Attachment J2 REVISED 03.09.22 Price Proposal Form.xlsx
XLSX spreadsheet 110 KB Posted
- Solicitation number
- N4008521R2534
About this file
This solicitation is for an Indefinite Delivery/Indefinite Quantity (IDIQ) Environmental Multiple Award Contract (MAC) to provide environmental services and remedial actions at contaminated sites within the Naval Facilities Engineering Command Mid-Atlantic area of responsibility. The contract will have a one year base period and four one-year option periods, with a maximum total value of $30 million to be awarded across three to five basic contracts. Task orders will range from $50,000 to $250,000 for projects such as CERCLA, RCRA, UST, Clean Water Act, and natural resources work. The North American Industry Classification System code is 562910 for environmental remediation services. This 100% service-disabled veteran-owned small business set-aside solicitation seeks to obtain these services primarily at Naval Station Great Lakes in Illinois and Naval Support Activity Crane in Indiana.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Award
| NAVAL FACILITIES ENGINEERING COMMAND MID-ATLANTIC | CONTRACTOR BASIC ESTIMATE | ||||||||||||||||||||||||||||||||||||
| FEE ITEMIZATION SHEET | |||||||||||||||||||||||||||||||||||||
| DATE OF SCOPE/MOD: | A-E FIRM: | ||||||||||||||||||||||||||||||||||||
| DATE OF PROPOSAL: | CONTRACT NO.: | ||||||||||||||||||||||||||||||||||||
| Task 1 | Task 2 | Task 2 | Option 1 | Task 2 | Option 2 | Task 2 | Option 3 | Task 3 | Option 4 | Task 3 | Option 5 | Task 3 | Option 6 | Task 3 | Option 7 | Task 3 | Option 8 | Task 3 | Option 9 | Task 3 | Option 10 | Task 3 | Option 11 | Task 3 | Option 12 | Task 4 | Option 13 | Task 4 | Option 14 | Task 5 | |||||||
| PROJECT: | Project Management (CLIN 004) | UST Testing (CLIN 001) | Pre-priced option 1 - UST Monthly Inspections (SLIN 001) | Pre-priced option 2- UST Annual Inspections/ Annual Report (SLIN 002) | Pre-priced option 3- UST Triennial Testing and Reports (SLIN 003) | Pre-priced option 4- AST Inspections (SLIN 004) | Pre-priced option 5- Inspection of Challenge Owned ASTs (SLIN 005) | Pre-priced option 6- Inspection of TSC Owned ASTs (SLIN 006) | Pre-priced option 7- Inspection of MWR Owned ASTs (SLIN 007) | Pre-priced option 8- Inspection of Goodwill Owned ASTs (SLIN 008) | Pre-priced option 9- Inspection of MARFORRES Owned ASTs (SLIN 009) | Pre-priced option 10- Portable Container and Drum Storage Areas Monthly Inspections (SLIN 010) | Pre-priced option 11- AST Annual Inspections/ Annual Reports (SLIN 011) | Pre-priced option 12- Collection of Inspection Records/ Recordkeeping (SLIN 012) | Pre-priced option 13- Oil Water Separator Maintenance and Inspections (SLIN 013) | Pre-priced option 14- Inspection and Maintenace of Oil Water Separators owned by MWR (SLIN 014) | EPCRA Reporting (CLIN 003) | ||||||||||||||||||||
| LOCATION: | |||||||||||||||||||||||||||||||||||||
| CREF: | TOTAL | ||||||||||||||||||||||||||||||||||||
| PROPOSAL NO.: | THIS PAGE | ||||||||||||||||||||||||||||||||||||
| PART I - DIRECT SERVICES | |||||||||||||||||||||||||||||||||||||
| ITEM | $/HR | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST |
| Program Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Quality Control Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Project Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Certified Industrial Hygienist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Procurement/Contracts Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Site Health and Safety Officer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Safety and Health Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DIRECT LABOR | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DL & PROFIT | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| OTHER DIRECT COST | $/UNIT | ||||||||||||||||||||||||||||||||||||
| Reproduction (number of copies) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Compact disks | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (1") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (2") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Shipping (number of shipments) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| SUBCONTRACTORS | |||||||||||||||||||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| TOTAL ODC & SUBS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL ODC/SUBS & G&A | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL FEE - PART I - Direct Services | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PART II - TRAVEL | |||||||||||||||||||||||||||||||||||||
| ITEM | $/UNIT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | |
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| POV Usage (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Automobile Rental (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Fuel for Auto Rental (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 75% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 100% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Per Diem (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Taxes (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Airport Parking (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL TRAVEL | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| TOTAL FEE - PART II - Travel | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| *** GRAND TOTAL FEE *** | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Option Year 1
| NAVAL FACILITIES ENGINEERING COMMAND MID-ATLANTIC | CONTRACTOR BASIC ESTIMATE | ||||||||||||||||||||||||||||||||||||
| FEE ITEMIZATION SHEET | |||||||||||||||||||||||||||||||||||||
| DATE OF SCOPE/MOD: | A-E FIRM: | ||||||||||||||||||||||||||||||||||||
| DATE OF PROPOSAL: | CONTRACT NO.: | ||||||||||||||||||||||||||||||||||||
| Task 1 | Task 2 | Task 2 | Option 1 | Task 2 | Option 2 | Task 2 | Option 3 | Task 3 | Option 4 | Task 3 | Option 5 | Task 3 | Option 6 | Task 3 | Option 7 | Task 3 | Option 8 | Task 3 | Option 9 | Task 3 | Option 10 | Task 3 | Option 11 | Task 3 | Option 12 | Task 4 | Option 13 | Task 4 | Option 14 | Task 5 | |||||||
| PROJECT: | Project Management (CLIN 004) | UST Testing (CLIN 001) | Pre-priced option 1 - UST Monthly Inspections (SLIN 001) | Pre-priced option 2- UST Annual Inspections/ Annual Report (SLIN 002) | Stormwater Inspections and Sampling (CLIN 002) | Pre-priced option 4- AST Inspections (SLIN 004) | Pre-priced option 5- Inspection of Challenge Owned ASTs (SLIN 005) | Pre-priced option 6- Inspection of TSC Owned ASTs (SLIN 006) | Pre-priced option 7- Inspection of MWR Owned ASTs (SLIN 007) | Pre-priced option 8- Inspection of Goodwill Owned ASTs (SLIN 008) | Pre-priced option 9- Inspection of MARFORRES Owned ASTs (SLIN 009) | Pre-priced option 10- Portable Container and Drum Storage Areas Monthly Inspections (SLIN 010) | Pre-priced option 11- AST Annual Inspections/ Annual Reports (SLIN 011) | Pre-priced option 12- Collection of Inspection Records/ Recordkeeping (SLIN 012) | Pre-priced option 13- Oil Water Separator Maintenance and Inspections (SLIN 013) | Pre-priced option 14- Inspection and Maintenace of Oil Water Separators owned by MWR (SLIN 014) | EPCRA Reporting (CLIN 003) | ||||||||||||||||||||
| LOCATION: | |||||||||||||||||||||||||||||||||||||
| CREF: | TOTAL | ||||||||||||||||||||||||||||||||||||
| PROPOSAL NO.: | THIS PAGE | ||||||||||||||||||||||||||||||||||||
| PART I - DIRECT SERVICES | |||||||||||||||||||||||||||||||||||||
| ITEM | $/HR | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST |
| Program Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Quality Control Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Project Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Certified Industrial Hygienist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Procurement/Contracts Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Site Health and Safety Officer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Safety and Health Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DIRECT LABOR | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DL & PROFIT | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| OTHER DIRECT COST | $/UNIT | ||||||||||||||||||||||||||||||||||||
| Reproduction (number of copies) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Compact disks | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (1") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (2") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Shipping (number of shipments) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| SUBCONTRACTORS | |||||||||||||||||||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| TOTAL ODC & SUBS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL ODC/SUBS & G&A | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL FEE - PART I - Direct Services | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PART II - TRAVEL | |||||||||||||||||||||||||||||||||||||
| ITEM | $/UNIT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | |
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| POV Usage (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Automobile Rental (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Fuel for Auto Rental (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 75% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 100% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Per Diem (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Taxes (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Airport Parking (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL TRAVEL | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| TOTAL FEE - PART II - Travel | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| *** GRAND TOTAL FEE *** | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Option Year 2
| NAVAL FACILITIES ENGINEERING COMMAND MID-ATLANTIC | CONTRACTOR BASIC ESTIMATE | ||||||||||||||||||||||||||||||||||||
| FEE ITEMIZATION SHEET | |||||||||||||||||||||||||||||||||||||
| DATE OF SCOPE/MOD: | A-E FIRM: | ||||||||||||||||||||||||||||||||||||
| DATE OF PROPOSAL: | CONTRACT NO.: | ||||||||||||||||||||||||||||||||||||
| Task 1 | Task 2 | Task 2 | Option 1 | Task 2 | Option 2 | Task 2 | Option 3 | Task 3 | Option 4 | Task 3 | Option 5 | Task 3 | Option 6 | Task 3 | Option 7 | Task 3 | Option 8 | Task 3 | Option 9 | Task 3 | Option 10 | Task 3 | Option 11 | Task 3 | Option 12 | Task 4 | Option 13 | Task 4 | Option 14 | Task 5 | |||||||
| PROJECT: | Project Management (CLIN 004) | UST Testing (CLIN 001) | Pre-priced option 1 - UST Monthly Inspections (SLIN 001) | Pre-priced option 2- UST Annual Inspections/ Annual Report (SLIN 002) | Stormwater Inspections and Sampling (CLIN 002) | Pre-priced option 4- AST Inspections (SLIN 004) | Pre-priced option 5- Inspection of Challenge Owned ASTs (SLIN 005) | Pre-priced option 6- Inspection of TSC Owned ASTs (SLIN 006) | Pre-priced option 7- Inspection of MWR Owned ASTs (SLIN 007) | Pre-priced option 8- Inspection of Goodwill Owned ASTs (SLIN 008) | Pre-priced option 9- Inspection of MARFORRES Owned ASTs (SLIN 009) | Pre-priced option 10- Portable Container and Drum Storage Areas Monthly Inspections (SLIN 010) | Pre-priced option 11- AST Annual Inspections/ Annual Reports (SLIN 011) | Pre-priced option 12- Collection of Inspection Records/ Recordkeeping (SLIN 012) | Pre-priced option 13- Oil Water Separator Maintenance and Inspections (SLIN 013) | Pre-priced option 14- Inspection and Maintenace of Oil Water Separators owned by MWR (SLIN 014) | EPCRA Reporting (CLIN 003) | ||||||||||||||||||||
| LOCATION: | |||||||||||||||||||||||||||||||||||||
| CREF: | TOTAL | ||||||||||||||||||||||||||||||||||||
| PROPOSAL NO.: | THIS PAGE | ||||||||||||||||||||||||||||||||||||
| PART I - DIRECT SERVICES | |||||||||||||||||||||||||||||||||||||
| ITEM | $/HR | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST |
| Program Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Quality Control Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Project Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Certified Industrial Hygienist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Procurement/Contracts Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Site Health and Safety Officer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Safety and Health Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DIRECT LABOR | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DL & PROFIT | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| OTHER DIRECT COST | $/UNIT | ||||||||||||||||||||||||||||||||||||
| Reproduction (number of copies) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Compact disks | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (1") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (2") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Shipping (number of shipments) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| SUBCONTRACTORS | |||||||||||||||||||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| TOTAL ODC & SUBS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL ODC/SUBS & G&A | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL FEE - PART I - Direct Services | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PART II - TRAVEL | |||||||||||||||||||||||||||||||||||||
| ITEM | $/UNIT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | |
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| POV Usage (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Automobile Rental (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Fuel for Auto Rental (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 75% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 100% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Per Diem (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Taxes (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Airport Parking (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL TRAVEL | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| TOTAL FEE - PART II - Travel | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| *** GRAND TOTAL FEE *** | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Option Year 3
| NAVAL FACILITIES ENGINEERING COMMAND MID-ATLANTIC | CONTRACTOR BASIC ESTIMATE | ||||||||||||||||||||||||||||||||||||||
| FEE ITEMIZATION SHEET | |||||||||||||||||||||||||||||||||||||||
| DATE OF SCOPE/MOD: | A-E FIRM: | ||||||||||||||||||||||||||||||||||||||
| DATE OF PROPOSAL: | CONTRACT NO.: | ||||||||||||||||||||||||||||||||||||||
| Task 1 | Task 2 | Task 2 | Option 1 | Task 2 | Option 2 | Task 2 | Option 3 | Task 3 | Option 4 | Task 3 | Option 5 | Task 3 | Option 6 | Task 3 | Option 7 | Task 3 | Option 8 | Task 3 | Option 9 | Task 3 | Option 10 | Task 3 | Option 11 | Task 3 | Option 12 | Task 4 | Option 13 | Task 4 | Option 14 | Task 5 | |||||||||
| PROJECT: | Project Management (CLIN 004) | UST Testing (CLIN 001) | Pre-priced option 1 - UST Monthly Inspections (SLIN 001) | Pre-priced option 2- UST Annual Inspections/ Annual Report (SLIN 002) | Stormwater Inspections and Sampling (CLIN 002) | Pre-priced option 3- UST Triennial Testing and Reports (SLIN 003) | Pre-priced option 4- AST Inspections (SLIN 004) | Pre-priced option 5- Inspection of Challenge Owned ASTs (SLIN 005) | Pre-priced option 6- Inspection of TSC Owned ASTs (SLIN 006) | Pre-priced option 7- Inspection of MWR Owned ASTs (SLIN 007) | Pre-priced option 8- Inspection of Goodwill Owned ASTs (SLIN 008) | Pre-priced option 9- Inspection of MARFORRES Owned ASTs (SLIN 009) | Pre-priced option 10- Portable Container and Drum Storage Areas Monthly Inspections (SLIN 010) | Pre-priced option 11- AST Annual Inspections/ Annual Reports (SLIN 011) | Pre-priced option 12- Collection of Inspection Records/ Recordkeeping (SLIN 012) | Pre-priced option 13- Oil Water Separator Maintenance and Inspections (SLIN 013) | Pre-priced option 14- Inspection and Maintenace of Oil Water Separators owned by MWR (SLIN 014) | EPCRA Reporting (CLIN 003) | |||||||||||||||||||||
| LOCATION: | |||||||||||||||||||||||||||||||||||||||
| CREF: | TOTAL | ||||||||||||||||||||||||||||||||||||||
| PROPOSAL NO.: | THIS PAGE | ||||||||||||||||||||||||||||||||||||||
| PART I - DIRECT SERVICES | |||||||||||||||||||||||||||||||||||||||
| ITEM | $/HR | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST |
| Program Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Quality Control Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Project Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Senior Project Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Senior Project Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Certified Industrial Hygienist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Procurement/Contracts Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Site Health and Safety Officer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Safety and Health Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| TOTAL DIRECT LABOR | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| TOTAL DL & PROFIT | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| OTHER DIRECT COST | $/UNIT | ||||||||||||||||||||||||||||||||||||||
| Reproduction (number of copies) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Compact disks | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Binders (1") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Binders (2") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Shipping (number of shipments) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| SUBCONTRACTORS | |||||||||||||||||||||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||||
| TOTAL ODC & SUBS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | |||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | |||||||||||||||||||
| TOTAL ODC/SUBS & G&A | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | |||||||||||||||||||
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | |||||||||||||||||||
| TOTAL FEE - PART I - Direct Services | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | |||||||||||||||||||
| PART II - TRAVEL | |||||||||||||||||||||||||||||||||||||||
| ITEM | $/UNIT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | |
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| POV Usage (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Automobile Rental (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Fuel for Auto Rental (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| 75% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| 100% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Lodging Per Diem (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Lodging Taxes (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| Airport Parking (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| TOTAL TRAVEL | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||
| TOTAL FEE - PART II - Travel | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||
| *** GRAND TOTAL FEE *** | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Option Year 4
| NAVAL FACILITIES ENGINEERING COMMAND MID-ATLANTIC | CONTRACTOR BASIC ESTIMATE | ||||||||||||||||||||||||||||||||||||
| FEE ITEMIZATION SHEET | |||||||||||||||||||||||||||||||||||||
| DATE OF SCOPE/MOD: | A-E FIRM: | ||||||||||||||||||||||||||||||||||||
| DATE OF PROPOSAL: | CONTRACT NO.: | ||||||||||||||||||||||||||||||||||||
| Task 1 | Task 2 | Task 2 | Option 1 | Task 2 | Option 2 | Task 2 | Option 3 | Task 3 | Option 4 | Task 3 | Option 5 | Task 3 | Option 6 | Task 3 | Option 7 | Task 3 | Option 8 | Task 3 | Option 9 | Task 3 | Option 10 | Task 3 | Option 11 | Task 3 | Option 12 | Task 4 | Option 13 | Task 4 | Option 14 | Task 5 | |||||||
| PROJECT: | Project Management (CLIN 004) | UST Testing (CLIN 001) | Pre-priced option 1 - UST Monthly Inspections (SLIN 001) | Pre-priced option 2- UST Annual Inspections/ Annual Report (SLIN 002) | Stormwater Inspections and Sampling (CLIN 002) | Pre-priced option 4- AST Inspections (SLIN 004) | Pre-priced option 5- Inspection of Challenge Owned ASTs (SLIN 005) | Pre-priced option 6- Inspection of TSC Owned ASTs (SLIN 006) | Pre-priced option 7- Inspection of MWR Owned ASTs (SLIN 007) | Pre-priced option 8- Inspection of Goodwill Owned ASTs (SLIN 008) | Pre-priced option 9- Inspection of MARFORRES Owned ASTs (SLIN 009) | Pre-priced option 10- Portable Container and Drum Storage Areas Monthly Inspections (SLIN 010) | Pre-priced option 11- AST Annual Inspections/ Annual Reports (SLIN 011) | Pre-priced option 12- Collection of Inspection Records/ Recordkeeping (SLIN 012) | Pre-priced option 13- Oil Water Separator Maintenance and Inspections (SLIN 013) | Pre-priced option 14- Inspection and Maintenace of Oil Water Separators owned by MWR (SLIN 014) | EPCRA Reporting (CLIN 003) | ||||||||||||||||||||
| LOCATION: | |||||||||||||||||||||||||||||||||||||
| CREF: | TOTAL | ||||||||||||||||||||||||||||||||||||
| PROPOSAL NO.: | THIS PAGE | ||||||||||||||||||||||||||||||||||||
| PART I - DIRECT SERVICES | |||||||||||||||||||||||||||||||||||||
| ITEM | $/HR | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST | HRS | COST |
| Program Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Quality Control Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Project Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Engineer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Senior Project Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Scientist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Certified Industrial Hygienist | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Procurement/Contracts Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Site Health and Safety Officer | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Safety and Health Manager | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DIRECT LABOR | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL DL & PROFIT | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| OTHER DIRECT COST | $/UNIT | ||||||||||||||||||||||||||||||||||||
| Reproduction (number of copies) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Compact disks | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (1") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Binders (2") | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Shipping (number of shipments) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| SUBCONTRACTORS | |||||||||||||||||||||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | |||||||||||||||||||
| TOTAL ODC & SUBS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL ODC/SUBS & G&A | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PROFIT @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| TOTAL FEE - PART I - Direct Services | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0.00 | $0 | ||||||||||||||||||
| PART II - TRAVEL | |||||||||||||||||||||||||||||||||||||
| ITEM | $/UNIT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | AMT | COST | |
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Roundtrip Airfare | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| POV Usage (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Automobile Rental (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Fuel for Auto Rental (miles) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 75% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| 100% Meals Per Diem | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Per Diem (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Lodging Taxes (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| Airport Parking (days) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $0 | ||||||||||||||||||
| TOTAL TRAVEL | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| G&A @ | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| TOTAL FEE - PART II - Travel | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||||||||
| *** GRAND TOTAL FEE *** | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
File details come from the government source that posted it. Updated .