1596300_dwg_03of35_V1_General Civil.pdf
PDF 14 MB Posted
- Attached to
- Design Bid-Build P228 ATC Tower and Air Operations, Marine Corps Air Station, Cherry Point, North Carolina
- Solicitation number
- N4008522R2504
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6TH AVENUE
D W
D W
D W
DW
DW
DW
DW
DW
DW
DW DW DW DW DW
DW
DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW
FW FW
FWFW
FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW FW
ATCT
FFE 28.00
RMD
FFE 28.00
NO PARKINGNO
P
AR
KI
NG
MTRACON
FFE 28.00
W
W
W
W W
W
WW
W
W
W
25'25'
20'
20'
26'
.5'
(EXISTING)
32'
KNOX BOX
KNOX BOX
25'25'
30'
30'32'
40' 66.08'
STM
STM
STM
STM
STM
STM
STM
STM
W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W W W W W W W W W W W
W
W
WW
W
W
SSFM SSFM
SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM SSFM
SSFM SSFM SSFM
W
W
W
W
W
W
1" = 30'A1 FIRE PROTECTION SITE PLAN - AREA 1
GENERAL NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
X
PLAN
NORTH
KEY PLAN
PLAN
NORTH
SCALE IN FEET
30' 60'
GI131
IS
SU
ED
F
OR
B
ID
/18
/22
WORK NOTES
1. FIRE DEPARTMENT VEHICLE ACCESS
2. FIRE HYDRANT
3. POST INDICATOR VALVE
4. FIRE PUMP ROOM
5. FIRE DEPARTMENT MAIN ENTRANCE TO ATCT.
6. FIRE DEPARTMENT MAIN ENTRANCE TO TRACON.
7. FIRE DEPARTMENT MAIN ENTRANCE TO RMD.
8. WALL MOUNTED FIRE DEPARTMENT CONNECTION FOR
ATCT.
9. WALL MOUNTED FIRE DEPARTMENT CONNECTION FOR
TRACON/RMD.
10. MOTORIZED SLIDE GATE WITH KNOX BOX
1. SEE SHEET C001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL
NOTES.
2. THE EXISTING SITE UTILITIES AND FEATURES SHOWN ARE BASED ON A
FIELD RUN TOPOGRAPHIC SURVEY PERFORMED BY MSA, P.C. IN MAY 2018.
3. DIMENSIONS ARE IN SURVEY FEET UNLESS OTHERWISE NOTED.
4. WHERE APPLICABLE, THE FOLLOWING MINIMUM FIRE PROTECTION
PROVISIONS MUST BE INCLUDED ON THE CODE COMPLIANCE SITE PLAN IN
ACCORDANCE WITH UFC 3-600-01:
a. LINE OF ENCROACHMENT IDENTIFYING ASSUMED PROPERTY LINES
AND MINIMUM SEPARATION DISTANCES FROM ADJACENT
BUILDINGS.
b. BUILDING PERIMETER USED FOR FRONTAGE INCREASES.
c. FIRE DEPARTMENT ACCESS.
d. FIRE LANE WIDTH, MARKING AND LOCATIONS, APPROACH ROADS
AND TURN RADIUS AND LOCATION.
e. TYPE AND QUANTITY OF ANTITERRORISM SECURE ACCESS.
f. INTENDED FIRE DEPARTMENT MAIN ENTRANCE TO FACILITY.
g. LOCATION OF FIRE DEPARTMENT CONNECTIONS.
h. FIRE HYDRANTS, POST INDICATOR VALVE OR VALVES AND THEIR
CONNECTED WATER DISTRIBUTION MAINS SERVING FACILITY.
i. FIRE PUMP ROOM.
j. WATER STORAGE TANKS.
k. HAZARDOUS MATERIAL SPILL CONTAINMENT TANKS.
l. BACKFLOW PREVENTION ASSEMBLY OR ASSEMBLIES SERVING
WATER-BASED FIRE PROTECTION SYSTEMS (IF LOCATED OUTSIDE
OF BUILDING).
4-16.8.3 FIRE HYDRANTS MUST BE INSTALLED IN ACCORDANCE WITH NFPA
24, BUT SPACED NOT MORE THAN 300 FEET APART. PROVIDE A MINIMUM OF TWO
HYDRANTS LOCATED SO THAT PROTECTED EXPOSURES CAN BE REACHED
THROUGH HOSE RUNS NOT EXCEEDING 300 FEET.
9-3.5.8.4 HYDRANTS MUST ALSO BE SPACED IN ACCORDANCE WITH THE
FOLLOWING REQUIREMENTS:
a. AT LEAST ONE HYDRANT MUST BE LOCATED WITHIN 150 FEET OF
THE FIRE DEPARTMENT CONNECTION.
9-3.5.9PROTECTION
HYDRANTS LOCATED ADJACENT TO PARKING AREAS, VEHICLE TRAFFIC AREAS,
OR OTHER AREAS SUBJECT TO MECHANICAL DAMAGE, MUST BE PROTECTED BY
BOLLARDS. THE BOLLARDS MUST BE LOCATED SO THEY ARE NOT DIRECTLY IN
FRONT OF AN OUTLET. THE BOLLARDS MUST ALLOW CLEARANCE TO ATTACH
HOSES, ALLOW FOR THE REMOVAL OF THE HYDRANT CAPS, AND FOR THE
HYDRANT TO BE OPENED AND CLOSED WITHOUT OBSTRUCTIONS, REFER TO
UFC 3-260-01 WHERE BOLLARDS ARE REQUIRED FOR HYDRANTS LOCATED
ADJACENT TO AIRCRAFT PARKING AND SERVICING APRONS.
IS
SU
ED
F
OR
B
ID
X
GI132
GI131
GI131
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
A 08/18/22
W
W W
W W
W W
W W
W
W W W
D W
D W
D W
D W
X X
X
X X
X
X X
X
XX
X X X X
X
X X X X X
NO PARKING
LANE
LANE
NO PARKING
LA
NE
FI
RE
NO PARKING
P
FIRE
P
FIRE
P
LANE
FIRE
P
AIRFIELD
OPERATIONS
BUILDING
X X X
XX
XX
W
W
W
W
W W W W W W W
W W W W
W
W W W W W W
W W
W W
W
W W
W W
W W W W
W
AIRSIDE LANDSIDE
AI
RS
ID
E
LA
ND
SI
DE
AIRSIDELANDSIDE
AIRSIDELANDSIDE
37' 43'
13' 13'
172.37'
12' 12'
25'
25'
23'
47'
47'
47'
30'
1" = 30'A1 FIRE PROTECTION SITE PLAN - AREA 2
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
X
PLAN
NORTH
WORK NOTES
GENERAL NOTES
KEY PLANKEY PLAN
SCALE IN FEET
30' 60'
PLAN
NORTH
GI132
1. FIRE DEPARTMENT VEHICLE ACCESS
2. FIRE HYDRANT
3. FIRE DEPARTMENT MAIN ENTRANCE
4. WALL MOUNTED FIRE DEPARTMENT CONNECTION
5. POST INDICATOR VALVE WITH SIGNAGE
6. REMOVABLE BOLLARDS
7. EXISTING FIRE HYDRANT
1. SEE SHEET C001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL
NOTES.
