROTECTION
CURB INLET FILTER
A3
CE501
FILTER RING
CE101
CONCRETE WASHOUT
C1
CE501
SF
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
COMM
COMM
COMM COMM COMM COMM
COMM
COMM COMM COMM
COMM
COMM
COMM COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
LOCLO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LOC
LOC
LOC
LO
C
LOC
LOC LOC LOC LOC LOC
LOC
LOC
LOC LOC LOC
LO
C
LO
C
LOC LOC LOC LOC
1BEGIN
3 3 3 3 3
1 BEGIN
U G
E U
G E
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
UGE
6 8
3 3
A1 INITIAL EROSION CONTROL PLAN - AREA 2
GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PLAN
NORTH
WORK NOTES
KEY PLAN
MA
TC
H
LIN
E
SH
EE
T
CE
MA
TC
H
LIN
E
SH
EE
T
CE
1" = 30' 0
SCALE IN FEET
30' 60'
PLAN
NORTH CE101
CE103CE104
IS
SU
ED
F
OR
B
ID
1. SEE SHEET C-001 FOR SURVEY AND CIVIL NOTES AND LEGENDS.
2. SEE SHEET CE100 FOR EROSION CONTROL NOTES.
3. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235
DESIGN DOCUMENTS.
4. SEE SHEET GI143 FOR TEMPORARY BARRIER MOUNTED FENCE
WITH FILTER FABRIC LAYOUT PLAN.
5. NO MORE THAN 100 LINEAR FEET OF TRENCH MAY BE OPEN AT
ONE TIME IN LOCATIONS WITHIN AREA OF KNOWN GROUNDWATER
CONTAMINATION AND WHERE THE EXCAVATION DEPTH EXTENDS
INTO THE GROUNDWATER TABLE.
6. TEMPORARY DIVERSION, DRAINAGE PIPE AND INLETS (PVC) TO BE
INSTALLED PRIOR TO TRENCHING TO PREVENT SURFACE WATER
FROM ENTERING EXCAVATED TRENCHES WITHIN AREAS OF
KNOWN GROUNDWATER CONTAMINATION. REMOVE TEMPORARY
PIPING AND INLETS UPON COMPLETION OF BACKFILLING.
SEQUENCE OF EXCAVATION TO BE PERFORMED PER THE
APPROVED DEWATERING WORK PLAN.
1. TEMPORARY BARRIER MOUNTED FENCE WITH FILTER FABRIC
2. CRUSHED STONE CONSTRUCTION EXIT
3. BLOCK AND GRAVEL INLET PROTECTION
4. CURB INLET FILTER
4. CONCRETE WASHOUT
5. TEMPORARY DIVERSION
6. TEMPORARY DRAINAGE PIPE AND INLETS (MIN. 12" DIAMETER
PIPE AND 24" WIDE DRAINAGE STRUCTURES)
7. COMM DUCTBANK. SEE TELECOMMUNICATIONS PLANS
8. ELEC DUCTBANK. SEE ELECTRICAL PLANS
A1
GI501A1
CE501 C3
CE501
X
CE102
ESC LEGEND
CONSTRUCTION EXIT
BARRIER MOUNTED FENCE
WITH FILTER FABRIC
INLET PROTECTION
CURB INLET FILTER
C3
CE502
CE102
CONCRETE WASHOUT
C1
CE501A1
CE502
TEMPORARY DIVERSION
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOCLOC
LOC
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LO
C
LOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LOC LOC
LOCLOC
LO
C
LO
C
LO
C
X
U K
U K
U K
UK
UK
U K
A1 BID OPTION INITIAL EROSION CONTROL PLAN - AREA 3
GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
MA
TC
H
LIN
E
SH
EE
T
CE
MATCH LINE SHEET CE104
PLAN
NORTH
WORK NOTES
KEY PLAN
1" = 30' 0
SCALE IN FEET
30' 60'
PLAN
NORTH CE101
CE102
CE104 CE103
IS
SU
ED
F
OR
B
ID
3. SEE SHEET GI144 FOR TEMPORARY BARRIER MOUNTED FENCE
WITH FILTER FABRIC LAYOUT PLAN.
