This document provides an amendment to a solicitation for an Indefinite Delivery/Indefinite Quantity Environmental Multiple Award Contract for environmental services and remedial actions. The amendment reschedules a site visit, addresses questions received, provides revisions to the statement of work, and attaches additional documents. Key details include:
-
The site visit is rescheduled to February 22, 2022 at 9:00 am at Naval Station Great Lakes due to potential inclement weather. Contractors must RSVP with attendee names by February 17.
-
Revisions update calendar years and waste characterization requirements in the statement of work. Attachments include previous EPCRA reports and annual Tier II reports to aid cost estimation.
-
The contract type is IDIQ with a maximum value of $30 million over five years across three to five awards. Task orders will range from $50,000 to $250,000 for work at Naval Station Great Lakes, Naval Support Activity Crane, and other Navy and Marine Corps facilities in the NAVFAC Atlantic area of responsibility.
-
The solicitation remains open and proposals are due as originally scheduled. The amendment provides additional details to assist offerors in preparing proposals for the environmental services and remedial action requirements.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is being issued to reschedule the site visit, address questions received in response to the solicitation, provide revisions, and attachements. The Government has endeavored to mark changes w ith blue strikeout for deletions and green text for new additions. It is the Offerors responsibility to read the entire solicitation including all amendments.
Attachments w ill be provided seperately.
The closing date for this solicitation is unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Feb-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008521R2534
X 9B. DATED (SEE ITEM 11)
27-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Feb-2022
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521R2534
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to provide the following:
SITE VISIT
Due to the possibility of inclement weather at Naval Station Great Lakes, the site visit for the seed project has been rescheduled.
The site visit will now be held on Tuesday, February 22, 2022 at 9:00 am.
Attending the site visit is not a requirement to submit a proposal. Contractors intending to participate in the site visit must provide FULL name and company affiliation for each person planning to attend by COB February 17, 2022 to Amy Keiler at amy.w.keiler.civ@us.navy.mil.
Contractors should plan to meet Ms. Tara Lester at the Welcome/Visitor Center parking lot at 620 Farragut Ave.
Great Lakes, IL 60088. Contractors should plan to leave their vehicles in this parking lot, and Ms. Lester will escort them in a minivan around the base. NO QUESTIONS WILL BE ANSWERED DURING THE SITE VISIT. All questions must be submitted in writing to the Contract Specialist Amy Keiler at amy.w.keiler.civ@us.navy.mil.
Please be sure to bring a driver’s license or other form of valid ID to get on base. Please note that you will be required to wear a mask indoors and/or when 6 foot separation cannot be maintained.
Attachment J1 PTO Scope of Work:
Under Section E Option Years, the following statement is added to Option Year 1, Option Year 2, Option Year 3, and Option Year 4:
The contractor will be expected to update their work plan to add the stormwater inspections, sampling, and monitoring upon award of the option year. The due dates for these tasks are referenced in the Deliverable Table
Include the following attachments:
2016 EPCRA Report (Period Jan-Dec 2016) combined Appendices
RY2020 Annual Tier II Report Naval Station Great Lakes
Questions and Answers:
Questions 1-8 and responses were provided in Amendment 0001.
9. Task 5 [EPCRA Reporting (CLIN 003)] in the Statement of Work requires the contractor to perform Section 311 and 312 data collection activities, including an on-site physical inventory, to update the calendar year 2020 reported data and prepare an internal inventory report for calendar year 2021. Are the reporting calendar years in the SOW correct? The calendar year 2021 report is due to be reported to regulatory agencies on or before March 1.
Response: No, the years listed in the SOW are not correct. This contract will not be awarded in time for those dates to be applicable.
The following paragraph under Task 5 EPCRA Reporting (CLIN 003) has been revised:
FROM: The Contractor will make necessary changes to the draft Sections 311 and 312 Summary Report in response to comments received from NSGL POCs and COR, and shall prepare a final Sections 311 and 312 Summary Report, submitted to Distribution electronically. The Contractor shall prepare the reports required for submittal to regulatory agencies under EPCRA Section 311 and 312. The Section 311 report shall update the previous CY20 submission. The report shall be based on the material gathered by the Contractor under this task and shall include a chemical listing of all reportable Section 311 hazardous materials and EHS. The Section 312 report shall consist of Tier II forms based on hazardous materials inventories for CY21. Electronic reporting is required by the State Emergency Response Commission (SERC) using E-Plan, an internet based application. The Contractor will not be submitting any of these reports directly to any regulatory agencies, including the SERC. The Contractor will submit the final versions of the reports for NSGL to submit to regulatory agencies.
TO: The Contractor will make necessary changes to the draft Sections 311 and 312 Summary Report in response to comments received from NSGL POCs and COR, and shall prepare a final Sections 311 and 312 Summary Report, submitted to Distribution electronically. The Contractor shall prepare the reports required for submittal to regulatory agencies under EPCRA Section 311 and 312. The Section 311 report shall update the previous CY20 CY21 submission. The report shall be based on the material gathered by the Contractor under this task and shall include a chemical listing of all reportable Section 311 hazardous materials and EHS. The Section 312 report shall consist of Tier II forms based on hazardous materials inventories for CY21 CY22. Electronic reporting is required by the State Emergency Response Commission (SERC) using E-Plan, an internet based application. The Contractor will not be submitting any of these reports directly to any regulatory agencies, including the SERC. The Contractor will submit the final versions of the reports for NSGL to submit to regulatory agencies
10. Will the Navy graciously consider extending the proposal due date by at least one week so that adjustments to the proposal can be made following receipt of the inquiry response from the Navy?
Response: An extension was granted in Amend. 0001, the proposal due date will not be extended at this time.
11. Solicitation Section L.4 Proposal Submittal Requirements: Can a smaller font be used in exhibits to facilitate presentation?
Response: Yes, a smaller font will be acceptable in exhibits. Please ensure font is still legible with the reduced font size.
12. Solicitation Section L.8.1.3.5 Indicates all pages in Factor 1 must be numbered in the upper right had corner of the page. Can teaming and joint venture agreements be excluded from this requirement and inserted as an independent PDF into Factor 1 Tab C?
Response: No, however factor C is excluded from the page count under section L.8.1.4. See response to Question 8 in Amendment 0001 in regards to the page count of factor A and B with regards to resume.
13. J1 PTO 001 Scope of Work, Section 2.1. This section in the sample project states that there are 3 ASTs at Building 1506; however, only 2 ASTs are identified for this location in Section 2.1.4 of the SOW. Are there 2 or 3 ASTs at Building 1506? If 3, then please provide tank ID, contents and capacity for the third tank.
Response: There are 3 tanks that fall under Task 2.1 at Bldg. 1506. 15047-04A is a 10K gallon tank storing biodiesel, however the biodiesel tank will not need a tank tightness or PV Vent Cap test. For past testing, we have had the contractor, inspect the ATG and sensors for all 3 of these tanks as defined in
2.1.3.2 of J1 PTO Scope of Work. This scope of work will also include the inspection of the ATG and sensors of this third tank, in addition to the other two tanks originally included in the Scope of Work.
14. J1 PTO 001 Scope of Work, Section 4: The SOW states that the volume of material to be removed from the OWS is unknown. Please provide an assumed quantity of material to provide a fair and uniform basis for bidding/bidders.
Response: The Contractor shall utilize the NSGL Oil Water Separator (OWS) Management Plan dated April 2020 provided as Enclosure O to estimate potential waste volumes for disposal.
15. J1 PTO 001 Scope of Work, Section 4: Please provide the sampling frequency and analyses required for drummed material removed from the OWS in order to provide a fair and uniform basis for bidding/bidders.
Response: See Enclosure M in J9 PTO 001 for pump-out frequency for each OWS. Each pump-out from each OWS shall have a representative sample taken for analysis (one sample per event per OWS). The purpose of the samples are to characterize the waste stream from the OWS during each pump out prior to disposal. The SOW states that the Contractor needs to analyze the waste to determine if it is a Hazardous Waste according to the Illinois EPA guidelines and for PFAS and PFOA. The Government expectation is that the contractor propose the analyses that they will be utilizing to meet the requirements of the scope (i.e.
appropriately characterize waste as per Illinois EPA regulations)
16. J1 PTO 001 Scope of Work (labeled Appendix A): Is this a real task order being issued as the first award under the EMAC?
Response: Yes, J1 is a real task order being issued as the first award under the EMAC.
17. J1 PTO 001 Scope of Work, Section 5, CLIN 003: Please provide the quantity and type of analysis that are required for hazardous materials characterization. Alternatively, please provide the Tier 2 reports for the last 2 years to use as a basis for estimating.
Response: See RY2020 Annual Tier II Report for Naval Station Great Lakes to estimate the quantity and type of hazardous materials. The RY2021 report has not yet been prepared.
18. J1 PTO 001 Scope of Work, Section 5, CLIN 003: EPCRA is associated with products used and stored on-site. Could the Navy clarify the information it is requesting regarding releases to air, land, water, etc.?
Typically this type of multi-media is not associated with EPCRA reporting, and is associated with other types of permits and audits. An example is volatilization of chemicals are typically covered by air permits and water discharges are covered by NPDES permits.
Response: In regards to the Toxic Release Inventory (Section 313), the contractor will be expected to complete an evaluation similar to pages 15-16 of the RY2016 reports for RY2022. Previously, due to a combination of standard exemptions as well as volume calculations below thresholds, no chemicals required a Form R (TRI) reporting.
19. Attachment J2 Price and Proposal Form: Attachment J2 has no place for option year pricing. Please clarify how the Navy wishes to see option year pricing.
Response: Please provide option year pricing as additional tabs to your proposal form. The same pricing format shall be utilized for each option year, as shown in Attachment J2. Each tab should be labeled with the number of option year, i.e. "Option Year 1", Option Year 2", etc.
20. Attachment J2 Price and Proposal Form: Can the listed subcontractors be replaced with the actual type of subcontractors needed for PTO1? Can bidders add rows to accommodate additional subcontractors and/or equipment?
Response: Yes, you can replace the listed subcontractors in attachment J2 with actual type of subcontractors. Yes, bidders can add as many additional rows required to accurately reflect the subcontractors and equipment being proposed to fulfill the requirements of PTO 001.