2. THE EXISTING SITE UTILITIES AND FEATURES SHOWN ARE BASED ON A
FIELD RUN TOPOGRAPHIC SURVEY PERFORMED BY MSA, P.C. IN MAY 2018.
3. DIMENSIONS ARE IN SURVEY FEET UNLESS OTHERWISE NOTED.
4. WHERE APPLICABLE, THE FOLLOWING MINIMUM FIRE PROTECTION
PROVISIONS MUST BE INCLUDED ON THE CODE COMPLIANCE SITE PLAN IN
ACCORDANCE WITH UFC 3-600-01:
a. LINE OF ENCROACHMENT IDENTIFYING ASSUMED PROPERTY LINES
AND MINIMUM SEPARATION DISTANCES FROM ADJACENT
BUILDINGS.
b. BUILDING PERIMETER USED FOR FRONTAGE INCREASES.
c. FIRE DEPARTMENT ACCESS.
d. FIRE LANE WIDTH, MARKING AND LOCATIONS, APPROACH ROADS
AND TURN RADIUS AND LOCATION.
e. TYPE AND QUANTITY OF ANTITERRORISM SECURE ACCESS.
f. INTENDED FIRE DEPARTMENT MAIN ENTRANCE TO FACILITY.
g. LOCATION OF FIRE DEPARTMENT CONNECTIONS.
h. FIRE HYDRANTS, POST INDICATOR VALVE OR VALVES AND THEIR
CONNECTED WATER DISTRIBUTION MAINS SERVING FACILITY.
i. FIRE PUMP ROOM.
j. WATER STORAGE TANKS.
k. HAZARDOUS MATERIAL SPILL CONTAINMENT TANKS.
l. BACKFLOW PREVENTION ASSEMBLY OR ASSEMBLIES SERVING
WATER-BASED FIRE PROTECTION SYSTEMS (IF LOCATED OUTSIDE
OF BUILDING).
4-16.8.3 FIRE HYDRANTS MUST BE INSTALLED IN ACCORDANCE WITH NFPA
24, BUT SPACED NOT MORE THAN 300 FEET APART. PROVIDE A MINIMUM OF TWO
HYDRANTS LOCATED SO THAT PROTECTED EXPOSURES CAN BE REACHED
THROUGH HOSE RUNS NOT EXCEEDING 300 FEET.
9-3.5.8.4 HYDRANTS MUST ALSO BE SPACED IN ACCORDANCE WITH THE
FOLLOWING REQUIREMENTS:
a. AT LEAST ONE HYDRANT MUST BE LOCATED WITHIN 150 FEET OF
THE FIRE DEPARTMENT CONNECTION.
9-3.5.9PROTECTION
HYDRANTS LOCATED ADJACENT TO PARKING AREAS, VEHICLE TRAFFIC AREAS,
OR OTHER AREAS SUBJECT TO MECHANICAL DAMAGE, MUST BE PROTECTED BY
BOLLARDS. THE BOLLARDS MUST BE LOCATED SO THEY ARE NOT DIRECTLY IN
FRONT OF AN OUTLET. THE BOLLARDS MUST ALLOW CLEARANCE TO ATTACH
HOSES, ALLOW FOR THE REMOVAL OF THE HYDRANT CAPS, AND FOR THE
HYDRANT TO BE OPENED AND CLOSED WITHOUT OBSTRUCTIONS, REFER TO
UFC 3-260-01 WHERE BOLLARDS ARE REQUIRED FOR HYDRANTS LOCATED
ADJACENT TO AIRCRAFT PARKING AND SERVICING APRONS.
IS
SU
ED
F
OR
B
ID
X
GI131
GI132
GI132
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
N
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
I. CONTRACTOR ACCESS AND STAGING
1. UTILIZE THE SLOCUM GATE TO 6TH AVENUE AS AN ACCESS AND HAUL
ROUTE FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT,
AND DELIVERIES. ACCESS ROUTES AND HAUL ROUTES ARE SUBJECT
TO CHANGE AT THE DIRECTION OF THE CONTRACTING OFFICER AND
MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE
PROJECT SITE.
2. COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL
ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY
ACCESS TO ALL PROJECT AREAS, AIRFIELD, AND EXISTING ROADWAYS
AT ALL TIMES WITHOUT DELAY TO EMERGENCY AND SECURITY VEHICLE
RESPONSE TIME.
3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO
CONSTRUCTION ACTIVITIES, NOTIFY THE CONTRACTING OFFICER,
POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY
SERVICES OF THE CLOSURE.
4. MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS
CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS. ALL
DEBRIS HAULING TRUCKS MUST FULLY COVER LOADS WHEN HAULING
MATERIALS FROM THE SITE.
5. RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION
LIMITS UNLESS COORDINATED OTHERWISE WITH THE CONTRACTING
OFFICER.
6. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND
STOCKPILE AREA FOR MATERIALS AND EQUIPMENT. LOCATIONS OF
CONTRACTOR'S STAGING AREAS ARE SHOWN ON SHEET GI142, GI143,
AND GI144. CONTACT THE MCAS CHERRY POINT REAL ESTATE
DEPARTMENT TO OBTAIN SITE APPROVAL FOR THESE OR OTHER
AREAS. CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE
DIRECTION OF THE CONTRACTING OFFICER AND MAY CHANGE BASED
ON OPERATIONAL REQUIREMENTS OF THE PROJECT SITE AND
AIRFIELD.
7. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, PARK EQUIPMENT
AND VEHICLES IN THE STAGING AREA.
8. PROVIDE AND INSTALL AT THE CONSTRUCTION ENTRANCE A
PROFESSIONALLY PAINTED SIGN, MEETING CONTRACTING OFFICER
APPROVAL, TO DIRECT MATERIAL SUPPLIERS, EMPLOYEES, AND
DELIVERIES TO THE CONSTRUCTION SITE. THE SIGN MUST READ
“CONSTRUCTION VEHICLES ONLY - NO VENDORS ALLOWED.”
9. PROVIDE (TO THE CONTRACTING OFFICER) A MINIMUM NOTICE OF 48
HOURS PRIOR TO CONSTRUCTION DELIVERIES TO THE BASE.
DELIVERIES MUST BE SCHEDULED MONDAY-FRIDAY, 8:00 AM TO 3:00 PM.
10. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO
SEARCH BY SECURITY WHEN ENTERING THE BASE AND MAY
EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT AND
VALID PHOTO IDENTIFICATION PER BASE SECURITY REQUIREMENTS,
AND ALL VEHICLES MUST HAVE CURRENT AND VALID REGISTRATION
AND INSURANCE.
11. ALL CONTRACTOR VEHICLES AND PERSONNEL MUST BE RESPONSIBLE
FOR COORDINATING WITH THE BASE SECURITY OFFICE IN OBTAINING
PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING
THE BASE AND ALL SECURE AREAS.
12. RESTORE ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY
OTHER AREAS DISTURBED BY THE CONTRACTOR TO THEIR ORIGINAL
CONDITION OR BETTER TO THE SATISFACTION OF THE CONTRACTING
OFFICER.
13. EXISTING CONDITIONS OF ALL ROADWAYS ALONG THE CONTRACTOR
HAUL ROUTE MUST BE DOCUMENTED BY PHOTOS OR VIDEO PRIOR TO
THE START OF WORK TO ENSURE ROAD IS RESTORED TO
PRE-CONSTRUCTION CONDITIONS FOLLOWING COMPLETION OF THE
PROJECT.