1. TEMPORARY BARRIER MOUNTED FENCE WITH FILTER FABRIC
2. FILTER RING
3. BLOCK AND GRAVEL INLET PROTECTION
A3
CE501A3
CE502 C3
CE501
X
ALL WORK THIS SHEET IS
A BID OPTION - EXISTING
CONSTRUCTION TO BE
REMOVED
ESC LEGEND
BARRIER MOUNTED FENCE
WITH FILTER FABRIC
INLET PROTECTION
FILTER RING
CE103
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
LOC LOC LOC LOC
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC LOC LOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
X X
X
X
X
G
G1
A1 BID OPTION INITIAL EROSION CONTROL PLAN - AREA 4
GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
MATCH LINE SHEET CE103
MA
TC
H
LIN
E
SH
EE
T
CE
PLAN
NORTH
KEY PLAN
1" = 30' 0
SCALE IN FEET
30' 60'
PLAN
NORTH CE101
CE102
CE103CE104
1. SEE SHEET C-001 FOR SURVEY AND CIVIL NOTES AND LEGENDS.
2. SEE SHEET CE100 FOR OVERALL INITIAL EROSION CONTROL PLAN.
3. SEE SHEET GI144 FOR TEMPORARY BARRIER MOUNTED FENCE
WITH FILTER FABRIC LAYOUT PLAN.
IS
SU
ED
F
OR
B
ID
A1
CE501
ALL WORK THIS SHEET IS
A BID OPTION - EXISTING
CONSTRUCTION TO BE
REMOVED
WORK NOTES
1. TEMPORARY BARRIER MOUNTED FENCE WITH FILTER FABRIC
2. CRUSHED STONE CONSTRUCTION EXIT
3. BLOCK AND GRAVEL INLET PROTECTION
A3
CE501
C3
CE501
X
ESC LEGEND
BARRIER MOUNTED FENCE
WITH FILTER FABRIC
INLET PROTECTION
CONSTRUCTION EXIT
CE104
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LO
C
LOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOCLOC
LOCLOC
LO
C
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
25.5
.5
25.0
25.0
24.0
.0
.0
27.0
26.0
25.0
25.0
27.0
26.0
27.0
26.0
26.0
.0
.0
.0
24.0
24.0
24.0
25.025.0
25.0
25.0
27.0
26.0
25.0
27.0
27.0
FIRE PUMP
HOUSE
6TH AVENUE
.025
.5
.5
.5
.0
.5
25.
.0
.0
.0
.0
.5
.0
.0
.5
.0
27.0
27.0
26.0
.0
.0
.0
.0
.526
.0
25.
.5
.0
.5
.0
.5
.5
.5
27.5
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
D
CO
S
SFSFSFSFSFSFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SFSFSFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
5BEGIN
5END
5END
5BEGIN
5BEGIN
SF
SF
SF
SF
A1 INTERMEDIATE EROSION CONTROL PLAN - AREA 1
WORK NOTES
GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PLAN
NORTH
KEY PLAN
1" = 30' 0
SCALE IN FEET
30' 60'
CE112
CE113CE114
PLAN
NORTH
IS
SU
ED
F
OR
B
ID
1. BLOCK AND GRAVEL INLET PROTECTION
2. TEMPORARY SEEDING AND MULCHING, SEE SHEET CE503
3. CONCRETE WASHOUT
4. TOPSOIL STOCKPILE
5. SILT FENCE
6. FILTER RING
1. SEE SHEET C-001 FOR SURVEY AND CIVIL NOTES AND LEGENDS.
2. SEE SHEET CE100 FOR EROSION CONTROL NOTES.
3. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235
DESIGN DOCUMENTS.
4. COORDINATE AND REVISE LOCATION OF SILT FENCE ADJACENT
TO BUILDING B1699 AS NEEDED TO ALLOW FOR CONSTRUCTION
ACTIVITIES AFTER BUILDING B1699 DEMOLITION. COORDINATE
WITH P-197 CONTRACTOR.
C3
CE501
X
CE111
ESC LEGEND
CONSTRUCTION ENTRANCE
SILT FENCE
COMPOST SOCK
INLET PROTECTION
CE111
C1
CE501
CONCRETE WASHOUT
A3
CE501
FILTER RING
A3
CE501
SF
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
SSSS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
LOCLO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LOC
LOC
LOC
LO
C
LOC
LOC LOC LOC LOC LOC
LOC
LOC
LOC LOC LOC
LO
C
LO
C
LOC LOC LOC LOC
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
G G
G G
G G
G
G G
G G
G G
G G
D
UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD
UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD
UD UD UD UD UD
UD UD UD UD UD UD UD UD
CO
CO
CO
CO
D
24.0
25.0
24.0
25.0
26.0
25.0
25.025.0
24.5
24.5
24.5
24.
23.5
24.5
25.524.5
24.5
24.5
24.5
.0
25.0
.0
1 1
1 1
COMM
COMM
COMM COMM COMM COMM
COMM
COMM COMM COMM
COMM
COMM
COMM COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
U G
E U
G E
UGE
UGE
UGE
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
UGE
A1 INTERMEDIATE EROSION CONTROL PLAN - AREA 2
GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PLAN
NORTH
WORK NOTES
KEY PLAN
MA
TC
H
LIN
E
SH
EE
T
CE
MA
TC
H
LIN
E
SH
EE
T
CE
1" = 30' 0
SCALE IN FEET
30' 60'
PLAN
NORTH
IS
SU
ED
F
OR
B
ID
3. EXISTING CONDITIONS SHOWN INCLUDE CURRENT PROJECT P-235
DESIGN DOCUMENTS.
4. NO MORE THAN 100 LINEAR FEET OF TRENCH MAY BE OPEN AT
ONE TIME IN LOCATIONS WITHIN AREA OF KNOWN GROUNDWATER
CONTAMINATION AND WHERE THE EXCAVATION DEPTH EXTENDS
INTO THE GROUNDWATER TABLE.
5. TEMPORARY DIVERSION, DRAINAGE PIPE AND INLETS (PVC) TO BE
INSTALLED PRIOR TO TRENCHING TO PREVENT SURFACE WATER
FROM ENTERING EXCAVATED TRENCHES WITHIN AREAS OF
KNOWN GROUNDWATER CONTAMINATION. REMOVE TEMPORARY
PIPING AND INLETS UPON COMPLETION OF BACKFILLING.
SEQUENCE OF EXCAVATION TO BE PERFORMED PER THE
APPROVED DEWATERING WORK PLAN.
1. COMPOST SOCK
2. BLOCK AND GRAVEL INLET PROTECTION
3. CONCRETE WASHOUT
4. TEMPORARY DIVERSION
6. TEMPORARY DRAINAGE PIPE AND INLETS (MIN. 12" DIAMETER
PIPE AND 24" WIDE DRAINAGE STRUCTURES)
7. WATER MAIN
8. STORM DRAINAGE PIPE
9. SANITARY MAIN
C1
CE502C3
CE501
X
CE111
CE112
CE114 CE113
ESC LEGEND
CONSTRUCTION EXIT
BARRIER MOUNTED FENCE
WITH FILTER FABRIC
INLET PROTECTION
CURB INLET FILTER
CE112
C1
CE501
CONCRETE WASHOUT
A1
CE502
TEMPORARY DIVERSION
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
| CE100 - OVERALL EROSION CONTROL PLAN |
| CE101 - INITIAL EROSION CONTROL PLAN - AREA 1 |
| CE102 - INITIAL EROSION CONTROL PLAN - AREA 2 |
| CE103 - BID OPTION INITIAL EROSION CONTROL PLAN - AREA 3 |
| CE104 - BID OPTION INITIAL EROSION CONTROL PLAN - AREA 4 |
| CE111 - INTERMEDIATE EROSION CONTROL PLAN - AREA 1 |
| CE112 - INTERMEDIATE EROSION CONTROL PLAN - AREA 2 |
2022-08-15T06:57:54-0400
2022-08-15T06:58:10-0400
2022-08-15T06:58:11-0400
2022-08-15T06:58:12-0400
2022-08-15T06:58:12-0400
2022-08-15T06:58:13-0400
2022-08-15T06:58:14-0400
| 2022-09-22T08:53:47-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:13-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:13-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:14-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:15-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:15-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:16-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:28-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:44-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:45-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:45-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:46-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:47-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:54:47-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .