View the file

Other files

File Type Posted
AMEND 0010 UPDATED WAGE DETERMINATION FOR P228.pdf PDF
AMENDMENT 0011 FOR P228 ATC TOWER.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0008.pdf PDF
AMENDMENT 0007 FOR P228.pdf PDF
UPDATED REVISED BID SCHEDULE FOR P228.pdf PDF
AMENDMENT 0006 FOR P228.pdf PDF
AMENDMENT 0005 FOR P228.pdf PDF
UPDATED BID SCHEDULE FOR P228.pdf PDF
P228 PPI LOG 03.pdf PDF
P228 AMENDMENT 0004.pdf PDF
PPI LOG 02 FOR P228.pdf PDF
P228 AMENDMENT 0003.pdf PDF
P228 AMENDMENT 0003 DOCUMENT FOR PPI 4-7.pdf PDF
P228 AMENDMENT 0002.pdf PDF
AMENDMENT 0002-DRAWING REFERENCES.pdf PDF
P228 PPI LOG 01.pdf PDF
AMENDMENT 0001 FOR P228.pdf PDF
Site Visit Log P228.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
1596300_dwg_24of35_V2_Architectural.pdf PDF
1596300_dwg_16of35_V1_Civil.pdf PDF
1596300_dwg_28of35_V3_Equipment.pdf PDF
1596300_dwg_05of35_V1_Civil.pdf PDF
1596300_dwg_14of35_V1_Civil.pdf PDF
1596300_dwg_33of35_V4_Electrical.pdf PDF
1596300_dwg_12of35_V1_Civil.pdf PDF
1596300_dwg_06of35_V1_Civil.pdf PDF
1596300_dwg_21of35_V1_Landscape.pdf PDF
RFP FOR P228 ATC TOWER.pdf PDF
1596300_dwg_23of35_V2_Structural.pdf PDF
1596300_dwg_01of35_V1_General.pdf PDF
1596300_dwg_22of35_V2_General.pdf PDF
Attachment A - Pre-Propsal Injuiries Log.doc DOC document
1596300_dwg_17of35_V1_Civil.pdf PDF
1596300_dwg_09of35_V1_Civil.pdf PDF
1596300_dwg_15of35_V1_Civil.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
1596300_dwg_04of35_V1_Survey-Geotechnical.pdf PDF
1596300_dwg_34of35_V4_Telecommunications.pdf PDF
1596300_dwg_26of35_V2_Interiors.pdf PDF
USCG MULTI-USE COMPLEX - 00 01 15 LIST OF DRAWINGS 100422.pdf PDF
Attachment F - Small Business Participation Commitment Document.docx DOCX document
ATTACHMENT B BID SCHEDULE FOR P228 ATC TOWER.pdf PDF
JA ML-23-07 CHPT P228 Fire Protection_Redacted.pdf PDF
Attachment H- PIEE Vendor Access Instructions.pdf PDF
1596300_dwg_35of35_V4_Telecommunications.pdf PDF
1596300_dwg_11of35_V1_Civil.pdf PDF
1596300_dwg_27of35_V3_General.pdf PDF
1596300_spc01of01.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL INQUIRY ATTACHMENT

Solicitation Number: N40085-22-R-2504 Contractor Name:

Contractor POC (Name and email):

Instructions: DO NOT submit in PDF format. DO submit as a word document

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE AMENDMENT

60 01 30 00 1.5 01 30 00 – 1.5 states, “Provide other insurance coverage as required by State Portugal Guam Diego Garcia BIOT Low.” Please confirm this is not applicable to this solicitation.

RESPONSE: Confirmed, insurance required by State Portugal Guam Diego Garcia BIOT is not required.

AMEND 0005

61 01 14 00 1.3.4 The Exclusionary Period in 1.3.4 states no work can be performed during the Basewide Air Show for 3 days during May 202 to June 2020 and May 2021 and June 2021.

Please confirm this is applicable for May-June 2023 and May- June 2024.

RESPONSE: Confirmed revised dates in amendment 0004. Please review entire amendment including continuation page on Amendment 0004.

AMEND 0005

62 52.211-12 The Liquidated Damages – Construction clause is included by Reference but not by full text with a listed cost per calendar

RESPONSE: FAR 52.211-12

clause for Liquidated Damages has been added as Full Text.

AMEND 0005

day.

Please confirm there are no Liquidated Damages. If there are please provide them by the associated phase.

63 Attachment G

– Small Business Subcontracting

Plan

The Subcontracting Plan notes, Attachment 1provides breakdowns for the base year and option periods.

Percentages may be rounded to nearest tenth of a percent.” Page 10-11 of the Attachment provided a break down of Base Period, Option Period 1-4.4.

Please confirm this is not required for this contract as there are not Option Periods. The goals listed should be based on base bid and all options.

RESPONSE:

1. In accordance to Attachment G instructions, do not provide listing of subcontractors without a firm commitment. “If subcontracting firm commitments are not in place, do not add the subcontractor to the Table”.

2. The contents on the Small Business Participation Commitment form will be evaluated.

Instructions state, “If no subcontractors are identified, provide a detailed explanation for why subcontracts are not identified with frim commitments AND how your firm will be able to achieve the proposed small business participation”.

64 52.211-10 When this project previously bid, the government provided an updated 52.211- Commencement, Prosecution, and Completion of Work which noted the period of performance for each Phase and when the work could begin.

Please provide this information again so all offerors will bid based on the same required schedule.

Response: FAR 52.211-10 clause has been added as Full Text.