II. COORDINATION AND COMMUNICATION
1. AT THE TIME OF PROJECT MOBILIZATION, CONSTRUCTION ACTIVITIES
FOR P235 PROJECT MUST BE ON-GOING. P235 PROJECT COMPLETION
EXPECTED IN WINTER OF 2022, COORDINATE WITH P235 PROJECT FOR
CONSTRUCTION ACCESS TO SITE, UTILITY CONNECTIONS AND
PAVING/SIDEWALK CONNECTIONS.
2. CONTRACTOR MUST PROVIDE AN OPERATIONS PLAN FOR APPROVAL
BY THE CONTRACTING OFFICER THAT INDICATES MEASURES FOR
MAINTENANCE OF TRAFFIC ON ROADS AS WELL AS POTENTIAL OR
PLANNED DISRUPTIONS OF BASE OPERATIONS.
3. APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO
THE APPROVAL OF THE CONTRACTING OFFICER, WHO MUST BE
PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING
WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN
PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT MUST BE
DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE
WHO MUST BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE
CONTRACTOR'S PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT
AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE
REPRESENTATIVE MUST BE PROVIDED. PROVIDE NAMES AND
CONTACT INFORMATION OF REPRESENTATIVES TO THE CONTRACTING
OFFICER PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
4. MAINTAIN CONSTANT COORDINATION BETWEEN ANY
SUBCONTRACTORS AND THE CONTRACTING OFFICER. ALL
CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR MUST BE
REVIEWED AND APPROVED BY THE CONTRACTING OFFICER.
III. TRAFFIC CONTROL
1. PROVIDE A MINIMUM NOTICE OF 15 DAYS TO BASE AND THE
CONTRACTING OFFICER FOR ROAD CLOSURE PRIOR TO THE ROAD
REQUIRING CLOSURE, A TRAFFIC CONTROL PLAN PREPARED BY A
LICENSED PROFESSIONAL ENGINEER MUST BE PROVIDED TO THE BASE
AND CONTRACTING OFFICER AT THE TIME OF NOTIFICATION. PROVIDE
BARRICADES, JERSEY BARRIERS, PAVEMENT MARKINGS LIGHTS,
SIGNAGE AND OTHER PROTECTIVE DEVICES IN ACCORDANCE WITH THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
2. PRIOR TO CONSTRUCTION, CORDON OFF THE CONSTRUCTION WORK
AREA AND ASSOCIATED ROADWAYS AND AIRFIELD AREAS BY USING
BARRICADES APPROVED BY THE CONTRACTING OFFICER.
3. ALL CONSTRUCTION EQUIPMENT AND VEHICLES MUST BE MARKED
WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH
ARE CLEARLY VISIBLE. PROVIDE EACH VEHICLE WITH A FLAG
ATTACHED TO THE VEHICLE WHICH SHOULD BE AT LEAST 3 FEET
SQUARE HAVING INTERNATIONAL ORANGE AND WHITE CHECKERED
PATTERN SO THAT THE FLAG IS EASILY VISIBLE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING
PAVEMENT TO REMAIN.
5. PEDESTRIAN TRAFFIC MUST ONLY BE PERMITTED TO ACCESS EXISTING
FACILITIES WITHIN THE CONSTRUCTION LIMITS. PROVIDE DESIGNATED
PEDESTRIAN ACCESS ROUTES TO EXISTING FACILITIES DURING
CONSTRUCTION.
6. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL
DEVICES, REQUEST THE CONTRACTING OFFICER TO SCHEDULE AN
INSPECTION. NO ROADWAY OR PORTION OF THE AIRFIELD MAY BE
RE-OPENED UNTIL THE CONTRACTING OFFICER HAS COMPLETED
INSPECTION AND APPROVED IN WRITING THE RE-OPENING OF ACTIVE
AREAS.
7. REPAIR ANY DAMAGE TO ROADS AND PAVEMENTS TO REMAIN DUE TO
CONSTRUCTION EQUIPMENT OR TRAFFIC TO RESTORE THE ROADS AND
PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
IV. AIRFIELD OPERATIONS COORDINATION
1. COMPLY WITH ALL REQUIREMENTS INDICATED IN FEDERAL AVIATION
ADMINISTRATION (FAA) ADVISORY CIRCULAR (AC) 150/5370-2G,
OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION
(CURRENT EDITION).
2. CONTRACTOR MUST NOT ACCESS THE AIRCRAFT OPERATIONS AREA
WITHOUT CLEARANCE FROM BASE OPERATIONS AND THE
CONTRACTING OFFICER, AND MUST CONDUCT WORK IN SUCH A
MANNER TO ENSURE A MINIMUM HINDRANCE TO AVIATION
OPERATIONS. PROVIDE A MINIMUM NOTICE OF 4 DAYS TO BASE
OPERATIONS FOR ACCESS TO AN AIRCRAFT OPERATIONS AREA.
PEDESTRIAN TRAFFIC AND PRIVATELY OWNED VEHICLES MUST NOT BE
ALLOWED IN THE AIRCRAFT OPERATIONS AREA.
3. MAINTAIN RADIO CONTACT WITH AIRFIELD OPERATIONS AT ALL TIMES
DURING WORK ON THIS PROJECT. CONTRACTOR MUST FURNISH HIS
OWN 2-WAY RADIOS AND IS REQUIRED TO COMPLETE A TRAINING
SESSION ON RADIO USAGE TO BE CONDUCTED BY BASE OPERATIONS.
FREQUENCY OF RADIOS MUST BE COORDINATED WITH BASE
OPERATIONS.
4. CONSTRUCTION ACTIVITIES MAY REQUIRE CONTRACTOR TO CROSS
ACTIVE AIRFIELD AREAS AND AREAS WHERE AIRCRAFT OPERATIONS
ARE TAKING PLACE. CONTINUOUSLY MONITOR AIRCRAFT TRAFFIC ON
AND AROUND THE AIRPORT BY RADIO. CONTRACTOR IS REQUIRED TO
STOP AT ALL AIRFIELD SAFETY AREAS, MONITOR LOCAL RADIO AND
CHECK WITH AIRCRAFT OPERATIONS, AND PROCEED ACROSS AIRFIELD
ONLY AFTER PERMISSION IS GRANTED BY AIRCRAFT OPERATIONS. IF
AIRCRAFT ARE OPERATING OR ARE ON APPROACH TO AIRFIELD,
CONTRACTOR IS REQUIRED TO SUSPEND OPERATIONS, MOVE
PERSONNEL, EQUIPMENT, AND MATERIALS TO A SAFE LOCATION
OUTSIDE OF THE AIRFIELD SAFETY AREA, AND STAND BY UNTIL
AIRCRAFT USE IS COMPLETED.
5. CONSTRUCTION ACTIVITY AFFECTING AIRCRAFT MOVEMENT AREAS
AND AIRFIELD SAFETY REQUIREMENTS MUST BE COORDINATED WITH
BASE OPERATIONS AND THE CONTRACTING OFFICER. NO AIRCRAFT
OPERATIONS AREA MAY BE CLOSED WITHOUT APPROVAL FROM BASE
OPERATIONS.
6. NOTICES TO AIRMEN (NOTAMS) MUST BE ISSUED IN ACCORDANCE WITH
AC 150/5370-2E OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION, AND AC 150/5200-28D NOTICES TO AIRMEN FOR
AIRPORT OPERATORS. ALL NOTAMS MUST BE COORDINATED WITH
BASE OPERATIONS AND THE CONTRACTING OFFICER. NOTAMS MUST
BE ISSUED FOR RUNWAY THRESHOLD DISPLACEMENT, RUNWAY
CLOSURE, AND TAXIWAY CLOSURE. THE NOTAM INFORMATION MUST
INCLUDE PORTIONS OF THE AIRFIELD THAT ARE CLOSED OR
DISPLACED, THE DATE AND TIME OF THE BEGINNING AND ENDING OF
WORK, AND THE DURATION OF THE WORK. PROVIDE A MINIMUM NOTICE
OF 48 HOURS TO BASE OPERATIONS REGARDING THE NEED FOR
NOTICES TO AIRMEN (NOTAMS). DO NOT COMMENCE WORK ACTIVITIES
ON AIRFIELD AREAS UNTIL APPROPRIATE NOTAMS HAVE BEEN ISSUED
BY THE BASE OPERATIONS TO IDENTIFY WORK ACTIVITIES.
7. ALL CONSTRUCTION AREAS THAT POSE A HAZARD TO OPERATING
AIRCRAFT MUST BE PROPERLY MARKED WITH LOW-PROFILE
BARRICADES. ALL BARRICADES LOCATED WITHIN OR ADJACENT TO
AIRCRAFT OPERATIONS AREAS MUST BE LOW-PROFILE TYPE WITH
ORANGE MARKINGS AND RED FLASHING LIGHTS. LOW PROFILE
BARRICADES MUST BE KEPT OUTSIDE THE LIMITS OF ANY ACTIVE
AIRFIELD SAFETY AREA.
8. DEBRIS, WASTE, AND LOOSE MATERIALS CAPABLE OF CAUSING
DAMAGE TO AIRCRAFT AND HELICOPTER LANDING GEAR, PROPELLERS
AND ROTORS, OR OF BEING INGESTED BY JET ENGINES, MUST NOT BE
LEFT WITHIN ACTIVE AIRCRAFT OPERATION AREAS. CONTRACTOR IS
REQUIRED TO IMMEDIATELY CLEAN ANY DEBRIS CARRIED ONTO
AIRFIELD FROM CONTRACTOR'S EQUIPMENT OR OPERATIONS TO
PREVENT FOREIGN OBJECT DAMAGE (FOD). MATERIAL DROPPED
WITHIN THESE AREAS MUST BE CONTINUOUSLY REMOVED BY SURFACE
SWEEPERS OR OTHER APPROVED METHODS DURING WORKING HOURS.
STOCKPILED MATERIAL MUST BE CONSTRAINED IN A MANNER TO
PREVENT MOVEMENT RESULTING FROM AIRCRAFT PROPWASH OR JET
BLAST. KEEP A FULLY OPERATIONAL SURFACE SWEEPER AT THE
PROJECT SITE AT ALL TIMES.
9. ANY DAMAGE TO EXISTING AIRFIELD LIGHTING, AIRCRAFT
NAVIGATIONAL AIDS (NAVAIDS), OR AIRFIELD PAVEMENTS-TO-REMAIN
DUE TO CONSTRUCTION MUST BE COMMUNICATED TO THE
CONTRACTING OFFICER AND MUST BE REPAIRED OR REPLACED BY THE
CONTRACTOR TO THE SATISFACTION OF THE CONTRACTING OFFICER.
V. EQUIPMENT AND STOCKPILE HEIGHT
1. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT
OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY
FEDERAL AVIATION ADMINISTRATION (FAA) ADVISORY CIRCULAR AC
150/5370-2E AND AC 150/5300-13 (CURRENT EDITIONS). WHEN
EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH
SURFACES OR WHEN CRANES WILL BE USED ON-SITE, SUBMIT AN FAA
FORM 7460-1 TO THE REGIONAL OFFICE A MINIMUM OF 90 DAYS IN
ADVANCE. PERMISSION TO USE CRANES WILL BE ISSUED BY BASE
OPERATIONS AND THE CONTRACTING OFFICER AFTER APPROVAL BY
THE FAA.
2. DURING PERIODS OF LOW VISIBILITY, VEHICLES AND EQUIPMENT MUST
BE IDENTIFIED BY AN APPROPRIATELY SIZED FLASHING OR STEADY
BURNING AMBER BEACON MOUNTED ON THE UPPER MOST PART OF
THE VEHICLE OR EQUIPMENT SUCH THAT IT IS CONSPICUOUS FROM
ANY DIRECTION INCLUDING FROM THE AIR.
3. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES MUST HAVE
BOOMS OR ARMS LOWERED TO THEIR LOWEST ELEVATION.
4. DO NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS IN
ANY AREA WHERE SUCH STOCKPILES WOULD PENETRATE AVIATION
SURFACES. IDENTIFY ALL STOCKPILES ADJACENT TO AIRCRAFT
OPERATIONS AREA WITH A 360-DEGREE RED OBSTRUCTION LIGHT
PLACED AT THE HIGHEST POINT OF THE STOCKPILE. STOCKPILING OF
MATERIAL WITHIN THE AIRFIELD SAFETY AREAS IS PROHIBITED.
VI. EXCAVATION AND TRENCHES
1. PROVIDE ALL EXCAVATION, TRENCHING, SHEETING, SHORING, AND
BRACING AS REQUIRED IN ACCORDANCE WITH LOCAL, STATE, AND
FEDERAL REGULATIONS, INCLUDING OSHA (29 CFR 1926) AND EM 385-1-1
(USCE SAFETY MANUAL) AND THE MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (MUTCD).
2. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE
MUST BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH
FLASHING RED LIGHTS ACCEPTABLE TO THE CLIENT REPRESENTATIVE.
3. PROVIDE A MINIMUM NOTICE OF 15 DAYS TO THE CONTRACTING
OFFICER AND ASSOCIATED UTILITY COMPANIES BEFORE PROCEEDING
WITH ANY EXCAVATION OR CONNECTION TO AN EXISTING UTILITY
SYSTEM. OBTAIN A DIG PERMIT FROM THE CONTRACTING OFFICER
PRIOR TO AN EXCAVATION ACTIVITIES.
4. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE
REQUIRED. SUBMIT A DEWATERING PLAN FOR CONTRACTING OFFICER
APPROVAL AT NO ADDITIONAL COST TO THE GOVERNMENT.
5. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON-HAND AND
READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE
MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND
COMPACT TRENCHES AS SPECIFIED.
6. A MAXIMUM OF 100 LINEAR FEET OF EXCAVATED TRENCH MAY BE OPEN
AT ANY TIME DURING CONSTRUCTION.
7. TAKE ALL NECESSARY PRECAUTIONS, INCLUDING PROVIDING SHORING
AND PIPE SUPPORTS, TO PROTECT ALL EXPOSED PIPING WITHIN
TRENCH EXCAVATIONS. IMMEDIATELY REPAIR ANY DAMAGE INCURRED
BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE PROJECT AND
TO THE SATISFACTION OF THE UTILITY OWNER.
8. COVER EXCAVATIONS AND TRENCHES WITHIN ACTIVE VEHICULAR AND
PEDESTRIAN AREAS AT THE END OF EACH WORK PERIOD. USE
BACKFILL AND TEMPORARY PAVEMENT OF STEEL PLATES.
VII. EXISTING FACILITIES ACCESS AND SECURITY
1. MAINTAIN PEDESTRIAN ACCESS TO ALL EXISTING FACILITIES TO REMAIN
AT ALL TIMES DURING CONSTRUCTION.
2. A PORTION OF THE FLIGHT LINE FENCE ADJACENT TO EXISTING
BUILDING 131 SITE WILL BE REMOVED AND REPLACED. COORDINATE
WITH THE CONTRACTING OFFICER AND BASE PERSONNEL TO MAINTAIN
A SECURE FLIGHT LINE PERIMETER DURING FENCE REPLACEMENT.
VIII. OTHER ACCESS AND SAFETY REQUIREMENTS
1. MAINTAIN SAFETY PRACTICES THAT CONFORM TO OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS.
2. CONTRACTOR IS RESPONSIBLE FOR SECURING ALL MATERIALS AND
EQUIPMENT NECESSARY TO COMPLETE THE PROJECT.
3. STOCKPILED MATERIAL MUST BE CONSTRAINED IN A MANNER TO
PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS.
4. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM
CONSTRUCTION PERSONNEL AND ACTIVITIES MUST BE REMOVED FROM
THE PROJECT LIMITS.
5. PROPERLY DISPOSE OF GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS
WASTE RESULTING FROM CONTRACTOR'S OPERATIONS IN
ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY
REQUIREMENTS AND PROPERLY REMOVE FROM THE PROJECT SITE. IF
HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING
CONSTRUCTION ACTIVITIES, IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER.
6. IF CONSTRUCTION REQUIRES THE DISRUPTION OR DISCONNECTION OF
ANY WATER LINES OR FIRE HYDRANTS ON PROJECT PROPERTY OR
ADJOINING PROPERTY, PROVIDE A MINIMUM ADVANCE NOTICE OF 15
DAYS TO CHERRY POINT FIRE AND EMERGENCY SERVICES.
7. FAILURE TO COMPLY WITH BASE OPERATIONS AND THE CLIENT
REPRESENTATIVE SAFETY REQUIREMENTS WILL RESULT IN THE
SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY
CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE
SATISFACTION OF THE CONTRACTING OFFICER.
8. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH BASE
SAFETY AND OPERATIONS MUST IMMEDIATELY BE REMOVED FROM THE
WORK AREA AND MUST NOT BE PERMITTED TO RETURN THROUGHOUT
THE REMAINDER OF THE PROJECT.
9. ALL HOT WORK REQUIRES APPROVAL OF CHERRY POINT FIRE AND
EMERGENCY SERVICES. THE CONTRACTOR MUST OBTAIN A PERMIT ON
A WEEKLY BASIS. A MINIMUM COOLDOWN TIME OF 120 MINUTES MUST
BE OBSERVED FOLLOWING ALL HOT WORK.
10. CONTRACTOR IS SUBJECT TO ALL BASE CLOSURES INCLUDING
FEDERAL HOLIDAYS, NATURAL DISASTER CLOSURES, AND NATIONAL
SECURITY CLOSURES.
SITE ACCESS AND SAFETY NOTES SITE ACCESS AND SAFETY NOTES SITE ACCESS AND SAFETY NOTES SITE ACCESS AND SAFETY NOTES SITE ACCESS AND SAFETY NOTES
IS
SU
ED
F
OR
B
ID
GI141
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution
3768 37
84525
129403583
138 139 42754037
1700374513
441645
25044
121 40
4249 4209
417040794078
3945 3946 3947 3948 3949 3950
CTR0013
CT
R3
72 41
A
4380A
1005 18 9543824582
143157
452190
CTR0017
84 A
CT
R0
29 16
65FR
C-
14 38
43104200
41984197
4311 4313
48684867
403840664280
CTR
193 420
11374
3452 T4
NE
W
B
EQ
ROOSEVELT BLVD
ROOSEVELT BLVD
ROOSEVELT BLV
D
CUNNINGHAM BLVD
CUNNINGHAM BLVD
CLEVELAND DRIVE
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
HARRISON DRIVE
TA
YL
OR
D
RI
VE
CURTIS ROAD
W
IN
BE
RR
Y
CR
OS
SI
NG
CURTISS ROAD
2ND AVENUE
MACKEREL R
OAD
BEACHEY ROAD
LA
NGLE
Y ROAD
WRIGHT ROAD
6TH AVENUE
2ND AVENUE
2ND AVENUE2ND AVENUE2ND AVENUE
C
ST
RE
ET
C
ST
RE
ET
C
ST
RE
ET
C
ST
RE
ET
C
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
1ST AVENUE1ST AVENUE
OA
K
ST
RE
ET
3RD AVENUE S
3R
D AVENUE N
HE
AV
EN
LY
LA
NE
COMMUNITY LOOP
RECREATION LANE
4TH AVENUE 4TH AVENUE 4TH AVENUE
4TH AVENUE
5TH AVENUE 5TH AVENUE
5TH AVENUE 5TH AVENUE 5TH AVENUE
6TH AVENUE
7TH AVENUE
G
ST
RE
ET
F
ST
RE
ET
H
ST
RE
ET
7TH AVENUE
7TH AVENUE
D
ST
RE
ET
E
XT
EN
SI
ON
RE
IN
DE
ER
R
OA
D
MU
LE
R
OA
D
WOMBAT ROAD
F STREET
2ND AVENUE
LA
NGLE
Y ROAD
BEACHEY ROAD
CONTRACTOR
HAUL ROUTE
CONTRACTOR
HAUL ROUTE
1.3 MILES
TO SLOCUM
GATE
CONTRACTOR
STAGING AND
LAYDOWN AREA
CONTRACTOR
HAUL ROUTE
CONTRACTOR
STAGING AND
LAYDOWN AREA
CONTRACTOR
STAGING AND
LAYDOWN AREA
ROOSEVELT BLVD
5TH AVENUE
6TH AVENUE
LANGLEY ROAD
A
ST
RE
ET
CONTRACTOR
HAUL ROUTE
3768 37
84525
129403583
138 139 42754037
1700374513
441645
25044
121 40
4249 4209
417040794078
3945 3946 3947 3948 3949 3950
CTR0013
CT
R3
72 41
A
4380A
1005 18 9543824582
143157
452190
CTR0017
84 A
CT
R0
29 16
65FR
C-
14 38
43104200
41984197
4311 4313
48684867
403840664280
CTR
193 420
11374
3452 T4
NE
W
B
EQ
ROOSEVELT BLVD
ROOSEVELT BLVD
ROOSEVELT BLV
D
CUNNINGHAM BLVD
CUNNINGHAM BLVD
CLEVELAND DRIVE
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
A
ST
RE
ET
HARRISON DRIVE
TA
YL
OR
D
RI
VE
CURTIS ROAD
W
IN
BE
RR
Y
CR
OS
SI
NG
CURTISS ROAD
2ND AVENUE
MACKEREL R
OAD
BEACHEY ROAD
LA
NGLE
Y ROAD
WRIGHT ROAD
6TH AVENUE
2ND AVENUE
2ND AVENUE2ND AVENUE2ND AVENUE
C
ST
RE
ET
C
ST
RE
ET
C
ST
RE
ET
C
ST
RE
ET
C
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
E
ST
RE
ET
1ST AVENUE1ST AVENUE
OA
K
ST
RE
ET
3RD AVENUE S
3R
D AVENUE N
HE
AV
EN
LY
LA
NE
COMMUNITY LOOP
RECREATION LANE
4TH AVENUE 4TH AVENUE 4TH AVENUE
4TH AVENUE
5TH AVENUE 5TH AVENUE
5TH AVENUE 5TH AVENUE 5TH AVENUE
6TH AVENUE
7TH AVENUE
G
ST
RE
ET
F
ST
RE
ET
H
ST
RE
ET
7TH AVENUE
7TH AVENUE
D
ST
RE
ET
E
XT
EN
SI
ON
RE
IN
DE
ER
R
OA
D
MU
LE
R
OA
D
WOMBAT ROAD
F STREET
2ND AVENUE
LA
NGLE
Y ROAD
BEACHEY ROAD
CONTRACTOR HAUL ROUTE VIA PROJECT
P-235 PROPOSED 5TH AVENUE EXTENSION
CONTRACTOR
HAUL ROUTE
1.3 MILES
TO SLOCUM
GATE
CONTRACTOR
STAGING AND
LAYDOWN AREA
CONTRACTOR
HAUL ROUTE
CONTRACTOR
STAGING AND
LAYDOWN AREA
CONTRACTOR
STAGING AND
LAYDOWN AREA
ROOSEVELT BLVD
5TH AVENUE
6TH AVENUE
LANGLEY ROAD
A
ST
RE
ET
CONTRACTOR
HAUL ROUTE
ACTIVE PROJECT P-235 CONSTRUCTION ON 6TH AVENUE
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
1" = 400'A1 0
SCALE IN FEET
400' 800'
SITE ACCESS AND STAGING PLAN
1" = 400'A1
GENERAL NOTES
1. SEE SHEET GI141 FOR SITE ACCESS AND SAFETY NOTES.
2. AT THE TIME OF PROJECT MOBILIZATION, CONSTRUCTION
ACTIVITIES FOR P235 PROJECT WILL BE ON-GOING. COORDINATE
WITH P235 PROJECT FOR CONSTRUCTION ACCESS TO SITE,
UTILITY CONNECTIONS AND PAVING/SIDEWALK CONNECTIONS.
3. 6TH AVENUE WILL BE CLOSED BY P235 CONSTRUCTION ACTIVITIES
AND WILL BE UNACCESSIBLE AND UNAVAILABLE FOR P228
CONSTRUCTION TRAFFIC AT ANY TIME.
4. SEE SHEETS CG101 AND CG102 FOR P235 LIMITS OF DISTURBANCE.
IS
SU
ED
F
OR
B
ID
PLAN
NORTH
GI142
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
UGG
UGG
UGG
U G
G
UGG
X
LO
C
LOC
LOC
LOC
LO
C
LOC
LO
C
LOCLOC
LO
C
LOC
LO
C
LO
C
LO
C
LOC LOC LOCLOCLOCLOC
LO
C
LO
C
LOC
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LO
C
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LOC LOC
LOC
LOC
LOC
LOC LOC LOC
LO
C
LO
C
LO
C
LOC
LOC LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
XX
X
X
X
NO PARKING
LANE
LANE
NO PARKING
LA
NE
FI
RE
NO PARKING
P
FIRE
P
FIRE
P
LANE
FIRE
P
AIRFIELD
OPERATIONS
BUILDING
X
X
CONTRACTOR
LAYDOWN AREA
BEGIN
END
FOD CHECK POINT3
BID OPTION - EXISTING CONSTRUCTION TO BE REMOVED
PHASE 1 PHASE 2
PHASE 1 PHASE 2
CONTRACTOR
LAYDOWN AREA2
(SEE GEN. NOTE 1)
24'
24'
(SEE GEN. NOTE 1)
CONTRACTOR HAUL ROUTE
TEMPORARY AIRFIELD
SERVICE ROAD DETOUR
TEMPORARY AIRFIELD
SERVICE ROAD DETOUR
TAXIWAY H
E 2632898.85 N 425838.68
E 2632797.59 N 425710.92
E 2632920.90 N 425860.02
E 2632940.95 N 425840.46
E 2633042.15 N 425941.63
E 2633181.95 N 426020.12
E 2633424.30 N 426268.79
E 2633591.67 N 426106.46
E 2633512.73 N 426025.56
E 2633726.97 N 425816.53
E 2633324.24 N 425403.75
E 2633349.98 N 425378.64
E 2633277.00 N 425362.53
E 2633220.83 N 425385.57 E 2633195.18 N 425410.72
E 2633306.24 N 425333.80
E 2633161.07 N 425375.76 E 2633140.84 N 425395.50 E 2633141.01 N 425473.12
E 2633029.44 N 425581.83 E 2633013.35 N 425565.27
E 2632931.51 N 425644.61 E 2632908.14 N 425649.72
E 2632868.48 N 425641.75
A1 AIRFIELD PHASING AND STAGING PLAN - 1
PHASE 1 NEW AIRFIELD OPERATIONS
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PLAN
NORTH
KEY PLAN
1" = 80'
PLAN
NORTH
GI143
1. INSTALL PERIMETER EROSION CONTROL MEASURES
1.1. RELOCATE EXISTING CONCRETE BARRIERS AND PROVIDE
ADDITIONAL CONCRETE BARRIERS AS NEEDED TO CREATE
TEMPORARY BARRIER WHERE INDICATED . INSTALL A ROW OF LOW
PROFILE BARRICADES WHERE INDICATED TO CREATE TEMPORARY
FLIGHT LINE ROAD. GOVERNMENT TO PROVIDE TEMPORARY
SIGNAGE TO BE MOUNTED TO JERSEY BARRIERS.
1.2. INSTALL EROSION CONTROL MEASURES AS SHOWN ON EROSION
CONTROL SHEETS
2. DEMOLISH AND REMOVE EXISTING BUILDINGS
2.1. B131
2.2. B4348
2.3. B4440.
3. DEMOLISH AND REMOVE SITE FEATURES
3.1. AIRSIDE CONCRETE
3.2. LANDSIDE CONCRETE
3.3. CHAIN-LINK SECURITY FENCING AND GATES
3.4. BOLLARDS
3.5. CURB AND GUTTER
4. DEMOLISH, REMOVE, AND ABANDON IN PLACE UTILITIES
4.1. DOMESTIC WATER LINES AND APPURTENANCES
4.2. STORM SEWER LINES, INLETS, AND STRUCTURES
4.3. SANITARY SEWER LINES AND STRUCTURES
4.4. TELECOMMUNICATIONS DUCT BANKS AND STRUCTURES
4.5. ELECTRICAL DUCT BANKS AND STRUCTURES
4.6. STEAM LINES
5. PROPOSED GRADING
5.1. ROUGH GRADE SITE
5.2. UNDERCUT SUBGRADE AND REPLACE WITH SAND ON LANDSIDE
5.3. CEMENT STABILIZE SUBGRADE ON AIRSIDE
5.4. CONSTRUCT FINISHED GRADES TO ELEVATIONS SHOWN ON PLANS
6. PROPOSED SITE WORK
6.1. NEW AIRFIELD OPERATIONS BUILDING
6.2. NEW LANDSIDE ASPHALT, LANDSIDE CONCRETE, AND AIRSIDE
CONCRETE PAVEMENTS
6.3. NEW SECURITY FENCING AND GATES
6.4. NEW PAVEMENT MARKINGS
6.5. NEW SIDEWALKS AND HOUSEKEEPING EQUIPMENT PADS
7. PROPOSED UTILITIES
7.1. DOMESTIC WATER LINES AND APPURTENANCES
7.2. STORM SEWER LINES, INLETS, AND STRUCTURES
7.3. SANITARY SEWER LINES AND STRUCTURES
7.4. TELECOMMUNICATIONS DUCT BANKS AND STRUCTURES
7.5. ELECTRICAL DUCT BANKS, EQUIPMENT, AND STRUCTURES
8. SALVAGE ALL JERSEY BARRIERS TO THE GOVERNMENT. DELIVER TO
YARD ON BASE PER COR.
IS
SU
ED
F
OR
B
ID
80' 120'0
WORK NOTES
1. TEMPORARY BARRIER MOUNTED FENCE WITH FILTER FABRIC
2. LOW PROFILE BARRICADE
3. KEEP LAV CART DISPOSAL SERVICE CLEAR OF ANY
OBSTRUCTIONS. LAV CART DISPOSAL SITE MUST BE
ACCESSIBLE AND OPERATIONAL THROUGHOUT DURATION OF
CONSTRUCTION.
4. RELOCATE EXISTING CONCRETE BARRIERS AS SHOWN
A1
GI501C1
GI501
X
GENERAL NOTES
1. INSTALL LOW PROFILE BARRICADES IN THIS AREA DURING DURATION
OF PAVEMENT MARKING REMOVAL ACTIVITIES ONLY. COORDINATE WITH
AND GIVE NOTICE TO COR AND AIRFIELD OPERATIONS AT LEAST 14
DAYS IN ADVANCE OF PLANNED MARKING REMOVAL ACTIVITIES.
FOD FENCE
LOW PROFILE BARRIER
PHASING LEGEND
SERVICE ROAD DETOUR
GI143
6T H
AV
EN
UE
A STREET
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
UGG
UGG
U G
G
UGG
X
LO
C
LOC
LOC
LOC
LO
C
LOC
LO
C
LOCLOC
LO
C
LOC
LO
C
LO
C
LO
C
LOC LOC LOCLOCLOCLOC
LO
C
LO
C
LOC
LO
C
LO
C
LO
C
LO
C
LOCLOCLOC
LO
C
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LOC LOC
LOC
LOC
LOC
LOC LOC LOC
LO
C
LO
C
LO
C
LOC
LOC LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
XX
X
X
X
NO PARKING
LANE
LANE
NO PARKING
LA
NE
FI
RE
NO PARKING
P
FIRE
P
FIRE
P
LANE
FIRE
P
AIRFIELD
OPERATIONS
BUILDING
X
X
CONTRACTOR
LAYDOWN AREA
CO
NT
RA
CT
OR
LA
YD
OW
N
AR
EA
BID OPTION
1END
PHASE 1 PHASE 2
PHASE 1 PHASE 2
BEGIN
BEGIN
2 END
2(SEE GEN. NOTE 1)
CONTRACTOR HAUL ROUTE
CONTRACTOR HAUL ROUTE
2 (SEE GEN. NOTE 1)
E 2633417.42 N 426319.80 E 2633451.42 N 426354.63
E 2633293.82 N 426507.68
E 2633327.25 N 426694.58
E 2633470.97 N 426729.54
E 2634063.45 N 426160.91
E 2634098.27 N 426087.48
E 2634054.33 N 425975.62
E 2633982.23 N 425940.54
E 2633861.32 N 425953.43
E 2633783.31 N 426036.17
E 2633661.51 N 426128.78
E 2633618.28 N 426122.41
E 2633642.66 N 426147.38
E 2633445.19 N 426290.32
E 2633652.08 N 426138.08
E 2633787.17 N 426031.00
E 2633658.65 N 425899.28
E 2633535.92 N 426019.02
A1 AIRFIELD PHASING AND STAGING PLAN - 2
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
PLAN
NORTH
KEY PLAN
1" = 80'
PLAN
NORTH
GI144
1. PHASE 2 WORK MAY NOT BEGIN UNTIL PHASE 1 IS COMPLETE AND NEW
AIR OPERATIONS AND ATCT BUILDINGS ARE OPERATIONAL AND WITH
COR APPROVAL.
2. INSTALL PERIMETER EROSION CONTROL MEASURES
2.1. RELOCATE EXISTING JERSEY BARRIERS AND PROVIDE
ADDITIONAL JERSEY BARRIERS AS NEEDED TO CREATE
TEMPORARY BARRIER WHERE INDICATED . INSTALL A ROW OF
LOW PROFILE BARRICADES WHERE INDICATED TO CREATE
TEMPORARY FLIGHT LINE ROAD. GOVERNMENT TO PROVIDE
TEMPORARY SIGNAGE TO BE MOUNTED TO JERSEY BARRIERS.
2.2. CONTRACTOR REQUIRED TO OBTAIN AIRFIELD DRIVING
CERTIFICATE TO INSTALL AND REMOVE TEMPORARY BARRICADES
FOR PHASE 2 WORK.
2.3. INSTALL EROSION CONTROL MEASURES AS SHOWN ON EROSION
CONTROL SHEETS.
3. DEMOLISH AND REMOVE EXISTING BUILDINGS
3.1. B199
3.2. B1641
3.3. B1639
4. DEMOLISH AND REMOVE SITE FEATURES
4.1. LANDSIDE ASPHALT PAVEMENT, LANDSIDE CONCRETE PAVEMENT,
SIDEWALKS, AND CONCRETE HOUSEKEEPING PADS
4.2. CHAIN-LINK SECURITY FENCING AND GATES
4.3. BOLLARDS
4.4. CURB AND GUTTER
5. DEMOLISH, REMOVE, AND ABANDON IN PLACE UTILITIES
5.1. DOMESTIC WATER LINES AND APPURTENANCES
5.2. STORM SEWER LINES, INLETS, AND STRUCTURES
5.3. SANITARY SEWER LINES AND STRUCTURES
5.4. TELECOMMUNICATIONS DUCT BANKS AND STRUCTURES
5.5. ELECTRICAL DUCT BANKS AND STRUCTURES
5.6. STEAM LINES
6. PROPOSED GRADING
6.1. GRADE SITE TO ELEVATIONS SHOWN ON PLANS
6.2. PERMANENTLY STABILIZE THE SITE WITH SODDING PER
LANDSCAPING PLANS
7. SALVAGE ALL JERSEY BARRIERS TO THE GOVERNMENT. DELIVER TO
YARD ON BASE PER COR.
IS
SU
ED
F
OR
B
ID
80' 120'0
PHASE 2 - BID OPTION - EXISTING
CONSTRUCTION TO BE REMOVED
WORK NOTES
1. TEMPORARY BARRIER MOUNTED FENCE WITH FILTER FABRIC
2. LOW PROFILE BARRICADE
3. KEEP LAV CART DISPOSAL SERVICE CLEAR OF ANY
OBSTRUCTIONS. LAV CART DISPOSAL SITE MUST BE
ACCESSIBLE AND OPERATIONAL THROUGHOUT DURATION OF
CONSTRUCTION.
A1
GI501C1
GI501
X
GENERAL NOTES
1. INSTALL LOW PROFILE BARRICADES IN THIS AREA DURING DURATION
OF PAVEMENT MARKING REMOVAL ACTIVITIES ONLY. COORDINATE WITH
AND GIVE NOTICE TO COR AND AIRFIELD OPERATIONS AT LEAST 14
DAYS IN ADVANCE OF PLANNED MARKING REMOVAL ACTIVITIES.
FOD FENCE
LOW PROFILE BARRIER
PHASING LEGEND
GI144
6T H
AV
EN
UE
A STREET
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
8'-0"
8"
SUPPORT BRACE
2X4, 24" IN LENGTH
SECURELY FASTENED WITH
ORANGE SANDBAGS (OR SIMILAR)
RED FLASHING LIGHT
2"X8" (NOMINAL)
ALTERNATING 6" BANDS
OF AVIATION WHITE &
ORANGE (ALL SIDES OF
BOARD)
BRACE BARRICADES
TO PREVENT TIP OVER OR
DISPLACEMENT AS MAY BE
INDUCED BY WIND OR JET BLAST
NOTES:
1. FLASHERS MUST BE BATTERY OPERATED. LENS MUST BE RED AND BE ABLE TO ROTATE 90°.
2. SUPPORT BRACES MUST BE SECURELY ATTACHED TO 2"X8".
3. PLACE SAND BAGS SHALL ON BOTH SIDES OF EACH SUPPORT BRACE. ALL SAND BAGS USED TO SECURE BARRICADES MUST
BE ORANGE
4. FACING OF 2"X8" TO BE COVERED WITH REFLECTIVE TAPE OR PAINT.
5. PROVIDE A SUFFICIENT NUMBER OF LOW PROFILE BARRICADES TO EXTEND ACROSS THE PAVEMENT AT THE LOCATIONS
SHOWN WITH BARRICADES PLACED END TO END WITH NO GAPS.
x x x x x x x x x x x x x
2" Ø GALV. STEEL
FENCE POST
1-5/8" Ø TOP RAIL
CONCRETE JERSEY BARRIER OR
WATER FILLED BARRIER
FENCE FABRIC
1/2" Ø ANCHOR BOLT
WITH LEVELING NUTS
3" Ø FENCE POST
2.5" O.D. STEEL SLEEVE
3" Ø CORED HOLE
GROUT
1/2" Ø BOLT
1/2" Ø A BOLT HOLE (TYP 4)
2" Ø STEEL POST
DETAIL OF
BASE PLATE
NOTES:
1. FURNISH ALL MATERIALS SHOWN. EXISTING CONCRETE BARRIERS ON SITE MAY BE USED BY THE CONTRACTOR AS SHOWN ON THE DRAWINGS AND AS DIRECTED BY THE COR. CONTRACTOR IS
RESPONSIBLE FOR FURNISHING NAY ADDITIONAL BARRIERS REQUIRED.
2. BARRIERS WILL BE SUBJECTED TO JET BLAST FROM TAXIING AIRCRAFT ON APRON. PROVIDE THE BARRIER SYSTEM SUCH THAT OVERTURN FROM JET BLAST IS PREVENTED AND CONTRACTOR PERSONNEL
PROTECTION FROM FOD RESULTING FROM JET BLAST IS MAXIMIZED.
3. INTERCONNECT BARRIERS WITH ONE ANOTHER TO RESIST THE POSSIBILITY OF OVERTURN DUE TO JET BLAST.
4. THE POST ATTACHMENT METHODS SHOWN ARE RECOMMENDATIONS. THE CONTRACTOR MAY SUBMIT ADDITIONAL METHODS TO THE COR FOR APPROVAL.
5. PLACE FILTER FABRIC ON THE GROUND FIRST. PLACE CONCRETE BARRIER ON TOP OF FABRIC WITH MINIMUM 6" OVERLAP. WRAP FILTER FABRIC AROUND THE BARRIER ON THE CONSTRUCTION SIDE AND SECURED TO THE FENCE FABRIC WITH WIRE TIES. WIRE TIES MUST BE SPACED MAXIMUM 24".
2" Ø GALV. STEEL
LINE FENCE POST
1-5/8" Ø BOTTOM RAIL
1-5/8" TOP RAIL
No. 8 BAR PIN (TYP)
CIRCULAR YELLOW REFLECTOR
(TYP. 3 PER FENCE POST)
CIRCULAR YELLOW
REFLECTOR. 3 REQ'D PER
POST, AT TOP, MIDDLE AND
BOTTOM ON A.O.A. SIDE)
2" Ø GALV. STEEL
CORNER FENCE POST
EXISTING PCC CONCRETE
PAVEMENT SURFACE
6' 0" CHAIN LINK FENCE
6"19"
2"
2"
2"
10' 0" BARRIER LINE SECTION (TYP)
5' 0"
10' 0" BARRIER CORNER SECTION (TYP)
9"
SECTION VIEW
ALTERNATE METHOD OF
POST ATTACHMENT
ELEVATION VIEW
1-5/8" Ø BOTTOM
RAIL
9"
4"
6"x6"x.375"
STEEL BASE PLATE
6" 3"
6"
4"
3"
2"X2"X1/4" WELDED STEEL BRACE (TYP 4)
2" Ø STEEL BRACE
PIPE
9"
12"
2.5"
FENCE FABRIC WITH BROWN
PRIVACY SCREEN
(NOT SHOWN FOR CLARITY)
DRAINAGE POCKET, TYP
C1 LOW PROFILE BARRICADE
NTS
A1 TEMPORARY BARRIER MOUNTED FENCE WITH FILTER FABRIC
NTS
6" MIN
FILTER FABRIC
FILTER FABRIC, FILTER X, MIRAFI 100X,
STABILINKA T140N, OR APPROVED
EQUAL
3" M
IN
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
FY
P -2
A
TC
T
O W
E R
A N
D A
IR
O
P E
R A
TI
O
N S
1317 EXECUTIVE BLVD.
SUITE 300
CHESAPEAKE, VA 23320
IS
SU
ED
F
OR
B
ID
GI501
SAT-TO FORM SIGNED BY
DON ELLIOT 12/19/19
PR
OFESS I ONAL
ENG I N E E R
NO
RTH CAROL I NA
CASS NDRA L Z WART
SEAL
049323
| GI131 FIRE PROTECTION SITE PLAN - AREA 1 |
| GI132 FIRE PROTECTION SITE PLAN - AREA 2 |
| GI141 SITE ACCESS AND SAFETY NOTES |
| GI142 SITE ACCESS AND STAGING PLAN |
| GI143 AIRFIELD PHASING AND STAGING PLAN - 1 |
| GI144 AIRFIELD PHASING AND STAGING PLAN - 2 |
| GI501 ACCESS AND LAYDOWN DETAILS |
2022-08-15T06:41:38-0400
2022-08-15T06:41:56-0400
2022-08-15T06:42:00-0400
2022-08-15T06:42:03-0400
2022-08-15T06:42:06-0400
2022-08-15T06:42:09-0400
2022-08-15T06:42:11-0400
| 2022-09-22T08:28:13-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:25-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:26-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:27-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:28-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:28-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:29-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:42-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:58-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:28:59-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:29:00-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:29:00-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:29:01-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-09-22T08:29:02-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .